Immediate measure
6. Painting materials such as Place the painting in storage place Immediate
thinner, paint, varnish which is
flammable placed in the second
floor of the building. And welding Long term measure
worker carried out nearby , there
is high chance to catch fire when Arrange a fire marshal to monitor hot 5 days.
thinner when contact with work
welding spark which results fire Carry out risk assessment by a 3 weak
and explosion of materials sever competent person
injury burns to the to the workers
Immediate measure
14. One worker was working on Stop working on unprotected edges Immediately
the stair case that doesnt have
hand rails. He is over reaching to Avoid over reaching while working Immediately
clean the concrete surface to start
the tile work. There is a chance of Long term measure
fall because he is not wearing Provide safety harness to arrest the
safety harness. This will cause fall 2 days
serious disabilities, injuries and
can cause death. Provide refreshment training to the 2 weeks
worker
15. Drinking water provided for Immediate measure
workers were not placed in a Provide good housekeeping Immediately
clean area. The area is
contaminated and it is not labeled Long term measure
with date, time and water testing Use disposable paper cups and avoid
results were not displayed. common cup that have more chance 2 days
Common cup used to drink water to spread the disease.
also found as dirty. This will cause
Diarrhea, Cholera, and other Replace the facility to somewhere 1 week
serious illnesses such as Typhoid, else having good hygiene
and Dysentery.
16. While filling diesel to the Immediate measure
power generator the workers Provide good house keeping Immediately
accidently spill some diesel on the
floor and this incident may have Long term measure
the potential to cause slip of the Provide spill kit tray to prevent the 2 days
worker on the same floor and spillage to the floors
increases the like hood of spinal
injury, broken bones etc. Avoid manual filling by providing
instruments and mechanical aids 3 weeks
Immediate measure
17. The roof of the temporary Remove the asbestos sheet Immediately
changing room that is used by all
workers was build with asbestos
and the condition is even worse, Long term measure
that it is already deteriorated. Use FRP roofing sheets 2 days
There is a chance of asbestos fiber
inhalation hazard that may cause Provide instruction and information
the workers breathing problems and training regarding the side
and when it is inhaled for long effects of asbestos 4 weeks
time will cause cancer.
Immediate measure
18. Workers were walking to Provide cool drinks to workers Immediately
mess hall that is 100M away from
the site for having lunch by foot Long term measure
during hot weather condition. The Provide transportation to reach the 2 days
time noticed as 1 pm. At this time mess hall
the heat level by sun is at the
peak and this incident will cause Make changes in lunch time schedule
dehydration, muscle cramp, heat by changing the time to 11am 2 weeks
stress and unconsciousness.