Академический Документы
Профессиональный Документы
Культура Документы
Assistance
Assistance
Assistance
Technical
PLANNED ACTIVITIES
Supply
Cash
IDR
IR : 2.1.1 By June 2015, evidence-based advocacy and technical support in policy, guidelines, and strategy f
focus districts) level contribute to increased emphasis on equity to reduce stunting, including ECD (OT 110
IR : 2.1.5: By December 2015, equitable immunization system policies and strategies to support GoI achieve
preventable disease (polio, measles, rubella, maternal and neonatal tetanus) elimination and eradication go
of Under Five children are developed, approved and implemented. (OT 104)
EPI-BA-Technical support strengthen
routine immunization & surveillance
sytem
IR 2.1.9 : By 2015 National and sub national WASH policies and guidelines are available and implemented
access and suitability in 7 targeted provinces and 28 districts to contribute to MDGs Goals including in 3 d
WASH-ACEH-Contribute to improve
efficiency and increase amount of
funds allocated to AMPL through
evidence based advocacy, improved
coordination, planning and
monitoring of WASH programme in
the Province and 3 focus districts
WASH-ACEH-Contribute to the
development of water quality
monitoring system & regulation at
Province and district level
WASH-ACEH-Support to Province
AMPL for documentation of best
practices their dissemination to scale
up the STBM in Aceh Province
IR 2.1.12 By December 2014, core child survival interventions especially in poorest districts are supported
development strategy, implementation guidelines and monitoring for equity (OT 106 - health systems for clin
(OT:106)
IR 2.2.1 By 2015, increased in health seeking, child feeding practices and wash behaviors in targeted popula
additional 5% of 1a) children below six months of age will be exclusively breast-fed, 1b) children 6-23 mon
1c) children 20-23 months will benefit from continued breast-feeding, 1d) pregnant women will receive at lea
least an additional 25% of usage of improved sanitation facilities, 10% of hand washing with soap and, 5%
storage (OT 108)
NUT Aceh - Suporting Province to
introduce, use & monitor IYCF nodule
for trainning till cadre level in 3
districts
WASH-ACEH-Strengthening the
implementation of community
triggering, STBM monitoring system,
ODF village verification and
declaration in 3 district focus of Aceh
province
WASH-ACEH-Strengthening the
capacity of Puskesmas staff, midwife
and Posyandu and PAUD cadres in
promoting hygiene behaviour
(handwashing with soap, water
treatment and waste management at
household level) in 3 districts focus of
Aceh province
Assistance
Assistance
Supply
Cash
IDR
-
, Maluku, North Maluku, South Sulawesi, West Sulawesi, Papua, and West
tions are increased by 20% from baseline (OT 107)
USD
-
-
UNICEF s
Assistance
Assistance
Assistance
Technical
PLANNED ACTIVITIES
Supply
Cash
IDR
IR : 2.1.1 By June 2015, evidence-based advocacy and technical support in policy, guidelines, and strategy f
including ECD (OT 110)
Aceh Province
Penyusunan Renstra Pokjanal
1 15,000
Posyandu Provinsi
Finalisasi Renstra Pokjanal
2 4,000
Posyandu Provinsi
Sosialisasi Renstra Pokjanal
3 5,000
Posyandu Provinsi
Aceh Province
, guidelines, and strategy formulation at national and sub-national (selected focus districts) level contribute to increas
15,000 15,000
20,000 20,000
15,000 15,000
15,000 ###
4,000 ###
5,000 ###
15,000 ###
Implementing Mekanisme
Partner(s) Pendanaan
1-6 7-12 13-18 19-24
University
Muhammadiyah
University
Muhammadiyah Langsung ke
UNMUHA
University
Muhammadiyah
Poltekes Aceh
Langsung ke
Poltekes Aceh
Langsung ke
Poltekes Aceh
Poltekes Aceh
BPM Aceh
BPM Aceh
LSM Lokal atau
BPM Aceh Kementrian ke
BPM Aceh
BPM Aceh
Assistanc
Assistanc
Assistanc
Technical
budget
Supply
PLANNED ACTIVITIES
Cash
e
IDR USD
IR : 2.1.4 By September 2015, at selected districts level in NAD, Central Java, NTT, Maluku, North Maluku, So
threatening conditions are increased by 20% from baseline (OT 107)
NAD - Development, finalization
and dissemination of Bupati
regulation on recruitment,
placement and competency of
midwife in Aceh Besar, Aceh Jaya
and Aceh Timur
Aceh Timur District
Pembuatan dan sosialisasi
1 15,000 15,000
Perbup Uji Kompetensi
1-6 7-12
Funded Grant Unfunded Funded Grant Unfunde
d
T, Maluku, North Maluku, South Sulawesi, West Sulawesi, Papua, and West Papua, coverage of management of matern
15,000 SC 080905
SC 080905 5,000
25,000 - 10,000 - -
imeframe (in months)
Mekanisme
Implementing Partner(s)
13-18 19-24 Pendanaan
Universitas Langsung ke
Muhammadiyah UNMUHA
Kementrian ke
Dinkes Aceh Jaya
dinkes kab
Kementrian ke
Dinkes Aceh Tiimur
dinkes kab
UNICEF support 2014-2015 Timeframe (in months)
Indicative plan
2014 2015
Technic
Implementing Mekanisme
Assista
Assista
Assista
Supply
PLANNED ACTIVITIES budget
Cash
nce
nce
nce
1-6 7-12 13-18 19-24 Partner(s) Pendanaan
al
IDR USD Funded Grant Unfunded Funded Grant Unfunded
IR : 2.1.5: By December 2015, equitable immunization system policies and strategies to support GoI achievement of international and national goals of vaccine preventable disease (polio, measles, rubella,
maternal and neonatal tetanus) elimination and eradication goals as well as reduction of major killers due to VPDs of Under Five children are developed, approved and implemented. (OT 104)
EPI-BA-Technical support
strengthen routine immunization & NO PLANNED ACTIVITIES 2014-2015
surveillance sytem
Assistance
Assistance
Assistance
budget
Technical
PLANNED ACTIVITIES
Supply
Cash
IDR
IR 2.1.9 : By 2015 National and sub national WASH policies and guidelines are available and implemented
MDGs Goals including in 3 districts from Aceh (OT 110)
WASH-ACEH-Contribute to improve
efficiency and increase amount of funds
allocated to AMPL through evidence
based advocacy, improved coordination,
planning and monitoring of WASH
programme in the Province and 3 focus
districts
WASH-ACEH-Contribute to the
development of water quality monitoring
system & regulation at Province and
district level
e available and implemented and regularly monitored for increase in equitable access and suitability in 7 targeted pr
10,000 10,000
Implementing Mekanisme
Partner(s) Pendanaan
1-6 7-12 13-18 19-24
Bappeda Aceh
LSM Lokal
Jaya
Kementrian ke
dinkes kab
Dinkes Aceh Timur
Assistance
Assistance
Assistance
budget
Technical
PLANNED ACTIVITIES
Supply
Cash
IDR USD Funded
IR 2.1.12 By December 2014, core child survival interventions especially in poorest districts are supported
equity (OT 106 - health systems for clinical services at facility and community levels) (OT:106)
Aceh Province
Socialization of MTBS-M to 5
1 6,000 6,000 6,000
selected districts
Aceh Province
Pelatihan TOT ANC Integrasi
dan MTBS/ICATT untuk
1 15,000 15,000 15,000
integrasi ke dalam kurikulum
pendidikan kebidanan di Aceh
2014 2015
tricts are supported with policy, evidence-based planning, HR development strategy, implementation guidelines and m
OT:106)
SC 080905
SC 080905
2,000
SC 080905
SC 080905
SC 080905
3,000
SC 080905
SC 080905
- 5,000 -
(in months)
Implementing Mekanisme
Partner(s) Pendanaan
19-24
Kementrian ke
Dinkes Prop Aceh Dinkes prop
(KIA)
Kementrian ke
Dinkes Aceh Timur dinkes kab
Poltekes Aceh
UNICEF support 201
Indicative plan
Assistance
Assistance
Assistance
budget
Technical
PLANNED ACTIVITIES
Supply
Cash
IDR USD
IR 2.2.1 By 2015, increased in health seeking, child feeding practices and wash behaviors in targeted popula
exclusively breast-fed, 1b) children 6-23 months will receive appropriate complementary feeding, 1c) childr
tablets during pregnancy and, 2) ) At least an additional 25% of usage of improved sanitation facilities, 10%
Aceh Province
WASH-ACEH-Strengthening the
implementation of community
triggering, STBM monitoring system,
ODF village verification and
declaration in 3 district focus of
Aceh province
2014 2015
1-6 7-12
Funded Grant Unfunded Funded Grant Unfunded
haviors in targeted populations of selected districts by: 1) At least an additional 5% of 1a) children below six months o
entary feeding, 1c) children 20-23 months will benefit from continued breast-feeding, 1d) pregnant women will receive
d sanitation facilities, 10% of hand washing with soap and, 5% households adopt water treatment and proper storage (
###
5,000 SC120757
10,000 SC120757
20,000 - 15,000 - -
imeframe (in months)
Implementing Mekanisme
Partner(s) Pendanaan
13-18 19-24
Langsung Ke
Poltekes Aceh
Poltekes
Kementrian ke
Dinkes Aceh Timur
dinkes kab
Kementrian
Dinkes Aceh Timur lewat dinkes
kab