Вы находитесь на странице: 1из 1

E

S
N

W
NOTE:

1-ALL DRAWINGS ARE IN MILLIMETRES.


2-DRAWING ARE NOT TO BE SCALED.
3-ALL LEVELS ARE IN METRES.

HATCH INDEX
D/S(1.5:1) U/S(1:1) D/S(1.5:1)
U/S(1:1)

CUTTING

FILLING

PROJECT TITLE EXTENSIVE SURVEY


PROJECT 2017
6th SEMESTER.B.E.(CIVIL)

LOCATION RAMAKUNJA PUTTUR TALUK


D.K.

COLLEGE VIVEKANANDA COLLEGE


OF ENGINEERING AND
TECHNOLOGY

87.000 DATUM (m) 90.000 90.000 90.000 90.000 90.000 90.000 90.000 90.000
DATUM (m) 87.000 87.000 87.000 87.000 87.000 87.000 87.000
20 15 10 15
20 15 10 15 CHAINAGE (m) 10 5 0 5
CHAINAGE (m) 10 5 0 5

REDUCED LEVEL(m) 90.515 90.550 91.545 91.640 92.520 94.355 95.515 97.175
REDUCED LEVEL(m) 88.675 89.195 89.660 90.165 90.52 91.825 92.64 93.645

FORMATION LEVEL (m) 93.00 96.3 98.875 95.2 DEPARTMENT OF CIVIL ENGINEERING
FORMATION LEVEL(m) 92.6 96.2 98.875 98.3
VIVEKANANDA COLLEGE OF ENGINEERING
DEPTH OF CUTTING DEPTH OF CUTTING & TECHNOLOGY. PUTTUR (D.K)
(m)
(m)
DEPTH OF FILLING 1.455 4.66 6.355 0.7
DEPTH OF FILLING 2.94 6.035 7.00 0.8 (m)
(m)
DRAWING TITLE CROSS SECTION AT OLD FULL
TANK LEVEL,CROSS SECTION
AT DEAD STORAGE
CROSS SECTION AT DEAD STORAGE
CROSS SECTION AT OLD FULL TANK LEVEL
PROJECT NAME : OLD TANK PROJECT

HEAD OF DEPT. : Dr SANDEEP J. NAYAK


BATCH NO. : A4 DATE : 14-2-17

CHECK/APPROVED PROF.H. AJITH HEBBAR

SCALE : 1 : 100

DRAWING NO. REVISION NO. SHEET NO.


OTP-2 01 2

Вам также может понравиться