Vie Summer Projet FLUOR,
Project Contract Som
Job Bulletin JB-14-021
JOB BULLETIN
JB-14-021
23June2017 — Revision 0
‘S3MIM.653.F0107 Rev 01 Inspection Report - General Line Equipment — Air Compressor
PURPOSE
‘The purpose of this job bulletin is to communicate the revision of S3MM.653.F0107 Inspection Report -
General Line Equipment and is effective immediately.
INFORMATION / INSTRUCTIONS
The Air Compressor tab of the attached Excel Workbook has been revised to include start-up steps for air
compressors as indicated below.
START-UP T
Conpressr level 0 within 15 degrees on
Feel evel adequate fo planned usage
poe to efling
‘Open the service ales) o ensure thst
al pressure relied fom the system.
‘Chose the service valves)
Ensure all hoses have whip checks and
Chicago fing estaining pins install |
_}
pace os
Fluor HSE Director Fluor V.P. Project Director
DEVS
Attachment(s); S3MM.653.F0107 Rev 01 Inspection Report - General Line Equipment
File No, 103_PROJ_ADMINiJob BulletinsFLUOR.
Air Compressor
[Company Name: Date
Equipment No: Sevial No:
[Type of Equipment Model No
Make:
Hours
TaitiaDate TaitiayDate
‘Good] Repair] NIA | Good [Repair] N/A | Good [Repair] N/A | Good] Repair] N/A | Good [Repair] WA | Good [Repair] NA | Good Repair] NA
GENERAL APPEARANCE
[Hood and Panes
:
irs = Condon
Tndereamiage
[ENGINE COMPARTMENT,
Bevery -Condition/Charge Level
[Coolant = Level = Provest
East System
Fan Radiator Tones
[Engine Condition
[GaugesTinsrumenis
[condition of pressure rei vave for
pressure receiver tank ealibratd)
[Cooting Sytem
Page Lf? Heal
Safety, and EnvironmentalForm S3MM.653.F0107 Rey 01
Inspection Report - General Line Equipment
Air Compressor
ialDate
inate
TaitalDate TaitalDate
‘Good| Repair] NA | Good] Repair] NIA | Good]
[Repair] NVA | Good] Repair] NIA | Good] Repair] N/A | Good|Repair] NIA | Good [Repaid] NIA
[START
OP
[Compressor velo within 15 degrees on
Fut eve adequate for planed usage pri
ho reing
[Open the servic valves() to ensure at
al pressures relieved fom the syst.
[Close the service valve)
Jensue al ose have whip checks and
chicago iting esvaining pins installed
‘SIGNATURES:
Inspected By:
Approved By:
Note: This form is referenced in Practices S3MM6S3.5103, SSMM.653.5200 and S3MM.653.3206
Estimated Hours to Repair:
Pape 2 Health, Safety, and Environmental