ITEM DESCRIPCIN
01 OBRAS PROVISIONALES
02 PAVIMENTO RIGIDO
03 SARDINELES DE CONCRETO
04 VEREDAS DE CONCRETO
04.03.02 CONCRETO F'C=175 KG/CM2, E=0.10 M, ACABADO 1.5 CM, MEZCLA 1:2
09 SEALIZACION VIAL
10 VARIOS
UND 1.00
MES 6.00
GLB 1.00
GLB 1.00
GLB 1.00
M2 16,772.29
M2 16,772.29
M3 4,837.58
M3 268.75
M3 268.75
M3 376.26
M3 276.07
M3 6,387.21
M2 10,975.41
M2 9,435.79
M2 1,881.53
M2 9,770.38
M 5,093.48
M2 9,770.38
M2 370.36
M2 370.36
M3 129.62
M3 162.03
M2 3,703.57
M3 185.18
M 630.50
M2 370.36
M2 4,468.26
M2 4,468.26
M3 893.65
M2 4,468.26
OS
UND. METRADO
M2 4,468.26
M3 1,117.07
M2 534.53
M2 4,468.26
M 1,560.00
M 12,576.00
M2 4,468.26
M2 604.36
M2 604.36
M3 60.44
M2 604.36
M3 75.54
M2 172.67
M3 60.44
M2 604.36
M 206.85
M2 538.70
M2 538.70
M3 269.35
M2 538.70
M3 336.69
M2 1,028.42
M3 200.79
kg 37,429.97
M 449.80
M2 1,285.58
M2 167.93
M2 167.93
M3 6.17
M2 167.93
M3 7.71
OS
UND. METRADO
M2 56.52
M3 8.48
M 15.75
kg 270.77
M2 167.93
M3 25.19
M2 167.93
UND 18.00
UND 38.00
UND 233.00
UND 233.00
M 3,785.90
M2 707.76
M2 16,772.29
M2 2,500.00
PLANILLA DE METRADOS
"CREACION DE PISTAS Y VEREDAS DE LOS JIRONES AREQUIPA 1 A 8 CDA, PUNO 1 A 7 CDA, F.M. PORRAS 1 A 4 CDA, AYACUCHO 1 Y 2 CDA, STIA
OBRA: CDA, JR. 01 1 Y 2 CDA, J. CHVEZ 1,2,3 Y 4 CDA, M. BASTIDAS 1 HASTA 5 CDA, MCAL CCERES 1 Y 2 CDA, PRCERES, 28 DE JULIO, JR. 3, FCO T
VILCA, 2 DE MAYO, PSJE 2, FCO QUISPE, PLONG PUNO EN PORTA CRUZ, DISTRITO DE CARAPO - HUANCA SANCOS - AYACUCHO"
N rea
Item Descripcion Und Cant. l (m) a (m) h (m) Parcial
veces (m)
01.00 OBRAS PROVISIONALES
01.01 CARTEL DE OBRA 8.50x3.60 M UNA CARA UND 1 1.00
01.05 FLETE TERRESTE KG (segn Listado de Insumos, ver Clculo de Flete) 1.00
N rea
Item Descripcion Und Cant. l (m) a (m) h (m) Parcial
veces (m)
VEREDAS
V-1 1 0.20 20.42 4.08
N rea
Item Descripcion Und Cant. l (m) a (m) h (m) Parcial
veces (m)
V-2 1 0.20 11.26 2.25
V-3 1 0.20 12.21 2.44
V-4 1 0.20 34.98 7.00
V-5 1 0.20 56.65 11.33
V-6 1 0.20 66.54 13.31
V-7 1 0.20 6.15 1.23
V-8 1 0.20 5.41 1.08
V-9 1 0.20 32.44 6.49
V-10 1 0.20 9.28 1.86
V-11 1 0.20 11.64 2.33
V-12 1 0.20 8.10 1.62
V-13 1 0.20 4.04 0.81
V-14 1 0.20 14.68 2.94
V-15 1 0.20 29.12 5.82
V-16 1 0.20 14.72 2.94
V-17 1 0.20 13.87 2.77
V-18 1 0.20 6.09 1.22
V-19 1 0.20 55.81 11.16
V-20 1 0.20 9.52 1.90
V-21 1 0.20 51.39 10.28
V-22 1 0.20 8.98 1.80
V-23 1 0.20 8.36 1.67
V-24 1 0.20 10.02 2.00
V-25 1 0.20 2.86 0.57
V-26 1 0.20 17.20 3.44
V-27 1 0.20 9.91 1.98
V-28 1 0.20 6.60 1.32
V-29 1 0.20 0.30 0.06
V-30 1 0.20 2.72 0.54
V-31 1 0.20 0.74 0.15
V-32 1 0.20 2.08 0.42
V-33 1 0.20 11.23 2.25
V-34 1 0.20 9.59 1.92
V-35 1 0.20 7.11 1.42
V-36 1 0.20 4.96 0.99
V-37 1 0.20 4.73 0.95
V-38 1 0.20 16.34 3.27
V-39 1 0.20 14.18 2.84
V-40 1 0.20 5.16 1.03
V-41 1 0.20 1.06 0.21
V-42 1 0.20 0.87 0.17
V-43 1 0.20 3.25 0.65
V-44 1 0.20 2.81 0.56
V-45 1 0.20 2.44 0.49
V-46 1 0.20 2.85 0.57
V-47 1 0.20 4.27 0.85
V-48 1 0.20 0.98 0.20
V-49 1 0.20 1.53 0.31
V-50 1 0.20 1.03 0.21
V-51 1 0.20 2.46 0.49
V-52 1 0.20 1.02 0.20
V-53 1 0.20 1.26 0.25
V-54 1 0.20 1.27 0.25
V-55 1 0.20 7.31 1.46
V-56 1 0.20 10.14 2.03
V-57 1 0.20 9.39 1.88
V-58 1 0.20 9.90 1.98
V-59 1 0.20 13.43 2.69
V-60 1 0.20 5.84 1.17
V-61 1 0.20 7.53 1.51
V-62 1 0.20 9.22 1.84
V-63 1 0.20 2.03 0.41
V-64 1 0.20 6.66 1.33
V-65 1 0.20 7.62 1.52
V-66 1 0.20 2.09 0.42
V-67 1 0.20 4.47 0.89
N rea
Item Descripcion Und Cant. l (m) a (m) h (m) Parcial
veces (m)
V-68 1 0.20 2.98 0.60
V-69 1 0.20 19.14 3.83
V-70 1 0.20 6.19 1.24
V-71 1 0.20 8.09 1.62
V-72 1 0.20 4.93 0.99
V-73 1 0.20 4.43 0.89
V-74 1 0.20 2.64 0.53
V-75 1 0.20 5.17 1.03
V-76 1 0.20 1.47 0.29
V-77 1 0.20 1.78 0.36
V-78 1 0.20 3.99 0.80
V-79 1 0.20 3.87 0.77
V-80 1 0.20 30.21 6.04
V-81 1 0.20 50.31 10.06
V-82 1 0.20 32.44 6.49
V-83 1 0.20 10.95 2.19
V-84 1 0.20 9.12 1.82
V-85 1 0.20 36.51 7.30
V-86 1 0.20 19.11 3.82
V-87 1 0.20 9.52 1.90
V-88 1 0.20 6.45 1.29
V-89 1 0.20 4.28 0.86
V-90 1 0.20 0.83 0.17
V-91 1 0.20 1.76 0.35
V-92 1 0.20 1.92 0.38
V-93 1 0.20 0.83 0.17
V-94 1 0.20 0.13 0.03
V-95 1 0.20 0.25 0.05
V-96 1 0.20 7.13 1.43
V-97 1 0.20 7.40 1.48
V-98 1 0.20 9.93 1.99
V-99 1 0.20 2.52 0.50
V-100 1 0.20 1.93 0.39
V-101 1 0.20 0.29 0.06
V-102 1 0.20 4.17 0.83
V-103 1 0.20 33.20 6.64
V-104 1 0.20 16.11 3.22
V-105 1 0.20 11.67 2.33
V-106 1 0.20 10.74 2.15
V-107 1 0.20 20.46 4.09
V-108 1 0.20 25.10 5.02
V-109 1 0.20 7.42 1.48
V-110 1 0.20 9.17 1.83
V-111 1 0.20 5.67 1.13
V-112 1 0.20 12.54 2.51
V-113 1 0.20 9.77 1.95
V-114 1 0.20 9.71 1.94
V-115 1 0.20 63.57 12.71
V-116 1 0.20 12.33 2.47
V-117 1 0.20 54.98 11.00
V-118 1 0.20 10.22 2.04
V-119 1 0.20 48.41 9.68
V-120 1 0.20 8.24 1.65
V-121 1 0.20 64.55 12.91
MARTILLOS
M - 01 1 0.20 11.77 2.35
M - 02 1 0.20 9.78 1.96
M - 03 1 0.20 5.96 1.19
M - 04 1 0.20 9.79 1.96
M - 05 1 0.20 13.80 2.76
M - 06 1 0.20 7.53 1.51
M - 07 1 0.20 1.96 0.39
M - 08 1 0.20 1.38 0.28
M - 09 1 0.20 0.59 0.12
M - 10 1 0.20 0.56 0.11
M - 11 1 0.20 0.55 0.11
M - 12 1 0.20 0.46 0.09
M - 13 1 0.20 2.65 0.53
N rea
Item Descripcion Und Cant. l (m) a (m) h (m) Parcial
veces (m)
M - 14 1 0.20 1.78 0.36
M - 15 1 0.20 0.90 0.18
M - 16 1 0.20 11.43 2.29
M - 17 1 0.20 2.38 0.48
M - 18 1 0.20 6.39 1.28
M - 19 1 0.20 6.69 1.34
M - 20 1 0.20 0.73 0.15
M - 21 1 0.20 0.66 0.13
M - 22 1 0.20 0.32 0.06
M - 23 1 0.20 1.28 0.26
M - 24 1 0.20 1.24 0.25
M - 25 1 0.20 0.64 0.13
RAMPAS 40 0.20 2.16 17.28
Techo
Prog. 0+333.95 - Jr. Arequipa 1 6.24 1.20 7.49 7.49
Prog. 0+115.85 - Jr. 28 de Julio 1 7.41 1.20 8.89 8.89
Prog. 0+379.05 - Jr. Puno 1 13.37 1.20 16.04 16.04
Parapeto
Prog. 0+333.95 - Jr. Arequipa 2 1.20 0.28 0.67 0.67
Prog. 0+115.85 - Jr. 28 de Julio 2 1.20 0.28 0.67 0.67
Prog. 0+379.05 - Jr. Puno 2 1.20 0.28 0.67 0.67
Aleros o Aletas
Prog. 0+333.95 - Jr. Arequipa 4 0.70 0.60 1.68 1.68
Prog. 0+115.85 - Jr. 28 de Julio 4 0.70 0.60 1.68 1.68
Prog. 0+379.05 - Jr. Puno 4 0.70 0.60 1.68 1.68
06.00 GRADERIA
06.01 OBRAS PRELIMINARES
06.01.01 LIMPIEZA DE TERRENO MANUAL M2
Jr. Micaela Bastida 1 13.45 5.20 69.94 69.94
06.01.01 TRAZO, NIVELACION Y REPLANTEO M2
Jr. Micaela Bastida 1 13.45 5.20 69.94 69.94
Sardineles
1 9.00 0.45 4.05
07.03.04 ACERO GRADO 60 EN SARDINELES M2
Sardineles
1 62.50 62.50
rea verde
CALLE AYACUCHO-LIMA 1.00 0.15 24.33 3.65
10.00 VARIOS
10.01 LIMPIEZA FINAL DE OBRA M2
rea intervenida
dem al tem 02.01.01 1 16,972.21 16,972.21
dem al tem 03.01.01 1 183.64 183.64
dem al tem 04.01.01 1 1,716.19 1,716.19
dem al tem 05.01.01 1 395.60 395.60
dem al tem 06.01.01 1 32.46 32.46
dem al tem 07.01.01 1 24.33 24.33
Total
1.00
4.00
1.00
1.00
1.00
Total
16,972.21
Total
Total
16,972.21
Total
1,468.33
394.80
97.35
136.30
1,634.47
412.39
16,972.21
16,972.21
769.19
3,416.68
Total
Total
2,021.96
Total
3,416.68
183.64
183.64
64.27
80.34
1,836.42
Total
91.82
314.00
183.64
1,674.17
Total
Total
1,674.17
334.83
Total
Total
Total
1,674.17
Total
Total
1,674.17
418.54
436.83
Total
Total
Total
Total
Total
1,674.17
Total
Total
738.06
Total
Total
1,832.75
Total
Total
1,674.17
390.78
Total
390.78
Total
78.16
Total
390.78
Total
97.69
126.53
Total
39.08
Total
390.78
Total
140.35
Total
54.04
54.04
63.74
Total
40.53
17.56
60.03
3.24
154.04
1420.00
23.78
Total
16.38
43.23
69.94
69.94
34.97
67.25
1.48
43.54
26.47
10.17
67.25
24.33
Total
24.33
1.42
24.33
1.78
13.05
1.96
4.05
62.50
3.56
3.65
24.33
3.00
25.00
101.00
Total
101.00
1.00
3,672.84
372.00
19,324.43
2,500.00
N de Longitud Longitud Total de Acero
Diamet.
Item Descripcin Cant. 0.25 0.56 1.02 1.55 2.24
(")
Veces (m) 1/4" 3/8" 1/2" 5/8" 3/4"
06.03.02 ALCANTARRILLADOS KG
6.19 Prog. 0+333.95 - Jr. Arequipa
LONGITUDINALES (U)
1.45 1.00 32.95 1.45 1/2 47.78
1.15 LONGITUDINALES
6.19 1.00 7.75 6.19 1/2 47.97
LONGITUDINALES (U)
1.45 1.00 39.05 1.45 1/2 56.62
1.15 LONGITUDINALES
7.41 1.00 7.75 7.41 1/2 57.43
LONGITUDINALES (U)
1.45 1.00 68.85 1.45 1/2 99.83
1.15 LONGITUDINALES
13.37 1.00 7.75 13.37 1/2 103.62
Longitud Total de Acero Sub-Total Total
3.97
1" (kg) (kg)
331.25
87.38
146.20
48.73
48.93
393.16
103.56
173.26
57.75
58.58
695.60
182.59
305.49
101.83
105.69
DESCRIPCION
AREA 1 (m2) 14.35
AREA 2 (m2) 11.41
AFARO 25 PERSONAS
N de Longitud Longitud Total de Acero
Diamet.
Item Descripcin Cant. 0.25 0.56 1.02 1.55 2.24
(")
Veces (m) 1/4" 3/8" 1/2" 5/8" 3/4"
07.03.04 SARDINELES EN JARDINES KG
TRANSVERSALES
0.43 1.00 59.30 0.43 3/8 25.20
LONGITUDINALES
37.17 2.00 1.00 23.72 1/2 47.44
Longitud Total de Acero Sub-Total Total
3.97
1" (kg) (kg)
62.50
14.11
48.39
PLANILLA DE VOLUMEN DE MOVIMIENTO DE TIERRA
"CREACIN DE PISTAS Y VEREDAS DE CALLE AYACUCHO CDRAS 01 AL 07; CALLE 28 DE JULIO CDRAS 01 AL 06;
OBRA: CALLE HUANCAVELICA CDRA 01; CALLE ADORACIN CDRA 01; CALLE LA UNIN CDRA 01; CALLE ICA CDRA 01;
LOCALIDAD DE SAN JERNIMO DE TAULLI, DISTRITO DE CARAPO - HUANCA SANCOS AYACUCHO"
PASAJE 8
Estaca AC AR D VC VCms VCrs VCrf VR
0+000.00 0.572 0.000
0+009.74 0.572 0.000 9.73521 5.57 2.78 0.56 2.23 0.00
TOTAL 5.57 2.78 0.56 2.23
RESUMEN
MS 2.78
RS 0.56
RF 2.23
VC_ACM 5.570
VR.ACUM 0.000
RESUMEN GENERAL
MS 1468.33
RS 394.80
RF 97.35
VC_ACM 1634.47
VR.ACUM 355.35
MIENTO DE TIERRA
LE 28 DE JULIO CDRAS 01 AL 06; CALLE PUCARUMI CDRA 01;
N CDRA 01; CALLE ICA CDRA 01; CALLE TACNA CDRA 01 DE LA
NCOS AYACUCHO"
OBRA
: CREACION DE PISTAS Y VEREDAS EN JR. MIRAFLORES, CUADRAS 01, 02, 03, 04, 05, 07, 08 Y 09, EN LA LOCALIDAD DE LUCANAMA
HUANCA SANCOS - AYACUCHO
MES : MARZO 2016
DIMENSIONES
PARTIDA DESCRIPCION UND. NVECES
LONG. ANCHO
06 MUROS DE CONTENCION
06.01 OBRAS PRELIMINARES
06.01.01 LIMPIEZA DE TERRENO MANUAL M2
Muro Calle 28 de Julio C-3 1.00 18.06 1.00
Muro Calle Adoracin 1.00 14.40 1.00
06.01.01 TRAZO, NIVELACION Y REPLANTEO M2
Muro Calle 28 de Julio C-3 1.00 18.06 1.00
Muro Calle Adoracin 1.00 14.40 1.00
MENSIONES
AREA VOLUMEN PARCIAL TOTAL
ALTO
32.46
18.06 18.06
14.40 14.40
32.46
18.06 18.06
14.40 14.40
34.08
1.40 18.96 18.96
1.40 15.12 15.12
24.35
13.55 13.55
10.80 10.80
8.76
4.88 4.88
3.89 3.89
11.04
6.14 6.14
4.90 4.90
22.72
1.00 12.64 12.64
1.00 10.08 10.08
90.79
14.45 14.45
11.52 11.52
1.50 1.50
34.31 34.31
27.36 27.36
1.65 1.65
23.61
6.00
3.00 3.00
3.00 3.00
3.10
1.24 1.24
1.86 1.86
6.49
0.20 3.61 3.61
0.20 2.88 2.88
20.00
10.00
10.00
LONGITUD SERVICIOS BASICOS
JIRON
(mt.) AGUA DESAGUE
AV. EL SOL (Cuadras 5, 6 y 7) 321.37 SI SI
AV VILCAS RAIMI (cuadras 10) 41.6 SI SI
AV VILCAS RAIMI (cuadras 11 y 12) 259.24 SI SI
AV VILCAS RAIMI (cuadras 5 y 6) 145.59 SI SI
AV VILCAS RAIMI (cuadra 1) 50.11 SI SI
AV. TAHUANTINSUYO (cuadras 2, 3 y 4) 285.71 SI SI
AV. INCA PACHACUTEC (cuadras 1) 81.8 SI SI
AV. INCA PACHACUTEC (cuadras 3 y 4) 213.89 SI SI
AV. INCA PACHACUTEC (cuadras 6) 43.67 SI SI
AV. LOS INCAS (cuadra 5) 128.14 SI SI
AV. APUMAYLA (cuadra 1) 111.23 SI SI
AV. CAMINO REAL (cuadras 5 y 6) 210.6 SI SI
1892.95
CIOS BASICOS
ESTADO
AFIRMADO 691489.38
AFIRMADO 89510.40
AFIRMADO 557804.73 557804.73
AFIRMADO 313264.89
AFIRMADO 107821.30
AFIRMADO 614760.03
AFIRMADO 176008.44
AFIRMADO 460225.48 460225.48
AFIRMADO 93964.41
AFIRMADO 275717.86
AFIRMADO 239332.74
AFIRMADO 453146.41
4073046.08 4073046.08 1018030.21
2151.692374336