In the north of Chile important events are occurring in mining, due to new innovations
in the matter of smelting and energy efficiency. The Copper Corporation (Codelco) has
set up a new concentrating plant integrated with a multipurpose smelter near the port
of Mejillones, whose purpose is to treat concentrates of greater complexity, which in
the other divisions could not be processed from an environmental or economic point of
view and At the same time, we obtain sub-products of high value, such as gold and
germanium. Therefore, in this work we address the operational problem of the daily
mass balance, in order to obtain the maximum production, so that positive results were
obtained. That the numbers are in the ranges of similar foundries of the north, only that
with the difference these concentrates are not able to be processed in any other part of
Chile.
1. Introduccin
Metales/
Ge(%wt) Au(%wt) Ag(%wt) Cu(%wt) Mo(%wt) ton/dia
Concentrados
0.01 0.01 0.2 30.0 48 300000 Chuquicamata
0.03 0.012 0.3 31 42 200000 Radomiro Tomic
0.02 0.020 0.35 33 47 200000 Ministro Hales
0.08 0.018 0.38 34 44 150000 El salvador
0.1 0.008 0.22 35 39 150000 Gabriela Mistral
Ge Au Ag Cu Mo
1000 40.192.0 534.7 5.400 10 Precios (kdol/ton)
800 34967.0 374.43 3.240 7.30 Costos (dolares/ton)
En donde las variables de decisin, la funcin objetivo y las restricciones del modelo
matemtico se describen a continuacin:
: , , , , 0
3. Resultados
Este modelo a simple vista parece un problema comn de programacin lineal, por lo
que ocupamos el software LINDO para intentar resolver el modelo matemtico como
se muestra a continuacin
Una propuesta seria separar el problema en dos problemas que no sufran el problema
de las variables escaladas, se podra optimizar la produccin de oro, plata y germanio
en un problema de maximizacin ya que los coeficientes que acompaan a estas
variables tienen un rango ms acotado y por otro lado maximizar la produccin de
cobre y molibdeno
Bibliografa:
Gustavo Lagos, Jose Miguel Lehuede, Marcelo Andia, Sulfur dioxide abatement
costs and compliance with health-based standards: the case of copper smelters.