Priority Client Task

1 NL Initial Meeting with NL Corporate


Create initial questionaire for on-site visit
Discuss upcoming branch office rollout (goals, staff involved, key contacts)

1 NL Create NL Proposal
Requirements Document
Equipment Order
VLAN / Subnet list
Switchport Connections
Physical Visio Diagram
Logical Visio Diagram

2 NL Onsite Visit
WIFI Site Survey
Get with Windows guys to determine cabinet

2 NL VLAN Configuration
Add VLANs 64,66,68,69,70,71,10 to NL-B1-SW1 (CORE)
Add VLANs 64,66,69,71 to NL-B1-SW2 and NL-B1-SW3
Configure Etherchannels between SW1, SW2, SW3 per diagram
Configure port-channels as trunks and add appropriate VLANs
Assign ports to VLANs per Port spreadsheet
Create routed interfaces on NL-B1-SW1 (CORE) for each VLAN
Configure NL-B1-SW1 (CORE) as the STP root bridge
Configure all switches to support RSTP
Time Assigned Competed Server PC1
180 11/7/2011 x Interface: F0/0 Interface: F0/0
30 x IP: 10.1.68.50/24 IP: 10.1.66.50/23
180 x Gateway: 10.1.68.1 Gateway: 10.1.66.1
no ip routing no ip routing
375 11/7/2011 x
15 x
240 x
30 x
30 x
30 x
30 x

11/10/2011
120 x
60 x

11/28/2011
PC2
Interface: F0/0
IP: 10.1.66.51/23
Gateway: 10.1.66.1
no ip routing