1) Technician-Instrumentation
E1.
Vendors, OEM, Client
EXTERNAL :
E2.
INTERNAL : Plant in-Charge, TST-Instrumentation, Procurement, HR
1 Ensure the proper operation of the plant with its control systems as designed
6 Ensure motivation, retention and capability enhancement of team members on the job
Key Responsibility: 1) Ensure the proper operations of the plant with its control systems as
designed
F8,
Monitor the performance of the control systems & identify any
1 F21,F23, 3
malfunctioning
F28,L11
F8,F21,
Take corrective actions wherever necessary to ensure proper
2 F23,F28, 4
functioning of the control system
L4,L2,L10
Ensure that all routine checks are being carried out F21,F24,
3 (Communication system, Processor memory, SCADA Trends, F28,F9, 4
Redundancy) F12,L3,L14
F21,F23,F
Provide Training to the operations in relation to Plant operations
4 24,F28,L5, 3
Control System
L8
F21,F28,L
5. Ensure stocking of control systems Spares and software 3
3,L7,L9
F21,F23,F
Develop, implement, Review & Upgrade SOPs and Input/Output
6 28,L5,L8,L 3
lists
13
F20,L3,L7,
5 Ensure stocking of Instrument Spares & repair Kits 3
L9
F24, L6,
L12, L11
F9, F20,
F21,
Evaluate the effectiveness of the implemented change & correct
2 F23, L2, 3
if necessary
L4, L11,
L13
Development of new ideas for better performance of the plant
3 3
and equipment.
Prepared the root cause analysis report for failed instruments
4 3
and share the report to other sites.
Ensure availability of PPEs in the department and their use by all L3,L15,F
2 3
team members 27
Ensure HSE audit points and review meeting points of L4,L11,F
3 4
instrumentation department are completed on time. 27
Ensure immediate attention to any accident case and take L2,L4,L1
4 4
corrective action in order to avoid any reoccurrence. 0,F27
F21,F27,
Ensure Instruments/Equipment Safety & proper functioning of
5 F28,L4,L 4
Fail - Safe interlocks.
11,L6
L2,L3,L1
6 Implementation of Work Permit system by the team 3
4
Key Responsibility: 5) Ensure timely compliance with quality systems & standards
ACTIVI REQD. REQD.
TY NO JOB ACTIVITY COMPET PROF.
ENCY LEVEL
Review the calibration certificates and ensure that all instrument F20,F23,
1. 4
accuracy is matched as per process tolerance L13,L14
Maintain all Documents (Certificates & reports) as per frequency
2 L3,L14 4
scheduled with ease of retrieval
Close Non-Conformity and observations raised by L4,L10,
3 3
Internal/External Auditors on time L13
F20,F21,
Breakdown analysis to be done & recorded based on MTBF and
4 F23,F24, 4
MTTR
L11,L13