Likelihood A B C D E
Fatality Permanent Disability Lost Time Injury Medical Treatment First Aid treatment
Permanent Damage Long Term Effect Large Area Long Term Effect Small Area Short Term Effect Large Area Short Term Effect Small Area
Expected to Occur
1
(once per week) H H H M M
Common
2
(once per month) H H M M L
3 Sometimes
(once per year) H M M L L
4 Rarely
(once in < 20 years) M M L L L
5 Highly Unlikely (once in > 20 yrs)
M L L L L
TITLE: Trenching ()
REVIEWED BY: SIGN: DATE: DEVELOPED BY: SIGN: DATE:
REVIEWED BY: SIGN: DATE: APPROVED BY: SIGN: DATE:
BASIC PPE REQUIRED FOR THIS JOB: (NOTE: EXTRA PPE REQUIRED FOR THIS JOB (As identified in the Recommended Procedures below)
Long Shirt Sleeves Long Trousers Hi vis vest or clothing Sun Hat/Brim Hard Hat (if working in designated hard hat areas/operations)
Safety Footwear Gloves (as required) P2 Mask (as required) Ear Plugs (as required) Safety Glasses Goggles (as required)
ADDITIONAL REFERENCES FOR THIS JOB: Construction Execution Procedure Vegetation Management Plan
Plant Hazard Assessments Alignment Sheets Emergency Response Plan HSSE Plan and Procedures
- He must take care when dismounting by
ensuring he uses the hand holds and foot
rests
Excavations Electrocution
- The banksman is to stay with the excavator
and act as a spotter when working in close
proximity to overhead power lines.
Signs and barriers Ensure permit to work
Working in close proximity Medium Low obtained and
to power lines
complied with
Permit to work
- For working in the EGAT ROW an EGAT
Permit to Work will have to be obtained and
a separate JSEA will for working underlines
will be produced
- The supervisor will give instruction to both
the banksman and the machine operator as
to the safe working distances.
HSE-JSEA-009 Rev:0 Trenching () Page 4 of 11
Consequences
Likelihood A B C D E
Fatality Permanent Disability Lost Time Injury Medical Treatment First Aid treatment
Permanent Damage Long Term Effect Large Area Long Term Effect Small Area Short Term Effect Large Area Short Term Effect Small Area
Expected to Occur
1
(once per week) H H H M M
Common
2
(once per month) H H M M L
3 Sometimes
(once per year) H M M L L
4 Rarely
(once in < 20 years) M M L L L
5 Highly Unlikely (once in > 20 yrs)
M L L L L
- All excavations will be inspected on a daily
basis prior to works taking place, more
frequent inspections are required in adverse
weather
HSE-JSEA-009 Rev:0 Trenching () Page 8 of 11
- Excavation in close proximity to public roads
and in particular schools must be signed
Consequences
Likelihood A B C D E
Fatality Permanent Disability Lost Time Injury Medical Treatment First Aid treatment
Permanent Damage Long Term Effect Large Area Long Term Effect Small Area Short Term Effect Large Area Short Term Effect Small Area
Expected to Occur
1
(once per week) H H H M M
Common
2
(once per month) H H M M L
3 Sometimes
(once per year) H M M L L
4 Rarely
(once in < 20 years) M M L L L
5 Highly Unlikely (once in > 20 yrs)
M L L L L
ADDITIONAL COMMENTS:
All persons in the crew to be instructed that they are not required to work in any situation or with any equipment that they do not believe is safe (If personnel feel at risk they are to stop work, inform their
supervisor of their concerns and sort the situation out).
(
)
Ensure adequate communications are available, i.e. mobile phones, project radios.
Report any near misses/dangerous occurrences or incidents to HSSE Team Member and Supervision.
/
Prior to the commencement of the work shift;
Vehicle pre-start checks to be completed and documented in logbook. Report any safety related faults to supervision.
All personnel to be involved in the morning pre-start meeting.
Review JSEA to ensure site conditions do not require further control measures to be implemented.
JSEA