Академический Документы
Профессиональный Документы
Культура Документы
1 2
E Gorong-Gorong Gg Al-hidayah 1
Panjang=2 50
F Gorong-Gorong Gg Al-hidayah 1
Panjang=2 50
G Gorong-Gorong Gg Al-hidayah 2
Panjang=2 50
I Drainase Gg Alidayah 1
Panjang = 11 Lebar 0,5 Tinggi=0,5
L Drainase Gg Al-hidayah 1
Panjang 10 lebar 0,6 Tinggi 0,1
N Drainase Gg Alidayah 2
p=50 Lebar 0,4
O Penutup Drainase JL Masjid Al-hidayah
Panjang 28 lebar 0,6
Err:509 Err:509
Err:509
Err:509 Err:509
Err:509
JUMLAH
PPN 10%
JUMLAH TOTAL
JUMLAH DIBULATKAN
TERBILANG : Err:509
REKAPITULASI
JUMLAH HARGA
Rp 95,313,540.63
Rp 17,471,430.80
Rp 90,064,729.19
Rp 107,375,256.05
Rp 1,425,270.14
Rp 1,425,270.14
Rp 1,425,270.14
Rp 15,388,315.23
Rp 9,538,102.39
Rp 6,027,707.66
Rp 9,399,004.56
Rp 15,585,226.97
Rp 4,308,090.49
Rp 35,394,414.20
Rp 7,492,324.00
Rp 10,500,000.00
Rp 57,500,000.00
Rp 57,500,000.00
Rp 57,500,000.00
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
RENCANA ANGGARAN BIAYA
PROGRAM : KOTAKU (Kota Tanpa Kumuh)
PEKERJAAN : DED PENINGATAN KAWASAN KUMUH KELURAHAN DURI BARAT
LOKASI : KELURAHAN DURI BARAT
TAHUN : 2017
BIAYA : Err:509
I Pekerjaan Pendahuluan
1 Pek. Pasang Papan Nama proyek 1.000 Ls
2 Pek. Pengukuran Dan Pas. Patok 74.000 m
To
II Pekerjaan Utama
1 Pek Batu Andesit 222 m
2 Pek. Pengecatan 138 m
To
III Pekerjaan Akhir
1 Pekerjaan Pembersihan Akhir 1.000 Ls
Tot
SUB TOTAL PEKERJAAN A
I Pekerjaan Pendahuluan
1 Pek. Pengukuran Dan Pas. Patok 34.000 m
To
II Pekerjaan Utama
1 Pek Batu Andesit 13.515 m
2 Pek Koral Sikat 40.885 m
To
III Pekerjaan Akhir
1 Pekerjaan Pembersihan Akhir 1.000 Ls
Tot
SUB TOTAL PEKERJAAN B
I Pekerjaan Pendahuluan
1 Pek. Pengukuran Dan Pas. Patok 145.000 m
To
II Pekerjaan Utama
1 Pek Batu Andesit 58.290 m
2 Pek Koral Sikat 231.710 m
3 Pek. Pengecatan 322.500 m
To
III Pekerjaan Akhir
1 Pekerjaan Pembersihan Akhir 1.000 Ls
Tot
SUB TOTAL PEKERJAAN C
I Pekerjaan Pendahuluan
1 Pek. Pengukuran Dan Pas. Patok 172.000 m
To
II Pekerjaan Utama
1 Pek Batu Andesit 73.530 m
2 Pek Koral Sikat 270.470 m
3 Pek. Pengecatan 430.000 m
To
III Pekerjaan Akhir
1 Pekerjaan Pembersihan Akhir 1.000 Ls
Tot
SUB TOTAL PEKERJAAN D
Gorong-Gorong Gg Al-hidayah 1
E
Panjang=2 50
I Pekerjaan Pendahuluan
1 Pek. Bongkar Beton Bertulang 0.270 m
To
II Pekerjaan Utama
Pek. Galian Tanah 1.926 m
Pek. Urugan Pasir 0.180 m
Pek. Gorong-gorong 50 cm 2.000 m
Pek. Cor Beton Lantai Kerja K100 0.216 m
Pek. Timbunan tanah 1.534 m
To
SUB TOTAL PEKERJAAN E
Gorong-Gorong Gg Al-hidayah 1
F
Panjang=2 50
No. URAIAN PEKERJAAN VOL SAT
I Pekerjaan Pendahuluan
1 Pek. Bongkar Beton Bertulang 0.270 m
To
II Pekerjaan Utama
Pek. Galian Tanah 1.926 m
Pek. Urugan Pasir 0.180 m
Pek. Gorong-gorong 50 cm 2.000 m
Pek. Cor Beton Lantai Kerja K100 0.216 m
Pek. Timbunan tanah 1.534 m
To
SUB TOTAL PEKERJAAN F
Gorong-Gorong Gg Al-hidayah 2
G
Panjang=2 50
I Pekerjaan Pendahuluan
1 Pek. Bongkar Beton Bertulang 0.270 m
To
II Pekerjaan Utama
Pek. Galian Tanah 1.926 m
Pek. Urugan Pasir 0.180 m
Pek. Gorong-gorong 50 cm 2.000 m
Pek. Cor Beton Lantai Kerja K100 0.216 m
Pek. Timbunan tanah 1.534 m
To
SUB TOTAL PEKERJAAN G
H Rehap&Penutup Drainase Gg Al-hidayah 1
Panjang 50 lebar 0,4 Tinggi 0,5
Panjang 50 lebar 0,70 Tinggi 0,10
I Pekerjaan Pendahuluan
Pek. Pengukuran Dan Pas. Bowplank 50.00 m
To
II Pekerjaan Utama
a Pekerjaan Drainase
1 Pekerjaan Plester Drainase 1.60 m
2 Pekerjaan Aci Drainase 1.60 m
Tot
SUB TOTAL PEKERJAAN H
I Drainase Gg Alidayah 1
Panjang = 11 Lebar 0,5 Tinggi=0,5
I Pekerjaan Pendahuluan
Pek. Pengukuran Dan Pas. Bowplank 11.00 m
To
II Pekerjaan Utama
a Pekerjaan Drainase
1 Pek. Galian Tanah 7.43 m
No. URAIAN PEKERJAAN VOL SAT
Tot
SUB TOTAL PEKERJAAN I
J Pekerjaan Penutup Drainase Gg Al-hidayah 1
Panjang 34 lebar 0,45 Tinggi 0,1
I Pekerjaan Pendahuluan
1 Pek. Pengukuran Dan Pas. Patok 34.000 m
To
II Pekerjaan Utama
a Pekerjaan Penutup Drainase
1 Pek. Bekisting Penutup Drainase 22.10 m
2 Pek. Pembesian Wiremesh M6 46.89 kg
3 Pek. Cor Penutup Drainase 1.53 m
To
III Pekerjaan Akhir
1 Pekerjaan Pembersihan Akhir 1.000 Ls
Tot
SUB TOTAL PEKERJAAN J
K Rehap & Penutup Drainase Gg Al-hidayah 1
Panjang 30 lebar 0,4 Tinggi 0,5
Panjang 30 lebar 0,70 Tinggi 0,10
I Pekerjaan Pendahuluan
Pek. Pengukuran Dan Pas. Bowplank 30.00 m
To
II Pekerjaan Utama
a Pekerjaan Drainase
1 Pekerjaan Plester Drainase 1.60 m
2 Pekerjaan Aci Drainase 1.60 m
b Pekerjaan Penutup Drainase
1 Pek. Bekisting Penutup Drainase 27.00 m
2 Pek. Pembesian Wiremesh M6 64.36 kg
3 Pek. Cor Penutup Drainase 2.10 m
To
III Pekerjaan Akhir
1 Pekerjaan Pembersihan Akhir 1.000 Ls
Tot
SUB TOTAL PEKERJAAN K
L Drainase Gg Al-hidayah 1
Panjang 10 lebar 0,6 Tinggi 0,1
A Pekerjaan Pendahuluan
1 Pek. Pengukuran Dan Pas. Bowplank 10.00 m
2 Pek. Bongkar drainase 4.13 m
No. URAIAN PEKERJAAN VOL SAT
To
B Pekerjaan Utama
a Pekerjaan Drainase
1 Pek. Galian Tanah 12.50 m
2 Pek. Urugan Pasir 0.50 m
3 Pek. Lantai Kerja 1.00 m
4 Pek. Timbunan tanah kembali 3.75 m
5 Pek. Bekisting 30.00 m
6 Pek. Pembesian 85.82 kg
7 Pek. Cor Beton K-175 2.80 m
Tot
SUB TOTAL PEKERJAAN L
M Rehap & Penutup Drainase GgAl-hidayah 1
Panjang 13 lebar 0,4 Tinggi 0,5
Panjang 13 lebar 0,7 Tinggi 0,10
I Pekerjaan Pendahuluan
Pek. Pengukuran Dan Pas. Bowplank 13.00 m
To
II Pekerjaan Utama
a Pekerjaan Drainase
1 Pekerjaan Plester Drainase 1.60 m
2 Pekerjaan Aci Drainase 1.60 m
b Pekerjaan Penutup Drainase
1 Pek. Bekisting Penutup Drainase 11.70 m
2 Pek. Pembesian Wiremesh M6 27.89 kg
3 Pek. Cor Penutup Drainase 0.91 m
To
III Pekerjaan Akhir
1 Pekerjaan Pembersihan Akhir 1.000 Ls
Tot
SUB TOTAL PEKERJAAN M
N Drainase Gg Alidayah 2
p=50 Lebar 0,4
I Pekerjaan Pendahuluan
1 Pek. Pengukuran Dan Pas. Patok 50.000 m
To
II Pekerjaan Drainase
a Pekerjaan Drainase
1 Pek. Galian Tanah 26.000 m
2 Pek. Urugan Pasir 2.000 m
3 Pek. Lantai Kerja 4.000 m
4 Pek. Timbunan tanah kembali 7.800 m
5 Pek. Bekisting 110.000 m
6 Pek. Pembesian waremsh M6 214.542 kg
7 Pek. Cor Beton K-175 7.000 m
No. URAIAN PEKERJAAN VOL SAT
To
III Pekerjaan Akhir
1 Pekerjaan Pembersihan Akhir 1.000 Ls
Tot
SUB TOTAL PEKERJAAN N
I Pekerjaan Pendahuluan
1 Pek. Pengukuran Dan Pas. Patok 28.000 m
To
II Pekerjaan Drainase
a Pekerjaan Penutup Drainase
1 Pek. Bekisting Penutup Drainase 22.400 m
2 Pek. Pembesian Wiremesh M6 51.490 m
3 Pek. Cor Penutup Drainase 1.680 m
To
III Pekerjaan Akhir
1 Pekerjaan Pembersihan Akhir 1.000 Ls
Tot
SUB TOTAL PEKERJAAN O
* Besi 8 Polos 0 -
* Pekerjaan Cor Camp 1Pc : 2Ps : 4Krl 0 -
Sub Jumlah IV
V Pekerjaan Lantai
1 Pekerjaan Cor Lantai Camp 1Pc : 2Ps : 4Krl Tbl. 0,10 M 0 0.286
Sub Jumlah V
VI Pekerjaan Pemipaan
1 Pekerjaan Pas. Pipa 1/2 " 0 65.000
2 Pekerjaan Pas. Pipa 2" 0 80.000
ANGGARAN BIAYA
Rp 350,000.00 Rp 350,000.00
Rp 10,956.00 Rp 810,744.00
Total Jumlah I Rp 1,160,744.00
409,530.000 90,915,660.000
Rp 21,992.30 Rp 3,037,136.63
Total Jumlah II Rp 93,952,796.63
Rp 200,000.00 Rp 200,000.00
Rp 10,956.00 Rp 372,504.00
Total Jumlah I Rp 372,504.00
Rp 409,530.00 Rp 5,534,797.95
Rp 277,953.50 Rp 11,364,128.85
Total Jumlah II Rp 16,898,926.80
Rp 200,000.00 Rp 200,000.00
Rp 10,956.00 Rp 1,588,620.00
Rp 409,530.00 Rp 23,871,503.70
Rp 277,953.50 Rp 64,404,605.49
Rp 21,992.30
Total Jumlah II Rp 88,276,109.19
Rp 200,000.00 Rp 200,000.00
Rp 10,956.00 Rp 1,884,432.00
Rp 409,530.00 Rp 30,112,740.90
Rp 277,953.50 Rp 75,178,083.15
Rp 21,992.30
Total Jumlah II Rp 105,290,824.05
Rp 200,000.00 Rp 200,000.00
Rp 667,320.50 Rp 180,176.54
Total Jumlah I Rp 180,176.54
60,622.10 Rp 116,758.16
201,520.00 Rp 36,273.60
408,210.00 Rp 816,420.00
1,041,913.02 Rp 225,053.21
32,989.00 Rp 50,588.63
Total Jumlah I Rp 1,245,093.61
Rp 1,425,270.14
HARGA SATUAN JUMLAH HARGA
Rp 667,320.50 Rp 180,176.54
Total Jumlah I Rp 180,176.54
60,622.10 Rp 116,758.16
201,520.00 Rp 36,273.60
408,210.00 Rp 816,420.00
1,041,913.02 Rp 225,053.21
32,989.00 Rp 50,588.63
Total Jumlah I Rp 1,245,093.61
Rp 1,425,270.14
Rp 667,320.50 Rp 180,176.54
Total Jumlah I Rp 180,176.54
60,622.10 Rp 116,758.16
201,520.00 Rp 36,273.60
408,210.00 Rp 816,420.00
1,041,913.02 Rp 225,053.21
32,989.00 Rp 50,588.63
Total Jumlah I Rp 1,245,093.61
Rp 1,425,270.14
10,956.00 Rp 547,800.00
Total Jumlah I Rp 547,800.00
62,404.10 Rp 99,846.56
71,995.00 Rp 115,192.00
76,659.00 Rp 3,449,655.00
64,317.65 Rp 6,899,419.05
1,164,686.46 Rp 4,076,402.61
Total Jumlah II Rp 14,640,515.23
Rp 200,000.00 Rp 200,000.00
10,956.00 Rp 120,516.00
Total Jumlah I Rp 120,516.00
60,622.10 Rp 450,119.09
HARGA SATUAN JUMLAH HARGA
201,520.00 Rp 99,752.40
1,041,913.02 Rp 1,031,493.89
32,989.00 Rp 73,483.00
57,189.00 Rp 1,698,513.30
64,317.65 Rp 3,686,261.04
1,164,686.46 Rp 2,177,963.68
Total Jumlah II Rp 9,217,586.39
Rp 200,000.00 Rp 200,000.00
Rp 10,956.00 Rp 372,504.00
Total Jumlah I Rp 372,504.00
Rp -
76,659.00 Rp 1,694,163.90
64,317.65 Rp 3,016,031.76
1,164,686.46
Total Jumlah II Rp 5,455,203.66
Rp 200,000.00 Rp 200,000.00
Rp 10,956.00 Rp 328,680.00
Total Jumlah I Rp 328,680.00
62,404.10 Rp 99,846.56
71,995.00 Rp 115,192.00
76,659.00 Rp 2,069,793.00
64,317.65 Rp 4,139,651.43
1,164,686.46 Rp 2,445,841.57
Total Jumlah II Rp 8,870,324.56
Rp 200,000.00 Rp 200,000.00
10956.000 Rp 109,560.00
627720.500 Rp 2,589,347.06
HARGA SATUAN JUMLAH HARGA
60622.100 Rp 757,776.25
201520.000 Rp 100,760.00
1041913.016 Rp 1,041,913.02
32989.000 Rp 123,708.75
57189.000 Rp 1,715,670.00
64317.654 Rp 5,519,535.24
1164686.460 Rp 3,261,122.09
57189.000 Rp 118,953.12
10,592.00 Rp 6,965.30
10,956.29 Rp 11,963.67
1164686.460 Rp 27,952.48
Total Jumlah II Rp 12,686,319.91
Rp 200,000.00 Rp 200,000.00
Rp 10,956.00 Rp 142,428.00
Total Jumlah I Rp 142,428.00
62,404.10 Rp 99,846.56
71,995.00 Rp 115,192.00
76,659.00 Rp 896,910.30
64,317.65 Rp 1,793,848.95
1,164,686.46 Rp 1,059,864.68
Total Jumlah II Rp 3,965,662.49
Rp 200,000.00 Rp 200,000.00
Rp 10,956.00 Rp 547,800.00
Total Jumlah I Rp 547,800.00
Rp 60,622.10 Rp 1,576,174.60
Rp 201,520.00 Rp 403,040.00
Rp 1,041,913.02 Rp 4,167,652.06
Rp 32,989.00 Rp 257,314.20
Rp 57,189.00 Rp 6,290,790.00
Rp 64,317.65 Rp 13,798,838.11
Rp 1,164,686.46 Rp 8,152,805.22
HARGA SATUAN JUMLAH HARGA
Rp 200,000.00 Rp 200,000.00
Rp 10,956.00 Rp 306,768.00
Total Jumlah I Rp 306,768.00
Rp 76,659.00 Rp 1,717,161.60
Rp 64,317.65 Rp 3,311,721.15
Rp 1,164,686.46 Rp 1,956,673.25
Total Jumlah II Rp 6,985,556.00
Rp 200,000.00 Rp 200,000.00
1,500,000.000 10,500,000.000
Rp 10,500,000.00
Ls Rp 150,000.00 ###
Ls Rp 350,000.00 ###
Sub Jumlah I ###
M3 Rp - Rp -
Btg Rp 60,000.00 ###
M3 Rp - Rp -
M3 Rp - Rp -
M3 Rp - Rp -
ub Jumlah II ###
M2 Rp - Rp -
Kg Rp - Rp -
M3 Rp - Rp -
M2 Rp - Rp -
Kg Rp - #VALUE!
Kg Rp - Rp -
M3 Rp - Rp -
ub Jumlah III #VALUE!
M2 Rp - Rp -
Kg Rp - Rp -
HARGA SATUAN JUMLAH HARGA
Kg Rp - Rp -
M3 Rp - Rp -
ub Jumlah IV Rp -
M3 Rp - Rp -
Sub Jumlah V Rp -
m' Rp - Rp -
m' Rp - Rp -
HARGA SATUAN BAHAN, UPAH DAN SEWA ALAT
WILAYAH KOTA PEKANBARU
TAHUN ANGGARAN 2016
1 2 3
1 Tukang Orang/Hari
2 Pekerja Orang/Hari
3 Pasir Urug M3
4 Pasir Cor (Agregat Halus) M3
5 Batu Kerikil M3
6 Koral Sikat Kilogram
7 Paku Biasa / Campur Kilogram
8 Semen PC (50 KG) Kilogram
9 Minyak Bekisting Liter
10 Papan Bekisting M3
SATUAN BAHAN, UPAH DAN SEWA ALAT
WILAYAH KOTA PEKANBARU
TAHUN ANGGARAN 2016
LOKASI
LEMBAH SARI
4
Rp 100,000.00
Rp 80,000.00
Rp 120,000.00
Rp 150,000.00
Rp 190,000.00
Rp 4,500.00
Rp 20,000.00
Rp 1,275.00
Rp 9,500.00
Rp 2,000,000.00
###
DAFTAR ANALISA HARGA SATUAN (SNI)
PROGRAM : KOTAKU (Kota Tanpa Kumuh)
KEGIATAN : Err:509
PEKERJAAN : DED PENINGATAN KAWASAN KUMUH KELURAHAN DURI BARAT
LOKASI : KELURAHAN DURI BARAT
BIAYA : Err:509
I PEKERJAAN RANGKA BETON
I. 1 ANALISA 1 M3 PEMBUATAN COR BETON BERTULANG CAMP. 1 PC : 2 PS : 4 KR
URAIAN HARGA BAHAN JUMLAH
a. Bahan
280.0000 Kg Semen Rp 1,275.00 Rp 357,000.00
0.4500 M3 Pasir Cor Rp 150,000.00 Rp 67,500.00
0.9000 M 3
Kerikil Rp 190,000.00 Rp 171,000.00
b. Upah
1.6500 OH Pekerja
0.2500 OH Tukang
JUMLAH Rp 595,500.00
JUMLAH TOTAL
b. Upah
0.3500 OH Pekerja
0.6200 OH Tukang
JUMLAH Rp 80,551.13
JUMLAH TOTAL
b. Upah
0.3000 OH Pekerja
0.2600 OH Tukang
JUMLAH Rp 86,950.00
JUMLAH TOTAL
ANALISA HARGA SATUAN (SNI)
HARGA UPAH JUMLAH
Rp 80,000.00 Rp 132,000.00
Rp 100,000.00 Rp 25,000.00
Rp 157,000.00
Rp 752,500.00
Rp 80,000.00 Rp 28,000.00
Rp 100,000.00 Rp 62,000.00
Rp 90,000.00
Rp 170,551.13
Rp 80,000.00 Rp 24,000.00
Rp 100,000.00 Rp 26,000.00
Rp 50,000.00
Rp 136,950.00
ANALISA HARGA SATUAN PEKERJAAN PENDAHULUAN
PERKIRAAN
NO. KOMPONEN KODE SATUAN KUANTITAS
A. UPAH
B. BAHAN
C. PERALATAN
PERKIRAAN
NO. KOMPONEN KODE SATUAN KUANTITAS
A. UPAH
B. BAHAN
C. PERALATAN
PERKIRAAN
NO. KOMPONEN KODE SATUAN KUANTITAS
A. UPAH
B. BAHAN
C. PERALATAN
PERKIRAAN
NO. KOMPONEN KODE SATUAN KUANTITAS
A. UPAH
B. BAHAN
C. PERALATAN
PERKIRAAN
NO. KOMPONEN KODE SATUAN KUANTITAS
A. UPAH
1 Pekerja OH 0.2500
2 Tukang Besi OH 0.2500
3 Kepala Tukang OH 0.0200
4 Mandor OH 0.0100
B. BAHAN
1 Wiremesh M6 Kg 1.0200
2 Kawat ikat Kg 0.0500
C. PERALATAN
PERKIRAAN
NO. KOMPONEN KODE SATUAN KUANTITAS
A. UPAH
B. BAHAN
1 Wiremesh M8 Kg 105.0000
2 Kawat Ikat Kg 1.5000
C. PERALATAN
JUMLAH HARGA PERALATAN
PERKIRAAN
NO. KOMPONEN KODE SATUAN KUANTITAS
A. UPAH
B. BAHAN
C. PERALATAN
PERKIRAAN
NO. KOMPONEN KODE SATUAN KUANTITAS
A. UPAH
B. BAHAN
PERKIRAAN
NO. KOMPONEN KODE SATUAN KUANTITAS
A. UPAH
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
PERKIRAAN
NO. KOMPONEN KODE SATUAN KUANTITAS
A. UPAH
B. BAHAN
C. PERALATAN
PERKIRAAN
NO. KOMPONEN KODE SATUAN KUANTITAS
A. UPAH
B. BAHAN
C. PERALATAN
PERKIRAAN
NO. KOMPONEN KODE SATUAN KUANTITAS
A. UPAH
1 Pekerja OH 1.2000
2 Tukang Batu OH 0.2000
3 Kepala Tukang OH 0.0200
4 Mandor OH 0.0600
B. BAHAN
C. PERALATAN
PERKIRAAN
NO. KOMPONEN KODE SATUAN KUANTITAS
A. UPAH
1 Pekerja OH 0.2200
2 Tukang OH 0.0150
3 Kepala Tukang OH 0.2500
4 Mandor OH 0.2500
B. BAHAN
C. PERALATAN
PERKIRAAN
NO. KOMPONEN KODE SATUAN KUANTITAS
A. UPAH
1 Pekerja OH 0.6200
2 Tukang OH 0.3500
0.0350
0.0300
JUMLAH HARGA TENAGA
B. BAHAN
1 Semen Kg 0.2350
2 pasir cor m3 0.0350
3 koral sikat kg 16.6670
4 air L 0.5000
C. PERALATAN
Mengecat 1 m2 bidang tembok baru (1 lapis plamir dan cat dasar, 2 lapis cat penutup)
Memasang 1 m2 Acian
PERKIRAAN
NO. KOMPONEN KODE SATUAN KUANTITAS
A. UPAH
B. BAHAN
C. PERALATAN
LAH HARGA PERALATAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
85,000.00 8,500.00
120,000.00 6,000.00
14,500.00
1,450.00
1.00
15,950.00
AAN PENDAHULUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
85,000.00 8,500.00
120,000.00 600.00
1,800,000.00 360.00
500.00 500.00
9,960.00
996.00
1.00
10,956.00
PEKERJAAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
85,000.00 18,700.00
100,000.00 11,000.00
110,000.00 3,630.00
120,000.00 3,960.00
1,800,000.00 15,000.00
1,800,000.00 9,000.00
13,000.00 5,200.00
16,000.00 3,200.00
69,690.00
6,969.00
1.00
76,659.00
PEKERJAAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
85,000.00 140,250.00
100,000.00 27,500.00
110,000.00 3,080.00
120,000.00 9,960.00
1,200.00 445,200.00
200,000.00 99,714.29
300,000.00 232,666.67
500.00 107,500.00
300,000.00 60,000.00
200,000.00 24,000.00
1,149,870.95
114,987.10
1.00
1,264,858.05
PEKERJAAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
85,000.00 21,250.00
100,000.00 25,000.00
110,000.00 2,200.00
120,000.00 1,200.00
7,912.35 8,070.59
15,000.00 750.00
PEKERJAAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
85,000.00 59,500.00
100,000.00 70,000.00
110,000.00 7,700.00
120,000.00 8,400.00
6,392.82 671,245.80
15,000.00 22,500.00
839,345.80
83,934.58
100.00
9,232.80
PEKERJAAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
85,000.00 140,250.00
100,000.00 27,500.00
110,000.00 3,080.00
120,000.00 9,960.00
1,200.00 391,200.00
200,000.00 108,571.43
245,000.00 186,744.44
500.00 107,500.00
300,000.00 60,000.00
200,000.00 24,000.00
1,058,805.87
105,880.59
1.00
1,164,686.46
PEKERJAAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
85,000.00 47,855.00
120,000.00 6,756.00
55,111.00
5,511.10
1.00
60,622.10
PEKERJAAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
85,000.00 28,050.00
120,000.00 1,440.00
500.00 500.00
29,990.00
2,999.00
1.00
32,989.00
PEKERJAAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
85,000.00 42,500.00
100,000.00 25,000.00
110,000.00 2,750.00
120,000.00 6,000.00
1,800,000.00 20,340.00
13,000.00 3,250.00
16,000.00 3,200.00
120,000.00 25,200.00
JUMLAH HARGA BAHAN 51,990.00
51,990.00
5,199.00
1.00
57,189.00
PEKERJAAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
85,000.00 25,500.00
120,000.00 1,200.00
130,000.00 156,000.00
JUMLAH HARGA BAHAN 156,000.00
500.00 500.00
183,200.00
18,320.00
201,520.00
PEKERJAAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
85,000.00 102,000.00
100,000.00 20,000.00
110,000.00 2,200.00
120,000.00 7,200.00
1,200.00 276,000.00
200,000.00 127,571.43
300,000.00 228,222.22
500.00 100,000.00
300,000.00 60,000.00
200,000.00 24,000.00
947,193.65
94,719.37
1,041,913.02
ATUAN PEKERJAAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
85,000.00 18,700.00
100,000.00 1,500.00
110,000.00 27,500.00
120,000.00 30,000.00
270,000.00 270,000.00
1,200.00 15,000.00
150,000.00 8,400.00
371,100.00
37,110.00
1.00
408,210.00
ATUAN PEKERJAAN
0
0
0
0
HARGA JUMLAH
SATUAN HARGA NO.
(Rp.) (Rp.)
A.
85,000.00 52,700.00 1
100,000.00 35,000.00 2
110,000.00 3,850.00
120,000.00 3,600.00
LAH HARGA TENAGA 95,150.00
B.
1,200.00 282.00 1
200,000.00 7,000.00 2
9,000.00 150,003.00 3
500.00 250.00 4
C.
252,685.00 D.
25,268.50 E.
1.00 F.
277,953.50 G.
Note :
566,695.00
3,960.00
570,655.00 570,655.00
570,655.00
57,065.50
1.00
627,720.50
blum di salim
1,700.00
6,300.00
693.00
300.00
8,993.00 19,993.00
uan pekerjaan dibulatkan 19,993.00
19,993.00
1,999.30
1.00
21,992.30
566,695.00
39,960.00
606,655.00 606,655.00
uan pekerjaan dibulatkan 606,655.00
Rp 606,655
Rp 60,666
1.00
667,320.50
25,500.00
15,000.00
1,650.00
1,800.00
43,950.00 56,731.20
uan pekerjaan dibulatkan 56,731.00
Rp 56,731
Rp 5,673
1.00
62,404.10
25,500.00
15,000.00
1,650.00
1,800.00
43,950.00 65,450.00
uan pekerjaan dibulatkan 65,450.00
Rp 65,450
Rp 6,545
1.00
71,995.00
ATUAN PEKERJAAN
0
0
0
0
HARGA JUMLAH
SATUAN HARGA NO.
(Rp.) (Rp.)
A.
85,000.00 59,500.00 1
100,000.00 70,000.00 2
110,000.00 7,700.00 3
120,000.00 8,400.00 4
B.
7,569.61 794,809.41 1
15,000.00 22,500.00 2
C.
HARGA PERALATAN
962,909.41 D.
96,290.94 E.
100.00 F.
10,592.00 G.
Note :
ANALISA HARGA SATUAN PEKERJAAN
UPAH
BAHAN
PERALATAN
HARGA PERALATAN
: PEMBESIAN 6
: 14
: 100 Kg
0
UPAH
AH HARGA TENAGA
BAHAN
PERALATAN
HARGA PERALATAN
38,250.00
50,000.00
2,200.00
1,200.00
91,650.00
12,000.00
3,400.00
265,000.00
250.00
280,650.00
0.00
372,300.00
37,230.00
1.00
409,530.00
JUMLAH
HARGA
(Rp.)
59,500.00
70,000.00
7,700.00
8,400.00
145,600.00
827,926.47
22,500.00
850,426.47
996,026.47
99,602.65
100.00
10,956.29
No URAIAN
Volume
D Gorong-Gorong, Jl Alidayah 1
Panjang 2m = 0,5
1 PEKERJAAN PERSIAPAN
1 Pek. Bongkar Beton Bertulang 0.27 M3
2 PEKERJAAN UTAMA
1 Pek. Galian Tanah 1.926 M3
2 Pek. Urugan Pasir 0.18 M3
3 Pek. Gorong-gorong 80 cm 2 M'
4 Pek. Cor Beton Lantai Kerja 0.216 M3
5 Pek. Timbunan tanah 1.5335 M3
E Gorong-Gorong, Jl Alidayah 1
Panjang 2m = 0,5
1 Pek. Pengukuran Dan Pas. Patok
1 Pek. Bongkar Beton Bertulang 0.27 M3
2 PEKERJAAN UTAMA
1 Pek. Galian Tanah 1.926 M3
2 Pek. Urugan Pasir 0.18 M3
3 Pek. Gorong-gorong 80 cm 2 M'
4 Pek. Cor Beton Lantai Kerja 0.216 M3
5 Pek. Timbunan tanah 1.5335 M3
D Gorong-Gorong, Jl Alidayah 2
Panjang 2m = 0,5
1 PEKERJAAN UTAMA
1 Pek. Bongkar Beton Bertulang 0.27 M3
2 PEKERJAAN UTAMA
1 Pek. Galian Tanah 1.926 M3
2 Pek. Urugan Pasir 0.18 M3
3 Pek. Gorong-gorong 80 cm 2 M'
4 Pek. Cor Beton Lantai Kerja 0.216 M3
5 Pek. Timbunan tanah 1.5335 M3
KUANTITAS PANJANG LEBAR TINGGI TEBAL JUMLAH
2 0.9 1.07 0.5
2 0.9 1.07 0
2 0.9 0.1 0
0
2 0.9 0.12 0
2 0.9 1.07 1.926
2 0.19625 0.3925
2 0.9 1.07 0.5
2 0.9 1.07 0
2 0.9 0.1 0
0
2 0.9 0.12 0
2 0.9 1.07 1.926
2 0.19625 0.3925
2 0.9 1.07 0.5
2 0.9 1.07 0
2 0.9 0.1 0
0
2 0.9 0.12 0
2 0.9 1.07 1.926
2 0.19625 0.3925
No URAIAN
Volume
I Drainase Gg Alidayah 1
Panjang = 11 Lebar 0,5 Tinggi=0,5
A PEKERJAAN PERSIAPAN
1 Pek. Pengukuran Dan Pas. Bowplank 11.00 M1
A PEKERJAAN PERSIAPAN
1 Pek. Pengukuran Dan Pas. Bowplank 34.00 M1
L Drainase Gg Al-hidayah 1
Panjang 10 lebar 0,6 Tinggi 0,1
A PEKERJAAN PERSIAPAN
1 Pek. Pengukuran Dan Pas. Bowplank 10.00 M1
2 Pek. Bongkar drainase 4.13 M3
N Drainase Gg Alidayah 2
p=50 Lebar 0,4
A PEKERJAAN PERSIAPAN
1 Pek. Pengukuran Dan Pas. Bowplank 50.00 M1
A PEKERJAAN PERSIAPAN
1 Pek. Pengukuran Dan Pas. Bowplank 28.00 M1
50.00 - 1.70
5.4
2.1
11.00 - 1.70
34.00
34.00 0.45 0.10
P.Penutup 0.50 0.5 5.4
2.1
34.00 - 0.23
30.00 - 1.70
0.41
13.00 - 1.70
-
5.4
2.1
50.00 - 1.40
28.00 -
0.5 5.4
56.00 28.00 0.60 0.10 0.40 2.1
56.00 28.00 0.60 0.10
56.00 28.00 0.60 0.10 0.03 0.30
36 36 75.6
14 15 81
156.6 34.755804 brt
85 11.34 7.4955908 lmbr
260.51529 kg
36 36 75.6
14 15 81
156.6 34.755804 brt
11.34 0.03 lmbr
1.07 kg
100 107.27
36 36 75.6
14 15 81
156.6 34.755804 brt
18.7 11.34 1.64903 lmbr
57.313363 kg
36 36 75.6
14 15 81
156.6 34.755804 brt
36 36 75.6
14 15 81
156.6 34.755804 brt
11.34 0.02 lmbr
0.69 kg
68.00 46.89
36 36 75.6
14 15 81
156.6 34.755804 brt
51 11.34 4.4973545 lmbr
156.30917 kg
36 36 75.6
14 15 81
156.6 34.755804 brt
11.34 0.03 lmbr
1.07 kg
64.36
36 36 75.6
14 15 81
156.6 34.755804 brt
28 11.34 2.4691358 lmbr
85.8168 kg
brt
Bnyk balok
4.00 4
berat besi 10
0.8 12.8
btng 1.0666666667 0.6576
berat besi 16
5.3333333 6 bh
59.04 4.92 1.0919448
btng
36 36 75.6
14 15 81
156.6 34.755804 brt
22.1 11.34 1.9488536 lmbr
67.733974 kg
36 36 75.6
14 15 81
156.6 34.755804 brt
11.34 0.03 lmbr
1.07 kg
27.89
36 36 75.6
14 15 81
156.6 34.755804 brt
70 11.34 6.1728395 lmbr
214.542 kg
36 36 75.6
14 15 81
156.6 34.755804 brt
11.34 0.03 lmbr
0.92 kg
51.49
No URAIAN
Volume
A Jl Masjid Al-hidayah Pek Pemasangan Batu Andesit
Panjang 74 m Lebar 3 m
A PEKERJAAN PERSIAPAN
B PEKERJAAN UTAMA
Pek Batu Andesit 222.00 M2
2 Pek. Pengecatan 138.10 M2
B Gg Al-hidayah 1 Pek Pemasangan Koral Sikat&Andesit
Panjang 34 m Lebar 1,6 m
A PEKERJAAN PERSIAPAN
B PEKERJAAN UTAMA
1 Pek Batu Andesit 13.52 M2
2 Pek Koral Sikat 40.885 M2
c Gg Al-hidayah 1 Pek Pemasangan Koral Sikat&Andesit
Panjang 145 m Lebar 2 m
A PEKERJAAN PERSIAPAN
B PEKERJAAN UTAMA
1 Pek Batu Andesit 58.29 M2
2 Pek Koral Sikat 231.71 M2
3 Pek. Pengecatan 322.5 M2
D Gg Al-hidayah 2 Pek Pemasangan Koral Sikat&Andesit
Panjang 172 m Lebar 2 m
A PEKERJAAN PERSIAPAN
B PEKERJAAN UTAMA
1 Pek Batu Andesit 73.53 M2
2 Pek Koral Sikat 270.47 M2
3 Pek. Pengecatan 430 M2
KUANTITAS PANJANG LEBAR TINGGI TEBAL JUMLAH
74.00 3.00
74.00 3.00 -
-
74.00 3.00
34.00 1.60
Andesit1: 0.195
Andesit2: 10.20
Koral 2.405
34.00 1.60
-
34.00 1.60 -
145.00 2.00
Andesit1: 0.255
145.00 Andesit2: 43.50
-
Koral 3.995
145.00 2.00 -
145.00 2.00
172.00 2.00
Andesit1: 0.255
172.00 Andesit2: 51.60
-
Koral 3.145
172.00 2.00 -
172.00 2.00
12.80
\
17 3.315
10.20
17 40.885
54.4 54.4
58.00 14.79
43.50
58.00 231.71
290 290.00
86.00 21.93
51.60
86.00 270.47
344 344.00
DAFTAR HARGA SATUAN UPAH & BAHAN
B BAHAN KAYU
1 Kayu Kelas III M3 Rp . 1,800,000.00
2 Kayu 5/7 M3 Rp . 1,800,000.00
3 Papan Bekisting M3 Rp . 1,800,000.00
4 Plywood 9 mm Lbr Rp . 120,000.00
5 Triplek 3 mm Lbr Rp . 55,000.00
6 Triplek 6mm Lbr Rp . 85,000.00
7 Triplek 9 mm Lbr Rp . 120,000.00
8 Kayu cerucuk 10-12 cm Btg Rp . 8,000.00
9 Kayu cerucuk 10-12 cm m' Rp .
10 LED 50W, Aluminium, Lithium Batt Set Rp . 8,000.00
C BAHAN BESI
1 Besi 6 btg Rp . 21,000.00
2 Besi 8 btg Rp . 36,000.00
3 Besi 10 btg Rp . 56,000.00
4 Kawat Ikat Beton Kg Rp . 15,000.00
5 Paku Biasa Kg Rp . 13,000.00
6 Waremesh 6 lembar Rp . 275,000.00
7 Waremesh 6 kg Rp . 7,912.35
8 Waremesh 8 lembar Rp . 395,000.00
Waremesh 8 kg 6,392.82
9 Pipa PVC 3/4' Btg Rp . 28,000.00
10 Pipa PVC 1/2' Btg Rp . 23,000.00
11 Kran Air 3/4' Bh Rp . 10,000.00
12 Tanki 1000 L Bh Rp . 1,050,000.00
13 Mesin air + Bor Unit Rp . 5,500,000.00
14 Besi Hollow 2,3-2,4' btg Rp . 50,000.00
D PERALATAN
1 Molen Sewa hari Rp . 300,000.00
2 Vibrator Sewa hari Rp . 200,000.00
3 Cangkul Bh Rp . 60,000.00
4 Gerobak Bh Rp . 410,000.00
5 Ember Bh Rp . 12,000.00
6 Benang Bh Rp . 3,000.00
7 Gergaji Bh Rp . 125,000.00
8 Palu Bh Rp . 35,000.00
9 Sekop Bh Rp . 48,000.00
10 Sendok Semen Bh Rp . 20,000.00
11 Linggis Bh Rp . 35,000.00
12 Kuas Roll Bh Rp . 25,000.00
13 Kuas Tangan Bh Rp . 20,000.00
C BAHAN FINISHING
1 Pipa PVC Dia. 2" M1 Rp . 85,000.00
2 Aspal Kg Rp .
3 Koral Sikat M2 Rp . 170,000.00
4 Batu Andesit M2 Rp . 250,000.00
5 Paving Block M2 Rp . 43,200.00
6 Paving Block BH Rp . 1,200.00
7 Prasasti BH Rp . 200,000.00
8 Marmer M2 Rp . 52,000.00
9 Cat air (Exterior) Liter Rp . 50,000.00
10 Cat Minyak Liter Rp . 52,000.00
11 Dempol kg Rp . 11,000.00
12 GRC M2 Rp . 150,000.00
13 Cat Besi liter Rp . 52,000.00
14 Glow Liquid (cat glow in the dark) liter Rp . 28,000.00
15 Pilox bh Rp . 20,000.00
16 Talang Air Hujan btg Rp . 55,000.00
17 Corong Talang bh Rp . 10,000.00
18 Tutup Talang bh Rp . 5,000.00
19 Keramik 30 x 30 Kotak Rp . 65,000.00
20 Keramik 20 x 25 Kotak Rp . 45,000.00
D LAIN-LAIN
1 Depot Air unit Rp .
2 Atap Seng kodi Rp . 850,000.00
3 Tong Sampah 3R bh Rp . 1,500,000.00
4 Kloset Jongkok bh Rp . 125,000.00
5 Bak Air bh Rp . 350,000.00
6 Glass Block bh Rp . 20,000.00
7 Pintu Kamar Mandi + kusen bh Rp . 250,000.00
8 Kusen Pintu Panel bh Rp . 500,000.00
cat dasar(decolit) kg Rp . 25000.00
Plamir kg Rp . 20000.00
Tempat Sampah bh Rp . 1500000.00
AN DAFTAR HARGA SATUAN UPAH & BAHAN
0 : 12/30/1899
0 : 12/30/1899
0 : 12/30/1899
0 : 2017
0 : Rp0.00
KETERANGAN NO URAIAN
5 1 2
B BAHAN KAYU
1 Kayu Kelas III
2 Kayu 5/7
3 Papan Bekisting
4 Plywood 9 mm
5 Triplek 3 mm
6 Triplek 6mm
7 Triplek 9 mm
8 Triplek 12 mm
9 Triplek 15 mm
6 Kayu cerucuk 10-12 cm
C BAHAN BESI
7,885.01 1 Besi Beton Polos
7,603.41 2 Besi 6
7,569.61 3 Besi 8
4 Besi 10
5 Kawat Ikat Beton
34.76 6 Paku Biasa
7 Waremesh 6
61.79 9 Waremesh 8
10 Waremesh 10
11 Pipa PVC 3/4'
12 Pipa PVC 1/2'
13 Kran Air 3/4'
14 Tanki 1000 L
15 Mesin air + Bor
16 Besi Hollow 2,3-2,4'
D PERALATAN
1 Molen
2 Vibrator
3 Cangkul
4 Gerobak
5 Ember
6 Benang
7 Gergaji
8 Palu
9 Sekop
10 Sendok Semen
11 Linggis
12 Kuas Roll
13 Kuas Tangan
C BAHAN FINISHING
1 Pipa PVC Dia. 2"
2 Koral Sikat
3 Batu Andesit
4 Paving Block
5 Paving Block
6 Prasasti
7 Cat air (Exterior)
8 Cat Minyak
9 Dempol
10 GRC
11 Marmer
12 Bunga + Pot
13 Cat Besi
14 Glow Liquid (cat glow in the dark)
15 Pilox
16 Talang Air Hujan
17 Corong Talang
Isi 6 buah 18 Tutup Talang
Isi 10 Buah 19 Keramik 30 x 30
20 Keramik 20 x 25
D LAIN-LAIN
1 Depot Air
2 Atap Seng
3 Tong Sampah 3R
4 Kloset Jongkok
5 Bak Air
6 Glass Block
7 Pintu Kamar Mandi + kusen
8 Kusen Pintu Panel
ATUAN UPAH & BAHAN
O/H @ Rp . 85,000.00
O/H @ Rp . 100,000.00
O/H @ Rp . 110,000.00
O/H @ Rp . 120,000.00
Kg @ Rp . 1,200.00
Zak @ Rp . 60,000.00
M3 @ Rp . 245,000.00
Kg @ Rp . 198.22
M3 @ Rp . 300,000.00
Kg @ Rp . 242.72
M3 @ Rp . 200,000.00
Kg @ Rp . 159.36
M3 @ Rp . 130,000.00
M3 @ Rp . 42,500.00
M3 @ Rp . 150,000.00
M2 @ Rp . 7,000.00
Buah @ Rp . 400.00
M' @ Rp . 230,000.00
M' @ Rp . 270,000.00
M' @ Rp . 400,000.00
L @ Rp . 500.00
Kg @ Rp . 16,000.00
M' @ Rp . 40,000.00
M3 @ Rp . 1,800,000.00
M3 @ Rp . 1,800,000.00
M3 @ Rp . 1,800,000.00
Lbr @ Rp . 120,000.00
Lbr @ Rp . 55,000.00
Lbr @ Rp . 85,000.00
Lbr @ Rp . 120,000.00
Lbr @ Rp . 165,000.00
Lbr @ Rp . 225,000.00
Btg @ Rp . 8,000.00
Kg @ Rp .
Kg @ Rp . 21,000.00
Kg @ Rp . 36,000.00
Kg @ Rp . 56,000.00
Kg @ Rp . 15,000.00
Kg @ Rp . 13,000.00
kg @ Rp . 275,000.00
kg @ Rp . 395,000.00
kg @ Rp . 550,000.00
Btg @ Rp . 28,000.00
Btg @ Rp . 23,000.00
Bh @ Rp . 10,000.00
Bh @ Rp . 1,050,000.00
Unit @ Rp . 5,500,000.00
btg @ Rp . 50,000.00
M1 @ Rp . 85,000.00
M2 @ Rp . 170,000.00
M2 @ Rp . 250,000.00
M2 @ Rp . 43,200.00
bh Rp 1,200.00
BH @ Rp . 200,000.00
Liter @ Rp . 50,000.00
Liter @ Rp . 52,000.00
kg @ Rp . 11,000.00
M2 @ Rp .
M2 @ Rp . 52,000.00
bh @ Rp . 150,000.00
liter @ Rp . 52,000.00
liter @ Rp . 28,000.00
bh @ Rp . 20,000.00
btg @ Rp . 55,000.00
bh @ Rp . 10,000.00
bh @ Rp . 5,000.00
Kotak @ Rp . 65,000.00 Isi 6 buah
Kotak @ Rp . 45,000.00 Isi 10 Buah
unit @ Rp .
kodi @ Rp . 850,000.00
bh @ Rp . 1,500,000.00
bh @ Rp . 125,000.00
bh @ Rp . 350,000.00
bh @ Rp . 20,000.00
bh @ Rp . 250,000.00
bh @ Rp . 500,000.00
No URAIAN Volume KUANTITAS PANJANG
B Pek Pemasangan Koral Sikat&Andesit 85.00
Panjang 85m Lebar 4 m
A PEKERJAAN PERSIAPAN
B PEKERJAAN UTAMA
1 Pek Batu Andesit 28.82 M2 85.00
2 Pek Koral Sikat 40.885 M
2
LEBAR TINGGI TEBAL JUMLAH
4.00
Andesit1: 0.195 17 3.315
Andesit2: 25.50 25.50
4.00 #REF!