Вы находитесь на странице: 1из 2

HSE PLAN PART 5

Probability Descriptions
(The highest category will always be used)
VALUE Status Description
Very much Happens several times per year in
5
likely a site
Happens several times per year in
4 Most Likely
our OC
3 Likely Incident occurred in our OC
Known to occur on the other OCs
2 Unlikely
and Construction industry
Never heard of in construction
1 Most Unlikely
industry

Severity

Severity is the degree or extent of harm that can be caused by the hazards
or the environment aspect as a result of an incident.

Severity of hazard is classified as per the table given below.

Severity Descriptions
(The highest category shall always be used)
Severity of the
VAL Result of Hazard to Result of Hazard to
Environment
UE Personnel Assets / Progress
impact
Single or multiple Catastrophic Damages,
5 Massive effect
Fatality Critical Delay
Serious Injury requiring Major Damages, Serious
4 Major effect
hospitalisation Delay
Serious Damage, Moderate
3 Lost Time Accident Localised effect
Delay
Injury requiring Medical
Moderate Damage, Minor
2 Treatment but not Lost Minor effect
Delay
Time
1 First Aid treatment only Minor Damage, No Delay Slight effect