VALORIZACIN DE OBRA N 01-2016

OBRA: "MEJORAMIENTO DE LOS SERVICIOS DE SALUD PARA LA ATENCIN INTEGRAL DEL PUESTO DE SALUD FLORENCIA DE MORA" PRESUPUESTO CONTRATADO: S/. 3,441,253.73
PROPIETARIO: MUNICIPALIDAD DISTRITAL DE FLORENCIA DE MORA
UBICACIN: LA LIBERTAD - TRUJILLO - FLORENCIA DE MORA
FECHA: 30 DE JUNIO DEL 2016
PRESUPUESTO AVANCE
SALDO
N DESCRIPCION REFERENCIAL ANTERIOR ACTUAL ACUMULADO
UND METR. P.UNIT. PRESUP. METR. VALORIZ. % METR. VALORIZ. % METR. VALORIZ. % METR. VALORIZ. %
01 ESTRUCTURAS 1,151,002.60 0.00 0.00 435,068.00 37.80 435,068.00 37.80 715,934.60 62.20
1.1 OBRAS PRELIMINARES 73,909.75 0.00 0.00 73,909.75 100.00 73,909.75 100.00 0.00 0.00
1.1.1 CARTEL DE IDENTIFICACION DE LA OBRA DE 2.40 X 3.60 m und 1.00 1,326.15 1,326.15 0.00 0.00 1.00 1,326.15 100.00% 1.00 1,326.15 100.00 0.00 0.00 0.00
1.1.2 CASETA DE ALMACEN Y GUARDIANIA m2 40.00 420.84 16,833.60 0.00 0.00 40.00 16,833.60 100.00% 40.00 16,833.60 100.00 0.00 0.00 0.00
1.1.3 TRASLADO DE MATERIAL, EQUIPO, OTROS A OBRA glb 1.00 27,000.00 27,000.00 0.00 0.00 1.00 27,000.00 100.00% 1.00 27,000.00 100.00 0.00 0.00 0.00
1.1.4 SEGUROS E IMPLEMENTOS DE SEGURIDAD glb 1.00 28,750.00 28,750.00 0.00 0.00 1.00 28,750.00 100.00% 1.00 28,750.00 100.00 0.00 0.00 0.00
1.2 TRABAJOS PRELIMINARES 95,207.62 0.00 0.00 95,207.62 100.00 95,207.62 100.00 0.00 0.00
1.2.1 DEMOLICION DE CONSTRUCCION EXISTENTE glb 1.00 74,852.35 74,852.35 0.00 0.00 1.00 74,852.35 100.00% 1.00 74,852.35 100.00 0.00 0.00 0.00
1.2.2 LIMPIEZA DE TERRENO MANUAL m2 2060.25 1.79 3,687.85 0.00 0.00 2060.25 3,687.85 100.00% 2,060.25 3,687.85 100.00 0.00 0.00 0.00
1.2.3 TRAZOS, NIVELACION Y REPLANTEOS m2 2060.25 8.09 16,667.42 0.00 0.00 2060.25 16,667.42 100.00% 2,060.25 16,667.42 100.00 0.00 0.00 0.00
1.3 MOVIMIENTO DE TIERRAS 252,667.93 0.00 0.00 202,087.50 79.98 202,087.50 79.98 50,580.44 20.02
1.3.1 CORTE DE EXPLANACION A NIVEL DE SUB RASANTE m3 927.11 12.99 12,043.16 0.00 0.00 927.11 12,043.16 100.00% 927.11 12,043.16 100.00 0.00 0.00 0.00
1.3.2 EXCAVACION DE ZANJAS PARA CIMIENTOS m2 281.71 39.24 11,054.30 0.00 0.00 281.71 11,054.30 100.00% 281.71 11,054.30 100.00 0.00 0.00 0.00
1.3.3 EXCAVACION DE ZANJAS PARA ZAPATAS Y CISTERNA m3 963.97 39.24 37,826.18 0.00 0.00 963.97 37,826.18 100.00% 963.97 37,826.18 100.00 0.00 0.00 0.00
1.3.4 REFINE Y NIVELACION DE ZANJAS PARA CIMIENTOS Y ZAPATAS m2 169.56 9.23 1,565.04 0.00 0.00 169.56 1,565.04 100.00% 169.56 1,565.04 100.00 0.00 0.00 0.00
1.3.5 RELLENO COMPACTADO C/ MATERIAL DE PRESTAMO ( AFIRMADO) m3 60.40 85.68 5,175.07 0.00 0.00 0.00 0.00 0.00% 0.00 0.00 0.00 60.40 5,175.07 100.00
1.3.6 SUB-BASE DE 0.10m F.C. 1.25 - Extendido, Riego y Compactado ( VEREDAS) m2 532.25 28.39 15,110.58 0.00 0.00 0.00 0.00 0.00% 0.00 0.00 0.00 532.25 15,110.58 100.00
1.3.7 BASE DE AFIRMADO DE 0.20 Extendido, Riego y Compactado en AREA LIBRE m2 891.81 33.97 30,294.79 0.00 0.00 0.00 0.00 0.00% 0.00 0.00 0.00 891.81 30,294.79 100.00
1.3.8 GRAVILLA DE 1/2" A 3/4" E= 0.10 Extendido. m2 713.45 17.23 12,292.74 0.00 0.00 713.45 12,292.74 100.00% 713.45 12,292.74 100.00 0.00 0.00 0.00
1.3.9 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO HASTA 30 KM m3 2824.63 45.07 127,306.07 0.00 0.00 2824.63 127,306.07 100.00% 2,824.63 127,306.07 100.00 0.00 0.00 0.00
1.4 ESTRUCTURAS DE CONCRETO 304,415.84 0.00 0.00 63,863.13 20.98 63,863.13 20.98 240,552.71 79.02
1.4.1 CONCRETO SIMPLE 142,750.74 0.00 0.00 63,863.13 44.74 63,863.13 44.74 78,887.61 55.26
1.4.1.1 CONCRETO EN CIMIENTOS CORRIDOS C : H 1:10 + 30% PG m3 181.28 352.29 63,863.13 0.00 0.00 181.28 63,863.13 100.00% 181.28 63,863.13 100.00 0.00 0.00 0.00
1.4.1.2 ENCOFRADO Y DESENCOFRADO NORMAL EN SOBRECIMIENTO DE SOGA m2 559.39 54.83 30,671.35 0.00 0.00 0.00 0.00 0.00% 0.00 0.00 0.00 559.39 30,671.35 100.00
1.4.1.3 CONCRETO 1:8+25% PM PARA SOBRECIMIENTOS DE 0.15 DE ANCHO m3 56.38 400.83 22,598.80 0.00 0.00 0.00 0.00 0.00% 0.00 0.00 0.00 56.38 22,598.80 100.00
1.4.1.4 CONCRETO EN FALSO PISO F'C=140 KG/CM2, E=4" m2 577.16 39.47 22,780.51 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 577.16 22,780.51 100.00
1.4.1.5 ENCOFRADO Y DESENCOFRADO EN BANCAS DE CONCRETO m2 8.64 41.22 356.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.64 356.14 100.00
1.4.1.6 BANCAS DE CONCRETO F'C=175 KG/CM2 m 5.40 459.41 2,480.81 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.40 2,480.81 100.00
1.4.2 VEREDAS DE CONCRETO 69,624.51 0.00 0.00 0.00 0.00 0.00 0.00 69,624.51 100.00
1.4.2.1 CORTE DE TERRENO H= 0.20M EN VEREDAS m2 425.80 30.52 12,995.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 425.80 12,995.42 100.00
1.4.2.2 CONFORMACION Y COMPACTACION DE SUB RAZANTE EN VEREDAS m2 425.80 5.46 2,324.87 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 425.80 2,324.87 100.00
1.4.2.3 BASE GRANULAR PARA VEREDAS DE 0.10 m m2 425.80 22.28 9,486.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 425.80 9,486.82 100.00
1.4.2.4 ENCOFRADO Y DESENCOFRADO NORMAL EN VEREDAS m2 248.38 54.50 13,536.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 248.38 13,536.71 100.00
1.4.2.5 VEREDA DE CONCRETO f'c= 175 kg/cm2 m2 425.80 70.50 30,018.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 425.80 30,018.90 100.00
1.4.2.6 JUNTAS ASFLTICAS m 496.77 2.54 1,261.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 496.77 1,261.80 100.00
1.4.3 SARDINELES 8,283.81 0.00 0.00 0.00 0.00 0.00 0.00 8,283.81 100.00
1.4.3.1 EXCAVACION DE ZANJAS PARA SARDINELES m 27.30 27.40 748.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 27.30 748.02 100.00
1.4.3.2 CONCRETO FC=175 kg/cm2 PARA SARDINELES m 15.93 459.41 7,318.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15.93 7,318.40 100.00
1.4.3.3 ENCOFRADO Y DESENCOFRADO DE SARDINELES m2 4.78 41.22 197.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.78 197.03 100.00
1.4.3.4 JUNTA ASFLTICA 1" EN SARDINELES m 1.37 4.86 6.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.37 6.66 100.00
1.4.3.5 CURADO DE SARDINELES CON CURADOR QUIMICO m 15.93 0.86 13.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15.93 13.70 100.00
VALORIZACIN DE OBRA N 01-2016
OBRA: "MEJORAMIENTO DE LOS SERVICIOS DE SALUD PARA LA ATENCIN INTEGRAL DEL PUESTO DE SALUD FLORENCIA DE MORA" PRESUPUESTO CONTRATADO: S/. 3,441,253.73
PROPIETARIO: MUNICIPALIDAD DISTRITAL DE FLORENCIA DE MORA
UBICACIN: LA LIBERTAD - TRUJILLO - FLORENCIA DE MORA
FECHA: 30 DE JUNIO DEL 2016
PRESUPUESTO AVANCE
SALDO
N DESCRIPCION REFERENCIAL ANTERIOR ACTUAL ACUMULADO
UND METR. P.UNIT. PRESUP. METR. VALORIZ. % METR. VALORIZ. % METR. VALORIZ. % METR. VALORIZ. %
1.4.4 PAVIMENTO RGIDO 83,756.78 0.00 0.00 0.00 0.00 0.00 0.00 83,756.78 100.00
1.4.4.1 CORTE A NIVEL DE SUBRASANTE EN PAVIMENTO RIGIDO m3 161.23 12.99 2,094.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 161.23 2,094.38 100.00
1.4.4.2 SUB-RASANTE - Nivelacion, Riego y Compactado m2 358.29 8.80 3,152.95 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 358.29 3,152.95 100.00
1.4.4.3 SUB-BASE DE 0.20 m F.C. 1.25 - Extendido, Riego y Compactado m2 465.78 28.39 13,223.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 465.78 13,223.49 100.00
1.4.4.4 BASE DE 0.20m F.C. 1.25 - Extendido, Riego y Compactado m2 465.78 33.97 15,822.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 465.78 15,822.55 100.00
1.4.4.5 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO HASTA 30 KM m3 209.60 45.07 9,446.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 209.60 9,446.67 100.00
1.4.4.6 CONCRETO EN PAVIMENTO RIGIDO H = 0.15 m f'c = 210 Kg/cm2 m3 53.74 598.76 32,177.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 53.74 32,177.36 100.00
1.4.4.7 ENCOFRADO Y DESENCOFRADO DE PAVIMENTO RIGIDO m2 116.64 41.16 4,800.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 116.64 4,800.90 100.00
1.4.4.8 JUNTA ASFLTICA 1" PAVIMENTO RIGIDO m 583.20 5.21 3,038.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 583.20 3,038.47 100.00
1.5 CONCRETO ARMADO 424,801.46 0.00 0.00 0.00 0.00 0.00 0.00 424,801.46 100.00
1.5.1 ZAPATAS Y VIGAS DE CIMENTACIN 99,169.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 99,169.76 100.00
1.5.1.1 CONCRETO PARA ZAPATAS f'c=210 kg/cm2 m3 74.54 593.87 44,267.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 74.54 44,267.07 100.00
1.5.1.2 ACERO fy=4200 kg/cm2 GRADO 60 EN ZAPATAS kg 2658.53 6.07 16,137.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,658.53 16,137.28 100.00
1.5.1.3 ENCOFRADO Y DESENCOFRADO DE VIGAS DE CIMENTACION m2 238.79 53.66 12,813.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 238.79 12,813.47 100.00
1.5.1.4 CONCRETO EN VIGAS DE CIMENTACION f'c=210 kg/cm2 m3 29.85 539.22 16,095.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 29.85 16,095.72 100.00
1.5.1.5 ACERO fy=4200 kg/cm2 GRADO 60 EN VIGAS DE CIMENTACION kg 1623.76 6.07 9,856.22 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,623.76 9,856.22 100.00
1.5.2 COLUMNAS 125,764.36 0.00 0.00 0.00 0.00 0.00 0.00 125,764.36 100.00
1.5.2.1 ACERO fy=4200 kg/cm2 GRADO 60 EN COLUMNAS kg 12249.21 6.07 74,352.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12,249.21 74,352.70 100.00
1.5.2.2 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 354.88 54.52 19,348.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 354.88 19,348.06 100.00
1.5.2.3 CONCRETO EN COLUMNAS f'c=210 kg/cm2 m3 53.55 598.76 32,063.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 53.55 32,063.60 100.00
1.5.3 VIGAS 97,576.02 0.00 0.00 0.00 0.00 0.00 0.00 97,576.02 100.00
1.5.3.1 ACERO fy=4200 kg/cm2 GRADO 60 kg 7538.36 6.07 45,757.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7,538.36 45,757.85 100.00
1.5.3.2 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 172.89 54.52 9,425.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 172.89 9,425.96 100.00
1.5.3.3 CONCRETO EN VIGAS f'c=210 kg/cm2 m3 70.80 598.76 42,392.21 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 70.80 42,392.21 100.00
1.5.4 LOSAS ALIGERADAS 102,291.32 0.00 0.00 0.00 0.00 0.00 0.00 102,291.32 100.00
1.5.4.1 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS m2 543.07 62.28 33,822.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 543.07 33,822.40 100.00
1.5.4.2 LADRILLO HUECO DE ARCILLA 15X25X30 cm PARA TECHO ALIGERADO und 5,609.91 3.14 17,615.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5,609.91 17,615.12 100.00
1.5.4.3 ACERO fy=4200 kg/cm2 GRADO 60 en LOSAS ALIGERADAS kg 3,690.40 6.07 22,400.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,690.40 22,400.73 100.00
1.5.4.4 CONCRETO EN LOSAS ALIGERADAS f'c=210 kg/cm2 m3 47.52 598.76 28,453.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 47.52 28,453.08 100.00
2 ARQUITECTURA 739,786.55 0.00 0.00 0.00 0.00 0.00 0.00 739,786.55 100.00
2.1 MUROS Y TABIQUES DE ALBAILERA 111,888.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 111,888.99 100.00
2.1.1 MURO DE SOGA LADRILLO KING-KONG CON CEMENTO-ARENA m2 1228.28 68.16 83,719.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,228.28 83,719.56 100.00
2.1.2 COBERTURA DE LADRILLO PASTELERO MEZCLA C:A m2 671.18 41.97 28,169.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 671.18 28,169.42 100.00
2.2 REVOQUES ENLUCIDOS Y MOLDURAS 135,547.15 0.00 0.00 0.00 0.00 0.00 0.00 135,547.15 100.00
2.2.1 TARRAJEO EN MUROS INT. Y EXT. CON MORTERO C:A 1:5 E=1.5CM m2 2691.43 40.33 108,545.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,691.43 108,545.37 100.00
2.2.2 TARRAJEO EN CIELORRASO CON MORTERO C:A 1:5 E=1.5CM m2 543.07 45.03 24,454.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 543.07 24,454.44 100.00
2.2.3 TARRAJEO DE SUPERFICIE DE VIGAS CON CEMENTO-ARENA m2 60.55 42.07 2,547.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 60.55 2,547.34 100.00
2.3 PISOS Y PAVIMENTOS 120,271.70 0.00 0.00 0.00 0.00 0.00 0.00 120,271.70 100.00
2.3.1 PISO DE CERAMICA DE COLOR DE 30 X30 m2 494.70 119.40 59,067.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 494.70 59,067.18 100.00
2.3.2 PISO DE CERAMICO DE 45X45 CM ( VEREDAS) m2 425.80 131.05 55,801.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 425.80 55,801.09 100.00
2.3.3 PISO DE CEMENTO PULIDO E=2" MEZCLA 1:4 m2 82.47 65.52 5,403.43 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 82.47 5,403.43 100.00
VALORIZACIN DE OBRA N 01-2016
OBRA: "MEJORAMIENTO DE LOS SERVICIOS DE SALUD PARA LA ATENCIN INTEGRAL DEL PUESTO DE SALUD FLORENCIA DE MORA" PRESUPUESTO CONTRATADO: S/. 3,441,253.73
PROPIETARIO: MUNICIPALIDAD DISTRITAL DE FLORENCIA DE MORA
UBICACIN: LA LIBERTAD - TRUJILLO - FLORENCIA DE MORA
FECHA: 30 DE JUNIO DEL 2016
PRESUPUESTO AVANCE
SALDO
N DESCRIPCION REFERENCIAL ANTERIOR ACTUAL ACUMULADO
UND METR. P.UNIT. PRESUP. METR. VALORIZ. % METR. VALORIZ. % METR. VALORIZ. % METR. VALORIZ. %
2.4 ZOCALOS Y CONTRAZOLCALOS 48,086.12 0.00 0.00 0.00 0.00 0.00 0.00 48,086.12 100.00
2.4.1 CONTRAZOCALO DE CERAMICA DE 20 X 30 cm DE COLOR m 385.56 79.26 30,559.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 385.56 30,559.49 100.00
2.4.2 ZOCALO DE CERAMICO DE 30X30 CM m2 158.04 110.90 17,526.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 158.04 17,526.64 100.00
2.5 CARPINTERA DE MADERA 35,595.63 0.00 0.00 0.00 0.00 0.00 0.00 35,595.63 100.00
2.5.1 PUERTAS DE MADERA DE 4.5 mm DE CEDRO m2 52.29 324.70 16,978.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 52.29 16,978.56 100.00
2.5.2 MARCOS DE MADERA PARA PUERTAS DE CEDRO 2" X 4" m 146.40 59.83 8,759.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 146.40 8,759.11 100.00
2.5.3 BANCAS DE MADERA EN SS.HH und 11.00 745.25 8,197.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11.00 8,197.75 100.00
2.5.4 MURO DE DRYWALL De 1/2'' Pared Simple Placa RH m2 19.28 86.11 1,660.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 19.28 1,660.20 100.00
2.6 CARPINTERA METLICA 105,537.32 0.00 0.00 0.00 0.00 0.00 0.00 105,537.32 100.00
2.6.1 PUERTA METALICA m2 25.11 554.03 13,911.69 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.11 13,911.69 100.00
2.6.2 VENTANA CON BARROTES DE FC 1/2 @ 0.20 M m2 20.11 354.94 7,137.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20.11 7,137.84 100.00
2.6.3 PUERTA CON MELAMINA Y PERFILES DE ALUMINIO und 6.00 234.43 1,406.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 1,406.58 100.00
2.6.4 PANEL DE PERFIL DE ALUMINIO CON MELAMINA m2 19.28 127.70 2,462.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 19.28 2,462.06 100.00
2.6.5 COBERTURA PERFIL 4 MM - CON ESTRUCTURA METALICA EN ESTACIONAMIENTO m2 35.00 584.13 20,444.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 35.00 20,444.55 100.00
2.6.6 COBERTURA DE POLICARBONATO EN BANCAS m2 20.16 234.57 4,728.93 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20.16 4,728.93 100.00
2.6.7 TUBOS DE ACERO DE D= 2" EN COBERTURA DE BANCAS DE CONCRETO m 42.00 66.95 2,811.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 42.00 2,811.90 100.00
2.6.8 CORREAS DE ACERO EN COBERTURA DE BANCAS DE CONCRETO m 50.40 24.27 1,223.21 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 50.40 1,223.21 100.00
2.6.9 CERCO DE MALLA METALICO m2 154.34 290.77 44,877.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 154.34 44,877.44 100.00
2.6.10 PASA MANOS METALICO m 46.05 141.87 6,533.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 46.05 6,533.11 100.00
2.7 CERRAJERA 5,254.20 0.00 0.00 0.00 0.00 0.00 0.00 5,254.20 100.00
2.7.1 CERRADURA PARA PUERTA PRINCIPAL PESADA und 28.00 109.69 3,071.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 28.00 3,071.32 100.00
2.7.2 BISAGRA CAPUCHINA DE 3 1/2" X 3 1/2" und 112.00 19.49 2,182.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 112.00 2,182.88 100.00
2.8 VIDRIOS, CRISTALES Y SIMILARES 13,813.13 0.00 0.00 0.00 0.00 0.00 0.00 13,813.13 100.00
2.8.1 VIDRIOS TEMPLADOS SEMIDOBLES INCOLORO CRUDO p2 601.08 13.68 8,222.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 601.08 8,222.77 100.00
2.8.2 MURO DE BLOQUE DE VIDRIO (20X20 cm.) CON MORTERO 1:5 m2 24.70 226.33 5,590.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 24.70 5,590.35 100.00
2.9 PINTURA 101,890.83 0.00 0.00 0.00 0.00 0.00 0.00 101,890.83 100.00
2.9.1 PINTURA VINILICA EN CIELO RASO 2 MANOS m2 543.07 22.18 12,045.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 543.07 12,045.29 100.00
2.9.2 PINTURA VINILICA EN SUPERFICIE DE VIGAS Y 2 MANOS m2 60.55 20.12 1,218.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 60.55 1,218.27 100.00
2.9.3 PINTURA VINILICA EN MUROS EXTERIORES 2 MANOS m2 2691.43 32.55 87,606.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,691.43 87,606.05 100.00
2.9.4 PINTURA EN PUERTAS CON BARNIZ 2 MANOS m2 52.29 19.53 1,021.22 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 52.29 1,021.22 100.00
2.10 PAISAJISMO 9,832.53 0.00 0.00 0.00 0.00 0.00 0.00 9,832.53 100.00
2.10.1 CORTE PARA SUB BASE EN GRASS NATURAL m2 99.19 12.60 1,249.79 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 99.19 1,249.79 100.00
2.10.2 MEJORAMIENTO DE SUELO CON MATERIAL ORGANICO Ep=0.25m.L m2 99.19 34.93 3,464.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 99.19 3,464.71 100.00
2.10.3 GRASS AMERICANO m2 99.19 17.69 1,754.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 99.19 1,754.67 100.00
2.10.4 FICUS BENJAMIN H=1.50M und 6.00 111.28 667.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 667.68 100.00
2.10.5 CONSERVACIN Y RIEGO DE JARDINES HASTA ENTREGA DE OBRA glb 1.00 2,695.68 2,695.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 2,695.68 100.00
VALORIZACIN DE OBRA N 01-2016
OBRA: "MEJORAMIENTO DE LOS SERVICIOS DE SALUD PARA LA ATENCIN INTEGRAL DEL PUESTO DE SALUD FLORENCIA DE MORA" PRESUPUESTO CONTRATADO: S/. 3,441,253.73
PROPIETARIO: MUNICIPALIDAD DISTRITAL DE FLORENCIA DE MORA
UBICACIN: LA LIBERTAD - TRUJILLO - FLORENCIA DE MORA
FECHA: 30 DE JUNIO DEL 2016
PRESUPUESTO AVANCE
SALDO
N DESCRIPCION REFERENCIAL ANTERIOR ACTUAL ACUMULADO
UND METR. P.UNIT. PRESUP. METR. VALORIZ. % METR. VALORIZ. % METR. VALORIZ. % METR. VALORIZ. %
2.11 SEGURIDAD 2,914.34 0.00 0.00 0.00 0.00 0.00 0.00 2,914.34 100.00
2.11.1 SEGURIDAD glb 1.00 2,914.34 2,914.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 2,914.34 100.00
2.12 SEALIZACIN 1,954.61 0.00 0.00 0.00 0.00 0.00 0.00 1,954.61 100.00
2.12.1 SEALIZACION glb 1.00 1,954.61 1,954.61 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1,954.61 100.00
2.13 CAPACITACIN 25,000.00 0.00 0.00 0.00 0.00 0.00 0.00 25,000.00 100.00
2.13.1 PROGRAMA DE CAPACITACION Y EDUCACION PREVENTIVA EN SALUD A LA POBLACION chla 5.00 5,000.00 25,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.00 25,000.00 100.00
2.14 MITIGACIN DE IMPACTO AMBIENTAL 22,200.00 0.00 0.00 0.00 0.00 0.00 0.00 22,200.00 100.00
2.14.1 MITIGACION DE IMPACTO AMBIENTAL glb 1.00 22,200.00 22,200.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 22,200.00 100.00
3 INSTALACIONES SANITARIAS 53,218.46 0.00 0.00 0.00 0.00 0.00 0.00 53,218.46 100.00
3.1 APARATOS Y ACCESORIOS SANITARIOS 11,852.93 0.00 0.00 0.00 0.00 0.00 0.00 11,852.93 100.00
3.1.1 INODORO MONTECARLO BLANCO COMERCIAL (SIN COLOCACION) und 9.00 385.65 3,470.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9.00 3,470.85 100.00
3.1.2 LAVATORIO DE PARED BLANCO 1 LLAVE pza 14.00 235.65 3,299.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 14.00 3,299.10 100.00
3.1.3 LAVADERO DE UNA POZA DE ACERO INOXIDABLE und 4.00 265.35 1,061.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 1,061.40 100.00
3.1.4 URINARIOS DE LOZA DE PICO DE LORO pza 2.00 185.65 371.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 371.30 100.00
3.1.5 LAVADERO DE CONCRETO UNA POZA und 2.00 254.65 509.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 509.30 100.00
3.1.6 JABONERAS DE LOZA COLOR CON ASA DE 15 X 15 cm pza 4.00 16.00 64.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 64.00 100.00
3.1.7 COLOCACION DE APARATOS SANITARIOS pza 31.00 95.46 2,959.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 31.00 2,959.26 100.00
3.1.8 COLOCACION DE ACCESORIOS SANITARIOS pza 4.00 29.43 117.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 117.72 100.00
3.2 SISTEMA DE DESAGUE 19,253.39 0.00 0.00 0.00 0.00 0.00 0.00 19,253.39 100.00
3.2.1 SALIDAS DE PVC SAL PARA DESAGUE DE 2" pto 32.00 89.46 2,862.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 32.00 2,862.72 100.00
3.2.2 SALIDAS DE PVC SAL PARA DESAGUE DE 4" pto 9.00 90.78 817.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9.00 817.02 100.00
3.2.3 SALIDAS DE PVC SAL PARA VENTILACION DE 2" pto 6.00 89.46 536.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 536.76 100.00
3.2.4 TUBERIA DE PVC SAL 2" m 165.25 24.17 3,994.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 165.25 3,994.09 100.00
3.2.5 TUBERIA DE PVC SAL 4" m 136.65 30.14 4,118.63 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 136.65 4,118.63 100.00
3.2.6 TUBERIA DE PVC SAL 6" m 97.82 36.36 3,556.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 97.82 3,556.74 100.00
3.2.7 REGISTRO DE BRONCE 4" pza 9.00 65.05 585.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9.00 585.45 100.00
3.2.8 SUMIDERO DE BRONCE 2" PROVISION Y COLOCACION pza 18.00 66.97 1,205.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 18.00 1,205.46 100.00
3.2.9 CAJA DE REGISTRO PARA AGUA DE 30 x 60 CM pza 11.00 143.32 1,576.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11.00 1,576.52 100.00
3.3 SISTEMA DE AGUA FRA 22,112.14 0.00 0.00 0.00 0.00 0.00 0.00 22,112.14 100.00
3.3.1 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" pto 35.00 87.43 3,060.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 35.00 3,060.05 100.00
3.3.2 RED DE DISTRIBUCION TUBERIA DE 3/4" PVC-SAP m 156.98 44.44 6,976.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 156.98 6,976.19 100.00
3.3.3 RED DE DISTRIBUCION TUBERIA DE 1/2" PVC-SAP m 268.54 20.74 5,569.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 268.54 5,569.52 100.00
3.3.4 VALVULA COMPUERTA DE BRONCE DE UNION ROSCADA DE 1/2" und 15.00 23.54 353.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15.00 353.10 100.00
3.3.5 GRIFO PARA RIEGO 1/2" und 4.00 64.35 257.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 257.40 100.00
3.3.6 TANQUE CISTERNA (ACCESORIOS) pza 1.00 496.67 496.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 496.67 100.00
3.3.7 TANQUE CISTERNA pza 1.00 3,235.56 3,235.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 3,235.56 100.00
3.3.8 TANQUE ELEVADO ROTOPLAS (ACCESORIOS) pza 1.00 462.58 462.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 462.58 100.00
3.3.9 TANQUES ELEVADO pza 1.00 1,701.07 1,701.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1,701.07 100.00
VALORIZACIN DE OBRA N 01-2016
OBRA: "MEJORAMIENTO DE LOS SERVICIOS DE SALUD PARA LA ATENCIN INTEGRAL DEL PUESTO DE SALUD FLORENCIA DE MORA" PRESUPUESTO CONTRATADO: S/. 3,441,253.73
PROPIETARIO: MUNICIPALIDAD DISTRITAL DE FLORENCIA DE MORA
UBICACIN: LA LIBERTAD - TRUJILLO - FLORENCIA DE MORA
FECHA: 30 DE JUNIO DEL 2016
PRESUPUESTO AVANCE
SALDO
N DESCRIPCION REFERENCIAL ANTERIOR ACTUAL ACUMULADO
UND METR. P.UNIT. PRESUP. METR. VALORIZ. % METR. VALORIZ. % METR. VALORIZ. % METR. VALORIZ. %
4 INSTALACIONES ELCTRICAS 156,655.12 0.00 0.00 0.00 0.00 0.00 0.00 156,655.12 100.00
4.1 SALIDAS CONDUCTORES Y/O TUBERIAS 23,149.82 0.00 0.00 0.00 0.00 0.00 0.00 23,149.82 100.00
4.1.1 SALIDA DE TECHO CON CABLE AWG TW 2.5 mm (14) + D PVC SEL 3/4 pto 67.00 107.96 7,233.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 67.00 7,233.32 100.00
4.1.2 SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE C/TUB. SEL D= 3/4" pto 68.00 99.59 6,772.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 68.00 6,772.12 100.00
4.1.3 SALIDA PARED P/ INTERRUPTORES C/Tubo SEL 3/4" pto 88.00 95.24 8,381.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 88.00 8,381.12 100.00
4.1.4 CAJA DE PASO OCTOGONAL 4"X4" und 6.00 127.21 763.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 763.26 100.00
4.2 TABLEROS E INTERRUPTORES 3,438.38 0.00 0.00 0.00 0.00 0.00 0.00 3,438.38 100.00
4.2.1 TABLERO GENERAL C/CAJA pza 1.00 469.33 469.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 469.33 100.00
4.2.2 TABLERO DISTRIBUCIN und 5.00 209.33 1,046.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.00 1,046.65 100.00
4.2.3 POZO CONEXION A TIERRA und 3.00 640.80 1,922.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 1,922.40 100.00
4.3 ARTEFACTOS ELCTRICOS 130,066.92 0.00 0.00 0.00 0.00 0.00 0.00 130,066.92 100.00
4.3.1 FLUORESCENTE RECTO ISPE PANTALLA 2X40W C/EQ+PANTALLA DOBLE EMPOTRADO und 52.00 213.87 11,121.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 52.00 11,121.24 100.00
4.3.2 MONTAJE DE ARTEFACTO SPOT LIGHT FOCOS und 15.00 71.09 1,066.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15.00 1,066.35 100.00
4.3.3 ELECTROBOMBA Y ACCESORIOS pza 1.00 1,480.94 1,480.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1,480.94 100.00
4.3.4 GRUPO ELECTROGENO und 1.00 116,398.39 116,398.39 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 116,398.39 100.00
5 EQUIPAMIENTO 513,695.60 0.00 0.00 9,699.71 1.89 9,699.71 1.89 503,995.89 98.11
5.1 CONSULTORIO MEDICINA GENERAL glb 1.00 25,752.00 25,752.00 0.00 0.00 0.14 3,678.86 14.29 0.14 3,678.86 14.29 0.86 22,073.14 85.71
5.2 CONSULTORIO OBSTETRICIO glb 1.00 42,146.00 42,146.00 0.00 0.00 0.14 6,020.86 14.29 0.14 6,020.86 14.29 0.86 36,125.14 85.71
5.3 COLSULTORIO ENFERMERA glb 1.00 75,080.00 75,080.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 75,080.00 100.00
5.4 CONSULTORIO DE ODONTOLOGA GENERAL CON SOPORTE DE RADIOLOGA ORAL glb 1.00 98,383.00 98,383.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 98,383.00 100.00
5.5 SALA DE ESPERA glb 1.00 9,174.00 9,174.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 9,174.00 100.00
5.6 CAJA, ADMISIN, CITAS, ARCHIVO Y RENIEC glb 1.00 16,627.00 16,627.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 16,627.00 100.00
5.7 SS.HH DAMAS, CABALLEROS, DISCAPACITADOS glb 1.00 270.00 270.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 270.00 100.00
5.8 ESPENDIO DE MEDICAMIENTOS glb 1.00 4,440.00 4,440.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 4,440.00 100.00
5.9 LABORATORIO CLNICO glb 1.00 89,981.60 89,981.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 89,981.60 100.00
5.10 TOMA DE MUESTRAS-ESPUTO glb 1.00 9,492.00 9,492.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 9,492.00 100.00
5.11 CUATO DE LIMPIEZA glb 1.00 11,460.00 11,460.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 11,460.00 100.00
5.12 RESIDUOS SLIDOS Y ACOPIO glb 1.00 2,920.00 2,920.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 2,920.00 100.00
5.13 TPICO URGENCIAS Y EMERGENCIAS(EMG2) glb 1.00 116,783.00 116,783.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 116,783.00 100.00
5.14 CASETA DE GUARDIANA Y ESTACIONAMIENTO glb 1.00 1,540.00 1,540.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1,540.00 100.00
5.15 ESTERILIZACIN RPIDA glb 1.00 9,647.00 9,647.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 9,647.00 100.00
COSTO DIRECTO 2,614,358.33 0.00 0.00% 444,767.71 17.01% 444,767.71 17.01% 2,169,590.62 82.99%
GASTOS GENERALES (10%) 261,435.83 0.00 44,476.77 44,476.77 216,959.06
UTILIDAD (5%) 130,717.92 0.00 22,238.39 22,238.39 108,479.53
SUBTOTAL 3,006,512.08 0.00 511,482.87 511,482.87 2,495,029.21
FR = 0.97 2,916,316.72
IMPUESTOS (IGV) 18% 524,937.01 0.00 92,066.92 92,066.92 449,105.26
TOTAL VALORIZADO S/. 3,441,253.73 0.00 0.00% 603,549.79 17.54% 603,549.79 17.54% 2,944,134.47 85.55%