EMPLOYER: M/s AL Fazeela Technical services APP APPROVED

ENGINEER: M/s Adnan Saffarini AAN APPROVED AS NOTED


PROJECT: Proposed B+G+1 villa UCR UNDER CONSULTANT REVIEW
Date: 18.6.2017 AANR APPROVED AS NOTED RESUBMIT
NAR NOT APPROVED, RESUBMIT
MATERIAL SUBMITTALS - MEP LOG
1ST SUBMISSION 2nd SUBMISSION
DATE APPROVAL DATE APPROVAL APPROVAL
SL No: REF. DESCRIPTION REV. DATE REPLIED DATE REPLIED DATE REPLIED DATE REPLIED
SUBMITTED STATUS SUBMITTED STATUS STATUS

1 SUBMITTAL 01 AIR TERMINALS R00 18.06.2017


2 SUBMITTAL 02 FLEXIBLE DUCT R00 18.06.2017
3 SUBMITTAL 03 FLEXIBLE DUCT CONNECTOR R00 18.06.2017
4 SUBMITTAL 04 PRE INSULATED DUCT R00 18.06.2017
5 SUBMITTAL 05 REFRIGERANT PIPE R00 18.06.2017
6 SUBMITTAL 06 PIPE INSULATION R00 18.06.2017
7 SUBMITTAL 07 VOLUME CONTROL DAMPERS R00 18.06.2017
8 SUBMITTAL 08 UPVC DRAINAGE PIPE R00 18.06.2017
9 SUBMITTAL 09 DECO DUCT ELECTRICAL CONDUITS & ACCESSORIES R00 18.06.2017