OVERBURDEN (OB) REMOVAL


PROCEDURE

Acknowledgement

Prepared by, Checked by, Approved by,

Azim Kholis Rikanto Surtiyono Bob Bratadjaja Rudy Setyopurnomo


Operation Department Operation Director General Affair Director President Director

Revision history

Revision No. Date Remarks


Number : DIP-DO-01-003
DIP INTEGRATED MANAGEMENT SYSTEM Issuance date : 10-06-2014
OVERBURDEN REMOVAL Revision : 00

PROCEDURE Page : Page 2 of 9

Table of content
Page

1 Title 1

2 Acknowledgement & Revision history 1

3 Table of content 2

4 Objectives 3

5 Scope of work 3

6 Definition 3

7 Responsibilities 3

8 Functional deployment chart (FDC) 4

9 Detail procedure (SIPOC) .............................................................. 5


.
10 Related documents 6

11 Reference 6
Number : DIP-DO-01-003
DIP INTEGRATED MANAGEMENT SYSTEM Issuance date : 10-06-2014
OVERBURDEN REMOVAL Revision : 00

PROCEDURE Page : Page 3 of 9

I. DEFINITION
1.1. Production Planning and Control (PPC) A person/group of persons who responsible to create
production/operation planning and control to achieve short term and long term
operation/production efficiency and productivity and to reach target of operating profit and
EBITDA.

II. OBJECTIVE
OB Removal Procedure is established to:
To achieve targeted productivity/efficiency and EBITDA/Operating Profit.
To plan, organize, perform/accomplish, control the daily work order for land clearing, top soil
stripping, and OB removal in accordance to daily, weekly, and monthly target.
Guide mine operation (mine contractor) to perform activities of land clearing, top soil stripping, and
OB removal in accordance with work order issued by PPC to assure achievement of daily,
weekly, and monthly production target.
Closely monitor work order actual result of land clearing, top soil stripping, and OB removal from the
site in order to monitor any delay of daily and weekly production, so that Production Control
can provide feedback to Production Planning for recovery on daily and weekly basis.

III. SCOPE OF WORK


The scope of work of this procedure is limited to the following activities:
Land Clearing
Top soil stripping
OB removal

IV. RESPONSIBILITY
4.1. Production Planning
4.1.1. Assure that Monthly Mine Plan is up to date.
4.1.2. Assure that Top Soil Removed Area-Data is available.
4.1.3. Assure that Blasted Area-Data is available.
4.1.4. Assure Equipment and Operator Readiness.
4.1.5. Assure Disposal Area Availability.
4.1.6. Assure thah actual achievement from previous operation is available.
4.1.7. Create work order based on working plan, recomendations, and the last actual field
condition to reach daily EBITDA/OPERATING PROFIT margin.
4.1.8. Release Daily Work Order.
4.2. Mine Engineer
4.2.1. Develop working plan for overburden removal & disposal -based on Pit design,
disposal, road and drainage/water management.
4.2.2. Collect all recommendations.
4.2.3. Revise OB Removal and Dumping Working Plan.
4.3. Mine Operation
4.3.1. Make recommendation based on process sequence and consideration on activity.
4.3.2. Joint Survey and Stake out (pick up data) area and signed by Install ribbon at removal
and disposal area.
Number : DIP-DO-01-003
DIP INTEGRATED MANAGEMENT SYSTEM Issuance date : 10-06-2014
OVERBURDEN REMOVAL Revision : 00

PROCEDURE Page : Page 4 of 9

4.3.3. Release crosscheck form to assure work order based on actual field condition.
4.3.4. Commence Removal Process.
4.3.5. Sign Crosscheck form (for every strip) at portal.
4.3.6. Collect Crosscheck from and entry data for crosschecking further analysis.
4.3.7. Joint survey to measure OB removal and disposal distance-and calculation.
4.4. Checker
4.4.1. Monitor/control of dumping OB to DT
4.4.2. Fill Crosscheck form (for every single truck passing check point) and sign at pit
4.4.3. Collect Crosscheck from and entry data for crosschecking further analysis (calculate OB
removal)
4.5. GM Mine Operation (KTT)
4.5.1. Inform Mine Operations to commence process.
4.5.2. Supervise OB Removal and dumping.
4.5.3. Review Plan and develop action.
4.5.4. Sign actual achievement of production and EBITDA report and invoice draft.
4.6. Mine Contractor
4.6.1. Joint Survey and Stake out (pick up data) area and signed by Install ribbon at removal
and disposal area.
4.6.2. Perform OB Removal activity.
4.6.3. Fill Crosscheck form (for every single truck passing check point) and sign at pit.
4.6.4. Perform OB dumping.
4.6.5. Sign Crosscheck form (for every trip).
4.6.6. Joint survey to measure OB removal and disposal distance-and calculation.
4.6.7. Prepare Final Report/Berita Acara-attach WO and Survey Report.
4.6.8. Create OB Removal Invoice draft.
Number : DIP-DO-01-003
DIP INTEGRATED MANAGEMENT SYSTEM Issuance date : 10-06-2014
OVERBURDEN REMOVAL Revision : 00

PROCEDURE Page : Page 5 of 9

V. Functional Deployment Chart


Number : DIP-DO-01-003
DIP INTEGRATED MANAGEMENT SYSTEM Issuance date : 10-06-2014
OVERBURDEN REMOVAL Revision : 00

PROCEDURE Page : Page 6 of 9

VI. DETAIL PROCEDURE (SIPOC).


4.7. Input
Supplier Input Indicator
Mine Engineer Monthly Mine Plan Complete, Accurate, and Timely
Top Soil Complete, Accurate, and Timely
Operation Control Removed/Stripping
Area-Data
Operation Control Land Clearing Area-Data Complete, Accurate, and Timely
OPERATION CONTROL- Complete, Accurate, and Timely
Blasted Area-Data
Mine Surveyor & QC (PT DIP)
Finance Production Budget Complete, Accurate, and Timely
Equipment and Operator Complete, Accurate, and Timely
Production Planning
Readiness
Land Management Disposal Area Availability Complete, Accurate, and Timely
Actual achievement from Complete, Accurate, and Timely
Production Control
previous operation

4.8. Process
4.8.1. Plan
Plan Owner Indicator
Assure that Monthly Mine Plan is up to Available, Detail Check, and
Production Planning
date Timely
Assure that Land Clearing Area-Data is Available, Detail Check, and
Production Planning
available Timely
Assure that Top Soil Removed Area-Data Available, Detail Check, and
Production Planning
is available Timely
Assure that Blasted Area-Data is Available, Detail Check, and
Production Planning
available Timely
Assure that Production Budget is up to Available, Detail Check, and
Production Planning
date Timely
Assure Equipment and Operator Available, Detail Check, and Daily
Production Planning
Availlablle Check.
Available, Detail Check, and Daily
Assure Equipment Readiness Mine Supervisor
Check. Safety and Working Order
Available, Detail Check, and
Assure Disposal Area Availability Production Planning
Timely
Assure thah actual achievement from Available, Detail Check, and Daily
Production Planning
previous operation is available

4.8.2. Do
No Do Owner Indicator
1 Develop working plan for
overburden removal & disposal Mining Engineer Complete. Good coordination with
-based on Pit design, disposal, operation mager and supervisor
road and drainage/water through daily and weekly meeting
management
2 Make recommendation based on
Comprehensive include probability
process sequence and Mine Operation
will be occure and the best solution.
consideration on activity
3 Collect all recommendations Complete. Approved. In a Timely
Mining Engineer Manner.
Number : DIP-DO-01-003
DIP INTEGRATED MANAGEMENT SYSTEM Issuance date : 10-06-2014
OVERBURDEN REMOVAL Revision : 00

PROCEDURE Page : Page 7 of 9

4 Joint Survey and Stake out (pick MINE CONTRACTOR- Complete. Accurate Based on
up data) area and signed by Install Surveyor Working Plan, Land Clearing Area-
ribbon at removal and disposal data/Top Soil Stripping Area Data.
area Timely
OPERATION
CONTROL-
Mine Surveyor & QC
5 Revise OB Removal and Dumping OPERATION Complete action base on real
Working Plan Mining Engineer condition at the field/site. Timely
6 Create work order based on Production Planning
working plan, recomendations,
and the last actual field condition Complete. Clear. EBITDA margin
to reach daily 50%. Daily
EBITDA/OPERATING PROFIT
margin
7 Release crosscheck form to OPERATION
Complete. Available. Daily, weekly,
assure work order based on actual Mine Operation
and monthly release.
field condition
8 Release Daily Work Order Production Planning Complete, Available. In a timely
manner for each day.
9 Inform Mine Operations to OPERATION Clear instruction base on work
commence process GM Mine Ops (KTT) order. Good coordination. Timely
10 Commence Removal Process Mine Operation Clear instruction base on work
order. Good coordination. Timely
11 Perform OB Removal MINE CONTRACTOR Complete. Keep comply with Work
order, Planning and safety rule.
Timely
12 Supervise OB Removal and OPERATION Clear Instruction and good
dumping GM Mine Ops (KTT) coordination. Keep comply with
working order. Timely
13 Fill Crosscheck form (for every CHECKER
Complete. Filled in correctly and
single truck passing check point) (CONTRACTOR)
accurately
and sign at pit
14 Perform OB Dumping DT DRIVER Keep comply with Work order,
(CONTRACTOR) Planning and safety rule. Timely
15 Sign Crosscheck form (for every DT DRIVER
Complete. Accurate
trip) (CONTRACTOR)
16 Sign Crosscheck form (for every CHECKER-at site
Complete. Accurate
strip) at portal
17 Collect Crosscheck from and entry CHECKER-at site
data for crosschecking further Complete. Accurate
analysis
18 Joint survey to measure OB MINE CONTRACTOR-
removal and disposal distance- Surveyor
and calculation OPERATION Complete. Accurate. Every 2 or 3
CONTROL- days
Mine Surveyor & QC
(PT DIP)
19 Review Plan and develop action GM Mine Ops (KTT) Complete review. Good
Coordination through daily brefing.
20 Prepare Final Report/Berita Acara- MINE CONTRACTOR Complete. Accurate. Before date 10
attach WO and Survey Report monthly
21 Approve Berita Acara and OB Production Control
Removal Report (attach WO dan Complete. Accurate, timely
Survey Report)
Submit actual achievement of Production Control Complete. Accurate data. Daily
production and EBITDA to
Number : DIP-DO-01-003
DIP INTEGRATED MANAGEMENT SYSTEM Issuance date : 10-06-2014
OVERBURDEN REMOVAL Revision : 00

PROCEDURE Page : Page 8 of 9

Production Planning
22 Create OB Removal Invoice draft MINE CONTRACTOR Complete. Accurate. Before date 10
monthly
23 Sign actual achievement of GM Mine Ops (KTT)
production and EBITDA report and Complete. Accurate. Timely
invoice draft

4.8.3. Check
Check Owner Indicator
All work orders done in Detail Check. Good Coordination with
GM Mine Ops (KTT)
accordance to target? related party
Detail Check. Good Coordination with
All financial targets achieved? GM Mine Ops (KTT)
Finance Department
Berita Acara and OB Removal Contractor Deatil Check. Make sure the data is
Report-draft agreed? GM Mine Ops (KTT) complete and accurate
All activities in accordance with OPERATION CONTROL-
No incident and accident
HSE standard? GM Mine Ops (KTT)
Contractor Complete. Approved with the signature
OB Removal Invoice agreed?
GM Mine Ops (KTT) of KTT. Timely

4.8.4. Act
Act Owner Indicator
Increase productivity to recover
production delay to reach GM Mine Ops (KTT) Measurable. Effective and efficient
production target
All financial targets achieved?
Increase cost efficiency to reach GM Mine Ops (KTT) Measurable. Effective and efficient
financial target
Berita Acara and OB Removal Contractor Complete. Checked by Operation
Report-draft agreed? GM Mine Ops (KTT) Control. Timely
All activities in accordance with OPERATION CONTROL-
No incident and accident
HSE standard? GM Mine Ops (KTT)
Contractor
Complete. Approved with the signature
OB Removal Invoice agreed? OPERATION
of KTT. Timely
GM Mine Ops (KTT)
Send actual production and
Total bcm and EBITDA/EBITDA
financial achievement report to Production Control
margin. Daily Report
Production Planning
Send OB Removal Invoice- Complete, accurate, attached WO and
Production Control
approved survey report

4.9. Output
Number : DIP-DO-01-003
DIP INTEGRATED MANAGEMENT SYSTEM Issuance date : 10-06-2014
OVERBURDEN REMOVAL Revision : 00

PROCEDURE Page : Page 9 of 9

Output Indicator Customer


Draft OB Removal and Dumping Complete. Measurable. In Mine Operation
Working Plan Accordance with plan and
timely
OB Removal and Dumping Complete. Measurable. In GM Mine Ops (KTT)
Working Plan-revised Accordance with plan and Mine Operation
timely MINE CONTRACTOR
Survey and Stakeout Report Complete and Accurate GM Mine Ops (KTT)
Mine Operation
OB Removal and Dumping Complete. Measureble. MINE CONTRACTOR
Working Order-Daily Easy to be understood and
Timely
Crosscheck form Complete. Easy to be MINE CONTRACTOR
understood and filled
Crosscheck form-signed Complete. Easy to be CHECKER-at site
understood and filled
DT DRIVER (CONTRACTOR)
Berita Acara and OB Removal Complete. Accurate and OPERATION
Report-draft Timely Mining Engineer
OPERATION
Mine Operation
OPERATION CONTROL-
Mine Surveyor & QC
Berita Acara and OB Removal Complete. Accurate and MINE CONTRACTOR
Report (attach WO dan Survey Timely
Report)-approved
OB Removal Invoice-draft Complete. Accurate and OPERATION CONTROL
Timely
OB Removal and Dumping Complete. Accurate and OPERATION
Working Plan-approved Timely GM Mine Ops (KTT)
OPERATION
Mine Operation
MINE CONTRACTOR
Survey Report (every 3 or 2 Complete. Accurate and MINE CONTRACTOR
days) Timely
OB Removal Invoice-approved Complete. Accurate and FINANCE
Timely

5. RELATED DOCUMENTS
5.1. Daily OB Removal report
5.2. OB Removal related MoM

6. REFERENCE

6.1. Company annual production target.

Вам также может понравиться