LOCATION:
2) CONCRETE
Column Footing Dimension: 1.80 x 1.20
(F-1) Thickness: 0.250 m
Total Volume: 1.80 x 1.20 x 0.250
= 0.54 cu.m.
3) Masonry
CHB 4 Area: 6.26 + 5.46 + 6.20 + 6.20 + 2.87
= 26.99 m2
Deduction: 1.2 + 0.30 + 1.47 + 1.47 = 4.44
Total Area: 26.99 4.44 = 22.55 sq.m.
4) Reinforcement
Footing (F-1) No. of bars:
a)8 20mm
b)12 20mm
a) Length:
(2x0.345)+(2x0.30)+1.2
= 2.49 m
Total Length
= 2.49 x 12 = 29.88 m
b) Length:
(2x0.345)+(2x0.30)+1.8
= 3.09 m
Total Length
= 3.09 x 8 = 24.72 m
a) Length:
2(0.345) + 2(0.30) + 1.80 = 3.09 m
Total Length: 3.09 x 12 = 37.08m
b) Length:
2(0.345) + 2(0.30) + 1.80 = 3.09 m
Total Length: 3.09 x 12 = 37.08m