Boq Surplus
Boq Minus
Tender
Soil Excavation Open cutting > 2m depth m 3
80.58
Soil Back Fill Compaction 95% Max density. m3 60.44
Soil Disposal m3 20.15
Sand Bending t=100mm m3 13.38
Lean Concrete f'c 15 Mpa ; t=50mm m3 6.69
Formwork Plywood m2 2,602.85
Finishing Interior :
- Floor (F4) PVC tile m2 750.00
- Baseboard (B2) Paint baseboard m2 19.50
- Ceilling (C1) Gypsum board, for office & m2
meeting room 405.60
Vendor 6937.50
1100.00
vendor 1050.00
1,363.00 -11.00 Minus
Boq Surplus
Boq Minus
Tender
Soil Excavation Open cutting < 2m depth m3 115.12
Soil Back Fill Compaction 95% max density m3 76.72
Soil Disposal m3 38.40
Compacted Sand Fill t=100mm m3 9.53
Lean Concrete f'c 15MPa ; t=50mm m3 4.77
Formwork Plywood m2 994.52
0.00 Sama
Boq Surplus
Boq Minus
Tender
Piling
PC Pile Class B Type I, depth
- PC Piles dia. 600mm m' 672.00
28m ; 24 points
Pile Splicing
- PC Piles dia. 600mm 2 splicing per point nos 48.00
Concrete fill f'c 28 MPa with
PHT Piles dia. 600mm nos 24.00
rebar, depth 1.5m
Soil Excavation Open cutting > 2m depth m3 270.00
Soil Back Fill Compaction 95% Max density. m3 192.06
Soil Disposal m3 77.94
Compacted Sand Fill t=100mm m3 17.50
Lean Concrete f'c 15 MPa ; t=50mm m3 8.75
Formwork Plywood m2 2296.76
Toilet :
- Water Closet European set 2.00
- Urinal set 2.00
- Wash Basin set 1.00
- Service Sink c/w mop rack set 1.00
- Septic Tank set 1.00
Finishing Interior :
- Floor (F6) Non slip ceramic tile c/w mortar m2 234.50
- Floor (F6) Non slip ceramic tile c/w mortar m2 15.00
- Floor (F5) Ceramic tile ; for toilet m2 20.00
Paint baseboard ; for main m2
- Baseboard (B2) control room, rest room, & 33.30
analysis room
672.00 Surplus
48.00 Surplus
24.00 Surplus
136.29 133.71 Surplus
92.43 99.63 Surplus
43.86 34.08 Surplus
5.60 11.90 Surplus
5.60 3.15 Surplus
994.52 1302.24 Surplus
211.28 Surplus
374.00 -104.50 Minus
1.00 Surplus
1.00
2.00 8.00 Surplus
1.00 Surplus
0
0.00 Minus
1
Surplus
Surplus
15.20 0.00 sama
0.00 sama
269.50
BOQ ORE PREPARATION PAKAI SIRTU Pondasi 1.6 m x 1.6 m
Boq Surplus
Boq Minus
Tender
Soil Excavation Open cutting < 2m depth m3 162.22
Soil Back Fill Compaction 95% max density m3 108.07
Soil Disposal m3 54.14
Compacted Sand Fill t=100mm m3 13.43
Lean Concrete f'c 15MPa ; t=50mm m3 6.72
Formwork Plywood m2 1391.68
0.00 Sama
Boq Surplus
Boq Minus
Tender
Soil Excavation Open cutting < 2m depth m3 162.22
Soil Back Fill Compaction 95% max density m3 108.07
Soil Disposal m3 54.14
Compacted Sand Fill t=100mm m3 13.43
Lean Concrete f'c 15MPa ; t=50mm m3 6.72
Formwork Plywood m2 1391.68
0.00 Sama
Boq Surplus
Boq Minus
Boq Minus
Tender
Soil Excavation Open cutting > 2m depth m3 24.00
Soil Back Fill Compaction 95% Max density m3 19.36
Soil Disposal m3 4.64
Compacted Sand Fill t=100mm m3 2.88
Lean Concrete f'c 15 MPa ; t=50mm m3 1.44
Formwork Plywood m2 217.38
Finishing Interior :
- Floor (F4) PVC tile m2 34.38
- Baseboard (B2) Paint baseboard m2 7.88
Light Steel Roof Frame Kg
M8-150, SNI 07-0663-1995 BJ-50 ; f y
Wire Mesh m2 0.00
= 5000 kg/cm2
Aktual Deviasi Status
18.20 5.80 Surplus
14.30 5.06 Surplus
3.90 0.74 Surplus
1.44 1.44 Surplus
1.44 0.00 sama
209.20 8.18 Surplus
Boq Surplus
Boq Minus
sama
Tender
Soil Excavation Open cutting < 2m depth m3 8.00
Soil Back Fill Compaction 95% max density m3 1.52
Soil Disposal m3 6.48
Compacted Sand Fill t=100mm m3 3.09
Lean Concrete f'c 15MPa ; t=50mm m3 1.54
Formwork Plywood m2 10.76
0 38.016 Surplus
9.2 0 Surplus
Sama
2 0 Sama
2 0 Sama
2 0 Sama
2.00 0 Sama
28.00 0 Sama
FENCEN AND GATES
Boq Surplus
Boq Minus
sama
Tender
Soil Excavation Open cutting < 2m depth m3 395.95
Soil Disposal m3 180.69
Soil Back Fill Compaction 95% max density m3 215.26
Compacted Sand Fill t=100mm m3 27.97
Lean Concrete f'c 15MPa ; t=50mm m3 27.97
Concrete Foundation f'c 28MPa ; Cement type II m3 124.76
1,402.37 - sama
2,474.07 - sama
2,474.07 - sama
- sama
7.00 - sama
BOQ weigh bridge pondasi 2 m * 2 m Soil Improvement
Tender
Piling
PC Pile Class B Type I, depth
- PC Piles dia. 400mm m' 168.00
28m ; 6 points
Pile Splicing
- PC Piles dia. 400mm 2 splicing per point nos 12.00
Concrete fill f'c 28 MPa with
PHT Piles dia. 400mm nos 6.00
rebar, depth 1m
Soil Excavation Open cutting > 2m depth m3 110.87
Soil Back Fill Compaction 95% Max density m3 59.70
Soil Disposal m3 51.18
Compacted Sand Fill t=100mm m3 7.67
Lean Concrete f'c 15 MPa ; t=50mm m3 3.83
Anstampeng t=200mm m3 7.67
Masonry Foundation m3 2.92
Formwork Plywood m2 917.37
Finishing Interior :
- Floor (F5) Ceramic tile. m2 32.00
- Baseboard (B1) PVC baseboard m2 3.90
- Baseboard (B3) Ceramic tile ; for toilet m2 1.20
Acoustic gypsum board ; for m2
- Ceilling (C2) control room 28.00
168.00 Surplus
0
0 12.00 Surplus
6.00 Surplus
0
72.96 37.91 Surplus
32.685 27.01 Surplus
40.275 10.90 Surplus
5.25 2.42 Surplus
5.25 -1.42 Minus
0 7.67 Surplus
0 2.92 Surplus
917.37 0.00 Sama
36 195.56 Surplus
259.96 Surplus
0.32 Surplus
0
0.32 Surplus
1.00 Surplus
2
0.00 Sama
1
0.00 Sama
3
4.00 Surplus
1.00 Surplus
1 0.00 Sama
1 0.00 Sama
1 0.00 Sama
1 0.00 Sama
1 0.00 Sama
9 23.00 Surplus
1.8 2.10 Surplus
1.20 0.00 Sama
28.00 0.00 Sama
4.00 0.00 Sama
72.96 -72.96 minus
BOQ ROAD LIGHTING & SITE OUTDOOR LIGHTING (PRELIMINAR
Tender
Road Lighting & Site Outdoor Lighting
Road Lighting
Soil Excavation Open cutting < 2m depth m3 34
Soil Disposal m3 13.60
Soil Back Fill Compaction 95% max density m3 20.40
Compacted Sand Fill t=100mm m3 2.13
Lean Concrete f'c 15MPa ; t=50mm m3 -
Concrete f'c 28MPa ; Cement type II m3 11.48
Park Ligthing
Soil Excavation Open cutting < 2m depth m3 11.60
Soil Disposal m3 4.64
Soil Back Fill Compaction 95% max density m3 6.96
Compacted Sand Fill t=100mm m3 0.73
Lean Concrete f'c 15MPa ; t=50mm m3 -
Concrete f'c 28MPa ; Cement type II m3 3.92
NOTE : SELISIH BOQ MASIH SAMA , KARENA DATA DESIGN MASIH PRELIMINARY D
MENGIKUTI TENDER. SELISIH BOQ AKAN BERUBAH JIKA DATA TELAH FIX DARI EL
ING (PRELIMINARY)
0.00 sama
1147.50
204.00 0.00 sama
340.00 0.00 sama
0.00 sama
0.00 sama
11.60 0.00 sama
4.64 0.00 sama
6.96 0.00 sama
0.73 0.00 sama
0.00 0.00 sama
3.92 0.00 sama
0.00 sama
391.50
69.60 0.00 sama
116.00 0.00 sama
0.00 sama
0.00 sama
6.00 0.00 sama
2.40 0.00 sama
3.60 0.00 sama
0.38 0.00 sama
0.00 0.00 sama
2.03 0.00 sama
0.00 sama
202.50
36.00 0.00 sama
60.00 0.00 sama
0.00 sama
0.00 sama
660.94 0.00 sama
73.44 0.00 sama
587.50 0.00 sama
3.13 0.00 sama
1.56 0.00 sama
68.75 0.00 sama
0.00 sama
6875.00
110.00 0.00 sama
60 0.00 sama
Tender
Soil Excavation Open cutting < 2m depth m3 83.75
Soil Back Fill Compaction 95% max density m3 55.89
Soil Disposal m3 27.86
Compacted Sand Fill t=100mm m3 6.94
Lean Concrete f'c 15MPa ; t=50mm m3 3.47
Formwork Plywood m2 1153.80
tender
Soil Excavation Open cutting < 2m depth m3 0
Soil Back Fill Compaction 95% max density m3 0
Soil Disposal m3 0
Lean Concrete f'c 15MPa ; t=50mm m3 0
Formwork Plywood m2 0