Академический Документы
Профессиональный Документы
Культура Документы
Data as in Tender
Notice/
Sl. Tender Document/ To be Read as /
Volume Clause No Remarks
No BOQ/Technical Correction
Specification/ 2nd
Corrigendum
1 Vol. 2 Bill No. 5, Bill no-5, subsection-E Revised BOQ of Electrical The tenderers are
BOQ. Subsection-E (Station & Building - portion of Bill no-5, requested to submit
Electrical portion) subsection-E is attached revised Electrical
as Annexure-A (3 pages) portion of bill no-5,
to corrigendum notice-3. sub section-E
instead of original
Electrical portion of
Bill no-5, sub
section-E.
2 Vol-3 E-3.3.20.1 Missing of description in Addition of description in
Tech. and E- Para E-3.3.20.1 of one Para E-3.3.20.1 as sub-
Spec 3.3.20.2 sub-para: (a) 11/0.415 para (a), namely,
kV,100kVATransformer, 11/ 0.415 kV, 100kVA
in Tech Specification of Transformer in the
the item. Small Specification as per
correction to para E Annexure B (3 pages) of
3.3.20.2. corrigendum notice -3, and
renumbering of existing
Sub Para nos (a), (b), (c)
and (d) as (b), (c), (d) and
(e) respectively.
3 Vol. 2 Bill No C, Supply of MG Supply of MG Monoblock
BOQ Item-C-3.7 Monoblock Prestessed Prestessed Concrete
Concrete sleepers : sleepers : 150 Nos.
2325 Nos.
4 Vol-3 Vol.3, Vol.3, Subsection D: Replace Clause D 4.4 and
Tech. Subsection D: Bridge & Culvert, Para- D 6.16 as per Annexure-C
Spec. Bridge & D 4.4 and D 6.16 (2 pages) of corrigendum
Culvert notice -3.