Camp at M/s.

Continental
Carbon India Limited

MISMATCHING OF TG DECK FOUNDATION WITH


TURBINE BOTTOM CASING MATTER RESOLVED
It was observed while while casting the deck
positioning the turbine bottom foundation. Hence, both the
casing that the turbine rear rear sole plates of MOC-IS
right sole plate holes - 3Nos. 2002 were removed and re-
and turbine rear left sole plate drilled according to the
hole -1 No. (looking from required locations; ie, with
turbine front pedestal end) respect to the misaligned
were not matching with the location of sleeve pipes of
deck foundation due to the deck foundation. Prior to
Turbine bottom casing with misalignment happened with above, half portion of the
mismatched sole plates the pipe sleeves of deck slab existing bolt holes of the sole
plates were built-up with weld
metal inorder to avoid oblong
holes. Among the three rear
right sole plate holes, one of
the bolt holes (in the mid) is
concentric with the turbine
casing hole. After completing
the modification in the sole
plate, the bolt hole of sole
The mismatched sole plate Grinding under progress with
plate had become excentric
hole with the embedded the rear right casing leg; red
with the casing hole. Hence it
sleeves provided in the civil color hatch marks shows the
was requisite to grind and
foundation due to the built-up portion of the sole
extend the bolt hole of rear
plate with weld metal-
right casing leg to the extent misalignment of sleeves during
execution excentric holes
of lodging the nut of the stud
Bolt of the turbine. The
modified sole plates have been
fixed with the turbine bottom
casing with 2 nos. of bolts.
After completing the above
exercise, all the foundation
stud bolts were inserted
through the holes of sole
Rear right casing leg with sole plates & sleeves, observed no
Rear right casing leg with sole
plate front elevation fouling with the sleeve edges.
plate front elevation
The stud bolts were tightened
to the required extent and
completed the alignment of
(centering of turbine front
pedestal) of turbine bottom
casing. Then the turbine rotor
has been placed on the casing
on 15/12/07. IBR and Non-
Rear right casing leg after IBR piping works are under
progress. Spring supports, Red color hatch mark shows
completion of modification and the build up portion of sole
insertion of stud bolt with nut IBR valves, piping (IBR & Non
IBR) are yet to be received. plate with weld metal

-2-