Академический Документы
Профессиональный Документы
Культура Документы
4 3 2 1
6 5 4 3 2 1 S-103
2000
S-103
1 : 85
1400
1087
C6x8.2 STRUT
2 2
3000
3000
C6x8.2 STRUT
3 3
TRUSS-1
TRUSS-1
3000
3000
14000
C6x8.2 STRUT
4 4
1200
ROOF FRAME - 1
ROOF FRAME - 1
ROOF FRAME - 1
3000
7 Roof Plan 2
5 C6x8.2 STRUT S-103
1 : 125
3000
C-Purlins LC 100x50x15x2.0MM
2200
Channel C6x8.2 ROOF FRAME
Channel C4x5.4 FRAME STRUT
Beam Support
S-103
NOT TO SCALE
6 Roof Plan 1 3D Roof Frame
S-103
1 : 125 12 Connection Detail 14
S-103
NOT TO SCALE
200 200 200 200
S-103
NOT TO SCALE
TOP BARS: 2PCS - 16MM TOP BARS: 2PCS - 16MM TOP BARS: 3PCS - 12mm TOP BARS: 2PCS - 12mm
VERTICAL AND WEB:
TOP AND BOTTOM CHORD:
300
300
L 40x40x3
6 5 4 3 2
400
400
L 65x65x5mm
BOT BARS: 2PCS - 12mm BOT BARS: 3PCS - 12mm
MM @600MM
AT SUPPORT AT MIDSPAN 110
12
O.C. C-PURLINS LC
S-103
110 100x50x15x2.0MM
STIRRUP: 10MM SPACED @ @ 600MM O.C.
1031
C6x8.2
220
1-50MM
STIRRUP: 10MM SPACED @ 10-100MM
C6x8.2
1-50MM REST @ 150MM C6x8.2
151
C6x8.2
320
10-100MM
REST @ 150MM C6x8.2
1067 1067 1067 1067 1067 1067 C6x8.2
1009 6400 1000
DESIGNER NOTES ENGINEERING PROJECT TITLE AND LOCATION CLIENT'S NAME SHEET CONTENT SHEET NO
THESE DRAWINGS AS INTRUMENT OF SERVICE, ARE THE PROPERTY
S-103
WRITTEN CONSENT OR PERMISSION FROM THE AFOREMENTIONED
CIVIL ENGINEER
DATE PLOTTED:
CONTRACTOR.
-ALL DESCREPANCIES ARE TO BE IMMEDIATELY REPORTED TO THE
PTR NO. : DATE ISSUED. : ARCHTECT, ENGINEER AND PROJECT MANAGER. PTR NO. : 7141831 DATE ISSUED. : MAR. 14, 2017 CHECKED BY.: IPG DATE CHECKED:
-CONTRACTOR ARE TO PREPARE AND SUBMIT SHOP DRAWINGS TO LOT 1043-C-2-F-7 BRGY. GUISGUIS-TALON, SARIAYA, QUEZON
PLACE ISSUED : TIN NO. : ARCHITECT AND ENGINEER BEFORE COMMENCEMENT OF WORK. PLACE ISSUED : TERESA, RIZAL TIN NO. : 422-592-338-000 APPROVED BY.: IPG DATE APPROVED: