Kresna Yasha

From: Kresna Yasha <kresna.yasha@bsibatu.com>


Sent: Sunday, June 11, 2017 8:23 AM
To: jarrod.taylor@bsibatu.com; 'Slamet Usman' (slamet.usman@bsibatu.com);
donny.suhendra@bsibatu.com; muttaqin@bsibatu.com
Cc: akhlis.tashwim@bsibatu.com; 'arsyad.tunru@bsibatu.com';
soniansyah@bsibatu.com; suharto@bsibatu.com; 'Sukaca .';
'nyoman.sujana@bsibatu.com'; 'Taggy Kenap' (taggy.kenap@bsibatu.com); Asian
Sitompul; Hariadhi Kusuma (hariadhi.kusuma@bsibatu.com);
teddy.hayanata@bsibatu.com
Subject: Maintenance Daily Activity

Gents,

Please find out following is the daily activity of the Maintenance Team.

1. No Accident nor incident. 3 ea OK-KAN


2. ADR & Heap Leach :

Monitor EW Hg Scrubber running normal, KOG Hg Scrubber standby Electrics.


Inspected and repaired Level Switch of the Regeneration Kiln Carbon Hoper (LE-05)
Electrics.
Inspection of Over Head Lines from Electrics.
Permanent Activation for SCADA System Computer at OPP Managers Office (License)
Electrics.
Checked Lighting at MIA area found the Thermal overload on the contactor and photo cell
faulty, temporary repaired Electrics.
Carbon Loaded Screen temporary repaired to minimize carbon passing the screen
Mechanics.
Daily PM check, greasing and monitoring bearing temperatures OPP areal generals
Mechanics and Electrics.

3. OPP
Carry out fabrication of ; 12 pcs Mine Geology sample tray, FDR-01 rubber skirt and BIN-02
(Agglomerator Surge Bin) wear plate using bisalloy 20.0mm Mechanics.
Adjusted belt tracking of FDR-01 Mechanics.
Fabricate deflector plate of head chute conveyor CVR-01 (completed) Mechanics.
Continue fabricate 12 ea Sample Tray for Mine Geology Mechanics.
2 hours Shutdown Jobs completed;
o Installed / welded wear plate skirting board BIN-02 Agglomerator Surge Bin, with
plate 20mm x 545mm x 1110 (4sheet) Mechanics.
o Inspected and re-band-it Scalping Screen Mechanics.
o Replaced Rollers on the CVR-08 (2 ea) and CVR-09 (3 ea) Mechanics.
o Cleaned up Load Cells of the CVR-07 weigher and inspected the Tachometer Wheel
Electrics.
o Re-positioned FDR-01 under speed junction box and tidy up the cable Electrics.
o Assisted Operation and Mechanics for the shutdown Electrics.
Replaced Flood Light on the Scalping Screen area Electrics.
Routine daily inspection for Mechanics and Electric.

Regards

1
Kresna Yasha

From: Kresna Yasha <kresna.yasha@bsibatu.com>


Sent: Monday, June 12, 2017 8:18 AM
To: jarrod.taylor@bsibatu.com; 'Slamet Usman' (slamet.usman@bsibatu.com);
donny.suhendra@bsibatu.com; muttaqin@bsibatu.com
Cc: akhlis.tashwim@bsibatu.com; 'arsyad.tunru@bsibatu.com';
soniansyah@bsibatu.com; suharto@bsibatu.com; 'Sukaca .';
'nyoman.sujana@bsibatu.com'; 'Taggy Kenap' (taggy.kenap@bsibatu.com); Asian
Sitompul; Hariadhi Kusuma (hariadhi.kusuma@bsibatu.com);
teddy.hayanata@bsibatu.com
Subject: Maintenance Daily Activity

Gents,

Please find out following is the daily activity of the Maintenance Team.

1. No Accident nor incident.


2. ADR & Heap Leach :

PM checks and cleaned up for WT-02, WB-08 and WB-09 area Electrics.
Checked LSL-8036 and LSL-8044 Lime Mixing Tank, cable broken hit by Agitator blade
Electrics.
Continue working on the Dewatering with operation, could not access the PLC Program (we
dont have software for Schneider M40 PLC) Electrics.
Repaired Controller of Lighting at MIA Electrics.
Checked PLC Program on the WT-02 Pumps control and add program for run in auto for
pumping to OPP by monitoring the pressure (continue) Electrics.
Checked Power to Repeater adjacent to the Block 13 Office, ELCB tripped Electrics.
Replaced gasket of HCL dosing pump #1 (80-PMP-58) and made some spares Mechanics.
Daily PM check, greasing and monitoring bearing temperatures OPP areal generals
Mechanics and Electrics.

3. OPP
Carry out fabrication of ; 12 pcs Mine Geology sample tray and Oxygen/Acetylene cradle
Mechanics.
Adjusted belt tracking and trimmed belt peeled off on FDR-01 Mechanics.
Repaired deflector plate of FDR-01 for spares Mechanics.
Call Out for Primary Jaw Crusher Tripped, found loose RTDs cable inside the motor junction
box (down time 80 mins)- Electrics.
Re-adjusted FDR-01 under speed Electrics.
Checked and monitor RFID for Trucks at Load Out, no reading for TC-3129 Electrics.
Routine daily inspection for Mechanics and Electric.

Regards

Kresna Yasha
E/I Superintendent

1
Kresna Yasha

From: Kresna Yasha <kresna.yasha@bsibatu.com>


Sent: Tuesday, June 13, 2017 7:57 AM
To: jarrod.taylor@bsibatu.com; 'Slamet Usman' (slamet.usman@bsibatu.com);
donny.suhendra@bsibatu.com; muttaqin@bsibatu.com
Cc: akhlis.tashwim@bsibatu.com; 'arsyad.tunru@bsibatu.com';
soniansyah@bsibatu.com; suharto@bsibatu.com; 'Sukaca .';
'nyoman.sujana@bsibatu.com'; 'Taggy Kenap' (taggy.kenap@bsibatu.com); Asian
Sitompul; Hariadhi Kusuma (hariadhi.kusuma@bsibatu.com);
teddy.hayanata@bsibatu.com; Achmad Niam (ahmad.niam@bsibatu.com)
Subject: Maintenance Daily Activity

Gents,

Please find out following is the daily activity of the Maintenance Team.

1. No Accident nor incident. 2 OK-KAN


2. ADR & Heap Leach :

Checked and inspected Kilns thermocouples there is leaks of hot air from the tapping point,
installed insulation (glass wools) - Electrics.
Checked the erratic signal of KOG Hg Scrubber Flow Switch (FS-128), found temperature of
the process is higher than Flow Switch operating temperature (85 C) Electrics.
Checked and identified un-used/terminated cables at Dewatering area Electrics.
Run new power cable for the PLS pump upgrade at Heap Leach and prepare for VSD
installation Electrics.
On the Job training for PLC troubleshooting ADR Plant (Niam, Adam and Arsyad) Electrics.
Inspected Loaded carbon screen Mechanics.
Daily PM check, greasing and monitoring bearing temperatures OPP areal generals
Mechanics and Electrics.

3. OPP
Carry out fabrication of ; 12 pcs Mine Geology sample tray, wear plate for under size
vibrating grizzly, Scalping screen and Oxygen/Acetylene cradle Mechanics.
Adjusted belt tracking and trimmed belt peeled off on FDR-01 Mechanics.
Repaired deflector plate of FDR-01 for spares Mechanics.
Call out for Installed and re-band-it Scalping Screen (3 pcs fall off) Mechanics.
Call Out for FDR-02 Gate stuck on Open position, found the solenoid connector plug full with
water and MCB was tripped 20:38 to 00:10 (212 mins)- Electrics.
Re-adjusted FDR-01 under speed Electrics.
Checked Sampler system VSD parameters for pak Karl Electrics.
Routine daily inspection for Mechanics and Electric.

Regards

Kresna Yasha
E/I Superintendent

1
Kresna Yasha

From: Kresna Yasha <kresna.yasha@bsibatu.com>


Sent: Wednesday, June 14, 2017 7:12 AM
To: jarrod.taylor@bsibatu.com; 'Slamet Usman' (slamet.usman@bsibatu.com);
donny.suhendra@bsibatu.com; muttaqin@bsibatu.com
Cc: akhlis.tashwim@bsibatu.com; 'arsyad.tunru@bsibatu.com';
soniansyah@bsibatu.com; suharto@bsibatu.com; 'Sukaca .';
'nyoman.sujana@bsibatu.com'; 'Taggy Kenap' (taggy.kenap@bsibatu.com); Asian
Sitompul; Hariadhi Kusuma (hariadhi.kusuma@bsibatu.com);
teddy.hayanata@bsibatu.com; Achmad Niam (ahmad.niam@bsibatu.com)
Subject: Maintenance Daily Activity

Gents,

Please find out following is the daily activity of the Maintenance Team.

1. No Accident nor incident.


2. ADR & Heap Leach :

Checked and inspected Kilns thermocouples there is leaks of hot air from the tapping point,
installed insulation (glass wools) - Electrics.
Reset FAN-22 Hg Scrubber tripped on VSD (Overload) and continue monitoring the Fan
Electrics.
Reset DAM #5 Pump tripped on overload, increase the overload setting to 110% of Motor
Full Load Current Electrics.
Run new power cable for the PLS pump upgrade at Heap Leach and prepare for VSD
installation (continue) Electrics.
Repaired kilns feed hoper gate valve stuck and failed to close Mechanics.
Daily PM check, greasing and monitoring bearing temperatures OPP areal generals
Mechanics and Electrics.

3. OPP
Carry out fabrication of ; 12 pcs Mine Geology sample tray, wear plate for under size
vibrating grizzly, Scalping screen and Oxygen/Acetylene cradle Mechanics.
Adjusted belt tracking, trimmed belt peeled off and clipped the belt of FDR-01 Mechanics.
Preparation for shutdown, FDR-01, CVR-03 and Scalping Screen (SCR-02) Mechanics.
Call Out for FDR-01 for assist mechanics crew repaired the ripped belt at 03:00 to 06:00 and
20:00 to 23:30 - Electrics.
Re-adjusted CVR-03 belt drift roller and replaced loose nut of the belt rip switch Electrics.
Checked and cleaned up under speed sensor of CVR-01 Electrics.
Call out for assist mechanics repaired Screen #02 (15-SCR-02) at 03:00 Electrics.
Routine daily inspection for Mechanics and Electric.

Regards

Kresna Yasha
E/I Superintendent

1
Kresna Yasha

From: Kresna Yasha <kresna.yasha@bsibatu.com>


Sent: Thursday, June 15, 2017 7:43 AM
To: jarrod.taylor@bsibatu.com; 'Slamet Usman' (slamet.usman@bsibatu.com);
donny.suhendra@bsibatu.com; muttaqin@bsibatu.com
Cc: akhlis.tashwim@bsibatu.com; 'arsyad.tunru@bsibatu.com';
soniansyah@bsibatu.com; suharto@bsibatu.com; 'Sukaca .';
'nyoman.sujana@bsibatu.com'; 'Taggy Kenap' (taggy.kenap@bsibatu.com); Asian
Sitompul; Hariadhi Kusuma (hariadhi.kusuma@bsibatu.com);
teddy.hayanata@bsibatu.com; Achmad Niam (ahmad.niam@bsibatu.com)
Subject: Maintenance Daily Activity

Gents,

Please find out following is the daily activity of the Maintenance Team.

1. No Accident nor incident.


2. ADR & Heap Leach :

Checked LIT-121 Hg Scrubber Level error, found manual valve still closed Electrics.
Checked and tested AAS equipment at Interteks Lab Electrics.
Checked AV-6047 Lime to Detox valve, awaiting for parts and plan to use ball valve
Electrics.
Daily PM check, greasing and monitoring bearing temperatures OPP areal generals
Mechanics and Electrics.

3. OPP
Shutdown Tasks completed;
o Installed skirting wear plate board and set the gap 10mm between liner and belt,
clipped the belt (FDR-01) Mechanics
o Clipped CVR-03 belt approx.. 6.0 meter Mechanics.
o Checked and re-band it scalping screen Mechanics.
o Full Calibration for CVR-06 and CVR-07 weightometer Electrics.
o Checked Tachometer wheel of CVR-06 and CVR-07 weightometer Electrics.
o Checked and retightened all RTDs connections of the Primary Jaw Crusher
Electrics.
Carry out fabrication of ; 12 pcs Mine Geology sample tray, wear plate for under size
vibrating grizzly, Scalping screen and Oxygen/Acetylene cradle Mechanics.
Call Out for Scalping screen re-band it at 03:00 to 05:00 - Mechanics.
Routine daily inspection for Mechanics and Electric.

Regards

Kresna Yasha
E/I Superintendent

PT. Bumi Suksesindo Tujuh Bukit Operations


1
Kresna Yasha

From: Kresna Yasha <kresna.yasha@bsibatu.com>


Sent: Friday, June 16, 2017 8:28 AM
To: jarrod.taylor@bsibatu.com; 'Slamet Usman' (slamet.usman@bsibatu.com);
donny.suhendra@bsibatu.com; muttaqin@bsibatu.com
Cc: akhlis.tashwim@bsibatu.com; 'arsyad.tunru@bsibatu.com';
soniansyah@bsibatu.com; suharto@bsibatu.com; 'Sukaca .';
'nyoman.sujana@bsibatu.com'; 'Taggy Kenap' (taggy.kenap@bsibatu.com); Asian
Sitompul; Hariadhi Kusuma (hariadhi.kusuma@bsibatu.com);
teddy.hayanata@bsibatu.com; Achmad Niam (ahmad.niam@bsibatu.com)
Subject: Maintenance Daily Activity

Gents,

Please find out following is the daily activity of the Maintenance Team.

1. No Accident nor incident. 1 ea OK KAN


2. ADR & Heap Leach :

Checked FIT-9025 Diesel fuel flowmeter to Header Tank, we need Hart Communicator to
reset and investigate the alarm Electrics.
Checked erratic reading of FIT-5005 Detox area Electrics.
Repaired temporary power installation from ADR Maintenance W/shop to Construction
w/shop Electrics.
Assist Operation for testing the Dewatering, found dosing pump leaks will be continue after
repair Electrics.
Temporary replace AV-6047 Lime to Detox valve with available parts Electrics and
Mechanics.
Assist Intertek to remove bearings from the shaft of Bow Machine 2 unit Mechanics.
Daily PM check, greasing and monitoring bearing temperatures OPP areal generals
Mechanics and Electrics.

3. OPP
Carry out fabrication of ; 12 pcs Mine Geology sample tray (completed), wear plate for under
size vibrating grizzly + Scalping screen undersize head chute of CVR-04, and
Oxygen/Acetylene cradle Mechanics.
Fabricate wear plate for secondary discharge chute, according to the drawings no. LDP-M-
16139-20-CL-1-DT01-A, DT02-A and DT03-A Mechanics.
Retightened some bolt of the skirting frame (loose) on the CVR-03 Mechanics.
Assist Operation to adjusted the Secondary Jaw Crusher Gap Mechanics.
Call Out for assist operation to unblocked Appron Feeder from big rocks from 20:00
Mechanics and Electrics.
Routine daily inspection for Mechanics and Electric.

Regards

Kresna Yasha
E/I Superintendent

1
Kresna Yasha

From: Kresna Yasha <kresna.yasha@bsibatu.com>


Sent: Saturday, June 17, 2017 8:20 AM
To: jarrod.taylor@bsibatu.com; 'Slamet Usman' (slamet.usman@bsibatu.com);
donny.suhendra@bsibatu.com; muttaqin@bsibatu.com
Cc: akhlis.tashwim@bsibatu.com; 'arsyad.tunru@bsibatu.com';
soniansyah@bsibatu.com; suharto@bsibatu.com; 'Sukaca .';
'nyoman.sujana@bsibatu.com'; 'Taggy Kenap' (taggy.kenap@bsibatu.com); Asian
Sitompul; Hariadhi Kusuma (hariadhi.kusuma@bsibatu.com);
teddy.hayanata@bsibatu.com; Achmad Niam (ahmad.niam@bsibatu.com)
Subject: Maintenance Daily Activity

Gents,

Please find out following is the daily activity of the Maintenance Team.

1. No Accident nor incident. 1 ea OK KAN


2. ADR & Heap Leach :

Assist Operation to run the KOG Hg Scrubber Electrics.


Checks erratic reading of FIT-5005 Detox area continue Electrics.
Install new Oven at Intertek Labs Electrics.
Continue install VSD for PLS Pump upgrade preparation Electrics.
Call out for Regeneration Kiln stopped without any alarms at 18:50 Electrics.
Temporary replace AV-6047 Lime to Detox valve with butterfly valve continue Electrics
and Mechanics.
Repaired dosing pump 65-PMP-95, found the air inlet housing was damaged continue
Mechanics.
Daily PM check, greasing and monitoring bearing temperatures OPP areal generals
Mechanics and Electrics.

3. OPP
Carry out fabrication of ; liners plate for primary and secondary crusher chute and
Oxygen/Acetylene cradle Mechanics.
Call out for Assist Operation to un-blocked the big rock on the ROM Bin Mechanics and
Electrics.
During the shutdown the tasks were completed;
o Replaced Rollers of CVR-01, CVR-02 and CVR-06 Mechanics.
o Re-band it scalping screen panels Mechanics.
o Checked RTDs connection on the Primary Jaw Crusher Motor Electrics.
Call Out at 01:00 for Load Out Gate FDR-02 failed to close/open Mechanics and Electrics.
Routine daily inspection for Mechanics and Electric.

Regards

Kresna Yasha
E/I Superintendent