Академический Документы
Профессиональный Документы
Культура Документы
FEBRUARY 2009
OFFICE OF ORIGIN
BANGALORE
OWNER
CONCESSIONAIRE
PROJECT
CHANDAPURA PROJECT
TITLE
Design of RETAINING WALL
SHEET NOS/
ANNEXURES INITIALS SIGNATURE INITIALS SIGNATURE INITIALS SIGNATURE
This note is the property of Erinco India Pvt. Ltd. It should not be used, copied or reproduced
without their written permission
DESIGN OF RETAINING WALL
(HEIGHT 2.2m)
FRL 0.2 m 0m
0m
Earth side
6
Ph 3
2m 1.85 m 0.000 m
1.85 m
2.2 m
4
0.84 m
a
7
0.35 m 2
5
0.2 m 1 GL
A
1.8 m 0.25 m 0
2.05 m
Sl no TYPE DESCRIPTION STATUS ACTUAL/PROVIDEDPERMISSIBLE/REQUIRED UNIT UPDATE
STABILITY
1 STABILITY OVERTURNING PASS 3.26 2
2 STABILITY SLIDING PASS 1.68 1.5
BASE PRESSURE
3 STRESS TOE PASS 8.61 <25 t/m2
4 STRESS HEEL PASS 0.03 >0 t/m2
WALL
5 EFFECTIVE DEPTH BASE PASS 194.00 152.03 mm
6 EFFECTIVE DEPTH CURTAILMENT PASS 195.00 97.92 mm
7 REINFORCEMENT BASE MAIN PASS 513.82 496.42 mm2
8 REINFORCEMENT CURTAILMENT MAIN PASS 392.50 204.89 mm2
9 REINFORCEMENT OUTER FACE MAIN PASS 261.67 232.80 mm2
10 REINFORCEMENT BASE DISTRIBUTION PASS 261.67 150.00 mm2
11 REINFORCEMENT CURTAILMENT DISTRIBUTION PASS 261.67 150.00 mm2
12 REINFORCEMENT OUTER FACE DISTRIBUTION PASS 261.67 150.00 mm2
HEEL
13 EFFECTIVE DEPTH TOP PASS 294.00 232.11 mm
14 REINFORCEMENT TOP MAIN PASS 869.54 763.57 mm2
15 REINFORCEMENT BOTTOM MAIN PASS 356.82 #REF! mm2
16 REINFORCEMENT TOP DISTRIBUTION PASS 261.67 165.00 mm2
17 REINFORCEMENT BOTTOM DISTRIBUTION PASS 261.67 165.00 mm2
18 STRESS SHEAR PASS 0.23 0.23 Mpa
SOIL DATA
SBC = 15 t/m2
Density of soil fill = 1.8 t/m3
Angle of internal friction = 30
Surcharge angle = 0
Wall angle = 88.45
Angle of wall friction d = 2/3 = 20
Friction coefficient = 0.5
sin 2 ( + ) cos 1
Ka = x
sin 2 sin( - ) sin( + ) sin( - )
2
1 +
sin( - ) sin( + )
Ka = 0.290
CONCRETE DATA
BASE PRESSURES
STABILITY CHECK
Against overturning
Overturning moment = -2.68 t-m
Resisting moment = 8.75 t-m
Factor of safety = Resisting moment = 3.26 >2
Overturning moment
OK
Against sliding
Factor of safety = *vertical force = 1.68 >1.5
horizontal force
OK
DESIGN OF WALL
A) AT BASE
M
Effective depth required = Qb = 152.03 mm
Actual depth provided = 250 mm
Effective depth provided = 194 mm
>REQUIRED HENCE SAFE
Area of steel required = M/s stjd = 496.42 mm2
Minimum steel = 388.00 mm2
Area of steel to be provided = 496.42 mm2
Provide 12 mm dia bars
Area of each bar = 113.04 mm2
Spacing required = 227.71 mm
Provide 12 mm dia bars @ 220 mm c/c
Area of steel provided = 513.82 mm2
SAFE
Distribution steel of 25% of main steel = 124.11 mm2
Distribution steel of 0.12% of c/s area = 300.00 mm2
Distribution steel to be provided = 300.00 mm2
Distribution steel on each face = 150.00 mm2
Provide 10 mm dia bars
Area of each bar = 78.50 mm2
Spacing required = 523.33 mm
Provide 10 mm dia bars @ 300 mm c/c
Distribution steel provided = 261.67 mm2
SAFE
OUTER FACE
DESIGN OF HEEL
2.05 m
TOP REINFORCEMENT
Max BM at critical section = 4.12 t-m
Effective depth required = 232.11 mm
Clear cover = 50 mm
Actual depth provided = 350 mm
Effective depth provided = 294 mm
>REQUIRED HENCE OK
BOTTOM REINFORCEMENT
Minimum steel of 0.12 % of c/s area = 352.80 mm2
Area of steel to be provided = 352.80 mm2
Provide 10 mm dia bars
Area of each bar = 78.50 mm2
Spacing required = 222.51 mm
Provide 10 mm dia bars @ 220 mm c/c
Ast provided = 356.82 mm2
SAFE
Distribution steel of 25 % of main steel = 88.20 mm2
Distribution steel of 0.12 % of c/s area = 330.00 mm2
Distribution steel to be provided = 165.00 mm2
Provide 10 mm dia bars
Area of each bar = 78.50 mm2
Spacing required = 475.76 mm
Provide 10 mm dia bars @ 300 mm c/c
Distribution steel provided = 261.67 mm2
SAFE
CHECK FOR SHEAR
1.8 m
>ACTUAL HENCE OK
DESIGN OF RETAINING WALL
(HEIGHT 2.0m)
FRL 0.2 m 0m
0m
Earth side
6
Ph 3
1.8 m 1.65 m 0.000 m
1.65 m
2m
4
0.76 m
a
7
0.35 m 2
5
0.2 m 1 GL
A
1.7 m 0.25 m 0
1.95 m
Sl no TYPE DESCRIPTION STATUS ACTUAL/PROVIDEDPERMISSIBLE/REQUIRED UNIT UPDATE
STABILITY
1 STABILITY OVERTURNING PASS 3.38 2
2 STABILITY SLIDING PASS 1.67 1.5
BASE PRESSURE
3 STRESS TOE PASS 7.75 <25 t/m2
4 STRESS HEEL PASS 0.14 >0 t/m2
WALL
5 EFFECTIVE DEPTH BASE PASS 195.00 132.98 mm
1 REINFORCEMENT BASE MAIN PASS 392.50 377.86 mm2
6 REINFORCEMENT OUTER FACE MAIN PASS 261.67 234.00 mm2
2 REINFORCEMENT BASE DISTRIBUTION PASS 261.67 150.00 mm2
7 REINFORCEMENT OUTER FACE DISTRIBUTION PASS 261.67 150.00 mm2
HEEL
8 EFFECTIVE DEPTH TOP PASS 295.00 211.09 mm
9 REINFORCEMENT TOP MAIN PASS 654.17 629.34 mm2
10 REINFORCEMENT BOTTOM MAIN PASS 356.82 354.00 mm2
11 REINFORCEMENT TOP DISTRIBUTION PASS 261.67 165.00 mm2
12 REINFORCEMENT BOTTOM DISTRIBUTION PASS 261.67 165.00 mm2
13 STRESS SHEAR PASS 0.20 0.21 Mpa
SOIL DATA
SBC = 15 t/m2
Density of soil fill = 1.8 t/m3
Angle of internal friction = 30
Surcharge angle = 0
Wall angle = 88.26
Angle of wall friction d = 2/3 = 20
Friction coefficient = 0.5
sin 2 ( + ) cos 1
Ka = x
sin 2 sin( - ) sin( + ) sin( - )
2
1 +
sin( - ) sin( + )
Ka = 0.291
CONCRETE DATA
BASE PRESSURES
STABILITY CHECK
Against overturning
Overturning moment = -2.14 t-m
Resisting moment = 7.24 t-m
Factor of safety = Resisting moment = 3.38 >2
Overturning moment
OK
Against sliding
Factor of safety = *vertical force = 1.67 >1.5
horizontal force
OK
DESIGN OF WALL
A) AT BASE
M
Effective depth required = Qb = 132.98 mm
Actual depth provided = 250 mm
Effective depth provided = 195 mm
>REQUIRED HENCE SAFE
Area of steel required = M/s stjd = 377.86 mm2
Minimum steel = 390.00 mm2
Area of steel to be provided = 390.00 mm2
Provide 10 mm dia bars
Area of each bar = 78.50 mm2
Spacing required = 201.28 mm
Provide 10 mm dia bars @ 200 mm c/c
Area of steel provided = 392.50 mm2
SAFE
Distribution steel of 25% of main steel = 97.50 mm2
Distribution steel of 0.12% of c/s area = 300.00 mm2
Distribution steel to be provided = 300.00 mm2
Distribution steel on each face = 150.00 mm2
Provide 10 mm dia bars
Area of each bar = 78.50 mm2
Spacing required = 523.33 mm
Provide 10 mm dia bars @ 300 mm c/c
Distribution steel provided = 261.67 mm2
SAFE
OUTER FACE
DESIGN OF HEEL
1.95 m
TOP REINFORCEMENT
Max BM at critical section = 3.40 t-m
Effective depth required = 211.09 mm
Clear cover = 50 mm
Actual depth provided = 350 mm
Effective depth provided = 295 mm
>REQUIRED HENCE OK
BOTTOM REINFORCEMENT
Minimum steel of 0.12 % of c/s area = 354.00 mm2
Area of steel to be provided = 354.00 mm2
Provide 10 mm dia bars
Area of each bar = 78.50 mm2
Spacing required = 221.75 mm
Provide 10 mm dia bars @ 220 mm c/c
Ast provided = 356.82 mm2
SAFE
Distribution steel of 25 % of main steel = 88.50 mm2
Distribution steel of 0.12 % of c/s area = 330.00 mm2
Distribution steel to be provided = 165.00 mm2
Provide 10 mm dia bars
Area of each bar = 78.50 mm2
Spacing required = 475.76 mm
Provide 10 mm dia bars @ 300 mm c/c
Distribution steel provided = 261.67 mm2
SAFE
CHECK FOR SHEAR
1.7 m
>ACTUAL HENCE OK
DESIGN OF RETAINING WALL
(HEIGHT 1.5m)
FRL 0.2 m 0m
0m
Earth side
6
Ph 3
1.3 m 1.15 m 0.000 m
1.15 m
1.5 m
4
0.55 m
a
7
0.35 m 2
5
0.2 m 1 GL
A
1.4 m 0.25 m 0
1.65 m
Sl no TYPE DESCRIPTION STATUS ACTUAL/PROVIDED PERMISSIBLE/REQUIRED UNIT UPDATE
STABILITY
1 STABILITY OVERTURNING PASS 3.60 2
2 STABILITY SLIDING PASS 1.59 1.5
BASE PRESSURE
3 STRESS TOE PASS 5.78 <25 t/m2
4 STRESS HEEL PASS 0.26 >0 t/m2
WALL
5 EFFECTIVE DEPTH BASE PASS 195.00 88.18 mm
1 REINFORCEMENT BASE MAIN PASS 392.50 166.15 mm2
6 REINFORCEMENT OUTER FACE MAIN PASS 261.67 234.00 mm2
2 REINFORCEMENT BASE DISTRIBUTION PASS 261.67 150.00 mm2
7 REINFORCEMENT OUTER FACE DISTRIBUTION PASS 261.67 150.00 mm2
HEEL
8 EFFECTIVE DEPTH TOP PASS 295.00 152.73 mm
9 REINFORCEMENT TOP MAIN PASS 603.85 329.47 mm2
10 REINFORCEMENT BOTTOM MAIN PASS 356.82 354.00 mm2
11 REINFORCEMENT TOP DISTRIBUTION PASS 261.67 165.00 mm2
12 REINFORCEMENT BOTTOM DISTRIBUTION PASS 261.67 165.00 mm2
13 STRESS SHEAR PASS 0.12 0.21 Mpa
SOIL DATA
SBC = 15 t/m2
Density of soil fill = 1.8 t/m3
Angle of internal friction = 30
Surcharge angle = 0
Wall angle = 87.51
Angle of wall friction d = 2/3 = 20
Friction coefficient = 0.5
sin 2 ( + ) cos 1
Ka = x
sin2 sin( - ) sin( + ) sin( - )
2
1 +
sin( - ) sin( + )
Ka = 0.297
CONCRETE DATA
BASE PRESSURES
STABILITY CHECK
Against overturning
Overturning moment = -1.10 t-m
Resisting moment = 3.95 t-m
Factor of safety = Resisting moment = 3.60 >2
Overturning moment
OK
Against sliding
Factor of safety = *vertical force = 1.59 >1.5
horizontal force
OK
DESIGN OF WALL
A) AT BASE
M
Effective depth required = Qb = 88.18 mm
Actual depth provided = 250 mm
Effective depth provided = 195 mm
>REQUIRED HENCE SAFE
Area of steel required = M/s stjd = 166.15 mm2
Minimum steel = 390.00 mm2
Area of steel to be provided = 390.00 mm2
Provide 10 mm dia bars
Area of each bar = 78.50 mm2
Spacing required = 201.28 mm
Provide 10 mm dia bars @ 200 mm c/c
Area of steel provided = 392.50 mm2
SAFE
Distribution steel of 25% of main steel = 97.50 mm2
Distribution steel of 0.12% of c/s area = 300.00 mm2
Distribution steel to be provided = 300.00 mm2
Distribution steel on each face = 150.00 mm2
Provide 10 mm dia bars
Area of each bar = 78.50 mm2
Spacing required = 523.33 mm
Provide 10 mm dia bars @ 300 mm c/c
Distribution steel provided = 261.67 mm2
SAFE
OUTER FACE
DESIGN OF HEEL
1.65 m
TOP REINFORCEMENT
Max BM at critical section = 1.78 t-m
Effective depth required = 152.73 mm
Clear cover = 50 mm
Actual depth provided = 350 mm
Effective depth provided = 295 mm
>REQUIRED HENCE OK
BOTTOM REINFORCEMENT
Minimum steel of 0.12 % of c/s area = 354.00 mm2
Area of steel to be provided = 354.00 mm2
Provide 10 mm dia bars
Area of each bar = 78.50 mm2
Spacing required = 221.75 mm
Provide 10 mm dia bars @ 220 mm c/c
Ast provided = 356.82 mm2
SAFE
Distribution steel of 25 % of main steel = 88.50 mm2
Distribution steel of 0.12 % of c/s area = 330.00 mm2
Distribution steel to be provided = 165.00 mm2
Provide 10 mm dia bars
Area of each bar = 78.50 mm2
Spacing required = 475.76 mm
Provide 10 mm dia bars @ 300 mm c/c
Distribution steel provided = 261.67 mm2
SAFE
CHECK FOR SHEAR
1.4 m
>ACTUAL HENCE OK