Академический Документы
Профессиональный Документы
Культура Документы
Approved by: ALAN YAP (MANAGER) 12 SEPT 2017 Last Review Date:
(Name,Designation) 12/9/2017.
(Date)
1 Arranging Falling Objects Foot Injury Wear Safety Covered Shoe Moderate Remote
Product on
Shelves
Falling from Height Sprain Using Ladder, Heavy products on Moderate Remote
Lower Shelve & Light Products
on Upper Shelves
2 Doing Packing Cut by metal strap or Hand Wear Safety Glove Moderate Remote
for Shipment knock by hammer
3 Operating Burn Hand Wear Safety Glove, Read & Moderate Remote
Electric Strap Understand the operation manual
Mechine
4 Operating Forklift Follow to work place Physical Injury Wear Safty Gears when Moderate Remote
& Stock Picker instruction operating
5 Robber Dealing with workplace Physical Injury Post Sign Stating ViewCam & Moderate Remote
robber Robbery Alarm
6 Work place Keep workplace Dry & Slip & Fall Floor Mopped after business Minor Remote
cleaniness Clean hours
NAGER)
3.Risk Control
2d. 3a. 3b.
Action Officer,
Risk Additional
Designation
Level Risk Control
(Follow-up Date)
Approved by: ALAN YAP (MANAGER) 12 SEPT 2017 Last Review Date:
(Name,Designation) 12/9/2017.
(Date)
1 Arranging Falling Objects Foot Injury Wear Safety Covered Shoe Moderate Remote
Product on
Shelves
Falling from Height Sprain Using Ladder, Heavy products on Moderate Remote
Lower Shelve & Light Products
on Upper Shelves
2 Doing Packing Cut by metal strap or Hand Wear Safety Glove Moderate Remote
for Shipment knock by hammer
3 Operating Burn Hand Wear Safety Glove, Read & Moderate Remote
Electric Strap Understand the operation manual
Mechine
4 Operating Forklift Follow to work place Physical Injury Wear Safty Gears when Moderate Remote
instruction operating
5 Robber Dealing with workplace Physical Injury Post Sign Stating ViewCam & Moderate Remote
robber Robbery Alarm
6 Work place Keep workplace Dry & Slip & Fall Floor Mopped after business Minor Remote
cleaniness Clean hours
NAGER)
3.Risk Control
2d. 3a. 3b.
Action Officer,
Risk Additional
Designation
Level Risk Control
(Follow-up Date)