Instructions for assembly and use (Method statement)
9732-398-01
Introduction User information Column formwork Top 50
tion
Introduc-
2 999809702 - 07/2013
User information Column formwork Top 50 Introduction
Contents
4 System description
5 Design of column formwork
8 Column formwork with Multipurpose walings
WS10 Top50
10 Column formwork with Multi-purpose walings
WU12 Top50
12 Ladder system
13 Instructions for assembly and use
15 Component overview
999809702 - 07/2013 3
User information Column formwork Top 50
System description
The proven Doka beams, multipurpose walings and Cross-sections continuously adjustable up to
Doka formwork sheets are also used for column form- 120 x 120 cm
work. No form-ties through the column
Clean, smooth concrete surfaces
Easy assembly and handling
9732-398-01
4 999809702 - 07/2013
User information Column formwork Top 50
Z 9732-405-01
A
C
B
9732-225-01
9732-300-01
E
F
G
To achieve exact plumbing & aligning of the
column formwork, the best arrangement of A Universal angle tie bracket
the panel struts is as shown above.
B Wing nut 15.0
Always attach panel struts to free-standing C Tie-rod 15.0
formwork halves to prevent them from falling
D Flange reinforcement
over.
E Corner connecting plate 90/50
The Corner connecting plate 90/50 connects the wal- F Doka beam H20
ings rigidly and precisely across the corner. G Multipurpose waling
Together with tie-rods, the Universal angle tie bracket
enables the walings to be diagonally tension-braced.
CAUTION
Risk of tie overload if not correctly positioned!
Make sure that the Universal angle tie
bracket is bolted into the right holes for the
Multipurpose waling WS10 Top50 or WU12
Top50, depending on which type of waling is
being used!
9732-381-02 9732-381-01
999809702 - 07/2013 5
User information Column formwork Top 50
A Spacer plank
B Profiled timber former
9732-357-01
Rectangular column formwork
As far as possible, set the angles of the form-ties in the same ratio as
the length-to-width ratio of the column cross section.
: Length : Width
6 999809702 - 07/2013
User information Column formwork Top 50
on column formwork.
Important note:
Spread-angle of slinging chains: max. 30.
Shore the formwork in a windproof manner
when erecting it and when it is temporarily
placed in the standing position.
B A
Using the easy-to-attach Lifting bracket, the col-
umn formwork can be safely lifted by crane:
For each half of the column formwork, attach two Lift-
ing brackets to the Doka beams symmetrically (so as
9732-303-01
How to mount:
Mount the brackets. A
Screw on the floor decking.
9732-304-01
Slot in the railing planks.
Put up sideguards with Edge protection system XP. B
CAUTION
Where the column is 5.0 m high or more, or
where one half of the column formwork has
a dead weight of 800 kg or above, the Lift-
ing-bracket for column formwork is used.
Its high inherent rigidity enables the column
formwork to be lifted safely by crane.
For more information, please contact your
Doka technician.
999809702 - 07/2013 7
User information Column formwork Top 50
A
Connecting pin 10cm *) 16 16 16 16 16 16
Wing nut 15.0 4 4 4 4 4 4
9732-305-01
Tie-rod 15.0mm 1.00m 2 2 2 2 2 2
B *) When column formwork is transported flat:
B Secure the connecting pins with Spring cotters 5mm.
Example 52 x 52 cm Example 70 x 70 cm
A
9732-308-01
9732-307-01
B
B
8 999809702 - 07/2013
User information Column formwork Top 50
Column height h
Space [cm] between walings
[m]
G 195 195 195 195
F 155 155 155 155
E 140 140 140 140
G
10.0 D 140 140 140 140
C 140 140 140 140
B 140 140 140 140
A 40 40 40 40
G 140 140 140 140
F
F 140 140 140 140
E 140 140 140 140
9.0 D 140 140 140 140
C 140 140 140 140
E
h
A 40 40 40 40
E 180 180 180 180
9732-313-01
999809702 - 07/2013 9
User information Column formwork Top 50
A tie bracket
9732-310-01
Flange-clamp
20 20 20 20 24 24
H20
Connecting pin
16 16 16 16 16 16
B
10cm *)
B Wing nut 15.0 4 4 4 4 4 4
Tie-rod 15.0mm
2 2 2 2 2 2
A Multi-purpose waling WU12 Top50 1.50m 1.00m
B Multi-purpose waling WU12 Top50 1.75m *) When column formwork is transported flat:
A
9732-312-01
9732-311-01
B
B
10 999809702 - 07/2013
User information Column formwork Top 50
[cm]
With rectangular columns, the longer of the
Number of
two sides is the applicable dimension for struc- Doka beams
tural design purposes. H20 on each
5 5 5 5 6 6
side
Column
height h Space [cm] between walings
[m]
K 145 145
K
I 160 110 110
H 170 170 120 95 95
G 195 140 140 105 95 95
I
F 155 120 120 105 95 95
10.0
E 140 120 120 105 95 95
H
D 140 120 120 105 95 95
C 140 120 120 105 95 95
B 140 120 120 105 95 95
G
A 40 40 40 40 30 30
h
I 155 155
F
A 40 40 40 40 30 30
H 135 135
G 170 170 170 110 110
B
999809702 - 07/2013 11
User information Column formwork Top 50
Ladder system
Position a of the top waling level:
min. 24 cm below the platform decking (differs from
the instructions given elsewhere in this User Infor-
mation booklet)
If this rule is ignored, there is a risk of collisions
between the multi-purpose waling and the Universal
bracket 90.
To provide shear bracing, fix an Angle connector
9x5cm to the outermost beam, directly beneath the
multi-purpose waling, using 4 "Universal screws
countersunk head Torx 5x40mm".
Position b of the extra multipurpose waling:
22 cm below the top waling level, as a pressure
point.
a
A
b
a ... min. 24.0 cm
b ... 22.0 cm
A Angle connector 9x5cm
12 999809702 - 07/2013
User information Column formwork Top 50
Preparations
The half-shells are pre-assembled face-down on an
assembly bench.
The professionals from the Doka "Ready-to-
Use Service" plan and assemble site-ready
and custom formworks exactly to your speci-
fications. 9732-400-01
Mount the platforms to the face-down element. Detach the half-shell from the crane.
Mount the 'Ladder system' components to the face-
down element.
Mount the panel struts to the face-down element.
9732-399-01
999809702 - 07/2013 13
User information Column formwork Top 50
WARNING
The formwork tends to adhere to the concrete.
When stripping the formwork, do not try to
break concrete cohesion using the crane!
Risk of crane overload.
Use suitable tools such as timber wedges or
a special pry-bar to detach the formwork
from the concrete.
Lift away the first half-shell by crane and place it
down flat for intermediate storage.
Attach the second half-shell (the one with panel
struts) to the crane.
Undo the ground anchors of the panel struts.
9732-401-01
14 999809702 - 07/2013
User information Column formwork Top 50 Component overview
999809702 - 07/2013 15
Near to you, worldwide
Doka is one of the world leaders in developing, manu- technical support are provided swiftly and profession-
facturing and distributing formwork technology for use in ally.
all fields of the construction sector. An enterprise forming part of the Umdasch Group, the
With more than 160 sales and logistics facilities in over Doka Group employs a worldwide workforce of more
70 countries, the Doka Group has a highly efficient dis- than 5600.
tribution network which ensures that equipment and
Doka GmbH | Josef Umdasch Platz 1 | 3300 Amstetten | Austria | T +43 7472 605-0 | F +43 7472 66430 | oesterreich@doka.com | www.doka.com 999809702 - 07/2013