Академический Документы
Профессиональный Документы
Культура Документы
Load
no. Room/Area Location Item Quantity (kW)
Suction pump- Block A 1 11
1 Cold Water Suction room Ground level Suction pump- Block B 1 12
Suction pump- Block C 1 11
Block A -level 15 Transfer pump -Block A 1 13
2 Cold Water Break tank Block B - level 15 Transfer pump -Block B 1 13
Block C - level 15 Transfer pump -Block C 1 12
3 Cold Water Roof tank Block A, B, C -roof Booster pump 3 2
4 Hose Reel tank Ground level HR pump 2 4
5 Hose Reel Break tank Block A, B, C -level 15 HR pump 3 4
6 Wet Riser tank Ground level WR pump 1 74
7 Wet Riser Break tank Block A, B, C -level 15 WR pump 3 76
8 Lift Motor room Block A, B, C -roof Lift panel 3 92
Total
Electrical Load
Normal
Block A Block B
no. Room/Area Location Item TNB1 TNB 2
1 Cold Water Suction room Ground level Suction pump 11 12
2 Cold Water Break tank Block A, B, C -level 15 Transfer pump 13 13
3 Cold Water Roof tank Block A, B, C -roof Booster pump 2 2
4 Hose Reel tank Ground level HR pump 8
5 Hose Reel Break tank Block A, B, C -level 15 HR pump 4 4
6 Wet Riser tank Ground level WR pump 74
7 Wet Riser Break tank Block A, B, C -level 15 WR pump 76 76
8 Lift Motor room Block A, B, C -roof Lift panel 92 92
Total (W) 280 199
Essential
no. Room/Area Location Item Genset 1 Genset 2
Suction pump- Block B & C 23
1 Cold Water Suction room Ground level
Cold Water Break tank Suction pump- Block A 11
Transfer pump - Block B & C 25
2 Block A,B,C -level 15
Transfer pump - Block A 13
Booster pump - Block B & C 4
3 Block A,B,C -Roof
Booster pump - Block A 2
4 Hose Reel tank Ground level HR pump 8
HR pump - Block B & C 8
Block A,B,C -level 15
5 Hose Reel Break tank HR pump - Block A 4
6 Wet Riser tank Ground level WR pump 74
WR pump - Block B & C 152
7 Wet Riser Break tank Block A, B, C -level 15 WR pump - Block A 76
Lift panel - Block B & C 46
8 Lift Motor room Block A, B, C -roof Lift panel - Block A 23
Total (W) 258 211
Total Normal/ Essensial
Load Load Remark
Ess.
(kW) (kW)
11 Essential 11
12 Essential 12
11 Essential 11
13 Essential 13
13 Essential 13
12 Essential 12
6 Essential 6
8 Essential 8
12 Essential 12
74 Essential 74
228 Essential 228
276 Essential 69 Bomba lift only
676 469
Block C
TNB 3
11
12
2
76
92
197
Electrical Load
Type A, B, C, D
WATER DOOR
LIGHTING SSO 13 A FAN A/C TEL.
ROOM /AREA HEATER BELL FWS
POINT POINT POINT POINT
POINT POINT
LIVING / DINING 2 4 1 1 1
KITCHEN 1 2
BALCONY / LANAI 0
FOYER 1 1
ENTRANCE 1
YARD 1 1
MASTER BEDROOM 2 2 1 1
BEDROOM 2 1 1 1
BEDROOM 3 1 1 1
MASTER BATHROOM 1 1
BATHROOM 2 1 1
TOTAL 12 11 4 2 2 1 0 1
W/POINT 40 250 100 1000 1000 15
TCL (W) 480 2750 400 2000 2000 15 7645
DF 0.6 0.6 0.6 0.4 0.3 0.2
MD (W) 288 1650 240 800 600 3 3581
Dewan Serbaguna
LIGHTING SSO 13 A FAN A/C TEL. TV POINT DBTPN
(60A)
ROOM /AREA FWS
POINT POINT POINT POINT
TOTAL 45 30 25 10 1 1 1 1
W/POINT 60 250 60 746
TCL (W) 2700 7500 1500 7460
DF 0.7 0.7 0.6 0.5
MD (W) 1890 5250 900 3730 11770
Kedai Serbaneka
LIGHTING SSO 13 A FAN A/C TEL. DB (60A)
ROOM /AREA FWS
POINT POINT POINT POINT SPN
TOTAL 7 7 3 1 1 1 1
W/POINT 60 250 60 746
TCL (W) 420 1750 180 746
DF 0.7 0.7 0.6 0.5
MD (W) 294 1225 108 373 2000
Bilik Bacaan
LIGHTING SSO 13 A FAN A/C TEL. DB (60A)
ROOM /AREA FWS
POINT POINT POINT POINT SPN
TOTAL 2 2 2 1 1 1 1
W/POINT 60 250 60 746
TCL (W) 120 500 120 746
DF 0.7 0.7 0.6 0.5
MD (W) 84 350 72 373 879
Ruang Solat
LIGHTING SSO 13 A FAN DB (60A)
ROOM /AREA POINT POINT SPN
TOTAL 2 2 1 1
W/POINT 60 250 60
TCL (W) 120 500 60
DF 0.7 0.7 0.6
MD (W) 84 350 36 470
Pejabat Pengurusan
LIGHTING SSO 13 A FAN A/C TEL. TV POINT DBSPN
(60A)
ROOM /AREA FWS
POINT POINT POINT POINT
TOTAL 5 6 3 1 1 1 1 1
W/POINT 60 250 60 746
TCL (W) 300 1500 180 746
DF 0.7 0.7 0.6 0.5
MD (W) 210 1050 108 373 1741
Multistorey carpark
LIGHTING SSO 13 A DB (60A)
ROOM /AREA POINT TPN
TOTAL 160 16 1
W/POINT 60 250
TCL (W) 9600 4000
DF 0.7 0.7
MD (W) 6720 2800 9520
Taska/ Tadika
LIGHTING SSO 13 A FAN A/C TEL. DB (60A)
ROOM /AREA FWS
POINT POINT POINT POINT SPN
TOTAL 12 8 7 1 1 1 1
W/POINT 60 250 60 746
TCL (W) 720 2000 420 746
DF 0.7 0.7 0.6 0.5
MD (W) 504 1400 252 373 2529
Bilik Surat
LIGHTING SSO 13 A DB (60A)
ROOM /AREA POINT TPN
TOTAL 2 2 1
W/POINT 60 250
TCL (W) 120 500
DF 0.7 0.7
MD (W) 84 350 434
TV POINT
Requirement by TNB
50% - Consumer, 50% -Spare
1 transformer = 1000kVA
50% = 500kVA
Requirement by TNB
50% - Consumer, 50% -Spare
1 transformer = 1000kVA
50% = 500kVA
2927.31 kW 4.051645
3443.897882 kVA
308 5 1540 kW
2520.541 kVA
154 5 770 kW
1260.27 kVA
TNB 3 (Double Chamber)
Blok Type Unit MD(kW) Total
A Type A 334 3.581 1196.05
Total 1196.05
Requirement by TNB
50% - Consumer, 50% -Spare
1 transformer = 1000kVA
50% = 500kVA
Requirement by TNB
50% - Consumer, 50% -Spare
1 transformer = 1000kVA
50% = 500kVA
kVA
308.00 \ 0.85 = 362.353
Genset Block A
Genset Type Unit MD(kW) Total
Mechanical Load 211.00 211.00
Electrical 30.00 30.00
Total 241.00
kVA