Академический Документы
Профессиональный Документы
Культура Документы
19)
Company : utcn
User name : codrea vasile
Project name :
Project reference :
Comment :
Date : 05/12/2016
utcn
Project name :
ArcelorMittal Composite Bridge Predesign Project reference :
(v3.19)
Comment :
ESTIMATED QUANTITIES
Lengths (m)
Position Span Number Profile Nominal On/Under Sum Weight (t) Pre-camber (cm)
1 1 6 HE 600 A 17.00 0.20 17.20 18.346 3.0
2 2 6 HE 600 A 22.00 0.00 22.00 23.466 4.6
3 3 6 HE 600 A 17.00 0.20 17.20 18.346 3.0
60.157
Shear connectors :
Slab concrete :
2
Surface of slab : 604.80 m
NB :
Mass on slab :