Вы находитесь на странице: 1из 4

WORKERS / STAFF MOVEMENT OBSERVED AT FACTORY MAIN CO

10:30 AM - 12:30 PM - 14:30 PM - 16:30 PM - 18:30 PM -


Serial Type Of Activity 12:30 PM 14:30 PM 16:30 PM 18:30 PM 20:30 PM
No.
1 Liner transfer from Munawar Warehouse to Factory Main Corridor. 3 1

Liner transfer from Munawar warehouse to Factory Main Corridor To


2 1 4 2 10 1
Departments (Plants).

3 Liner Transfer From Munawar to Dying Section. 2

Chemical Drum / IBC transfer from Munawar Drum Yard to Factory Main
4 4
Corridor.
Chemical Bags / buckets transfer from New Warehouse to Factory Main
5 1 3
Corridor.
Chemical drum / IBC / Chemical Bags / Buckets transfer from Factory Main
6 3 1 2
Corridor to Mixing Departments.
Packing / packaging material (Cartons, Swing Labels, Master Card etc.) transfer
7 3 1
from Packaging store to shop floors.

8 Transfer of finished goods from shop floor to Factory Main Corridor. 1

9 Transfer of finished goods from Factory Main Corridor to New Warehouse. 1 2 1 2 1

10 Transfer of consumable store items from Factory Corridor to Consumable Store. 1

11 Transfer of yarn from Munawar Warehouse to Factory Corridor. 1 2

12 Transfer to yarn from Factory Corridor to shop floor (MKU Department) 1

13 Transfer of packaging material from Factory Main Corridor to Packaging store. 2 2 - - -


Transfer of former bins / trollies from Nitrile Building Ground Floor to NMF /
14 2 2 - - -
NFT Plant.

15 Reject IBC / Drum Shifting To Munawar Drum Yard. - - - - -

16 Reject Liner Shifting 1 - - - -

17 Reject Carton Shifting 1 - - - -

18 Petrol 7 Liter PSL To Drum Yard 1 - - - -

19 Drum To Work Shop 1 - - - -

20 Transfer Chemical From Drum Yard To PSL - - 1 - -

TOTAL 25 12 6 24 2

GRAND TOTAL 71
RY MAIN CORRIDORS
DATED: 7/1/2017

20:30 PM - REMARKS
21:30 PM

2 For Shipment

- -
- -

- -

- -

- -

- For Safety Water Engine

- For Plant Parts

- -

Вам также может понравиться