Вы находитесь на странице: 1из 5

POWER SYSTEM STUDIES AND

PROTECTION OF GENERATORS

26 & 27 JULY 2017


FOUR POINTS BY SHERATON, PUCHONG

100% SATISFACTION GUARANTEED


We ensure satisfaction in our training courses.
If you think this training does not meet the
HRDF/SBL objective as mentioned in the brochure, we
will replace you with other training with the
Claimable same or less value (valid 1 year).

Our Consultant: Ir. Lee CK

COURSE OBJECTIVES
To introduce various concepts related to the power system studies and protection of large
generators of > 3 MW

WHO SHOULD ATTEND


Electrical engineers who are involved in the design, operation, load flow and short-circuit
studies and protection of large generators

COURSE FEATURES
Conducted through lectures, question and answer sessions and video presentations

www.iknowledge.com.my | E: info@iknowledge.com.my |T: +603-76511000 | F: +603-76511001


POWER SYSTEM STUDIES AND PROTECTION OF GENERATORS

COURSE OBJECTIVES

To introduce various concepts related to the power system studies and protection of large
generators of > 3 MW

WHO SHOULD ATTEND

Electrical engineers who are involved in the design, operation, load flow and short-circuit studies
and protection of large generators

COURSE FEATURES

Conducted through lectures, question and answer sessions and video presentations

COURSE CONTENTS

1) Control of Generators
The twins of generators mechanical and electrical components, the two inputs of mechanical
power and exciter, the two controls - governor and AVR, operation as synchronised or standalone
machines and outputs of MW/frequency Mvar/voltage. The four modes of operation as
synchronous and induction generators and motors. What happens to a synchronous generator
when it loses its prime mover or excitation? Generator capability curve.

Connection directly to busbars and through stepup transformers. Earthing through neutral earthing
resistor or single-phase distribution transformer. First synchronising of generator.

2) Per Unit System


Why the per unit system is such a useful tool in the study of a multi-voltage power systems. How to
remember some of the more complicated equations? Importance of the N2 relationship between
the HV and LV equivalent impedances for a transformer. Use of per unit system for computation of
motor starting voltage dip and short-circuit currents.

3) Basic Formulas & Concepts for Power System Studies

Formulas for estimating:


Three-and two-phase fault currents
Earth fault currents in system with neutral earthing resistor
Load flow voltage drop
Motor starting voltage dip in generators and transformers

Understanding the existence of sequence components during unbalanced faults. Understanding


the fault current decrement and the transient and transient components of fault currents in
generators.

Need to understand the transformer emf equation and the V/f behaviour of iron-core equipment in
connection with the overfluxing protection of large generators. Application of the distance
protection relay as protection for generator short-circuits, loss of excitation and pole slipping.

www.iknowledge.com.my | E: info@iknowledge.com.my | T: +603-76511000 | F: +603-76511001


POWER SYSTEM STUDIES AND PROTECTION OF GENERATORS

4) Use of Generator Impedance Data for Fault Analysis

Significance of generator saturated and unsaturated sub-transient and transient direct-axis,


quadrature-axis, negative sequence and zero sequence impedances. How to select only five of the
generator reactances for power system studies.

Examples of:

Per unit system


Motor starting voltage dip
Fault analysis

There will be some overlap with an earlier course

5) Concept of Differential Protection

Application of differential protection to more important HV equipment. Biased differential or low


impedance and high impedance differential protections. Need for bias coils to stabilise the relay
during external fault or transient non-fault conditions. Stability test of differential relays.

6) Protection of Large Generators

Disturbances. Differential protection for internal short-circuits. Backup distance and voltage
dependent overcurrent protections. 100% stator earth fault protection. Negative phase protection
against unbalanced current conditions. Loss of excitation and reverse power protections against loss
of inputs. Overvoltage, overfluxing and Volts/Hertz protection. Frequency, poles-slipping, loss of
synchronism and power swing protections. Inadvertent energising, unbalanced voltage and breaker
failure protections. Generator tripping matrix.

7) Case Studies of Generator Trippings


Review of several cases of generator trippings.

8) Free Excel File


For calculating motor starting voltage dip and fault currents in a simple system

9) Optional Demonstration of Power System Analysis Software


30-day free trial version of the software available upon request

www.iknowledge.com.my | E: info@iknowledge.com.my | T: +603-76511000 | F: +603-76511001


POWER SYSTEM STUDIES AND PROTECTION OF GENERATORS

OUR CONSULTANT

Ir. Lee CK is a 1974 electrical engineering graduate from Strathclyde University, Glasgow with
more than 40 years of experience in the power supply industry.

Specialises in providing technical training of electrical courses and performing power system
studies.
Previously the Engineering Manager of Tamco Corporate Holdings Sdn Bhd, which
manufactures indoor medium- and low-voltage switchgear.
More than 15 years working as a protection engineer in Lembaga Letrik Negara and another
five years in a large consultancy practice.
Malaysian Energy Commission (Suruhanjaya Tenaga) certified competent/services engineer up
to 275kV.
Since 1997, trained more than 6,500 participants from electricity utilities, petrochemical industry
and multi-national companies throughout Malaysia as well as in Oman, India, Myanmar,
Thailand, Vietnam, China, Philippines, Brunei, Singapore and Indonesia and three countries in
Africa.
Carried out various training programmes for Petronas Instep, Brunei Shell Petroleum, Brunei LNG,
Petroleum Development Oman, Tenaga Nasional Berhad, Sarawak |Energy Bhd and Intel.
Topics include Power System Protection, Basic Electrical Engineering, Applications, Operation &
Maintenance of Electrical Equipment, Commissioning of Power Transformers, Protection &
Starting of Induction Motors, Medium Voltage Switchgear, Arc Flash Awareness, Electrical
Safety & Competency and Power System Studies.

www.iknowledge.com.my | E: info@iknowledge.com.my | T: +603-76511000 | F: +603-76511001


POWER SYSTEM STUDIES AND PROTECTION OF GENERATORS
26 & 27 JULY 2017

REGISTRATION FORM Faezah 03-76511000 4 EASY WAYS TO REGISTER


Please register the following personnel to attend the training as above Call : +603-76511000
Please photocopy for multiple bookings. Fax : +603-76511001/2
Email : register@iknowledge.com.my
Mail : Suite 3A21, Kelana Centre Point, Block A,
Name: _____________________________________ Jalan SS7/19, Kelana Jaya, 47301 Petaling
Jaya Selangor, Malaysia
Designation & Dept. : _____________________________________
Email: _____________________________________ TRAINING INVESTMENT
Early Bird Registration
Office (Direct Line) _____________________________________ (Before 26th June 2017)
Early Bird Pricing : RM 3500 per pax
Mobile Phone: _____________________________________ (RM 3710/pax incl 6% GST)

Normal Registration
Individual Pricing : RM 3800 per pax
Name: _____________________________________ (RM 4028/pax incl 6% GST)
Group Pricing : RM 3700 per pax
Designation & Dept. : _____________________________________ (RM 3922/pax incl 6% GST) (for 3 pax and above)
GST No. : 001842814976
Email: _____________________________________
Office (Direct Line) _____________________________________ UPCOMING COURSES
i. SIEMENS PLC
Mobile Phone: _____________________________________ ii. Electronics Troubleshooting
iii. Basic Air Conditioning
iv. Centrifugal Pumps
Name: _____________________________________ Please contact our sales personnel for detailed of
2017 course calendar
Designation & Dept. : _____________________________________
COMPANY REGISTRATION POLICY
Email: _____________________________________ It is important to read and understand our Company
Registration Policy before signing or stamping the
Office (Direct Line) _____________________________________ registration form. You may get a copy of our policy
from our personnel or from the link below:
Mobile Phone: _____________________________________ http://www.iknowledge.com.my/policy

*Company Name: _____________________________________ CANCELLATION & PAYMENT POLICY


(*For Tax Invoice Issuance) You may substitute the participants any time. No
cancellation is allowed upon issuance of
Contact Person: _____________________________________ confirmation and tax invoice. Payment has to be
made prior to training date.
Designation: _____________________________________
Address: _____________________________________ PROGRAM POLICY
Our consultant & topics are confirmed at the time
Office (General Line): _____________________________________ of publishing. However, circumstances beyond the
control of the organizers may occur. Asia
Office (Direct Line): _____________________________________ iKnowledge S/B reserves the right to alter or modify
the advertised speakers/ dates/topics if necessary.
Fax No: _____________________________________
PAYMENT DETAILS
Email: _____________________________________ Payment is required within 7 days upon receipt of the
invoice. All payment must be received 7 working days
prior to the training date.
Person In Charge: _____________________________________
(Finance) 1. Direct Deposit
Email (Finance): _____________________________________ Company Name: ASIA IKNOWLEDGE SDN BHD
Account number: 144-300-562-0
Contact Number: _____________________________________ Bank: United Overseas Bank (Malaysia) Berhad,
(Finance) UOBM Damansara Uptown, Ground Floor, No. 1, Jalan
SS21/58, Damansara Uptown, 47400 Petaling Jaya,
I hereby agree to Asia iKnowledge Sdn. Bhd.s Company Registration Selangor
Policy by signing or affixing the company stamp below: * Please instruct your bank to pay all transfer charges
from your account and send in a copy of remittance
advice by email/fax.

2. Bank Cheque or Bank Draft


Payable to ASIA IKNOWLEDGE SDN BHD

Authorized Signature Company Stamp


www.iknowledge.com.my | E: info@iknowledge.com.my | T: +603-76511000 | F: +603-76511001

Вам также может понравиться