Академический Документы
Профессиональный Документы
Культура Документы
10'-8"
2"
8'-111
CHANGE
ROOM
DIAS
CHANGE
ROOM
CAFETERIA - 50 SEATS
PANTRY
BG-7 BG-6 BG-5 BG-4 BG-1 BG-7 BG-6 BG-5 BG-4 BG-3 BG-2 BG-1
AG-7 AG-7
DN DN
AG-6
41'-01
2"
AG-6
AG-5 AG-5
AG-4 AG-4
2"
26'-31
40'-4"
39'-6"
AG-3 AG-3
9'-0"
4'-0"
2"
11'-2"
10'-21
AG-2 AG-2
2'-2"
17'-8" 28'-2"
17'-7"
AG-1 AG-1
OPTION - 2
AUDITORIUM AND CAFETERIA AUDITORIUM AND CAFETERIA
TERRACE - PROPOSED FLOOR PLAN TERRACE - FLOORING PLAN
LIST OF CONTENTS
05 SECTIONS SN-TR-005
06 ELEVATIONS SN-TR-006
10 DETAILS TO BE ISSUED
PROPOSED TERRACE FLOOR FOR SANDOOR MEDICALS PVT.LTD. DRAFT COPY FOR REVIEW ONLY
NOT FOR CONSTRUCTION
BANJARA HILLS - HYDERABAD
CO ORDINATE WITH M.E.P DWGS
DATE:-20-12-2016
NOTES
GENERAL NOTES :
1. PRESENTED DRAWING INDICATE THE GENERAL SCOPE
OF THE PROJECT IN TERMS OF ARCHITECTURAL DESIGN
CONCEPT,THE DIMENSIONS OF THE BUILDING,THE MAJOR ARCHITECTURAL ELEMENTS AND THE TYPE OF
STRUCTURAL, MECHANICAL AND ELECTRICAL SYSTEMS.
THE DRAWINGS DO NOT NECESSARILY INDICATE OR DESCRIBE ALL WORK REQUIRED FOR FULL PERFORMANCE
AND COMPLETION OF THE REQUIREMENTS OF THE CONTRACT DOCUMENTS. ON THE BASIS OF THE THE GENERAL SCOPE
INDICATED OR DESCRIBED, THE CONTRACTOR SHALL FURNISH ALL ITEMS REQUIRED FOR THE PROPER EXECUTION AND
COMPLETION OF THE WORK.
2. THE CONTRACTOR SHALL CHECK AND VERIFY ALL THE DIMENSIONS AND JOB CONDITIONS BEFORE THE JOB COMMENCEMENT OF WORK AND BE RESPONSIBLE
FOR THEIR ACCURACY.ANY DISCREPANCIES BETWEEN FIELD CONDITIONS OR WITHIN THE DOCUMENTS ARE TO BE REPORTED TO THE ARCHITECT VIA THE
CONSTRUCTION MANAGER.
3. THE CONTRACTOR SHALL PREPARE "COORDINATION DRAWINGS" WHICH REPRESENT THAT ALL TRADES INVOLVED IN THE PROJECT HAVE COORDINATED THE
INSTALLATION OF THEIR WORK SO AS TO AVOID CONFLICTS AND/OR MISALIGNMENTS.
4. THE CONTRACTOR SHALL PERFORM ALL THE WORK IN ACCORDANCE WITH ALL APPLICABLE CODES,ORDINANCES,SAFETY ORDERS AND REGULATIONS AND
OWNER POLICIES AND DIRECTIVES.
5. THE CONTRACTOR SHALL COORDINATE, NOTIFY AND SCHEDULE ALL REMOVALS WITH THE OWNER'S REPRESENTATIVE PRIOR TO TO PROCEEDING THE WORK.
6. UNDER COMPLETION REMOVE ALL TEMPORARY PIPING AND EQUIPMENT, SHORING, SCAFFOLDS ETC. AND LEAVE ALL AREAS CLEAN AND FREE FROM MATERIAL
DEBRIS RESULTING FROM WORK PERFORMED.
7. ATTENTION IS DIRECTED TO THE FACT, THAT DUE TO THE NATURE OF THE PROJECT AND PREVIOUSLY EXECUTED CONTRACTORS, THE EXACT EXTENT OF WORK
CANNOT BE ALWAYS BE ACCURATELY DETERMINED PRIOR TO THE COMMENCEMENT OF WORK. ACTUAL FIELD CONDITIONS MAY REQUIRE MODIFICATIONS T
O CONSTRUCTION DETAILS AND WORK QUANTITIES. THE CONTRACTOR SHALL NOTIFY THE CM BEFORE ADAPTING THE WORK IN ACCORDANCE WITH FIELD
CONDITIONS.
8. ALL WORK CONTAINED IN ALL CEILINGS SHALL BE SIMULTANEOUSLY REPRESENTED ON A SINGLE DRAWING PREPARED BY CONTRACTORS, TO CONFIRM THAT
ALL TRADES "FIT" WITHIN THE ALLOTTED SPACE. ALL CONFLICTS SHALL BE RESOLVED PRIOR TO THE SUBMITTING SHOP DRAWINGS FOR THE CONSTRUCTION
MANAGER REVIEWS AND PRIOR TO THE EXECUTING ANY OF THE WORK WITHIN THE CEILING CAVITY.
DRAFT COPY FOR REVIEW
9. ALL CEILING DEVICES INCLUDING LIGHT FIXTURES, SPEAKERS, EXIT SIGNS ,DIFFUSERS, GRILLES, SPRINKLERS AND SMOKE DETECTORS ARE TO BE CENTERED ARCHITECT
IN TILE UNLESS NOTED OTHERWISE (U.N.O). ALL DEVICES SHOWN ARE FOR LOCATION INFORMATION ONLY. REFER TO MECHANICAL, ELECTRICAL , PLUMBING
AND FIRE PROTECTION (M.E.P.F) DRAWINGS FOR QUANTITIES AND INSTALLATION.
10. EXISTING WORK IS TO BE PROTECTED DURING CONSTRUCTION AND KEPT FREE OF DEBRIS. ANY EXISTING WORK DAMAGED DURING CONSTRUCTION IS TO B E
REPLACED WITH WORK OF EQUAL QUALITY TO THE CM.
DRAWN: CHECKED BY: DATE:
11. USE DIELECTRIC SEPARATOR ON ALL DISSIMILAR METALS.
V.ABHISHEK SK 20-12-2016
CLIENT:
13. FOR WALL/MATERIAL , CEILING MATERIAL LEGEND AND FLOOR MATERIAL LEGEND AND KEY NOTES OF THE RESPECTIVE ELEMENT REFER TO DRAWING NO.
SN-TR-010 SANDOOR MEDICALS PVT. LTD.
DWG. TITLE:
GENERAL NOTES
PROJECT NAME:
A B C D E F G
1
EXISTING AIR CONDITIONING
INFRASTRUCTURE
DN
5
PROPOSED AUDITORIUM
AND
CAFETERIA
6
DRAFT COPY FOR REVIEW
ARCHITECT
7 V.ABHISHEK SK 20-12-2016
CLIENT:
CONTEXT PLAN
A B C D E F G
6
DRAFT COPY FOR REVIEW
EXISTING COLUMNS ARCHITECT
TYPICAL
CLIENT:
D1
WD1
3 WALL SCHEDULES:
W1- PRECAST HIGH WEIGHT AEROCON WALL
PANELS
W2- CUTTEN WALL
01
LVL +2'-6" LVL +3'-6"
04 02
LEVEL TO BE X 03 DOOR SCHEDULES:
DETERMIND XXX D1- 4'-0" SOLID METAL DOUBLE DOOR
AT SITE
AUDITORIUM D2- 3'-6" SINGLE LEAF METAL DOOR
W2 D3- 3'-0" FLUSH DOOR
X
X
VERANDH
UP
EXISTING STRUCTURE
(SCREEN) WINDOW SCHEDULES:
5 WD1- 2'-0" WINDOW
WD1 WD2- 4'-0" WINDOW
D1
W2
W1
WD2
6
PANTRY
CAFETERIA
LVL +2'-6" KITCHEN COUNTER
D2 D3 DRAFT COPY FOR REVIEW
ARCHITECT
WD1
05
08 06 X
07 XXX
HAND WASH
Y DRAW: CHECKED BY: DATE:
Y V.ABHISHEK SK 20-12-2016
CLIENT:
DWG. TITLE:
SECTION
PROJECT NAME:
NOTES
X FASIA PANEL
XXX TRUSS STEEL JOIST TO BE CORRUGATED METAL
HIGH PRESSURE LAMINATE
DESIGNED BY STRUCTURAL ROOF DECKING
ENGINEER X
XXX
1'-0"
10'-8"
8'-112"
4" WALL
1
AEROCON PANEL FLOOR ON
LIGHT WEIGHT STEEL STRUCTURE
DESIGNED BY STRUCTURAL ENGINEER
A SECTION AT XX
TR-005
X SIM
FASIA PANEL TRUSS STEEL JOIST TO BE CORRUGATED METAL
XXX HIGH PRESSURE LAMINATE DESIGNED BY STRUCTURAL ROOF DECKING
ENGINEER SIM X
XXX DRAFT COPY FOR REVIEW
ARCHITECT
CLIENT:
TO BE DETERMIND AT SITE GROUND LINE/BASELINE
DWG. TITLE:
SECTION
B SECTION AT YY
TR-005
PROJECT NAME:
ARCHITECT
CLIENT:
DWG. TITLE:
UP
2-STEPS
WOOD FINISH
VITRIFIED TILES
3
26'-32"
1
40'-4"
AUDITORIUM
VERANDH
39'-6"
UP
UP
2-STEPS
4'-0"
10'-22"
11'-2"
PANTRY (SCREEN)
1
F2/VINYL
6
DRAFT COPY FOR REVIEW
F4/VITRIFIEDTILES
ARCHITECT
F3/VINYL
2'-2"
28'-2"
CAFETERIA
LVL +2'-6"
DRAW: CHECKED BY: DATE:
HAND WASH
V.ABHISHEK SK 20-12-2016
17'-7"
17'-8"
SCALE: DRAWING NO: REV. NO:
F4/VITRIFIEDTILES
1:8 SN-TR-008 00
CLIENT:
DWG. TITLE:
7
NOTES
DWG. TITLE:
ELEVATIONS
PROJECT NAME:
1'-0"
10'-8"
8'-112"
1
AC UNITS - OUTDOOR MACHINES
DIAS
VESTIBULE / AUDITORIUM - 100 SEATS
CORRIDOR
STEEL CHANGE
STRUCTURE
UNDERNEATH 4'-6" AISLE ROOM
CAFETERIA - 50 SEATS
PANTRY
BG-7 BG-6 BG-5 BG-4 BG-1 BG-7 BG-6 BG-5 BG-4 BG-3 BG-2 BG-1
AG-7 AG-7
DN DN DN DN
AG-6 41'-01
2"
AG-6
AG-5 AG-5
AG-4 AG-4
2"
26'-31
40'-4"
39'-6"
AG-3 AG-3
9'-0"
4'-0"
2"
11'-2"
10'-21
AG-2 AG-2
2'-2"
28'-2"
17'-7"
17'-8"
AG-1 AG-1
OPTION - 2
AUDITORIUM AND CAFETERIA AUDITORIUM AND CAFETERIA AUDITORIUM AND CAFETERIA
TERRACE - EXISTING FLOOR PLAN TERRACE - PROPOSED FLOOR PLAN TERRACE - FLOORING PLAN
1'-0"
10'-8"
8'-112"
1
AC UNITS - OUTDOOR MACHINES
DIAS
VESTIBULE / AUDITORIUM - 100 SEATS
CORRIDOR
STEEL CHANGE
STRUCTURE
UNDERNEATH 4'-6" AISLE ROOM
CAFETERIA - 50 SEATS
PANTRY
BG-7 BG-6 BG-5 BG-4 BG-1 BG-7 BG-6 BG-5 BG-4 BG-3 BG-2 BG-1
AG-7 AG-7
DN DN DN DN
AG-6 41'-01
2"
AG-6
AG-5 AG-5
AG-4 AG-4
2"
26'-31
40'-4"
39'-6"
AG-3 AG-3
9'-0"
4'-0"
2"
11'-2"
10'-21
AG-2 AG-2
2'-2"
28'-2"
17'-7"
17'-8"
AG-1 AG-1
OPTION - 2
AUDITORIUM AND CAFETERIA AUDITORIUM AND CAFETERIA AUDITORIUM AND CAFETERIA
TERRACE - EXISTING FLOOR PLAN TERRACE - PROPOSED FLOOR PLAN TERRACE - FLOORING PLAN