MUNICIPALIDAD DISTRITAL 1

DE HUAYLLABAMBA

RESUMEN DE VALORIZACIONES DE AVANCE DE OBRA


PRESUPUESTO TOTAL
CORRESPONDIENTE AL MES: AGOSTO 2013
PROYECTO: AMPLIACION SISTEMA DE DESAGUE EN LA C.C. DE HUAYOCCARI 2DA ETAPA DISTRITO DE HUAYLLABAMBA - URUBAMBA - CUSCO
FECHA DE PRESENTACIN: 02/09/2013

MONTO DE OBRA S/. 384,032.76 REGION : CUSCO


MONTO ASIGNADO 2011 : DEPARTAMENTO : CUSCO
FECHA DE INICIO DE OBRA : 24/JULIO/2013 PROVINCIA : URUBAMBA
PLAZO DE EJECUCIN : 150 Dias Calendarios DISTRITO : HUAYLLABAMBA
FECHA DE TERMINO : 12/ENERO/2011 LOCALIDAD : HUAYOCCARI

PRESUPUESTO AVANCES
PROGRAMADO VAL. ANTERIOR VAL. ACTUAL VAL. ACUMULADO
ITEM VALORIZACION
S/. Valorizado % Valorizado % Valorizado %
S/. S/. S/.

1 PROGRAMADO 384,032.76 3,330.06 0.87% 12,561.33 3.27% 15,891.39 4.14%

2 MAYOR METRADOS 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00%

ADICONAL POR PARTIDAS


3 3,183.71 283.18 8.89% 1,098.80 34.51% 1,381.98 43.41%
NUEVAS
4 DEDUCTIVOS 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00%

COSTO TOTAL 387,216.47 3,613.24 0.93% 13,660.13 3.53% 17,273.37 4.46%


MUNICIPALIDAD DISTRITAL 2
DE HUAYLLABAMBA

ACIONES DE AVANCE DE OBRA


PUESTO TOTAL

DA ETAPA DISTRITO DE HUAYLLABAMBA - URUBAMBA - CUSCO

: URUBAMBA
: HUAYLLABAMBA
: HUAYOCCARI

SALDO

Valorizado %
S/.

368,141.37 95.86%

0.00 0.00%

1,801.73 56.59%

0.00 0.00%

369,943.10 95.54%
MUNICIPALIDAD DISTRITAL 3
DE HUAYLLABAMBA

VALORIZACIN DE AVANCE DE OBRA PROGRAMADA


CORRESPONDIENTE ALSISTEMA
PROYECTO: AMPLIACION MES: AGOSTO 2013 EN LA C.C. DE HUAYOCCARI 2DA ETAPA DISTRITO DE HUAYLLABAMBA - URUBAMBA -
DE DESAGUE
CUSCO

AVANCES
PRESUPUESTO
VAL. ANTERIOR VAL. ACTUAL
PARTIDA DESCRIPCIN
P. U. PRES. VAL. VAL.
UND. METR. METR. METR.
S/. S/. S/. S/.
01.00 OBRAS PROVISIONALES 28,332.50 - -
01.01 EXCAVACION EN MATERIAL SUELTO m3 10.00 15.45 154.50 - - - -
01.02 CAMPAMENTO PROVISIONAL PARA LA OBRA m2 50.00 563.56 28,178.00 - - - -

02.00 RED DE ALCANTARILLADO (COLECTOR) 116,400.50 2,207.52 8,157.47


02.01 TRAZO NIVELACION Y REPLANTEO EN REDES m 2,326.00 1.34 3,116.84 1,330.70 1,783.14 113.00 151.42
02.02 EXCAVACION EN MATERIAL SUELTO PARA REDES DE ALCANTARILLADO m 815.70 7.35 5,995.40 - - 419.70 3,084.80
02.03 EXCAVACION DE ROCA SUELTA PARA REDES DE ALCANTARILLADO m 955.40 12.86 12,286.44 33.00 424.38 364.00 4,681.04
02.04 EXCAVACION EN ROCA FIJA PARA REDES DE ALCANTARILLADO m 554.90 49.98 27,733.90 - -
02.05 REFINE Y NIVELACION ZANJA EN ROCA SUELTA PARA RED DE ALCANTARILLADO m 2,326.00 0.51 1,186.26 - 471.00 240.21
02.06 CAMA DE APOYO EN REDES DE ALCANTARILLADO m 2,326.00 0.31 721.06 - - -
02.07 RELLENO COMP.ZANJA TERR.NORMAL"C"-TUB 4"-6" HASTA 1.00 M m 2,326.00 4.00 9,304.00 - - -
02.08 TUBERIA UPVC 6" ALCANTARILLADO S-25 m 2,326.00 23.07 53,660.82 - - -
02.09 DOBLE PRUEBA HIDRAULICA EN DESAGUES m 2,326.00 1.03 2,395.78 - - -

03.00 BUZONES (44 UND) 54,016.42 331.73 1,420.83


03.01 TRAZO NIVELACION Y REPLANTEO m2 88.47 5.69 503.39 58.30 331.73 6.03 34.31
03.02 EXCAVACION EN MATERIAL SUELTO m3 57.76 15.45 892.39 - - 42.22 652.30
03.03 EXCAVACION EN ROCA SUELTA m3 69.31 22.31 1,546.31 - - 32.91 734.22
03.04 ACARREO DE MATERIAL EXCEDENTE L=30 M. m3 158.84 5.15 818.03 - - - -
03.05 BUZON DE CONCRETO H=1.20, D=1.20 TAPA FF und 42.00 1,116.07 46,874.94 - - - -
03.06 BUZON DE CONCRETO H=2.00 D=1.20 TAPA FF und 2.00 1,447.38 2,894.76 - - - -
03.07 PICADO DE BUZON EXISTENTE PARA EMPALME DE TUBERIA m3 0.22 152.25 33.50 - - - -
03.08 EMPALME AL BUZON EXISTENTES DE LAS REDES COLECTORES DEL PROYECTO und 7.00 64.73 453.11 - - - -

04.00 CONEXION PRE DOMICILIARIA DE REDES COLECTORAS 33,734.23 - -


04.01 EXCAVACION EN MATERIAL SUELTO m3 122.50 15.45 1,892.63 - - - -
04.02 SUM ACCESORIOS DE CONEXIONES PRE DOMICLIARIAS DE REDES COLECTORAS glb 70.00 181.29 12,690.30 - - - -
04.03 COLOCACION DE ACCESORIOS EN CONEXIONES PREDOMICILIARIAS und 210.00 7.32 1,537.20 - - - -
MUNICIPALIDAD DISTRITAL 4
DE HUAYLLABAMBA

VALORIZACIN DE AVANCE DE OBRA PROGRAMADA


CORRESPONDIENTE ALSISTEMA
PROYECTO: AMPLIACION MES: AGOSTO 2013 EN LA C.C. DE HUAYOCCARI 2DA ETAPA DISTRITO DE HUAYLLABAMBA - URUBAMBA -
DE DESAGUE
CUSCO

AVANCES
PRESUPUESTO
VAL. ANTERIOR VAL. ACTUAL
PARTIDA DESCRIPCIN
P. U. PRES. VAL. VAL.
UND. METR. METR. METR.
S/. S/. S/. S/.
04.04 CAJA DE REGISTRO DE DESAGUE 12" X 24" pza 70.00 251.63 17,614.10 - - - -

05.00 SISTEMA TRATAMIENTO CON BIODIGESTORES, VIVIENDAS 45,022.62 - -

SIN POSIBILIDAD DE CONEXION A RED COLECTORA


05.01 TRAZO NIVELACION Y REPLANTEO EN OBRAS DE ARTE m2 325.44 1.06 344.97 - - - -
05.02 EXCAVACION EN ROCA SUELTA m3 265.23 16.61 4,405.47 - - - -
05.03 SUMIISTRO Y COLOCACION BIODIGESTORES FAMILIAR mod 14.00 1,350.18 18,902.52 - - - -
05.04 RELLENO CON MATERIAL PROPIO m3 79.57 5.15 409.79 - - - -
05.05 ENCOFRADO Y DESENCOFRADO DE OBRAS DE ARTE m2 69.05 27.66 1,909.92 - - - -
05.06 SOLADOS CONCRETO f'c=100 kg/cm2 h=2" m2 11.00 10.82 119.02 - - - -
05.07 CONCRETO F'C 210 KG/CM2 m3 5.04 395.70 1,994.33 - - - -
05.08 TAPA METALICA SANITARIA 0.60 X 0.60 M. und 14.00 107.21 1,500.94 - - - -
05.09 TUBERIA PVC SAP C-7.5 D=4" CRIBADA m 168.00 23.78 3,995.04 - - - -
05.10 FILTRO DE GRAVA m3 79.56 99.52 7,917.81 - - - -
MUNICIPALIDAD DISTRITAL 5
DE HUAYLLABAMBA

VALORIZACIN DE AVANCE DE OBRA PROGRAMADA


CORRESPONDIENTE ALSISTEMA
PROYECTO: AMPLIACION MES: AGOSTO 2013 EN LA C.C. DE HUAYOCCARI 2DA ETAPA DISTRITO DE HUAYLLABAMBA - URUBAMBA -
DE DESAGUE
CUSCO

AVANCES
PRESUPUESTO
VAL. ANTERIOR VAL. ACTUAL
PARTIDA DESCRIPCIN
P. U. PRES. VAL. VAL.
UND. METR. METR. METR.
S/. S/. S/. S/.
05.11 CAJA DE REGISTRO DE DESAGUE 12" X 24" pza 14.00 251.63 3,522.82 - - - -

06.00 PRUEBAS DE LABORATORIO 1,060.00 - -


06.01 ROTURA DE BRIQUETAS und 6.00 60.00 360.00 - - - -
06.02 DIEO DE MEZCLA und 1.00 400.00 400.00 - - - -
06.03 PRUEBA DE DESGASTE A LA ABRASION DE LOS AGREGADOS und 1.00 300.00 300.00 - - - -

07.00 CARTEL DE OBRA 1,050.28 - -


07.01 CARTEL DE OBRA und 1.00 1,050.28 1,050.28 - - - -

08.00 PLACA RECORDATORIO. 672.10 - -


08.01 PLACA RECORDATORIA DE ALUMINIO und 1.00 672.10 672.10 - - - -

09.00 TRANSPORTES Y FLETES 8,146.41 - -


09.01 FLETE TERRESTRE glb 1.00 5,017.78 5,017.78 - - - -
09.02 FLETE RURAL glb 1.00 3,128.63 3,128.63 - - - -

COSTO DIRECTO 288,435.06 2,539.25 9,578.30


GASTOS GENERALES ( 21.02%) 60,629.00 533.75 2,013.36
EXPEDIENTE TECNICO (3.99%) 11,500.00 101.24 381.89
GASTOS DE SUPERVISION (6.14%) 17,700.00 155.82 587.78
GASTOS DE LIQUIDACION (2.00%) 5,768.70 0.00 0.00
TOTAL PRESUPUESTO 384,032.76 3,330.06 12,561.33
PORCENTAJE DE AVANCE 0.87% 3.27%
MUNICIPALIDAD DISTRITAL 6
DE HUAYLLABAMBA

ANCE DE OBRA PROGRAMADA

FECHA DE PRESENTACIN: 02/09/2013

AVANCES
SALDO
VAL. ACUMULADO
VAL. VAL.
METR. % METR. %
S/. S/.

- 28,332.50
- - 0% 10.00 154.50 100%
- - 0% 50.00 28,178.00 100%

10,364.99 106,035.52
1,443.70 1,934.56 62% 882.30 1,182.28 38%
419.70 3,084.80 51% 396.00 2,910.60 49%
397.00 5,105.42 42% 558.40 7,181.02 58%
- - 0% 554.90 27,733.90 100%
471.00 240.21 20% 1,855.00 946.05 80%
- - 0% 2,326.00 721.06 100%
- - 0% 2,326.00 9,304.00 100%
- - 0% 2,326.00 53,660.82 100%
- - 0% 2,326.00 2,395.78 100%

1,752.56 52,263.86
64.33 366.04 73% 24.14 137.36 27%
42.22 652.30 73% 15.54 240.09 27%
32.91 734.22 47% 36.40 812.08 53%
- - 0% 158.84 818.03 100%
- - 0% 42.00 46,874.94 100%
- - 0% 2.00 2,894.76 100%
- - 0% 0.22 33.50 100%
- - 0% 7.00 453.11 100%

- 33,734.23
- - 0% 122.50 1,892.63 100%
- - 0% 70.00 12,690.30 100%
- - 0% 210.00 1,537.20 100%
MUNICIPALIDAD DISTRITAL 7
DE HUAYLLABAMBA

ANCE DE OBRA PROGRAMADA

FECHA DE PRESENTACIN: 02/09/2013

AVANCES
SALDO
VAL. ACUMULADO
VAL. VAL.
METR. % METR. %
S/. S/.
- - 0% 70.00 17,614.10 100%

- 45,022.62

- - 0% 325.44 344.97 100%


- - 0% 265.23 4,405.47 100%
- - 0% 14.00 18,902.52 100%
- - 0% 79.57 409.79 100%
- - 0% 69.05 1,909.92 100%
- - 0% 11.00 119.02 100%
- - 0% 5.04 1,994.33 100%
- - 0% 14.00 1,500.94 100%
- - 0% 168.00 3,995.04 100%
- - 0% 79.56 7,917.81 100%
MUNICIPALIDAD DISTRITAL 8
DE HUAYLLABAMBA

ANCE DE OBRA PROGRAMADA

FECHA DE PRESENTACIN: 02/09/2013

AVANCES
SALDO
VAL. ACUMULADO
VAL. VAL.
METR. % METR. %
S/. S/.
- - 0% 14.00 3,522.82 100%

- 1,060.00
- - 0% 6.00 360.00 100%
- - 0% 1.00 400.00 100%
- - 0% 1.00 300.00 100%

- 1,050.28
- - 0% 1.00 1,050.28 100%

- 672.10
- - 0% 1.00 672.10 100%

- 8,146.41
- - 0% 1.00 5,017.78 100%
- - 0% 1.00 3,128.63 100%

12,117.55 276,317.52
2,547.11 58,081.90
483.13 11,016.87
743.60 16,956.40
0.00 5,768.70
15,891.39 368,141.39
4.14% 95.86%
MUNICIPALIDAD DISTRITAL
DE HUAYLLABAMBA 9

VALORIZACIN - MAYORES METRADOS


CORRESPONDIENTE
PROYECTO: AL MES:
AMPLIACION AGOSTO
SISTEMA 2013
DE DESAGUE EN LA C.C. DE HUAYOCCARI 2DA ETAPA DISTRITO DE HUAYLLABAMBA -
URUBAMBA - CUSCO FECHA DE PRESENTACIN: 02

AVANCES
PRESUPUESTO
VAL. ANTERIOR VAL. ACTUAL VAL. ACUMULADO
ITEM DESCRIPCIN
P. U. PRES. VAL. VAL. VAL.
UND. METR. METR. METR. METR. %
S/. S/. S/. S/. S/.

COSTO DIRECTO 0.00 0.00 0.00


GASTOSGENERALES ( 13.15%) 0.00 0.00 #VALUE! 0.00
EXPEDIENTE TECNICO (2.71%) 0.00 0.00 #VALUE! 0.00
GASTOS DE SUPERVISION (2.86%) 0.00 0.00 #VALUE! 0.00
GASTOS DE LIQUIDACION (2.29%) 0.00 0.00 #VALUE! 0.00
TOTAL PRESUPUESTO 384,032.76 0.00 #VALUE! 0.00
PORCENTAJE DE AVANCE 0.00% #VALUE! 0.00%
MUNICIPALIDAD DISTRITAL
DE HUAYLLABAMBA 10

MAYORES METRADOS

FECHA DE PRESENTACIN: 02/09/2013

SALDO

VAL.
METR. %
S/.

###

###
###
MUNICIPALIDAD DISTRITAL
DE HUAYLLABAMBA 11

VALORIZACIN ADICIONALES POR PARTIDAS NUEVAS


CORRESPONDIENTE AL MES:
PROYECTO: AMPLIACION AGOSTO
SISTEMA 2013
DE DESAGUE EN LA C.C. DE HUAYOCCARI 2DA ETAPA DISTRITO DE
HUAYLLABAMBA - URUBAMBA - CUSCO FECHA DE PRESENTACIN: 02/09/2013

AVANCES
PRESUPUESTO SA
VAL. ANTERIOR VAL. ACTUAL VAL. ACUMULADO
PARTIDA DESCRIPCIN
P. U. PRES. VAL. VAL. VAL.
UND. METR. METR. METR. METR. % METR.
S/. S/. S/. S/. S/.
01.00 DEMOLICIONES
01.01 DEMOLICION DE CERCOS DE PIEDRA M3 69.34 14.81 1026.93 14.58 215.93 54.76 811.00 69.34 1026.93 100.00% 0.00
01.02 DEMOLICION DE CIMENTACION DE MURO M3 0.70 38.37 26.86 0.00 0.00 0.70 26.86 0.70 26.86 100.00% 0.00

02.00 TRABAJOS DE REPOCICION DE DEMOLICIONES


02.01 CONSTRUCCION DE MUROS DE PIEDRA M3 69.34 15.35 1064.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 69.34
02.02 CONCRETO F'c = 140 Kg/cm2 + 70 % P.G. M3 0.70 196.14 137.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.70
02.03 ENCOFRADO Y DESENCOFRADO (CIMIENTO DE CERCO M2 2.80 11.70 32.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 2.80
02.04 EXCAVACION DE ZANJAS PARA CIMIENTOS M3 1.96 14.42 28.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 1.96
02.05 RELLENO Y COMPACTADO CON MATERIAL PROPIO M3 1.96 38.11 74.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 1.96
COSTO DIRECTO 2,391.18 215.93 837.85 1053.78 1337.3
GASTOS GENERALES ( 21.02%) 502.63 45.39 176.12 221.51 281.12
EXPEDIENTE TECNICO (3.99%) 95.34 8.61 33.41 42.02 53.32
GASTOS DE SUPERVISION (6.14%) 146.74 13.25 51.42 64.67 82.07
GASTOS DE LIQUIDACION (2.00%) 47.82 0.00 0.00 0.00 47.82
TOTAL PRESUPUESTO 3,183.71 283.18 1,098.80 1,381.98 1,801.73
PORCENTAJE DE AVANCE 8.89% 34.51% 43.41% 56.59%
MUNICIPALIDAD DISTRITAL
DE HUAYLLABAMBA 12

ALES POR PARTIDAS NUEVAS

FECHA DE PRESENTACIN: 02/09/2013

SALDO

VAL.
%
S/.

0.00 0%
0.00 0%

1064.37 100%
137.30 100%
32.76 100%
28.26 100%
74.70 100%
1337.39 ###
281.12 ###
53.32
82.07 ###
47.82 ###
1,801.73
56.59%
% DE
ITEM DESCRIPCIN
EJECICION
01.00 OBRAS PROVISIONALES
01.01 EXCAVACION EN MATERIAL SUELTO 0%
01.02 CAMPAMENTO PROVISIONAL PARA LA OBRA 0%
02.00 RED DE ALCANTARILLADO (COLECTOR)
02.01 TRAZO NIVELACION Y REPLANTEO EN REDES 62%
02.02 EXCAVACION EN MATERIAL SUELTO PARA REDES DE ALCANTARILLADO 51%
02.03 EXCAVACION DE ROCA SUELTA PARA REDES DE ALCANTARILLADO 42%
02.04 EXCAVACION EN ROCA FIJA PARA REDES DE ALCANTARILLADO 0%
02.05 REFINE Y NIVELACION ZANJA EN ROCA SUELTA PARA RED DE ALCANTARILLADO 20%
02.06 CAMA DE APOYO EN REDES DE ALCANTARILLADO 0%
02.07 RELLENO COMP.ZANJA TERR.NORMAL"C"-TUB 4"-6" HASTA 1.00 M 0%
02.08 TUBERIA UPVC 6" ALCANTARILLADO S-25 0%
02.09 DOBLE PRUEBA HIDRAULICA EN DESAGUES 0%
03.00 BUZONES (44 UND)
03.01 TRAZO NIVELACION Y REPLANTEO 73%
03.02 EXCAVACION EN MATERIAL SUELTO 73%
03.03 EXCAVACION EN ROCA SUELTA 47%
03.04 ACARREO DE MATERIAL EXCEDENTE L=30 M. 0%
03.05 BUZON DE CONCRETO H=1.20, D=1.20 TAPA FF 0%
03.06 BUZON DE CONCRETO H=2.00 D=1.20 TAPA FF 0%
03.07 PICADO DE BUZON EXISTENTE PARA EMPALME DE TUBERIA 0%
03.08 EMPALME AL BUZON EXISTENTES DE LAS REDES COLECTORES DEL PROYECTO 0%
04.00 CONEXION PRE DOMICILIARIA DE REDES COLECTORAS
04.01 EXCAVACION EN MATERIAL SUELTO 0%
04.02 SUM ACCESORIOS DE CONEXIONES PRE DOMICLIARIAS DE REDES COLECTORAS 0%
04.03 COLOCACION DE ACCESORIOS EN CONEXIONES PREDOMICILIARIAS 0%
04.04 CAJA DE REGISTRO DE DESAGUE 12" X 24" 0%
05.00 SISTEMA TRATAMIENTO CON BIODIGESTORES, VIVIENDAS
SIN POSIBILIDAD DE CONEXION A RED COLECTORA
05.01 TRAZO NIVELACION Y REPLANTEO EN OBRAS DE ARTE 0%
05.02 EXCAVACION EN ROCA SUELTA 0%
05.03 SUMIISTRO Y COLOCACION BIODIGESTORES FAMILIAR 0%
05.04 RELLENO CON MATERIAL PROPIO 0%
05.05 ENCOFRADO Y DESENCOFRADO DE OBRAS DE ARTE 0%
05.06 SOLADOS CONCRETO f'c=100 kg/cm2 h=2" 0%
05.07 CONCRETO F'C 210 KG/CM2 0%
05.08 TAPA METALICA SANITARIA 0.60 X 0.60 M. 0%
05.09 TUBERIA PVC SAP C-7.5 D=4" CRIBADA 0%
05.10 FILTRO DE GRAVA 0%
05.11 CAJA DE REGISTRO DE DESAGUE 12" X 24" 0%
06.00 PRUEBAS DE LABORATORIO
06.01 ROTURA DE BRIQUETAS 0%
06.02 DIEO DE MEZCLA 0%
06.03 PRUEBA DE DESGASTE A LA ABRASION DE LOS AGREGADOS 0%
07.00 CARTEL DE OBRA
07.01 CARTEL DE OBRA 0%
08.00 PLACA RECORDATORIO.
08.01 PLACA RECORDATORIA DE ALUMINIO 0%
09.00 TRANSPORTES Y FLETES
09.01 FLETE TERRESTRE 0%
09.02 FLETE RURAL 0%

% DE
ITEM DESCRIPCIN
EJECICION
01.00 DEMOLICIONES
01.01 DEMOLICION DE CERCOS DE PIEDRA 100%
01.02 DEMOLICION DE CIMENTACION DE MURO 100%
02.00 TRABAJOS DE REPOCICION DE DEMOLICIONES
02.01 CONSTRUCCION DE MUROS DE PIEDRA 0%
02.02 CONCRETO F'c = 140 Kg/cm2 + 70 % P.G. 0%
02.03 ENCOFRADO Y DESENCOFRADO (CIMIENTO DE CERCO) 0%
02.04 EXCAVACION DE ZANJAS PARA CIMIENTOS 0%
02.05 RELLENO Y COMPACTADO CON MATERIAL PROPIO 0%