A Gas Pump Room ( Left & Right Side Block)
Internal Finish

1 No surface preparation for side concrete walls, grinding and


Finishing is required for loose concrete etc.

2 RCC bulging from inside is up to 3cm is observed need to be


bebebgrinded and make
Grinded and make in levelinwith
levelother
with osurface

3 The RCC repair works done internally should be with approved


RCC repair material only.

4 Ceiling found with chipped off for fixing of Bowl bolts should
Be repaired with grouting with approved rcc grout material.

5 Weather proof joints / junctions should be provided for all pipes


and bolts junction at soffit of slab .

The repair material should be as per approved MAS or in


compliance with project standards present the proof of Photos of
material actually used on site and purchase order/ delivery note of
the same.

6 The electrical boxes and the flexible conduits need to be provided


At the box and wall sleeve junction.

Page 1 of 17
Project: SARAYA BANDAR JISSAH Location MAIN ENTRANCE
Zone/Villa: ENTRY STATEMENT Date of snagging 28/07/2016
Level: GROUND FLOOR Type of finish

GAS PUMP ROOM ( INTERNAL FINISHING ITEMS)

INTERNAL PLASTER

7 Plaster found with tolerance beyond 15mm which is not


acceptable should be repair and rectify with approved material

8 Plaster found with major undulations and patch work

9 Electrical boxes edges not plastered with finishing and not at right
angle
10 Cut out in block work for Louvers found with shabby finish at
edges
11 Plaster found with nail marks and peel off to be repaired

12 Plaster found with vertical and horizontal cracks in surface should


Be repaired and rectify.
13 Paint finish for wall and ceiling not provided

14 Ceiling grinding of loose concrete and some places repair of


beam edges required.

Internal Floor
15 Floor concrete found with cracks and should be repaired with
approved material.

16 Concrete floor slopes not maintained towards the floor drain.

17 Concrete flooring is not provided for area inside or leveling floor


with any finish is not provided.
18 Louvered aluminum door at Entrance found with powder coating
Of poor finish also found with fading of powder coating color
19 Uneven colour consistency is observed in louvered door.
20 Minimum 25 year warranty is required for powder coated material

Page 2 of 17
Project: SARAYA BANDAR JISSAH Location MAIN ENTRANCE
Zone/Villa: ENTRY STATEMENT Date of snagging 28/07/2016
Level: GROUND FLOOR Type of finish

21 The 45degree chamfer cut is not aligned and not matching at


Central piece.
22 The central frame members are not of equal width for both
shutters.
Electrical Pump Room
23 Louvered door sealant filling is not consistent
24 Door opening plastered edges found broken.
25 Plaster found with cracks
26 Louvered openings found without plaster and paint finish from
inside found with shabby finish.
27 No paint finish provided internally.
External plaster
28 Paint and plaster found with cracks on external faade near
louvered cutouts.

29 Paint found with patchwork to be rectified.

30 Plaster and external finish junction at bottom should be with


waterproofing for all around the external wall surface.

31 Horizontal cracks found in front wall faade should be repaired.

Water feature
32 Bottom ledge / stub wall junction of plaster and bitumen
waterproofing not properly finished and found with shabby
junction

33 Coping stone thickness varies should be replaced and should be


Same thickness of all stones.

34 Stone joints found open without any sealant or grout.


35 Stone fixing edges not aligned
36 Coping stone found with broken edges should be replaced

Page 3 of 17
Project: SARAYA BANDAR JISSAH Location MAIN ENTRANCE
Zone/Villa: ENTRY STATEMENT Date of snagging 28/07/2016
Level: GROUND FLOOR Type of finish

37 Major colour variation observed in coping stone should be


replaced with matching colour stone

38 Two cut pieces at center of top of ledge wall not acceptable should
be replaced with full piece.
39 Any chipped off stone is not acceptable and should be replaced.

40 Bowl drawing is not approved refer SBJ-WVL-ESC-ZA-000192 also


owl
Bowl MIR is not approved .
41 Waterproofing should be with cementatious material but no
evidence available for any waterproofing, leakage found at slab
bottom should be rectified with approved material.

42
As per approved shop drawing quartz stone tiles to be continued
on top surface bellow the bowl.
43 Coping stone MAS not approved.

Sloping wall quartz stone cladding


44 Stone tiles found with uneven joints also joints not consistent

45 Some tiles protruding beyond tolerance from surface


46 Some tiles found with broken pieces to be replaced

47 All previous IR comments to be attended prior to Desnagging

Page 4 of 17
Project: SARAYA BANDAR JISSAH Location MAIN ENTRANCE
Zone/Villa: ENTRY STATEMENT Date of snagging 28/07/2016
Level: GROUND FLOOR Type of finish

Page 5 of 17
Project: SARAYA BANDAR JISSAH Location MAIN ENTRANCE
Zone/Villa: ENTRY STATEMENT Date of snagging 28/07/2016
Level: GROUND FLOOR Type of finish

Photo 1 Photo 2

RCC wall not in plumb, RCC wall found with loose material and
Grinding and repairs is required undulated surface to be made smooth with
grinding

Repair work not in level, RCC wall repairs Wall found with loose material to be
to be done with approved RCC repair cleaned and clear all loose mortar
material only

Page 6 of 17
Project: SARAYA BANDAR JISSAH Location MAIN ENTRANCE
Zone/Villa: ENTRY STATEMENT Date of snagging 28/07/2016
Level: GROUND FLOOR Type of finish

All electrical joints are open and not Plaster not in level, 10 to 15 mm level
secured with any means. difference in plaster surface should be
repaired

All bolts for fixing top bowl are exposed All electrical conduits are open not
not secured by any means also water secured for DB.
leakage found at bottom of slab, repair and
rectify with approved materials.

Page 7 of 17
Project: SARAYA BANDAR JISSAH Location MAIN ENTRANCE
Zone/Villa: ENTRY STATEMENT Date of snagging 28/07/2016
Level: GROUND FLOOR Type of finish

Major cracks found in plaster should be


repaired and rectify with approved Loose mortar and concrete marks on wall,
material and methodology. Undulations on wall plaster to be repaired.
.

Electrical boxes not in level should be All louver cut outs found with shabby
recessed only cover to be project out from finish, should be repaired and rectify
wall plaster, around box finishing plaster
required.

Page 8 of 17
Project: SARAYA BANDAR JISSAH Location MAIN ENTRANCE
Zone/Villa: ENTRY STATEMENT Date of snagging 28/07/2016
Level: GROUND FLOOR Type of finish

Plaster with patchwork and major Floor drain location is near steps but
undulations and cracks found in plaster. slopes in floor are not provided towards
drain, make desired slope in floor finish.

Electrical DBs not concealed or recessed Slab found with loose mortar, undulations
in wall, all pipes and conduits are exposed. should be repaired and rectify.

Page 9 of 17
Project: SARAYA BANDAR JISSAH Location MAIN ENTRANCE
Zone/Villa: ENTRY STATEMENT Date of snagging 28/07/2016
Level: GROUND FLOOR Type of finish

Slope in flooring to be made towards the Aluminium louver frames not aligned with
floor drain. jam, plaster to be repaired.

Floor finishing not provided, floor drain All corners found with damaged plaster
found at higher level than other floor, also should be repaired and rectify corner
found undulated concrete surface to be plaster.
repair and rectify. Page 10 of 17
Project: SARAYA BANDAR JISSAH Location MAIN ENTRANCE
Zone/Villa: ENTRY STATEMENT Date of snagging 28/07/2016
Level: GROUND FLOOR Type of finish

Beam found with broken edges to be Aluminum louvers found with


repaired with approved repair material. discoloration and patchwork

Louver frame corners and hinges found


damaged to be rectified.

Louver frame found with colour fading or


variation in powder coating colour to be
repair or rectify.
Page 11 of 17
Project: SARAYA BANDAR JISSAH Location MAIN ENTRANCE
Zone/Villa: ENTRY STATEMENT Date of snagging 28/07/2016
Level: GROUND FLOOR Type of finish

Louver frame corners not matching at 45*


for left shutter frame to be replaced

Louver frame widths not matching left


side louver frame lesser than right side
louver frame.

Bottom of louver door frame found


damaged to be rectified also powder
coating damaged
Page 12 of 17
Project: SARAYA BANDAR JISSAH Location MAIN ENTRANCE
Zone/Villa: ENTRY STATEMENT Date of snagging 28/07/2016
Level: GROUND FLOOR Type of finish

Door lintel inside found with damaged Door lintel inside found with damaged
plaster to be repaired also frame sealant plaster to be repaired also frame sealant
spill over to be rectified. not consistent to be rectified.

External plaster found with cracks at Bottom of basin wall and ground should
corners to be repaired and rectify. be with groove detailing for tucking
waterproofing membrane.
Page 13 of 17
Project: SARAYA BANDAR JISSAH Location MAIN ENTRANCE
Zone/Villa: ENTRY STATEMENT Date of snagging 28/07/2016
Level: GROUND FLOOR Type of finish

External plaster found with cracks and Louver cut out openings not finished from
undulation to be repaired with approved internal side should be repaired
material should be rectified.

External plaster found with cracks and External plaster found with cracks
undulation near louver opening to be vertically to be repaired with approved
repaired with approved material should be material should be rectified.
rectified.
Page 14 of 17
Project: SARAYA BANDAR JISSAH Location MAIN ENTRANCE
Zone/Villa: ENTRY STATEMENT Date of snagging 28/07/2016
Level: GROUND FLOOR Type of finish

Coping stone found broken and of not Coping stone found with different stone
approved thickness to be replaced, also thickness to be replaced
bottom of basin wall and ground should be
with groove detailing for tucking
waterproofing membrane.

Coping stone found broken and of not Coping stone found with major colour
approved thickness to be replaced variation which is not acceptable, stones to
be replaced.

Page 15 of 17
Project: SARAYA BANDAR JISSAH Location MAIN ENTRANCE
Zone/Villa: ENTRY STATEMENT Date of snagging 28/07/2016
Level: GROUND FLOOR Type of finish

Coping stone found with major colour Coping stone found with size variation so
variation which is not acceptable, stones to not consistent and uniform such pieces to
be replaced also joints not consistent be replaced

Glass mosaic tiles found with inconsistent Glass mosaic tiles found with shabby
joints also found broken edges to be finish for cutting around water drain in
replaced. basin should be rectified

Page 16 of 17
Project: SARAYA BANDAR JISSAH Location MAIN ENTRANCE
Zone/Villa: ENTRY STATEMENT Date of snagging 28/07/2016
Level: GROUND FLOOR Type of finish

Coping stone joints not even and Mosaic tiles found broken at many places
consistent found broken at corners at bottom and at hunching of basin

Mosaic tiles found not in level at many Mosaic tiles found not in level at all
places also not in plumb should be corners s also not in plumb as well as joint
repaired and rectify. thickness not consistent should be repaired
and rectify.