Republic of the Philippines

PROVINCE OF SURIGAO DEL SUR


MUNICIPALITY OF MARIHATAG
BARANGAY POBLACION

OFFICE OF THE PUNONG BARANGAY

Janaury 9, 2017

MRS. ADELAIDA P. MORENO


Municipal Budget Officer
Marihatag, Surigao del Sur

Madame:

Please, find the attachment, Our approved ANNUAL INVESTMENT PLAN


CY 2017 of Barangay Poblacion of this Municipality.

For your reference.

LEONARDO S.
TOMALON, JR.
Punong Barangay
Republic of the Philippines
PROVINCE OF SURIGAO DEL SUR
MUNICIPALITY OF MARIHATAG
BARANGAY POBLACION

OFFICE OF THE BARANGAY TREASURER

C E R T I F I C A T I ON

I HEREBY CERTIFY, that the amount of Six Hundred Five Thousand


Four Hundred Sixty Pesos ( P 605,460.00 ) covering the 20% Economic
Development Fund of Barangay Poblacion, Marihatag, Surigao del Sur has
been appropriated and available for disbursement for the year 2017.

ISSUED in connection with the submission of the Annual


Investment Plan (AIP) CY 2017 to the Sangguniang Barangay for the
approval and adoption this 9th day of January 2017 at Poblacion, Marihatag,
Surigao del Sur.

LORENA P. CANCIO

Barangay Treasurer
Republic of the Philippines
PROVINCE OF SURIGAO DEL SUR
MUNICIPALITY OF MARIHATAG
BARANGAY POBLACION

EXCERPT FROM THE MINUTES OF THE REGULAR MEETING OF


BARANGAY DEVELOPMENT COUNCILS OF BARANGAY POBLACION,
MARIHATAG, SURIGAO DEL SUR HELD ON December 16, 2016 AT THE
BARANGAY HALL.
PRESENT:
HON. LEONARDO S. TOMALON JR.
Punong Barangay

Hon. Ananito R. Beldia - Barangay Kagawad


Hon. Narciso E. Umapas - Barangay Kagawad
Hon. Erofe B. Orbeta - Barangay
Kagawad
Hon. Estrella P. Agosto - Barangay Kagawad
Hon. Carmelito S. Moreno - Barangay Kagawad
Hon. Ricardo T. Pontillo - Barangay Kagawad
Hon. Noliberto T. Curada - Barangay Kagawad
Mrs. Narcisita A. Sanches - BDC Member
Mrs. Welejada A. Espenido - BDC Member
Mrs. Estelita L. Lamela - BDC Member
Mrs. Bernardita R. Avila - BDC Member
Mr. Dionesio Tolentino - BDC Member
Mrs. Rosario M. Tabuyan - BDC Member
Mrs. Consorcia Bumaat - BDC Member
Mrs. Marita Macheca - BDC Member
Mr. Rufino Octobre - BDC Member
Mrs. Gleceria Escatron - BDC Member
Mrs. Tita Sarceda - BDC Member
Mrs. Ricarte Sebuala - BDC Member
Mrs. Marilou G. Cervantes - BDC Member
Mrs. Cresencia T. Natad - BDC Member
Mrs. Edwardo L. Murillo - BDC Member
Mr. Josefito Pingol - BDC Member
Mr. Patrocenio Baldo, Sr. - BDC Member
Mr. Norma Osorio - BDC Member
Mr. Linda Tomalon - BDC Member
Mr. Marcelino Agosto - BDC Member
Mr. Francisco Sabatin - BDC Member
Mr. Legorio Arezza - BDC Member

RESOLUTION NO. 2
(Series of 2016)

A RESOLUTION REQUESTING THE APPROVAL OF THE ANNUAL INVESTMENT


PLAN (AIP) OF BARANGAY POBLACION, MARIHATAG, SURIGAO DEL SUR FOR
CALENDAR YEAR 2017.

WHEREAS, Barangay Poblacion of the municipality of Marihatag is expecting


a total income of Three million Two Hundred Four Thousand Seven Hundred Ninety
Nine Pesos (P 3,204,799.00) which covers the 2017 Annual Investment Plan (AIP);

WHEREAS, the Internal Revenue Allotment (IRA) as of 2017 reaches the


amount of Three million Twenty Seven Thousand Two Hundred Ninety Nine Pesos (P
3,027,299.00) of which the 20% Economic Development Fund (EDF) which
comprises of Six Hundred Five Thousand Four Hundred Sixty Pesos (P 605,460.00)
shall be allocated for the priority development programs, projects, and activities of
the Barangay;

WHEREAS, after a series of careful deliberation the body unanimously


agreed for the Annual Investment Plan as of 2017 the most balanced appropriation
out of its limited resources of the Barangay towards sustainable development.

NOW THEREFORE: On motion of Ricarte S. Sebuala ( Purok President of


Sampaguita) duly seconded by all members present. Be it resolved by the Barangay
Development Council (BDC) of Barangay Poblacion, Marihatag, Surigao del Sur to
request the Sangguniang Barangay for the approval of the 2016 Annual Investment
Plan of Barangay Poblacion, Marihatag, Surigao del Sur.

RESOLVED FINALLY, to furnish copies of this resolution to all offices


concerned for their information and guidance.

ADOPTED AND APPROVED, this 16th day of December 2016 at Barangay


Poblacion, Marihatag, Surigao del Sur.

I HEREBY CERTIFY TO THE CORRECTNESS OF


THE FOREGOING RESOLUTIONS:

NOE S. ELIZAGA, JR.


Barangay Secretary

ATTESTED AND DULY APPROVED:

LEONARDO S. TOMALON, JR.


Punong Barangay
Republic of the Philippines
PROVINCE OF SURIGAO DEL SUR
MUNICIPALITY OF MARIHATAG
BARANGAY POBLACION

EXCERPT FROM THE MINUTES OF THE 61st REGULAR SESSION OF THE


SANGGUNIANG BARANGAY OF BARANGAY POBLACION, MARIHATAG, SURIGAO DEL
SUR HELD ON January 9, 2017 AT THE BARANGAY HALL.

PRESENT:
HON. LEONARDO S. TOMALON JR.
Punong Barangay

Hon. Ananito R. Beldia - Barangay Kagawad


Hon. Narciso E. Umapas - Barangay Kagawad
Hon. Erofe B. Orbeta - Barangay
Kagawad
Hon. Estrella P. Agosto - Barangay Kagawad
Hon. Carmelito S. Moreno - Barangay Kagawad
Hon. Ricardo T. Pontillo - Barangay Kagawad
Hon. Noliberto T. Curada - Barangay Kagawad

ABSENT: None

RESOLUTION NO. 01
(Series of 2017)

A RESOLUTION TO APPROVE THE ANNUAL INVESTMENT PLAN (AIP) OF


BARANGAY POBLACION, MARIHATAG, SURIGAO DEL SUR CALENDAR YEAR
2017 AND ITS IMMEDIATE IMPLEMENTATION.

WHEREAS, there has been outlined plans of projects by the Barangay


Development
Council imperative to be realized sooner;

WHEREAS, the immediate implementation of the propose projects is the key


to a collective effort of the elected and appointed officials of Barangay Poblacion,
Marihatag, Surigao del Sur to achieve its vision, mission and goal as well as the
attainment of the peoples basic demand for survival.

NOW THEREFORE, on motion of Sangguniang Barangay Ananito R. Beldia, Jr.


and duly seconded by all members present.

RESOLVED, To approve as the body hereby approved the Annual


Investment Plan of Barangay Poblacion, Marihatag, Surigao del Sur Calendar Year
2017 and its implementation.
RESOLVED FINALLY, To furnish copies of this resolution NO. 30 series of
2017 to all office concerned for their information, guidance and appropriate action.

ADOPTED AND APPROVED this 9th day of January 2017 at Barangay


Poblacion, Marihatag, Surigao Del Sur.

I HEREBY CERTIFY TO THE CORRECTNESS


OF THE FOREGOING RESOLUTION:

ALBERTO I. NAVALE, JR.


Barangay Secretary

ATTESTED AND DULY


APPROVED:

LEONARDO S. TOMALON,
JR.
Punong Barangay
Republic of the Philippines
PROVINCE OF SURIGAO DEL SUR
MUNICIPALITY OF MARIHATAG
BARANGAY POBLACION

PROJECT PROFILE

Title of Project: PHILHEALTH PARA SA MASA

I. OBJECTIVES:

1. To support Health Services beneficial to the inhabitants;


2. To counterpart the payment of the beneficiaries of Philhealth
member ; and
3. To implement program of Philhealth.

II. METHODOLOGY:

The Barangay treasurer in conformity with the Punong Barangay is


authorized to release the fund needed for the implementation of the project
(PHILHEALTH PARA SA MASA).

III. PARTICIPANTS/BENEFICIARIES:

The Constituents of Barangay Poblacion, Marihatag, Surigao del Sur.

IV. FUNDING REQUIREMENT:

It will be sourced out to the 20% Economic Development Fund in the


amount of Fifty Eight Thousand Four Hundred (P 60,473.00).

V. TIME FRAME:

January to December 2016

VI. LEAD OFFICE

Punong Barangay

Prepared By:

ALBERTO, JR., I. NAVALE


Barangay Secretary
Approved By:

LEONARDO, JR., S.
TOMALON
Punong Barangay

Republic of the Philippines


PROVINCE OF SURIGAO DEL SUR
MUNICIPALITY OF MARIHATAG
BARANGAY POBLACION

PROJECT PROFILE

Title of Project: MAINTENANCE OF ELECTRICAL SYSTEM

I. OBJECTIVES:

1. To provide funding counterpart for the electrification of the


Barangay;
2. To give convenience to the populace in terms of safety; and
3. To protect the constituents in their day to day undertaking.

II. METHODOLOGY:

The Barangay treasurer in conformity with the Punong Barangay is


authorized to release the fund needed for the implementation of the project
(MAINTENANCE OF ELECTRICAL SYSTEM).

III. PARTICIPANTS/BENEFICIARIES:

The Constituents of Barangay Poblacion, Marihatag, Surigao del Sur.

IV. FUNDING REQUIREMENT:

It will be sourced out to the 20% Economic Development Fund in the


amount of Seventy Thousand Pesos (P 70,000.00).

V. TIME FRAME:

January to December 2015

VI. LEAD OFFICE

Punong Barangay

Prepared By:

ALBERTO, JR., I. NAVALE


Barangay Secretary
Approved By:

LEONARDO, JR., S.
TOMALON
Punong Barangay

Republic of the Philippines


PROVINCE OF SURIGAO DEL SUR
MUNICIPALITY OF MARIHATAG
BARANGAY POBLACION

PROJECT PROFILE

Title of Project: OPERATION AND MAINTENANCE OF


KALAHI/PODER/MAKAMASANG TUGON PROJECT

I. OBJECTIVES:

1. To provide funding counterpart for the operation and maintenance;


2. To maintain the building conducive for learning process; and
3. To provide the learners peace and calm learning environment.

II. METHODOLOGY:

The Barangay treasurer in conformity with the Punong Barangay is


authorized to release the fund needed for the implementation of the project
(OPERATION AND MAINTENANCE OF KALAHI/PODER/MAKAMASANG TUGON
PROJECT).

III. PARTICIPANTS/BENEFICIARIES:

The Constituents of Barangay Poblacion, Marihatag, Surigao del Sur.

IV. FUNDING REQUIREMENT:

It will be sourced out to the 20% Economic Development Fund in the


amount of Twenty Thousand (P 25,000.00).

V. TIME FRAME:

January to December 2015

VI. LEAD OFFICE

Punong Barangay

Prepared By:

ALBERTO, JR., I. NAVALE


Barangay Secretary

Approved By:

LEONARDO, JR., S.
TOMALON
Punong Barangay

Republic of the Philippines


PROVINCE OF SURIGAO DEL SUR
MUNICIPALITY OF MARIHATAG
BARANGAY POBLACION

PROJECT PROFILE

Title of Project: IMPROVEMENT OF PUROK IPIL-IPIL AND PAGBAHANAN III DAY


CARE CENTERS

I. OBJECTIVES:

1. To maintain the physical appearance of the Day Care Centers;


2. To maintain the building conducive for learning process; and
3. To provide the learners peace and calm learning environment.

II. METHODOLOGY:

The Barangay treasurer in conformity with the Punong Barangay is


authorized to release the fund needed for the implementation of the project
(IMPROVEMENT OF PUROK IPIL-IPIL AND PAGBAHANAN DAY CARE CENTERS).

III. PARTICIPANTS/BENEFICIARIES:

The Constituents of Barangay Poblacion, Marihatag, Surigao del Sur.

IV. FUNDING REQUIREMENT:

It will be sourced out to the 20% Economic Development Fund in the


amount of Twenty Five Thousand P 25,000.00.

V. TIME FRAME:

January to December 2015

VI. LEAD OFFICE

Punong Barangay

Prepared By:

ALBERTO, JR., I. NAVALE


Barangay Secretary
Approved By:

LEONARDO, JR., S.
TOMALON
Punong Barangay

Republic of the Philippines


PROVINCE OF SURIGAO DEL SUR
MUNICIPALITY OF MARIHATAG
BARANGAY POBLACION

PROJECT PROFILE

Title of Project: INSTALLATION OF JETMATIC PUMP

I. OBJECTIVES:

1. To provide potable water to the populace of the barangay;


2. To avoid water borne diseases to the constituents particularly the
children; and
3. To lessen the time spent for fetching potable water.

II. METHODOLOGY:

The Barangay treasurer in conformity with the Punong Barangay is


authorized to release the fund needed for the implementation of the project
(INSTALLATION OF JETMATIC PUMP).

III. PARTICIPANTS/BENEFICIARIES:

The Constituents of Barangay Poblacion, Marihatag, Surigao del Sur.

IV. FUNDING REQUIREMENT:

It will be sourced out to the 20% Economic Development Fund in the


amount of Eighty Thousand (P 60,000.00).

V. TIME FRAME:

January to December 2015

VI. LEAD OFFICE

Punong Barangay

Prepared By:

ALBERTO, JR., I. NAVALE


Barangay Secretary
Approved By:

LEONARDO, JR., S.
TOMALON
Punong Barangay

Republic of the Philippines


PROVINCE OF SURIGAO DEL SUR
MUNICIPALITY OF MARIHATAG
BARANGAY POBLACION

PROJECT PROFILE

Title of Project: CONSTRUCTION OF STREETLIGHTING

I. OBJECTIVES:

1. To provide electricity to the interior puroks of the Barangay;


2. To give convenience of the inhabitants at night time; and
3. To protect the populace against intruders of their property.

II. METHODOLOGY:

The Barangay treasurer in conformity with the Punong Barangay is


authorized to release the fund needed for the implementation of the project
(INSTALLATION OF JETMATIC PUMP).

III. PARTICIPANTS/BENEFICIARIES:

The Constituents of Barangay Poblacion, Marihatag, Surigao del Sur.

IV. FUNDING REQUIREMENT:

It will be sourced out to the 20% Economic Development Fund in the


amount of Sixty Five Thousand (P 20,000.00).

V. TIME FRAME:

January to December 2015

VI. LEAD OFFICE

Punong Barangay

Prepared By:

ALBERTO, JR., I. NAVALE


Barangay Secretary

Approved By:
LEONARDO, JR., S.
TOMALON
Punong Barangay

Republic of the Philippines


PROVINCE OF SURIGAO DEL SUR
MUNICIPALITY OF MARIHATAG
BARANGAY POBLACION

PROJECT PROFILE

Title of Project: ACQUISITION OF BARANGAY SITE

I. OBJECTIVES:

1. To provide shelter to the homeless inhabitants of Barangay


Poblacion;
2. To protect the people against multifarious diseases; and
3. To have a sanitary environment.

II. METHODOLOGY:

The Barangay treasurer in conformity with the Punong Barangay is


authorized to release the fund needed for the implementation of the project
(ACQUISITION OF BARANGAY SITE).

III. PARTICIPANTS/BENEFICIARIES:

The Constituents of Barangay Poblacion, Marihatag, Surigao del Sur.

IV. FUNDING REQUIREMENT:

It will be sourced out to the 20% Economic Development Fund in the


amount of Twenty Thousand (P 171,954.00).

V. TIME FRAME:

January to December 2015

VI. LEAD OFFICE

Punong Barangay

Prepared By:

ALBERTO I. NAVALE, JR.


Barangay Secretary
Approved By:
LEONARDO S.
TOMALON, JR.
Punong Barangay

Republic of the Philippines


PROVINCE OF SURIGAO DEL SUR
MUNICIPALITY OF MARIHATAG
BARANGAY POBLACION

PROJECT PROFILE

Title of Project: REHABILITATION OF DRAINAGE SYSTEM ( No funds allotted


as of CY 2015)

I. OBJECTIVES:

1. To provide clean and sanitary environment in the barangay;


2. To avoid water borne diseases to the constituents particularly the
children; and
3. To destroy the habitat of mosquito and harmful insects.

II. METHODOLOGY:

The Barangay treasurer in conformity with the Punong Barangay is


authorized to release the fund needed for the implementation of the project
(REHABILITATION OF DRAINAGE SYSTEM).

III. PARTICIPANTS/BENEFICIARIES:

The Constituents of Barangay Poblacion, Marihatag, Surigao del Sur.

IV. FUNDING REQUIREMENT:

It will be sourced out to the 20% Economic Development Fund in the


amount of Eighty Thousand (P 30,000.00).

V. TIME FRAME:

January to December 2014

VI. LEAD OFFICE

Punong Barangay

Prepared By:

ALBERTO I. NAVALE, JR.


Barangay Secretary
Approved By:

LEONARDO S.
TOMALON, JR.
Punong Barangay

Republic of the Philippines


PROVINCE OF SURIGAO DEL SUR
MUNICIPALITY OF MARIHATAG
BARANGAY POBLACION

PROJECT PROFILE

Title of Project: CONSTRUCTION OF POTABLE WATERE SYSTEM LEVEL III

I. OBJECTIVES:

1. To provide clean and sanitary Potable water to barangay folks;


2. To avoid water borne diseases to the constituents particularly the
children; and
3. To minimize time in fetching Potable water.

II. METHODOLOGY:

The Barangay treasurer in conformity with the Punong Barangay is


authorized to release the fund needed for the implementation of the project
(REHABILITATION OF DRAINAGE SYSTEM).

III. PARTICIPANTS/BENEFICIARIES:

The Constituents of Barangay Poblacion, Marihatag, Surigao del Sur.

IV. FUNDING REQUIREMENT:

It will be sourced out to the 20% Economic Development Fund in the


amount of Forty Thousand (P 40,000.00).

V. TIME FRAME:

January to December 2015

VI. LEAD OFFICE

Punong Barangay

Prepared By:

ALBERTO, JR., I. NAVALE


Barangay Secretary
Approved By:

LEONARDO, JR., S.
TOMALON
Punong Barangay

Republic of the Philippines


PROVINCE OF SURIGAO DEL SUR
MUNICIPALITY OF MARIHATAG
BARANGAY POBLACION

PROJECT PROFILE

Title of Project: REPAIR AND MAINTENANCE OF FARM TO MARKET ROAD

I. OBJECTIVES:

1. To provide funds for the repair and maintenance of FMR;


2. To provide convenience to avoid water borne diseases to the
constituents particularly the children; and
3. To minimize time in fetching Potable water.

II. METHODOLOGY:

The Barangay treasurer in conformity with the Punong Barangay is


authorized to release the fund needed for the implementation of the project
(REHABILITATION OF DRAINAGE SYSTEM).

III. PARTICIPANTS/BENEFICIARIES:

The Constituents of Barangay Poblacion, Marihatag, Surigao del Sur.

IV. FUNDING REQUIREMENT:

It will be sourced out to the 20% Economic Development Fund in the


amount of Forty Thousand (P 50,000.00).

V. TIME FRAME:

January to December 2015

VI. LEAD OFFICE

Punong Barangay

Prepared By:

ALBERTO, JR., I. NAVALE


Barangay Secretary
Approved By:

LEONARDO, JR., S.
TOMALON
Punong Barangay