TURBINE BOTTOM CASING MATTER RESOLVED It was observed while while casting the deck positioning the turbine bottom foundation. Hence, both the casing that the turbine rear rear sole plates of MOC-IS right sole plate holes - 3Nos. 2002 were removed and re- and turbine rear left sole plate drilled according to the hole -1 No. (looking from required locations; ie, with turbine front pedestal end) respect to the misaligned were not matching with the location of sleeve pipes of deck foundation due to the deck foundation. Prior to Turbine bottom casing with misalignment happened with above, half portion of the mismatched sole plates the pipe sleeves of deck slab existing bolt holes of the sole plates were built-up with weld metal inorder to avoid oblong holes. Among the three rear right sole plate holes, one of the bolt holes (in the mid) is concentric with the turbine casing hole. After completing the modification in the sole plate, the bolt hole of sole The mismatched sole plate Grinding under progress with plate had become excentric hole with the embedded the rear right casing leg; red with the casing hole. Hence it sleeves provided in the civil color hatch marks shows the was requisite to grind and foundation due to the built-up portion of the sole extend the bolt hole of rear plate with weld metal- right casing leg to the extent misalignment of sleeves during execution excentric holes of lodging the nut of the stud Bolt of the turbine. The modified sole plates have been fixed with the turbine bottom casing with 2 nos. of bolts. After completing the above exercise, all the foundation stud bolts were inserted through the holes of sole Rear right casing leg with sole plates & sleeves, observed no Rear right casing leg with sole plate front elevation fouling with the sleeve edges. plate front elevation The stud bolts were tightened to the required extent and completed the alignment of (centering of turbine front pedestal) of turbine bottom casing. Then the turbine rotor has been placed on the casing on 15/12/07. IBR and Non- Rear right casing leg after IBR piping works are under progress. Spring supports, Red color hatch mark shows completion of modification and the build up portion of sole insertion of stud bolt with nut IBR valves, piping (IBR & Non IBR) are yet to be received. plate with weld metal