Вы находитесь на странице: 1из 11

MURO DE CONTENCION H= 1.80 M.

PROYECTO : PAVIMENTACION CUADRA 01 JR. CAJAMAR


CA Y CUADRA 10 JR. JOSE GALVEZ
OFICINA ZONAL : CAJAMARCA
PROYECTISTA : ING LORD P. AZAEDO ALCANTARA

DATOS PARA EL DISEO

Angulo de friccin interna = 30


Peso especifico del suelo = 1800 Kg/m3
Coeficiente de friccin = 0.65
Resistencia del terreno = 1.00 Kg/cm2
Resistencia del concreto (fc) = 100 Kg/cm2
Sobrecarga S/C = 200 Kg/m2

Dimensiones
a = 0.30 m.
c = 0.00 m.
d = 0.00 m.
h1 = 0.70 m.
h2 = 0.60 m.
H = 1.80 m.
t = 0.50 m.
Coeficiente (0.45-0.7) = 0.60 m.
B = 1.080 m.
D = 0.110 m.
D1 = 0.110 m.
b = 0.860 m.

ANALISIS DE LA ESTABILIDAD DEL MURO CON RELLENO Y SOBRE CARGA.-

FUERZA VERTICAL Xb (M) Mb(Kg*m)


W1 = 936.00 0.820 767.52
W2 = 873.60 0.483 422.24
W4 = 1296.00 0.540 699.84
T1 = 257.40 1.025 263.84
S/C = 82.00 0.875 71.75
Fv = 3445.00 Kg. Me = 2225.19 Kg*m

Fuerzas Horixontales.
Ea =C.W.h ( h + 2.h) /2
donde:

1SEN (f
C= (1-SEN ) = 0.333 h = S/C = 0.111
C= W
Luego:
1+SEN ( f )
Ea = 1092.000 Kg.

Y= h (h+3 h) = 0.633
3 (h+2 h)

1.- ESTABILIDAD AL VOLTEO.

C.S.V = Me = Me = 3.22 > 2 ... CORRECTO


Mv Ea.Y

PRESIONES EN EL SUELO.

0.01 Fv 0. 06 Fv.(e)
Max . + = 0.49 Kg/Cm2 < 1.00
B
B 2
... CORRECTO

0. 01 Fv 0. 06 Fv.(e)
Min . 2
= 0.15 Kg/Cm2 > 0.00
B
B ... CORRECTO

donde:
B MeMv
e=
2 Fv
=
( ) 0.095 m.

e B = 0.180 >e CORRECTO

Max.= 6

2.- ESTABILIDAD AL DESLIZAMIENTO.

C . S . D=
E = F ( f )=
f V
2.05 > 1,50 . . .CORRECTO

E E
a
a

3.- VERIFICACION DE ESFUERZOS EN LA PUNTA DE LA BASE.


t = 0.50 D = 0.11 m.
B = 1.08 D1 = 0.11 m.
d = 0.43 r = 0.07 m.

F VU =
3.1 ) 4847.600

M eU =
-) 3136.784

ahora;
maxu 0.487 < 1.00 CORRECTO

0.151 > 0 CORRECTO

Luego:
s minu =
X = 0.30 m.
Y = 0.03 m.

s1u= 0.45 Kg/cm2


s2u= 0.19 Kg/cm2

Finalmente:
Vu = 0.517 Tn.
Vadm = 12.470 Tn. . . . CORRECTO

3.2 ) Mu = 2876.420 Kg.*cm

ft = 0.07 Kg/cm2
ft adm. = 5.00 Kg/cm2 ft adm > ft ...
CORRECTO

4.- VERIFICACION DE ESFUERZOS EN EL TALON DE LA BASE.


D1 = 0.11 m. d = 0.43 m.
t = 0.50 m. S/c = 200.00 Kg.
H = 1.80 m.

pp 132.00 Kg/m.
relleno 2340.00 Kg/m.
2472.00 Kg/m.

Wt = 2672.000 Kg/m2 = Kg/cm2

-) Vu = 108.877 Kg. < Vadm = 12470.000 Kg . . . CORRECTO

-) M= 633.3036945905 Kg-cm

Luego:
ft= 0.02 < fadm=5 Kg/cm2 . . . CORRECTO

4.- VERIFICACION DE ESFUERZOS EN EL ARRANQUE DE LA PANTALLA.


b= 0.86 m
d= 0.81 m

-) V = Ea = 1092.000 Kg. < 23490.000 Kg . . . CORRECTO

-) M= 145.2 Kg*m = 14520 Kg*cm

Wp= 1809.60 Kg

fcomp.= 0.33 Kg/cm2

ftracc= 0.09 Kg/cm2

finalmente:

fcom.adm.= 45 Kg/cm2 >> 0.33 Kg/cm2 ... OK


ftracc.adm= 5 Kg/cm2 >> 0.09 Kg/cm2 ... OK
ESTRIBOS DE CONCRETO SIMPLE

PROYECTO : PAVIMENTACION CUADRA 01 JR. CAJAMAR


0 CA Y CUADRA 10 JR. JOSE GALVEZ
OFICINA ZONAL : CAJAMARCA
PROYECTISTA : ING LORD P. AZAEDO ALCANTARA

DATOS PARA EL DISEO

Angulo de friccin interna = 30


Peso especifico del suelo = 1800 Kg/m3
Coeficiente de friccin = 0.65
Resistencia del terreno = 1 Kg/cm2
Resistencia del concreto (fc) = 100 Kg/cm2
Sobrecarga S/C = 200 Kg/m2
Carga debido a la superestructura (P) = 9360.00 Kg.

Dimensiones
a = 0.30 m.
c = 0.00 m.
d = 0.00 m.
h1 = 0.70 m.
h2 = 0.60 m.
H = 1.80 m.
t = 0.50 m.
Coeficiente (0.5-0.7) = 0.60 m.
B = 1.08 m.
D = 0.11 m.
D1 = 0.11 m.
b = 0.86 m.

ANALISIS DE LA ESTABILIDAD CON SUPERESTRUCTURA Y RELLENO.-

FUERZA VERTICAL Xb (M) Mb(Kg*m)


W1 = 936.00 0.820 767.52
W2 = 873.60 0.483 422.24
W4 = 1296.00 0.540 699.84
T1 = 257.40 1.025 263.84
S/C = 82.00 0.875 71.75
P = 9360.00 0.82 7675.20
Fv = 12805.00 Kg. Me = 9900.39 Kg*m

Fuerzas Horixontales.
Ea =C.W.h ( h + 2.h) /2
donde:

1SEN (f
C= (1-SEN ) = 0.333 h = S/C = 0.111
C= W
1+SEN ( f )
1SEN (f )
C=
Luego:
1+SEN ( f )
Ea = 1092.000 Kg.

Y= h (h+3 h) = 0.633
3 (h+2 h)

1.- ESTABILIDAD AL VOLTEO.

C.S.V = Me = Me = 14.32 > 2 ... CORRECTO


Mv Ea.Y

PRESIONES EN EL SUELO.

0.01 Fv 0.06 Fv.(e)


Max . + 2
= 0.01 Kg/Cm2 < 1.00
B
B ... CORRECTO

0. 01 Fv 0. 06 Fv .(e)
Min . 2
= 2.37 Kg/Cm2 > 0.00
B
B ... CORRECTO

donde:
B MeMv
e=
2 Fv
=
( ) -0.179 m.

e B = 0.180 >e CORRECTO

Max. = 6
2.- ESTABILIDAD AL DESLIZAMIENTO.

C . S . D=
E = F ( f )=
f V
7.62 > 1,50 . . .CORRECTO

E E
a
a

3.- VERIFICACION DE ESFUERZOS EN LA PUNTA DE LA BASE.


t = 0.50 D = 0.11 m.
B = 1.08 D1 = 0.11 m.
d = 0.45 r = 0.05 m.

F VU =
3.1 ) 17951.600

M eU =
-) 13882.064
ahora;
maxu 0.005 < 1.00 CORRECTO

2.366 > 0 CORRECTO

Luego:
s minu =
X = -2.12 m.
Y = -0.24 m.

s1u= 0.25 Kg/cm2


s2u= 2.13 Kg/cm2

Finalmente:
Vu = 0.138 Tn.
Vadm = 13.050 Tn. . . . CORRECTO

3.2 ) Mu = 517.279 Kg.*cm

ft = 0.01 Kg/cm2

ft adm. = 5.00 Kg/cm2 ft adm > ft . . .


CORRECTO

4.- VERIFICACION DE ESFUERZOS EN EL TALON DE LA BASE.


D1 = 0.11 m. d = 0.45 m.
t = 0.50 m. S/c = 200.00 Kg.
H = 1.80 m.

pp 132.00 Kg/m.
relleno 2340.00 Kg/m.
2472.00 Kg/m.

Wt = 2672.000 Kg/m2 = Kg/cm2

-) Vu = -2176.376 Kg. < Vadm = 13050.000 Kg . . . CORRECTO

-) M= -12212.503347019 Kg-cm

Luego:
ft= -0.29 < fadm=5 Kg/cm2 . . . CORRECTO

4.- VERIFICACION DE ESFUERZOS EN EL ARRANQUE DE LA PANTALLA.


b= 0.86 m
d= 0.81 m

-) V = Ea = 1092.000 Kg. < 23490.000 Kg . . . CORRECTO

-) M= 145.2 Kg*m = 14520 Kg*cm

Wp= 1809.60 Kg

fcomp.= 0.33 Kg/cm2

ftracc= 0.09 Kg/cm2

finalmente:

fcom.adm.= 45 Kg/cm2 >> 0.33 Kg/cm2 ... OK


ftracc.adm= 5 Kg/cm2 >> 0.09 Kg/cm2 ... OK