COSTO DIRECTO
GASTOS GENERALES
SUB TOTAL
SUPERVISION
PRESUPUESTO TOTAL
Costo a May-15
S/. 803,747.60
S/. 224,052.40
-------------------------
S/. 1,027,800.00
S/. 67,700.00
============
S/. 1,095,500.00
Proyecto MEJORAMIENTO DEL SERVICIO DE AGUA DEL SISTEMA DE RIEGO LATERAL 40 MARGEN IZQUIERDA IRRIGACION SISA
Ubicacin DISTRITO CASPIZAPA - PROVINCIA PICOTA - REGION SAN MARTIN
Plazo Ejecucin 120 DIAS CALENDARIOS
Proyecto MEJORAMIENTO DEL SERVICIO DE AGUA DEL SISTEMA DE RIEGO LATERAL 40 MARGEN IZQUIERDA IRRIGACION SISA
Ubicacin DISTRITO CASPIZAPA - PROVINCIA PICOTA - REGION SAN MARTIN
Plazo Ejecucin 120 DIAS CALENDARIOS
PROYECTO MEJORAMIENTO DEL SERVICIO DE AGUA DEL SISTEMA DE RIEGO LATERAL 40 MARGEN IZQUIERDA IRRIGACION SISA
UBICACION DISTRITO CASPIZAPA - PROVINCIA PICOTA - REGION SAN MARTIN
PLAZO DE EJECUCION 120 DIAS CALENDARIOS
FECHA May-15
TOTAL A - 01
TOTAL A - 03
TOTAL A - 04
TOTAL B - 01
TOTAL B - 02
B.03 IMPRESOS, UTILES DE ESCRITORIO Y OFICINA, OTROS
SERVICIOS DE IMPRESIN GLB 1.00 1,702.40
TOTAL B - 03
B.04 ALQUILERES
ALQUILER DE OFICINA MES 1.00 4.00 300.00
ALQUILER DE CAMIONETA MES 1.00 4.00 2,000.00
ALQUILER EQUIPO DE TOPOGRAFIA (ESTACION TOTAL) UND 1.00 4.00 1,750.00
TOTAL B - 04
B.05 COMUNICACIONES
SERVICIO COURIER MES 1.00 4.00 300.00
TOTAL B - 05
B.06SEGUROS
PERSONAL PROFESIONAL, TECNICO, AUXILIAR Y OBREROS GLB 1.00
TOTAL B - 06
TOTAL B - 07
RESUMEN SERVICIOS
TOTAL
3,000.00
10,000.00
1,050.00
800.00
800.00
100.00 15,750.00
S/. 15,750.00
500.00
750.00
750.00 2,000.00
S/. 2,000.00
5,000.00
2,500.00 7,500.00
S/. 7,500.00
31,400.00
20,000.00
8,000.00
8,000.00
17,200.00
12,000.00
10,000.00 106,600.00
12,000.00
8,000.00
8,000.00 28,000.00
S/. 134,600.00
5,600.00
5,600.00
S/. 5,600.00
1,702.40 1,702.40
S/. 1,702.40
1,200.00
8,000.00
7,000.00 16,200.00
S/. 16,200.00
1,200.00 1,200.00
S/. 1,200.00
34,000.00 34,000.00
S/. 34,000.00
5,500.00 5,500.00
S/. 5,500.00
208,302.40
S/. 224,052.40
PROYECTO MEJORAMIENTO DEL SERVICIO DE AGUA DEL SISTEMA DE RIEGO LATERAL 40 MARGEN IZQUIERDA IRRIGACION SISA
UBICACION DISTRITO CASPISAPA - PROVINCIA PICOTA - REGION SAN MARTIN
PLAZO DE EJECUCION 120 DIAS CALENDARIOS
FECHA May-15
SUB TOTAL
SUB TOTAL
SUB TOTAL
6.00 COMUNICACIONES
S SERVICIO DE COURIER MES 1.00 4.00 100.00
SUB TOTAL
7.00 SEGUROS
S SEGUROS PERSONAL EST 1.00 1,000.00
SUB TOTAL
RESUMEN DE SUPERVISION DE OBRA
ITEM DESCRIPCION
1.00 BIENES
2.00 SERVICIOS
1,400.00 1,400.00
400.00 400.00
500.00 500.00
S/. 2,300.00
8,000.00 8,000.00
12,000.00 12,000.00
8,000.00 8,000.00
S/. 28,000.00
36,000.00 36,000.00
S/. 36,000.00
400.00 400.00
S/. 400.00
1,000.00 1,000.00
S/. 1,000.00
ESUMEN DE SUPERVISION DE OBRA
TOTAL S/.
S/. 500.00
S/. 67,200.00
S/. 67,700.00
COSTO DE HORA - HOMBRE VIGENTE EN OBRAS DE CONSTRUCCION CIVIL
Proyecto MEJORAMIENTO DEL SERVICIO DE AGUA DEL SISTEMA DE RIEGO LATERAL 40 MARGEN IZQUIERDA IRRIGACION SISA
Cliente JUNTA DE USUARIOS HUALLAGA CENTRAL
Lugar DISTRITO CASPIZAPA - PROVINCIA PICOTA - REGION SAN MARTIN
(Vigente desde el 25.05.2015)
CATEGORIA
DESCRIPCION
OPERARIO OFICIAL PEON
1.00 Remuneracin Bsica Vigente (RB) (vigente del 2013-06-01 al 2014-05-31) 52.10 44.10 39.40
2.00 Bonificacin Unificada de Construccin (BUC) (vigente del 2013-06-01 al 2014-05-31)
Operario 32.00% 16.67
Oficial 30.00% 13.23
Pen 30.00% 11.82
3.00 Leyes y Beneficios Sociales sobre la RB 113.21% 58.98 49.93 44.60
4.00 Leyes y Beneficios Sociales sobre el BUC 12.00% 2.00 1.59 1.42
5.00 Bonificacin Movilidad Acumulada 7.20 7.20 7.20
6.00 Overol (02 und.anuales) 0.40 0.40 0.40
7.00 Pliza de Seguro ESSALUD Vida (S/. 5.00 x mes)* 0.20 0.20 0.20
JORNAL DIARIO S/. 137.56 S/. 116.64 S/. 105.04
JORNAL HORARIO S/. 17.19 S/. 14.58 S/. 13.13
*A partir del 01 de enero del 2013 cuando el costo de la obra presupuestada sea mayor a 120 UIT (siendo la UIT vigente para el 2013 de S/.3,700) es decir, para obras mayores de
S/.444,000.00. Los empleadores de la construccin contratarn la pliza de seguro de ESSALUD-VIDA (actualmente + Vida Seguro de Accidente) por un monto de S/.5.00 mensuales
(vigente a partir de mayo 2007)
E VIGENTE EN OBRAS DE CONSTRUCCION CIVIL
Cronograma de Adquisicin de Materiales y Utilizacin de Equipo Mecnico
(Ejecucin Presupuestaria Directa - EPD)
Presupuesto REHABILITACION Y MEJORAMIENTO DEL CANAL DE RIEGO LATERAL 28 MARGEN IZQUIERDA IRRIGACION SISA
Cliente JUNTA DE USUARIOS HUALLAGA CENTRAL
Lugar SAN HILARION - PICOTA - SAN MARTIN Costo a OCT 2009
CLAVOS PARA MADERA C/C 2 1/2" KG 12.00 4.00 48.00 12.00 48.00 0.00 0.00 0.00 0.00 0.00
CLAVOS PARA MADERA C/C 3" KG 166.18 4.00 664.72 166.18 664.72 0.00 0.00 0.00
ALAMBRE NEGRO N16 KG 391.10 3.50 1,368.85 391.10 1,368.85 0.00 0.00 0.00
ALAMBRE NEGRO N8 KG 133.00 3.50 465.50 133.00 465.50 0.00 0.00 0.00
CLAVOS PARA CALAMINA KG 5.00 7.00 35.00 5.00 35.00 0.00 0.00 0.00
PERNO C/TUERCA-ARANDELA 3/4"X4" UND 6.00 7.80 46.80 6.00 46.80 0.00 0.00 0.00
ACERO DE REFUERZO FY=4200 GRADO 60 KG 6,844.32 2.61 17,863.68 0.00 0.00 6,844.32 17,863.68 0.00 0.00
ARENA FINA M3 52.16 50.00 2,608.00 0.00 0.00 52.16 2,608.00 0.00 0.00
PIEDRA SELECCIONADA M3 57.78 50.00 2,889.00 0.00 57.78 2,889.00 0.00 0.00
ARENA GRUESA M3 504.67 50.00 25,233.50 504.67 25,233.50 0.00 0.00 0.00
GRAVA 3/4 - 1/2 PULGADA M3 561.82 80.00 44,945.60 561.82 44,945.60 0.00 0.00 0.00
ASFALTO RC-250 GLN 186.30 10.00 1,863.00 0.00 186.30 1,863.00 0.00 0.00
CEMENTO PORTLAND TIPO I (42.5KG) BOL 7,407.96 23.50 174,087.06 0.00 0.00 4,407.96 103,587.06 3,000.00 70,500.00 0.00
WATER STOP PVC DE 9" M 69.51 28.00 1,946.28 0.00 69.51 1,946.28 0.00 0.00
YESO DE 28 Kg BOL 20.00 20.00 400.00 0.00 20.00 400.00 0.00 0.00
ADITIVO CURADOR GLN 496.58 29.00 14,400.82 0.00 496.58 14,400.82 0.00 0.00
ADITIVO DESMOLDEADOR DE ENCOFRADOS GLN 10.94 105.00 1,148.70 0.00 10.94 1,148.70 0.00 0.00
MOVILIZACION Y DESMOVILIZACION GLB 1.00 10,000.00 10,000.00 0.25 2,500.00 0.25 2,500.00 0.25 2,500.00 0.25 2,500.00
MADERA NACIONAL P/ENCOFRADO-CARP P2 2,984.38 3.50 10,445.33 2,984.38 10,445.33 0.00 0.00 0.00
TRIPLAY DE 4'x8'x 12 mm PLN 75.98 75.00 5,698.50 0.00 0.00 75.98 5,698.50 0.00 0.00
TRIPLAY 4 X 8 X 6 MM. PLN 25.00 45.00 1,125.00 0.00 0.00 25.00 1,125.00 0.00 0.00
CAPATAZ HH 559.86 16.37 9,164.91 139.97 2,291.31 139.97 2,291.31 139.97 2,291.31 139.95 2,290.98
OPERARIO HH 2,498.14 13.64 34,074.63 624.54 8,518.73 624.54 8,518.73 624.54 8,518.73 624.52 8,518.45
OFICIAL HH 6,147.48 12.08 74,261.56 1,536.87 18,565.39 1,536.87 18,565.39 1,536.87 18,565.39 1,536.87 18,565.39
PEON HH 24,742.15 10.91 269,936.86 6,185.54 67,484.24 6,185.54 67,484.24 6,185.55 67,484.35 6,185.52 67,484.02
CAMION VOLQUETE 12 M3. HM 798.55 150.00 119,782.50 798.55 119,782.50 0.00 0.00 0.00
MOTOBOMBA 10 HP 4" HM 400.00 20.00 8,000.00 100.00 2,000.00 100.00 2,000.00 100.00 2,000.00 100.00 2,000.00
CAMION CISTERNA 4X2 (AGUA) 1,500 GAL. HM 68.64 100.00 6,864.00 68.64 6,864.00 0.00 0.00 0.00
CAMION 4 M3 DIA 90.00 150.00 13,500.00 15.00 2,250.00 25.00 3,750.00 25.00 3,750.00 25.00 3,750.00
COMPACTADOR VIBR. TIPO PLANCHA 4 HP HM 173.25 20.00 3,465.00 0.00 0.00 86.63 1,732.60 86.62 1,732.40 0.00
RODILLO LISO VIBR AUTOP 70-100 HP 7-9 T. HM 137.28 140.00 19,219.20 137.28 19,219.20 0.00 0.00 0.00
CARGADOR RETROEXCAVADOR 62 HP 1 YD3 HM 404.27 180.00 72,768.60 0.00 0.00 200.00 36,000.00 204.27 36,768.60 0.00
CARGADOR S/LLANTAS 125-155 HP 3 YD3. HM 244.70 180.00 44,046.00 244.70 44,046.00 0.00 0.00 0.00
TRACTOR DE ORUGAS DE 140-160 HP HM 139.04 250.00 34,760.00 139.04 34,760.00 0.00 0.00 0.00
EXCAVADORA S/O 115-165 HP,.75-1.4Yd3 HM 112.88 250.00 28,220.00 112.88 28,220.00 0.00 0.00 0.00
VIBRADOR DE CONCRETO 4 HP 1.35" HM 176.60 15.00 2,649.00 0.00 58.87 883.05 58.87 883.05 58.86 882.90
MEZCLADORA CONCRETO TROMPO 8 HP 9 P3 HM 773.50 20.00 15,470.00 0.00 257.84 5,156.80 257.83 5,156.60 257.83 5,156.60
PINTURA ESMALTE GLN 4.00 40.00 160.00 4.00 160.00 0.00 0.00 0.00
CALAMINA PLN 50.00 16.00 800.00 50.00 800.00 0.00 0.00 0.00
IMPRESION DE BANNER (GIGANTOGRAFIA) M2 17.28 30.00 518.40 17.28 518.40 0.00 0.00 0.00
MADERA ASERRRADA DE USO ESTRUCTURAL P2 1,420.00 3.50 4,970.00 1,420.00 4,970.00 0.00 0.00 0.00
CERRAJERIA GLB 1.00 150.00 150.00 1.00 150.00 0.00 0.00 0.00
TOPOGRAFO MES 4.00 2,000.00 8,000.00 1.00 2,000.00 1.00 2,000.00 1.00 2,000.00 1.00 2,000.00
TEODOLITO MES 4.00 1,200.00 4,800.00 1.00 1,200.00 1.00 1,200.00 1.00 1,200.00 1.00 1,200.00
NIVEL AUTOMATICO MES 4.00 900.00 3,600.00 1.00 900.00 1.00 900.00 1.00 900.00 1.00 900.00
DERECHO DE EXTRACCION DE MATERIAL DE PRESTAMO EN CANTE M3 7,893.60 2.50 19,734.00 7,893.60 19,734.00 0.00 0.00 0.00
ADITIVO PLASTIFICANTE GLN 229.83 30.00 6,894.90 0.00 229.83 6,894.90 0.00 0.00
COMPUERTA METALICA CON MECANISMO DE IZAJE TIPO I UND 1.00 1,500.00 1,500.00 0.00 0.00 1.00 1,500.00 0.00
COMPUERTA METALICA CON MECANISMO DE IZAJE TIPO II UND 22.00 1,000.00 22,000.00 0.00 0.00 22.00 22,000.00 0.00
HERRAMIENTAS MANUALES %MO 1.00 20,056.11 20,056.11 0.10 2,005.61 0.30 6,016.83 0.30 6,016.83 0.30 6,016.83
COSTO DIRECTO S/. 1,166,649.01 S/. 472,192.68 S/. 319,423.89 S/. 253,767.26 S/. 121,265.17
Presupuesto REHABILITACION Y MEJORAMIENTO DEL CANAL DE RIEGO LATERAL 28 MARGEN IZQUIERDA IRRIGACION S
Cliente JUNTA DE USUARIOS HUALLAGA CENTRAL
Lugar SAN HILARION - PICOTA - SAN MARTIN
Agrupamiento
+02
+04
+32+37
Frmula Polinmica
(Ejecucin Presupuestaria Directa EPD- VR2)
Presupuesto REHABILITACION Y MEJORAMIENTO DEL CANAL DE RIEGO LATERAL 28 MARGEN IZQUIERDA IRRIGACION SISA
Cliente JUNTA DE USUARIOS HUALLAGA CENTRAL
Lugar SAN HILARION - PICOTA - SAN MARTIN
Moneda : NUEVOS SOLES
Area Geogrfica : 01 Fecha
KK == 0.261Jr
0.261Jr/ /JoJo++0.036
0.036ACr
ACr/ /ACo
ACo++0.131
0.131DMPr
DMPr/ /DMPo
DMPo++0.287
0.287MEIr
MEIr/ /MEIo
MEIo++0.285
0.285GGUUr
GGUUr/ /GGUUo
GGUUo
COEFICIENTE
MONOMIO N NOMENCLATURA INDICE UNIFICADO DESCRIPCIN
INCIDENCIA
01 J 47 MANO DE OBRA INC. LEYES SOCIALES 0.287
03 ACERO DE CONSTRUCCION CORRUGADO
02 AC 05 AGREGADO GRUESO 0.170
21 CEMENTO PORTLAND TIPO I
30 DOLAR MAS INFLACION DEL MERCADO USA
03 DMP 43 MADERA NACIONAL PARA ENCOF. Y CARPINT. 0.090
56 PLANCHA DE ACERO LAC
04 MEI 49 MAQUINARIA Y EQUIPO IMPORTADO 0.429
05 GGUU 39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 0.104
K = Coeficiente de reajuste
r = Sub - indice correspondiente a los ndices de Precios para el mes de reajuste.
o = Sub - indice correspondiente a los ndices de Precios del presupuesto base.
Frmula Polinmica
jecucin Presupuestaria Directa EPD- VR2)
E RIEGO LATERAL 28 MARGEN IZQUIERDA IRRIGACION SISA
OCT 09
/ACo
ACo++0.131
0.131DMPr
DMPr/ /DMPo
DMPo++0.287
0.287MEIr
MEIr/ /MEIo
MEIo++0.285
0.285GGUUr
GGUUr/ /GGUUo
GGUUo
PORCENTAJE INCIDENCIA
100.00%
8.54%
28.96%
62.50%
71.29%
15.60%
13.11%
100.00%
100.00%