Radiogram No.

5078u Form 24 for 04/13/07


HANDOVER TO E15 CREW
GMT CREW ACTIVITY

18:00-18:10 Morning inspection


18:10-18:40 Post-sleep
18:40-19:30 BREAKFAST
19:30-20:00 SFPVC Prep for Work
FE-1, CDR, FE-2,
19:30-19:40 Prep for Work
FE-1-15, CDR-15
CDR-15, FE-1,
19:40-19:55 CDR, FE-1-15, Daily Planning Conference (S-band)
FE-2
FE-1-15, FE-1,
19:55-20:15 Prep for Work
FE-2, CDR-15
19:55-20:15 CDR TRAC - hardware setup
VC PAO TV downlink (То=20:19, Т1, Т2, Т3 - Automated daily timeline)
FE-1-15, SFPVC-
20:15-20:40 Use Comm Panel ПА-4 (Push CHANNEL2, CHANNEL2 lights up (for
assists
comm via VHF1))
20:15-21:15 CDR-15 PLASMA-ISS. Hardware setup
20:15-20:30 FE-2 Food frequency questionnaire
20:15-20:30 TRAC - video equipment set up
CDR
20:30-21:05 TRAC - CDR data
20:30-20:45 FE-2 TRAC - history photo
20:45-21:45 FE-1 Physical Exercise (TVIS), Day 3
20:45-22:15 FE-2 Physical Exercise (CEVIS)
20:50-21:05 Verify ИП-1 sensor installation
FE-1-15
21:05-21:20 Taking readings from АОК ГАНК-4М gas analyzer
21:15-21:25 CDR-15 PLASMA-ISS. Experiment ops
21:25-22:25 CDR Physical Exercise (RED)
21:25-21:40 SFPVC VC12 SFP Earth Photo/Video Ops
21:25-21:40 FE-1-15, CDR-15 CMS exercise overview
21:40-21:50 CDR-15 PLASMA-ISS. Experiment ops
21:45-00:25 FE-1, FE-1-15 E14 to E15 Crew Handover
21:55-22:20 CDR-15 E14 to E15 Crew Handover
22:00-22:10 SFPVC Tagup with Consultants Team via VHF1
SAMPLE. ISS sample collection Tagup with specialists (VHF) / TM-12, item
22:10-23:10 SFPVC
6.3-6.4, p. 6-3
22:15-22:25 FE-2 PAO hardware setup
22:20-22:25 CDR-15 PLASMA-ISS. Experiment Ops (calibration)
22:25-22:35 FE-2,CDR Crew prep for PAO
22:25-22:45 CDR-15 E14 to E15 Crew Handover
22:35-22:55 FE-2,CDR TV greetings for NASA award ceremony in Houston (Ku + S-band)
22:45-22:55 CDR-15 PLASMA-ISS. Experiment ops
22:55-00:00 CDR-15 E14 to E15 Crew Handover
22:55-00:25 CDR TVIS Accessory Kit Audit
22:55-00:25 FE-2 Leak check kit reconfig, retrieval of PWRK kit and procedure printout
00:00-01:00 CDR-15 Physical Exercise (CEVIS)
00:20-00:40 SFPVC PILLE. Daily session. Retrieve, read, and install
Sampling condensate water [КАВ] upstream of СРВ-К2М ФГС – use
00:25-01:00 FE-1-15
compressor to take sample, pack the sample
00:25-01:00 FE-1 TRAC – FE1 data
00:25-00:30 CDR SAMS hardware activation
00:45-01:00 FE-2 TRAC - history photo
00:50-00:55 CDR SAMS hardware health check
00:55-01:00 CDR On MCC Go ISS O2 repress from Progress 359 СрПК (start)
SFPVC, FE-2,
01:00-02:00 CDR, FE-1, FE-1- LUNCH
15
01:00-01:50 CDR-15 LUNCH
01:50-02:00 CDR-15 PLASMA-ISS. Experiment ops
02:00-02:05 CDR ISS O2 repress from Progress 359 СрПК (terminate)
02:00-02:10 CDR-15 LUNCH
02:00-02:30 FE-2 Microgravity Acceleration Measurement System Screen Cleaning
02:00-02:50 FE-1-15 Pumping KAV from CWC to EDV using pumping unit and US filter / r/g 5109
02:00-02:10 SFPVC Private conference using IP-Phone (Ku-band)
02:10-02:25 SFPVC E-MAIL ops
02:15-03:00 FE-1 PLANTS-2. Plant sample collection. Close-out ops
02:15-03:00 CDR TVIS Monthly Maintenance
02:20-02:35 CDR-15 PLASMA-ISS. Experiment ops
02:30-03:05 FE-2 TRAC - FE2 data
02:35-02:50 CDR-15 PLASMA-ISS. Hardware teardown
02:50-03:00 CDR-15 Transfer of medical supply kit delivered by Soyuz
03:00-04:30 CDR Physical Exercise (TVIS + CEVIS)
CDR-15, FE-1,
03:00-04:00 E14 to E15 Crew Handover
FE-1-15
03:05-03:20 FE-2 TRAC - equipment stow
03:05-03:20 SFPVC MATRIX Z1. Preparations and video 3
03:20-03:40 FE-2 EPO (PL) demonstration - procedure review
03:45-04:45 FE-2 Physical Exercise (RED)
Replacing filters in FGB dust collectors ПС1, ПС2 (ФГБ1ПГО_2_224_1 bag
04:00-04:50 CDR-15
#353-8, b/c №351-3, bag #29. Discard removed filters. Update IMS)
04:00-05:00 FE-1 Physical Exercise (TVIS), day 3
04:15-04:30 FE-1-15 Evening work prep
04:30-04:50 CDR EPO (PL) demonstration - procedure review
04:30-05:30 FE-1-15 Physical Exercise (CEVIS)
04:45-05:15 FE-2 СОЖ Maintenance
04:50-05:05 SFPVC MATRIX Z1. Video 3 close-out ops. Phase 2 / r/g 5086
04:55-05:05 CDR O2 level check
04:55-05:15 CDR-15 IMS update
05:05-05:10 CDR OCA SSC router reboot
05:10-05:15 CDR SSC file server reboot
05:10-05:15 FE-1 Transfer TVIS/RED/CEVIS/HRM data to MEC
05:15-06:00 CDR, FE-1, FE-2 Evening work prep
05:15-05:30 SFPVC Earth photo/video ops
05:15-06:00 CDR-15 Evening work prep
05:30-06:00 FE-1-15 Evening work prep
CDR, FE-1, FE-2,
06:00-06:15 Daily Planning Conference (S-band)
CDR-15,
CDR, FE-1, FE-2,
06:15-06:30 Report prep
CDR-15, FE-1-15
06:15-06:20 SFPVC MUSCLE (LOW BACK PAIN) -Low Back Pain Questionnaire
06:30-07:00 DINNER
07:00-07:30 Daily Food Prep
07:30-08:30 Pre-sleep
08:30-17:00 SLEEP
Note: See OSTP for references to US activities.
End of Radiogram