Вы находитесь на странице: 1из 32

Thank you for considering IKO shingles.

For additional information on IKO's


full line of superior shingles, visit our
website www.iko.be or call our IKO Sales International
Service Centre + 32 11/34 01 82.
Bitumen Shingles
Notice: The information in this publication
is subject to change without notice.
IKO assumes no responsibility for
errors that may appear in this publication.
Warning: Check local building codes,
safety precautions and law procedures
that may apply to your particular situation.

Copyright by IKO Sales Int. Belgium.


All rights reserved. No part of this publication
may be copied or reproduced without
the express prior written permission
of IKO Sales International NV.
Order extra copies of this booklet direct
at IKO Sales Int. Belgium.

Verlegeanleitung
Bitumendachschindeln
Shingle Application Guide
Instruction De Pose Bardeaux
Bitumenleien Verleggingsinstructies

22/02-EU-02/05
INHALT CONTENTS SOMMAIRE INHOUD

02 Verlegeanleitung Bitumendachschindeln
03 Allgemeine bedingungen
04 Materialanforderungen
04 Begriffe
09 Leitlinie zur berechnung der Schindelmenge
09 Vorbereitung des Daches
11 Verlegung der Schindeln

19 Shingle Application Guide


20 General conditions
20 Material requirements
21 Terms
26 Estimating shingle requirements
27 Roof preparation
29 Shingle application

33 Instruction De Pose Bardeaux


34 Conditions gnrales
34 Matriel ncessaire
35 Concept
40 Estimation des bardeaux ncessaires
41 Prparation du toit
43 Pose des bardeaux

47 Bitumenleien Verleggingsinstructies
48 Algemene regels
48 Benodigde materialen
49 Begrippen
54 Benaderende berekening van
de nodige bitumenlei-hoeveelheden
55 Voorbereiding van het dak
57 Verleggen van de bitumenleien
01
ALLGEMEINE BEDINGUNGEN
INHALT Als allgemeine Richtlinie fr die Planung und Verlegung von Bitumen - Dachschindeln
gelten die REGELN FR DACHDECKUNGEN MIT BITUMENSCHINDELN, aufgestellt
und herausgegeben vom ZVDH in Juni 2001, und die REGELN FR DIE DECKUNG
Verlegeanleitung Bitumendachschindeln MIT BITUMENSCHINDELN aus dem abc der Bitumen-Dachbahnen, Ausgabe 1997
vom vdd.
In dieser Verlegeanleitung folgen nhere Einzelheiten und Anweisungen des Herstellers.
03 Allgemeine bedingungen IKO bernimmt keine Haftung fr Leckstellen aufgrund falscher Anwendung oder
04 Materialanforderungen einer falschen Vorbereitung der Dachoberflche. Die Schindeln drfen nicht direkt auf
einer Dmmung angebracht werden. Zwischen der Oberseite der Dmmung und der
04 Begriffe
zu nagelnden Flche mu fr eine durchgehende Belftung gesorgt werden.(Abbildung 3)
09 Leitlinie zur berechnung der Schindelmenge Auf der gleichen Dachflche drfen keine Schindeln verschiedener
09 Vorbereitung des Daches Herstellungsdaten/-kodes mit einander verarbeitet werden.
11 Verlegung der Schindeln Farbschattierungen sind bei Schindeln blich und stellen keinen Fehler dar. Um die
Farbunterschiede so klein wie mglich zu halten, mssen die Schindeln zufallsmig
aus verschiedenen Paketen genommen und gemischt werden.Verlegen Sie die
Schindeln nicht senkrecht sondern schrg nach oben ! (Abbildung 7)
Entfernen Sie die Antiklebestreifen von der Rckseite der Schindeln nicht, er dient
Verpackungszwecken und nicht zum Verkleben !
Allerdings mu die Schutzfolie der ArmourShield, DiamantShield und
BiberShield Schindeln whrend der Verarbeitung entfernt werden. (Abbildung 7-7)
Die bei der Produktion angebrachten Klebestreifen werden wirksam, sobald sie
Wrme oder direkter Sonneneinstrahlung ausgesetzt werden. Bei kaltem Wetter oder
auf steilen Dachschrgen ist eine Verklebung von Hand erforderlich. Es mu von IKO
zugelassener Kaltkleber verwendet werden, der mit den IKO-Schindeln kompatibel ist.
Bei warmem Wetter sollte man vor dem ffnen die Pakete biegen, um die Trennung
der Schindeln zu erleichtern.
Vorsicht: Um Beschdigung durch Fueindrcke zu vermeiden, bei sonnigem, heiem
Wetter nicht auf der Sonnenseite des Schindeldaches laufen.

02 03
MATERIALANFORDERUNGEN
Schindeln: 1a 4a I
IKO bietet oxidierte und modifizierte Glasvlies - Bitumenschindeln mit einer Auswahl
aus ca.60 verschiedenen Typen und Farben an.
Vordeckung (Nicht alle erforderlich - siehe Anweisungen):
IKO Armourbase PRO.
IKO Armourbase 30, eine 3,0 mm Glasvlies-Dachbahn aus oxidiertem Bitumen.

8
1b

cm
cm
IKO Armourbase 15, eine 2,1 mm Glasvlies-Dachbahn aus oxidiertem Bitumen. 15

IKO ArmourGard Eis & Wasserschutz, eine selbstklebende Dachbahn


(mit Schutztrennfolie) aus SBS modifiziertem Bitumen.
Kehlabdeckungen (fr Offene Kehle Verfahren): 4a II
IKO Armour Valley: eine 4,0 mm starke Dachbahn aus APP modifiziertem Bitumen in
zu den Schindeln passenden Farben, oder Kehlblech aus Metall.

50
cm
Traufleisten:

50
cm
Traufleisten aus Metall an Traufen und Seitenrndern.
Befestigung: 2 30 cm

Verzinkte Ngel: 25 mm lang und mit einem Kopfdurchmesser von 10 mm. Der
Schaft sollte 3 mm dick und aufgerauht sein. Cambridge-, Dynasty Schindeln und das
Nageln von Graten und Firsten erfordern 30 mm lange Ngel. 4b
Kaltkleber:
IKO Shingle Stick oder ein anderer von IKO zugelassener Kaltkleber.
Lftung:
3
Ausreichende Lftung, um die Mindestanforderungen an die Lftung zu erfllen.
Die Dachbelftungbrochre erhalten Sie bei ihrem Hndler oder direkt bei
IKO DACHSCHINDELN VERTRIEB GmbH.

5
cm
cm
10

BEGRIFFE
5 4c
Abbildung 1a. Abbildung 1b
1.Sichtlicher Teil 1.Seitenrnder/Giebel
2.Unsichtbarer Teil 2.Traufen
3.Blatteinschnitte 3.Kehlen
4.Selbstklebestreifen 4.Grat
5.Zungen 5.First

04 05
6a 6b I Selbstklebend 6b II Selbstklebend
15- 60 25 mm 60- 90 25 mm
25 mm

25 mm 25 mm

6b I Mit Klebepunkten 6b II Mit Klebepunkten


ArmourShield
15- 60 25 mm 50 mm 60- 85 25 mm 15- 60 60- 90
25 mm 25 mm

25 mm 25 mm
25 mm 25 mm

Monarch / Armourglass
BiberShield
20- 60 25 mm 60- 85 25 mm 50 mm
15- 60 25 mm 60- 90 25 mm

25 mm 25 mm 25 mm
25 mm

Monarch-Biber / Victorian DiamantShield

20- 60 25 mm 50 mm 60- 85 25 mm

25 mm 25 mm 6b I Laminiert 6b II Laminiert
Monarch-Diamant / Diamant 20- 60 25 mm 50 mm 60- 85 25 mm

155 mm 155 mm

Cambridge
15- 60 25 mm 50 mm 60- 85 25 mm

127 mm 127 mm

Dynasty

06 07
LEITLINIE ZUR BERECHNUNG DER SCHINDELMENGE VORBEREITUNG DES DACHES
I. DACHFLCHE (Abbildung 2)
Die Dachflche mu glatt, fest, trocken und gut vernagelt sein. Die Flche sollte
IKO Form IKO Schindeltyp Mindestdachneigung* Deckflche in Qm/paket je nach Dachneigung
bei Sparrenlnge < 10 m Schichtholz guter Qualitt sein, Verkleidungsbretter oder nicht furnierte Bauplatten
15- 25 25- 35 35- 45 >45 DNG (Scheiben- oder Brechplatten). Holzbretter drfen maximal 15 cm breit sein.
Rechteck Armourglass 15 2,48 2,69 2,90 3,00 Alle verwendeten Holzprodukte sollen richtig vorbehandelt sein, damit die
Monarch 15 2,12 2,30 2,48 2,58
Feuchtigkeit richtig ausgeglichen und ausbalanciert ist. Da Holz arbeitet, soll die
Biber Victorian 20 2,48 2,69 2,75 2,75
Monarch-Biber 20 2,12 2,30 2,34 2,34 Bedeckung versetzt und gengend untersttzt eingerichtet werden.
BiberShield 15 2,47 2,47 2,47 2,47
Dreieck Diamant 20 2,46 2,75 3,00 3,00
II. BELFTUNG (Abbildung 3)
Monarch-Diamant 20 2,00 2,24 2,46 2,46
DiamantShield 15 2,46 2,46 2,46 2,46 Es ist von entscheidender Bedeutung, da Wrme und Wasserdampf mit Hilfe einer
Wabe ArmourShield 15 3,00 3,00 3,00 3,00 geeigneten Belftung entweichen knnen. Dazu mu die Luft zwischen der
Laminiert Dynasty 15 2,32 2,32 2,32 2,32
Oberflche der Dmmung und der nagelbaren Dachflche von der Traufe bis zum
Cambridge 20 3,10 3,10 3,10 3,10
First frei zirkulieren knnen. Bei Dcher zwischen 15- 25 betrgt die netto Belftung
33 cm2 pro Qm der zugeneigten isolierten Dachflche, bei Dcher mit einer
Neigung zwischen 25- 85 reichen 16 cm2 pro Qm. Be- und Entlftung mssen
MINDESTBERDECKUNGEN
gleichmig zwischen Traufen und First verteilt werden.
Dachneigung Mindestberdeckung
III.VORDECKUNG
Das dritte Gebinde mu das erste Dachbahnen sollen so flach wie mglich verlegt werden damit Unebenheiten nach
15 100 mm noch um die in der Tabelle
25 80 mm Verlegung der Schindeln nicht sichtbar werden. Die Vordeckung parallel zu dem
aufgefrten Mindestwerte Gebinde (Wagerecht) verlegen.
35 60 mm berdecken.
45 50 mm
Dachneigungen 15- 20
1.Mglichkeit: (Abbildung 4a I)
Es ist zu empfehlen, die gesamte Dachflche mit IKO ArmourGard Eis &
I.Fr die Dachflche Wasserschutz oder einer gleichartigen modifizierten Dachbahn zu bedecken. Die
* Die Mindestdachneigung erhht sich um 5 ab Sparrenlnge >10m berlappungen am Ende mssen 15 cm und an den horizontalen Streifen 8 cm betragen.
Schindeleindeckungen werden nach dem Prinzip der Doppeldeckung 2.Mglichkeit: (Abbildung 4a II)
( Regeln fr Dachdeckungen mit Bitumenschindeln aufgestellt und herausgegeben Verwenden Sie IKO Armourbase PRO oder eine gleichwertige Dachbahn damit eine
vom ZVDH im Juni 2001 ) ausgefhrt. doppelte Unterlage fr die Dachflche entsteht. Schneiden Sie einen 50 cm
Nach diesem Prinzip wurde in der hier oben aufgefhrten Tabelle die Deckflche in breiten Anfangsstreifen und verlegen Sie die folgenden Bahnen mit 50 cm
Qm/Paket berechnet. waagerechter berlappung und 30 cm Endberlappung.

II. Fr Grate, Firste und Anfangsreihe. Dachneigungen 21- 85 (Abbildung 4 b)


Um sicherzugehen sollte man fr die Abdeckung der Grate und Firste und fr die Die gesamte Dachflche mu mit IKO Armourbase PRO oder einer geeigneten
Anfangsreihe 10-15 % mehr Material berechnen (je nach Menge der Dachdetails). Schindelunterlage bedeckt werden. Die Unterlage mu parallel zu den Traufen,
Bei Eindeckung mit Victorian oder Cambridge Schindeln bentigen Sie zur Verlegung mit einer waagerechten berlappung von 5 cm und 10 cm an den Enden verlegt
der Firste und Grate Rechteckschindeln in der gleichen Farbe. werden. Sichern Sie die Unterlage nur mit so vielen Ngeln, wie ntig, um sie auf
Bei Eindeckung mit Dynasty Schindeln bentigen Sie Dynasty Hip & Ridge. der Dachflche festzuhalten. Installieren Sie sie so flach wie mglich, damit keine
Unebenheiten auf die Schindeloberflche bertragen werden.

Dachneigungen 85- 90
Keine Vordeckbahn notwendig. Nur ArmourShield, DiamantShield oder BiberShield
Schindeln drfen verwendet werden.
08 09
IV:KEHLEN VERLEGUNG DER SCHINDELN
Zur Verlegung von Schindeln in den Dachkehlen kann entweder die Methode mit
I. NAGELN UND VERKLEBEN
offener, wechselseitig gedeckter oder einseitig durchgedeckter Kehle angewendet
Eine richtige Befestigung ist fr ein gutes Dach von entscheidender Bedeutung.
werden. Die Vorbereitung der Kehlen hngt von der gewhlten Methode ab:
Schlagen Sie die Ngel gerade ein, so da die Ngelkpfe bndig liegen, aber
Vorbereitung fr offene Kehle (Abbildung 5).
nicht in die Schindeloberflche dringen (Abbildung 6a).
Decken Sie die Kehlen mit 1m breitem Armourbase 30 als Unterlage ab (1).
Nageln Sie stets 2,5 cm oberhalb des Blatteinschnitts und 2,5 cm von jedem Rand
Die senkrechten berlappungen mssen 30 cm breit sein und geklebt oder
entfernt. Die korrekte Anordnung und Menge der Ngel fr jeden Schindeltyp und
geschweit werden (2). Die Endberlappungen der Unterlage der Dachflche mssen
jede Dachneigung entnehmen sie bitte der Abbildung 6b I. Bercksichtigen Sie, da
die Kehle um 15 cm berlappen (3). Schlieen Sie mit dem Verlegen von IKO
bei steilen Dachneigungen (> 60) oder starken Windeinflssen mehr Ngel sowie
Armour Valley oder Metallleisten ber die Unterlage in der Kehlen ab (4).
ein Verkleben von Hand mit IKO Shingle Stick erforderlich sind,
Nageln Sie die Bi-Armour Valley in Abstnden von 40 cm und 2,5 cm vom Rand.
wie in Abbildung 6b II gezeigt. Bei Verlegung unter kalten Witterungsbedingungen
Falls eine berlappung nicht zu vermeiden ist, mu sie 30 cm betragen und geklebt
mu zustzlich auch Kleber angewendet werden. In stark windigen Regionen sollen
oder geschweit werden (5). Leisten aus Metall sollten jede 25 cm befestigt werden
mindestens bei den fnf oberen Schindelreihen des Daches alle Zungen der Schindeln
und die berlappungen sollten 30 cm betragen sowie geklebt werden.
verklebt werden.
Vorbereitung fr wechselseitig gedeckte oder einseitig durchgedeckte Kehlen.
Die Klebepunkte mit Kaltkleber sollen nicht grer als 25 mm sein und der Kleber
Bereiten Sie die Kehlen entweder mit einer Schicht IKO ArmourGard Eis &
mu sparsam verwendet werden.
Wasserschutz mit 30 cm berlappung vor, oder verwenden Sie eine Schicht
Armourbase 30 (oder eine gleichwertige Unterlage), die 2,5 cm vom Rand vernagelt
ANFANGSREIHE (Abbildung 7)
wird. Die berlappungen sollten 30 cm betragen und geklebt werden.
Bereiten Sie die Anfangsreihe vor, indem Sie die Schindelzungen bis zum Ende des
Blatteinschnittes abschneiden. Krzen Sie diese Anfangsreihe in der Lnge um eine
V. SCHUTZ DER TRAUFEN (Abbildung 4 c)
halbe Zunge, damit die Stofugen nicht mit denen der ersten Schindelreihe
Unter klimatischen Bedingungen mit einer Januar-Durchschnittstemperatur unter -1C
zusammentreffen. Die Anfangsreihe mu die Traufe wie auch den Rand (Giebel) 6 bis
sollten die Traufen gegen Eisdmme, durch die sich Wasser unter den Schindeln auf
10 mm berragen (3).
dem Dach anstauen knnte, geschtzt werden. Bringen Sie IKO ArmourGard Eis &
Beim Verlegen von Dynasty oder Cambridge Schindeln kann man auch
Wasserschutz von den Traufen bis mindestens 60 cm ber die Innenwandlinie an.
Rechteckschindeln benutzen.
Verwenden Sie 8 cm waagrechte berlappung und 15 cm Endberlappung.
Stattdessen knnen Sie auch Armourbase 30 verwenden und eine doppelte Unterlage
ERSTE REIHEN UND VERLEGEMETHODE (Abbildung 7)
fr die Traufen vorsehen. Schneiden Sie einen 50 cm breiten Anfangsstreifen und
Erste Reihe (4):
verlegen Sie nacheinander geklebte Bahnen mit 50 cm waagerechter berlappung
Beginnen Sie mit einer vollstndigen Schindel, die Sie an Traufe und Seitenrand
und 30 cm Endberlappung in einem Abstand von 60 cm ber die Innenwandlinie hinaus.
bndig zur Anfangsreihe verlegen. Nageln Sie wie in Abbildung 6 gezeigt und
fahren Sie mit ganzen Schindeln fort.
VI.TRAUFLEISTEN (Abbildung 4b)
Zweite Reihe (5):
Die Traufleisten fr die Seitenrnder und Traufen des Daches sollten aus
Schneiden Sie eine halbe Zunge von einer Schindel ab und beginnen Sie am
korrosionsgeschtztem Material bestehen, das mindestens 8 cm ber den Rand ragt
Seitenrand. Nageln Sie die Schindel so, da die unteren Enden der Zungen bndig
und nach unten gebogen ist. Die Traufleisten sollten an den Seitenrndern ber der
mit der Spitze der Blatteinschnitte der Schindeln der ersten Reihe verlegt werden.
Unterlage (4) und bei den Traufen unter der Unterlage verlegt werden (5).
(Passen Sie dies fr Dachneigungen, die eine andere berdeckung erfordern, an.)
Dritte und folgende Reihen (6):
VII.KREIDELINIEN (Abbildung 7)
Beginnen Sie die dritte Reihe mit einer Schindel, bei der eine ganze Zunge
Kreidelinien dienen als visuelle Sttze, die zur waagerechten und senkrechten
abgeschnitten ist. Schneiden Sie bei jeder nchsten Reihe eine weitere halbe Zunge ab.
Ausrichtung der Schindeln beitragen. Sie dienen auch zur Ausrichtung der Schindeln
Fr optimalen Schutz gegen Wind und Regen sollten Sie die Schindeln an den
auf jeder Seite einer Gaube oder eines Schornsteins. Waagerechte Linien knnen alle
Dachrndern mit IKO Shingle Stick verkleben.
vier bis fnf Reihen (1) gezogen werden, und eine senkrechte Linie (2) sollte bei
Achtung: Beim Verlegen von Cambridge und Dynasty Schindeln mu man die zweite
langen Schindelstrecken benutzt werden, wobei eine Linie in der Mitte der Strecke
(5), dritte (6), vierte (7), ... Schindel um jeweils 25, 50, 75,... cm am Anfang krzen.
gezogen wird und die Schindeln links und rechts der Linie verlegt werden.
Alle Kreidelinien sollten als Leitlinien und nicht als Verlegelinien angesehen werden.

10 11
7 7

DiamantShield
Diamant

Armourglass - 4 Tab
Monarch - APP ArmourShield

Victorian BiberShield
Monarch - Biber

12 13
7 8a 9a

Cambridge
Dynasty

-75 cm

-50 cm

-25 cm 8b

II.SCHINDELVERLEGUNG IN KEHLEN
Offenkehlen-Verfahren (Abbildung 8a)
Ziehen Sie auf beiden Seiten der Kehle Kreidelinien. Der Abstand am First betrgt
15 cm und nimmt zur Traufe hin pro Meter um 1 cm zu (1). Schneiden Sie die
Schindeln auf diesen Linien zu und schneiden Sie aus der obersten Ecke ein 5 cm
groes Dreieck, um das Wasser in die Kehle abzuleiten (2). Binden Sie das Kehlende
jeder Schindel in in 5 cm breites Band IKO Shingle Stick ein (3) und vernageln Sie
die Schindeln 5 cm von der Kreidelinie entfernt (4).

Verfahren mit wechselseitiger Deckung (Abbildung 8b) 8c 9b


Verlegen Sie die Schindeln in der Kehlnaht. Die letzte Schindel soll wenigstens 30 cm
auf die angrenzende Dachoberflche ragen (1) und mit einem zustzlichen Nagel in
der oberen Schindelecke befestigt werden (2). Drcken Sie die Schindeln vor dem
Vernageln leicht in die Kehlnaht. Es darf bis 15 cm beidseitig der Kehlnaht nicht
vernagelt werden.

Verfahren mit einseitig durchgedeckte Kehle (Abbildung 8c) (ab Dachneigung > 23)
Angefangen wird mit der Eindeckung der Dachflche mit entweder der niedrigsten
Dachneigung oder der krzesten Hhe. Die Schindeln (1) muen mindestens 25 cm
auf die angrenzende Dachflche durchgedeckt werden. Die Anfangsreihe mu
wechselseitig gedeckt werden. Zu beachten ist, da innerhalb 15 cm links und rechts
des Kehlmittenbereiches keine Ngel eingeschlagen werden. Benutzen Sie aber einen
extra Nagel (2) zur Befestigung der oberen berragenden Schindelecke.

14 15
Die Seite der noch nicht eingedeckten Dachflche versehen Sie mit einer Kreidelinie Schornsteine (Abbildung 10a)
(3), die 5 cm entfernt, parallel zur Kehlmitte verluft. Stufenbleche (Abbildung 10b)
Decken Sie jezt die noch nicht eingedeckte Dachflche bis zur Kreidelinie ein.
Auf Hhe dieser Linie werden die Schindeln dann abgeschnitten.
Schneiden Sie aus der obersten Ecke ein 5 cm groes Dreieck (4), um das Wasser in
die Kehle abzuleiten. 10a 10b
Am Kehlende verkleben Sie jede Schindel 5 cm mit IKO Shingle Stick (5).

III.GRAT UND FIRSTE (Abbildung 9a und 9b)


Stimmen Sie die letzten Schindelreihen so ab, da die Firststcken gleichmig auf
beiden Seiten des Firstes die obersten Schindelreihen ausreichend abdecken.
Schneiden Sie rechtwinklige Schindeln an den Einschnitten in einzelne Stcke (1).
Armourshield: (A) ist sichtbaren Teil, (B) ist abgedeckter Teil (Abbildung 9a).
Verlegen Sie die Grat- und Firstschindelstcke nach dem Prinzip der Doppeldeckung.
Bei kalter Witterung sollten Sie die Schindeln vor dem Biegen erwrmen. Nageln Sie
den Dachabschlu 16 cm vom Ende der Zunge (2) und 2,5 cm von jeder Seite (3).
Beginnen Sie auf der der Hauptwindrichtung entgegengesetzten Seite des Firstes.
Bitte achten Sie unbedingt darauf, da die Ngel nicht sichtbar sind ! (Abbildung 9b)

IV.ANSCHLUSSBLECHE FR KAMIN UND WAND


Kaminanschlu mit Bitumenschindel und unterlegten Anschlussblechen (oder
Metallwinkel) wie nachstehend beschrieben fachgerecht herstellen:
Sanierung mit Cambridge oder Dynasty Schindeln.
Die Armourbase bzw. Armourgard Eis & Wasserschutzbahn am Kamin oder Wand Die Sanierungsbrochre Schindel auf Schindel erhalten Sie bei ihrem Hndler
ca.10 cm hochfhren. oder direkt bei IKO Dachschindeln Vertrieb.
Die Dachflche mit Bitumenschindel eindecken bis am Kamin oder Wand.
Die Anschlussblechen und Nockenblechen fachgerecht einbauen, fr die Ausfhrung
von An- und Abschlsse mit Blechen ist die Fachregel fr Metallarbeiten des
Dachdeckerhandwerks zu beachten.
Die berdeckung der einzelnen Nocken muss mind. der Hhenberdeckung der
Schindelgebinden entsprechen. Die dem Anschluss anlaufenden Bitumenschindeln
sind mit einer Nocke versehen.
Die Nocken nur im oberen (ca. 5 cm) Bereich vernaglen (nur auf der Schalung).
Die auf dem Blech liegende Bitumenschindeln mit IKO Shingle Stick verkleben.
Wandseitig sind die Nocken mittels Kappleiste regendicht abzusichern.

16 17
CONTENTS

Shingle Application Guide

20 General conditions
20 Material requirements
21 Terms
26 Estimating shingle requirements
27 Roof preparation
29 Shingle application

18 19
GENERAL CONDITIONS TERMS
IKO assumes no responsibility for leaks due to improper application, or failure to Figure 1a. Figure 1b.
properly prepare the roof surface. Shingles may not be installed directly over 1.Exposure 1.Rakes
insulation; flow-through ventilated air space must be provided between the insulation 2.Headlap 2.Eaves
and the nailable deck. 3.Cut-outs 3.Valleys
Do not mix different production dates/codes on the same roof surface. 4.Self Sealing Strip 4.Hips
Colour shading is inherent to shingles and is not a defect. In order to minimise 5.Tabs 5.Ridges
shading, shingles should be picked and mixed randomly from different bundles and
placed across and diagonally up the roof.
Do not rack the shingles up the roof ! 1a 4a I
Do not remove the tape from the back of the shingles. It is for packaging purposes
and not for sealing.
However, release film on the back of the ArmourShield, DiamantShield and
BiberShield shingles must be removed during application. (Figure 7 - 7)
The factory applied sealing strip will become effective when exposed to the heat of

8
the sun. Hand sealing is necessary for cold weather and steep slope application. 1b

cm
cm
15

Plastic cement must be approved by IKO to be compatible with IKO shingles.


Bend bundle before opening for easier separation.
Caution: During sunny, hot periods, avoid stepping on shingles on the sunny side of 4a II
the roof to prevent marking.

50
cm

50
MATERIAL REQUIREMENTS

cm
Shingles: 2 30 cm

IKOs selection of 60 different types and colours of fibreglass based oxidised


shingles and APP modified bitumen slates.
Underlayment: (Not all are required - see instructions) 4b
IKO Armourbase PRO.
IKO Armourbase 30, a 3,0 mm glassfibre based oxidised bitumen membrane.
IKO Armourbase 15, a 1,5 mm glassfibre based oxidised bitumen membrane.
IKO ArmourGard Ice & Water Protector, a SBS modified self-adhesive membrane. 3
Valley Coverings: (for Open Valley Method)

5
cm
cm
IKO Armour Valley: a 4,0 mm APP modified membrane in matching shingle 10

colours, or metal flashing.


Drip Edges:
4c
Metal drip edges for the eaves and rakes.
Fasteners:
Corrosion resistent nails 25 mm in length and a head diameter of 10 mm.
The shaft should be 3 mm in diameter and barbed. Cambridge shingles and nailing
of hips and ridges require nails 30 mm in length.
Plastic Cement:
IKO Shingle Stick or an IKO approved plastic cement.
Vents:
Sufficient vents to satisfy minimum venting requirements.
(Ask IKO or your local dealer for a Ventilation brochure).
20 21
6a 7

6b I 6b II Superglass - 3 Tab
25 mm 50 mm 25 mm

25 mm 25 mm

Superglass-3 Tab

25 mm 50 mm 25 mm

25 mm 25 mm

Monarch / Armourglass

25 mm 25 mm

25 mm 25 mm

Victorian / Superglass-Biber

Armourglass - 4 Tab
50 mm
25 mm 25 mm Monarch - APP

25 mm 25 mm

Monarch-Diamant / Diamant

25 mm 25 mm
25 mm

25 mm 25 mm

ArmourShield
Cambridge
25 mm 25 mm
50 mm
Dynasty

155 mm 155 mm

Cambridge

25 mm 50 mm 25 mm

127 mm 127 mm -75 cm

Dynasty
-50 cm

-25 cm

22 23
7 8a 9a

ArmourShield

8b

Diamant
Monarch - Diamant
DiamantShield

Victorian
Superglass - Biber
BiberShield 8c 9b

24 25
ESTIMATING SHINGLE REQUIREMENTS ROOF PREPARATION
I. For the Roof Deck. I. ROOF DECK (Figure 2)
Shingle exposure is in function of the roof pitch as displayed in the table below. The roof deck must be smooth, firm, dry and securely fastened.
Shingles may not be applied on roof pitches not specified. The deck should be made of good quality plywood, sheathing boards or nonveneer
Certain countries may have different regulations. structural panels (wafer or strandboard). Wooden boards can be maximum 15 cm
Check local building codes. wide. All wood products must be properly conditioned to be at moisture equilibrium.
Decking should be installed in a staggered manner and sufficiently supported. Failure
II. For the Hips and Ridges. to use proper decking material which can provide a rigid deck surface can result in
A good approximation is to order an extra 10 - 15 % material (depending on the deck movement which can damage the shingles.
amount of roof detail) for coverage of the hips, ridges and starter strip.
When applying Victorian, Superglass-Biber or Cambridge shingles be sure to order II. VENTILATION (Figure 3)
rectangular shingles in matching colour to cover hips and ridges. It is essential to allow heat dissipation and water vapor to escape the roof system
For Dynasty order Dynasty hip & ridge strips. through proper ventilation. Therefore, air must be able to circulate freely between
insulation and the nailable roof deck, from the eaves to the ridges. On roofpitches
15- 25 min. net free ventilation area is 33 cm2, on 25- 85 min. net free ventila-
tion area is 16 cm2 for each 1 m2 of insulated ceiling area (P), always divided evenly
Shingle type Roof pitch Exposure Roof coverage/Bundle kg/m2
between the eaves and the ridge.
Cambridge 20- 85 15,5 cm 3,10 m2 12,2
Armourglass 15- 25 12,5 cm 2,62 m2 12,5 (For additional information find the IKO ventilation brochure).
26- 85 14,3 cm 3,00 m2 10,9
Victorian 15- 25 11,5 cm 2,41 m2 13,1 III.UNDERLAYMENT
26- 85 13,0 cm 2,75 m2 11,5
BiberShield 15- 90 13,0 cm 2,47 m2 12,1 Install as flat as possible to prevent unevenness from being projected in the shingle
Diamant 15- 25 9,7 cm 2,62 m2 12,0 surface. Install parallel to the eaves.
26- 85 11,2 cm 3,00 m2 10,5
DiamantShield 15- 90 11,2 cm 2,46 m2 11,2
ArmourShield 15- 90 13,4 cm 3,00 m2 9,4 Slopes 15- 20
Superglass - 3 Tab 15- 25 12,5 cm 2,62 m2 11,0 Option 1: (Figure 4a I)
26- 85 14,3 cm 3,00 m2 9,7 It is advised to cover the entire roof deck with IKO ArmourGard Ice and Water
Superglass - Biber 15- 25 11,5 cm 2,65 m2 11,4
26- 85 13,0 cm 3,00 m2 10,1 Protector or a similar modified base sheet which will seal the entire deck.
Dynasty 15- 85 12,7 cm 2,32 m2 13,7 End laps must be 15 cm and horizontal laps 8 cm.
Monarch 15- 25 12,5 cm 2,25 m2 13,5 Option 2: (Figure 4a II)
26- 85 14,3 cm 2,58 m2 12,1
Monarch - Diamant 15- 25 9,7 cm 2,13 m2 13,5 Use IKO Armourbase PRO or a similar base sheet, to provide a double coverage
26- 85 11,2 cm 2,46 m2 11,7 of underlayment to the roof deck. Cut a starter strip 50 cm wide and lay succeeding
courses fastened with 50 cm horizontal laps and 30 cm end laps.
Slopes 21- 85 (Figure 4b)
The entire roof deck should be covered with IKO Armourbase PRO or an
Example: Shingle type: Armourglass approved shingle underlayment. The underlayment should be installed parallel to the
Roof Pitch: 32 eaves with a 5 cm horizontal lap and 10 cm end laps. Secure the underlayment with
Roof Surface: 240 m2 only enough nails to hold it in place.
Calculation: Roof Pitch 26- 85 = 3,00 m2/bundle Slopes 85- 90
240 m2 / 3,00 = 80 bundles No underlayment required. Only ArmourShield, DiamantShield and BiberShield
shingles can be applied.

26 27
IV:VALLEYS SHINGLE APPLICATION
One may follow either the Open, Woven or
5 I. NAILING & SEALING
Closed Cut method for shingle application in
Proper fastening is essential for a good roof. Drive the nails straight so that the nail
the roof valleys. Valley preparation depends
heads are flush with, but not cutting into the shingle surface (Figure 6a).
on the method:
Always nail 2,5 cm above the cut-out and 2,5 cm from each edge. For correct posi-
Open Valley Preparation (Figure 5).
tioning and nail quantities per type of shingle and roof slope see Figure 6b I.
Cover the valleys with 1 m wide underlay-
Note that steep slope application (> 60) or high wind areas require extra nails and
ment, Armourbase 30 (1). Vertical laps must
hand sealing with IKO Shingle Stick as shown in Figure 6b II. During cold weather
be 30 cm and cemented (2). The end laps
application extra cement must be a added in the same manner. In high wind areas
from the roof deck underlayment must over
the tabs of each shingle should be cemented for at least the top five courses of the
lap the valley by 15 cm (3). Finish the valleys
roof. Plastic cement should be applied in amounts no greater than 25 mm in diameter
by applying the IKO Armour Valley or
and used sparingly.
metal flashing on top of the underlayment in
Nail position for Dynasty and Cambridge: WHITE LINE = NAILING LINE.
the valleys (4). Nail the Bi-Armour Valley at
40 cm intervals 2,5 cm from the edge. If lapping is unavoidable it must be 30 cm
STARTER STRIP (Figure 7)
and cemented or torched (5). Metal flashing should be fastened every 25 cm
Prepare the starter strip by cutting off the shingle tabs along a line level with the top
and overlaps should be 30 cm and cemented.
of the cut-outs. Begin the starter strip by cutting the strip half a tab short so that its
Woven or Closed Cut Valley Preparation.
joints will not line up with the joints of the first course of shingles. The starter strip
Prepare the valley with one layer of IKO ArmourGard Ice and Water Protector with
should overhang the eaves by 6-10 mm and the rakes where applicable (3).
30 cm laps. Alternatively, use a layer of Armourbase 30 or an approved shingle
For Dynasty and Cambridge use rectangular shingles.
underlayment, nailed 2,5 cm from the edge. Laps should be 30 cm and cemented.
FIRST COURSES & APPLICATION PROCEDURE (Figure 7)
V. EAVES PROTECTION (Figure 4c)
First course (4):
In climates where average January temperatures are -1C, eaves should be protected
Start with a complete shingle applied flush with the starter strip at rake and eaves.
against ice damming which can cause water to back up the roof under the shingles.
Nail as shown in Figure 6a and continue across the roof with full shingles.
Apply IKO ArmourGard Ice and Water Protector from the eaves to the least 60 cm
Second course (5):
beyond the inside wall line. Use 8 cm horizontal laps and 15 cm end laps.
Cut half a tab from a shingle and start at the rake end. Nail the shingle so that the
Alternatively, use Armourbase 30 and provide a double coverage of underlayment to
lower edge of the tabs is flush with the top of the cut-out of the shingle in the first
the eaves. Cut a starter strip 50 cm wide and lay succeeding courses cemented with
course. (Adjust as needed for roof slopes requiring different exposures,
50 cm horizontal laps an 30 cm end laps to a distance 60 cm beyond the inside wall
see p.7 table/exposure).
line.
Third and succeeding courses (6):
Start the third course with a shingle from which a full tab has been cut. Cut off an
VI.DRIP EDGES (Figure 4b)
additional half tab for each succeeding course. For maximum protection against wind
Drip edges for the rakes and eaves of the roof should be made of corrosion-resistant
driven rain, cement the shingle at the rake edges.
material which extends at least 8 cm from the edge and bends downward over
Attention: When applying Cambridge or Dynasty shingles, trim off 25, 50, 75, ... cm
them. Drip edges should be applied over the underlayment at the rakes (4) and under
respectively from the left end of the first shingle in the second (5) , the third (6) , the
the underlayment at the eaves (5).
fourth (7) , ... course.
VII.CHALK LINES (Figure 7)
II. SHINGLE APPLICATION IN VALLEYS
Chalk lines provide visual guides that help align the shingles horizontally and vertical
Open Valley Method (Figure 8a)
ly. They also align shingles on each side of a dormer or chimney. Horizontal lines can
Snap two chalk lines from the ridge to the eaves 8 cm apart increasing in width by
be snapped every 4 to 5 courses (1) and a vertical line (2) should be used on long
1 cm per meter toward the eaves (1). Trim the shingles to these lines and cut a 5 cm
shingle runs where a line is snapped in the centre of the run and shingles are applied
triangle off the top corner to direct the water into the valley (2).
to the left and right of the line.
Glue the valley end of each shingle with IKO Shingle Stick (3) and nail the shingles
All chalk lines are to be considered as guiding lines not application lines.
5 cm back from the chalk line (4).
28 29
Woven Valley Method (Figure 8b) IV.FLASHINGS
Install the shingles through the valley intersection. The last shingle should extend at Chimneys (Figures 10a)
least 30 cm onto the intersecting roof surface (1) fastened with an extra nail at the Step Flashing (Figures 10b)
upper corner of the shingle (2). Press the shingles tightly into the valley before nailing.
No nailing within 15 cm of the valley centerline.
10a 10b
Closed Cut Method (Figure 8c) for slopes 23
For best performance: start applying on roof plane with the lower slope or biggest
surface. The starter strip must be woven (1) (extend +25 cm onto adjoining roof
plane). Do not nail within 15 cm of valley centerline. Use one extra nail (2) at the
end of each shingle crossing the valley. After completing this roof plane, snap a chalk
line (3) 5 cm from centerline on roof plane still to cover. Apply the shingles onto
second plane, trim shingles to the line and cut a 5 cm triangle (4) off the top corner
to direct the water into the valley.
Glue the valley end of each shingle with IKO Shingle Stick (5).

III.HIPS and RIDGES (Figure 9a & 9b)


Adjust the last few courses of shingles so that the ridge capping will adequately cover
the top courses of shingles equally on both sides of the ridge. Cut rectangular and
diamant shaped shingles into individual pieces by dividing the shingle at the cut-outs (1).
( ArmourShield: (A) is visual part, (B) is covered part ). (Figure 9a)
Apply the hip and ridge shingles double thickness by stacking two pieces and
bending them over the hip or the ridge. Reroofing with Cambridge or Dynasty shingles.
In cold weather warm the shingle before bending.
Nail the capping 16 cm from the tab edge (2) and 2,5 cm from each side (3).
Start application from the end of the ridge opposite the direction of the prevailing
winds. (Figure 9b)

30 31
SOMMAIRE

Instruction De Pose Bardeaux

34 Conditions gnrales
34 Matriel ncessaire
35 Concept
40 Estimation des bardeaux ncessaires
41 Prparation du toit
43 Pose des bardeaux

32 33
CONDITIONS GENERALES CONCEPT
IKO ne donne pas de garantie pour des infiltrations dues une pose non conforme
ou pour un dfaut du une mauvaise prparation du support. Les bardeaux ne Figure 1a Figure 1b
peuvent pas tre placs directement sur lisolation, une lame dair doit tre prvue 1.Pureau 1.Rives
entre lisolation et le panneau support. 2.Partie cache 2.Bords
Il ne faut pas mlanger des bardeaux de diffrentes dates de production sur le mme 3.Echancrures 3.Noues
toit. 4. Points thermo-collants 4.Artiers
Les nuances de couleurs sont propres aux bardeaux et ne sont pas un dfaut. Afin de 5. Jupes 5.Fatages
minimiser leur effet , les bardeaux doivent tre mlangs partir de diffrents paque-
ts et placs en diagonale sur le toit.
1a 4a I
La ligne auto-collante ne devient effective quavec lexposition la chaleur du soleil.
Par temps froid ou pour une forte pente de toit, il est conseill dutiliser en plus une
colle froid approuve par IKO et compatible avec les bardeaux IKO.
Attention: Pliez lgrement les paquets avant de les ouvrir, pour faciliter la sparation
des bardeaux.
Par temps trs chaud, viter de marcher sur les bardeaux du ct ensoleill afin

8
1b

cm
cm
15

dviter de laisser des empreintes.

MATERIEL NECESSAIRE 4a II
Bardeaux:
IKO offre une large gamme de bardeaux en bitume oxyd et bitume modifi

50
cm
armature voile de verre avec plus de 60 combinaisons form/couleur.

50
cm
Sous-couches: (pas toutes ncessaires - suivre les instructions)
IKO Armourbase PRO. 2 30 cm

IKO Armourbase 30, une membrane en bitume oxyd armature voile de verre de
3,0 mmdpaisseur.
IKO Armourbase 15, une membrane en bitume oxyd armature voile de verre de 4b
1,5mm dpaisseur.
IKO Armourgard Ice & Water Protector, une membrane en bitume modifi SBS
auto-adhsive.
Couverture de noues (pour mthode noue ouverte): 3
IKO Armour Valley: une membrane 4,0 mm en bitume modifi APP avec une

5
cm
cm
finition colore similaire celle des bardeaux. 10

Bandes de rive:
Profils mtalliques pour les bords et les rives.
4c
Fixation:
Clous galvaniss dune longueur de 25 mm et ayant une tte de diamtre de 10 mm .
La tige doit avoir une paisseur de 3 mm et tre torsade.
Pour le bardeau Cambridge et pour le clouage des artiers et fatires, il faut employ-
er des clous de 30 mm de long.
Colle bardeaux:
IKO Shingle Stick ou une autre colle froid approuve par IKO.
Ventilation:
Sorties dair ncessaires au respect des normes minimales de ventilation.

34 35
7

6a
Superglass - 3 Tab

6b I 6b II 50 mm
25 mm 25 mm

25 mm 25 mm

Superglass-3 Tab

25 mm 50 mm 25 mm

25 mm 25 mm

Monarch / Armourglass

25 mm 25 mm

25 mm 25 mm Armourglass - 4 Tab
Monarch - APP
Victorian / Superglass-Biber

25 mm 50 mm 25 mm

25 mm 25 mm

Monarch-Diamant / Diamant

25 mm 25 mm
25 mm

25 mm 25 mm Cambridge
Dynasty
ArmourShield

25 mm 50 mm 25 mm

155 mm 155 mm

Cambridge

25 mm 50 mm 25 mm -75 cm

-50 cm

127 mm 127 mm -25 cm

Dynasty

36 37
7 8a 9a

ArmourShield

8b

Diamant
Monarch - Diamant
DiamantShield

Victorian
Superglass - Biber
BiberShield 8c 9b

38 39
ESTIMATION DES BARDEAUX NECESSAIRES PREPARATION DU TOIT
I. Partie courante. I. PAN DU TOIT (Figure 2)
La hauteur de la partie visible des diffrents types de bardeaux est conditionne par Le pan de toit doit tre plan, rsistant, sec et fix solidement. Le pan doit tre de
la pente du toit comme montr sur le tableau ci-dessous. Les bardeaux ne peuvent bonne qualit - panneaux de contreplaqu ou voliges (max 15 cm de large).
tre poss pour des pentes non-spcifies. Toutes les pices de bois doivent tre suffisamment sches.
Certains pays ont leurs propres rglementations. Tous les panneaux doivent tre poss en quinconce et fixs convenablement. Le fait
Contrlez les prscriptions nationales. de ne pas employer un matriel appropi peut entraner une instabilit du toit et des
dommages aux bardeaux par la suite.
II. Fatages et artiers.
Une bonne approximation du supplment de matriaux pour lxcution des artiers, II. VENTILATION (Figure 3)
fatages et lignes de dpart est de lordre de 10-15% (dpendant du nombre de Il est essentiel que le toit soit ventil afin dliminer la chaleur et la condensation.
dtails). Quand vous posez du Victorian, Superglass-Biber ou le Cambridge, Cest pourquoi lair doit pouvoir circuler entre lisolation et le support, du bord au
veillez commander des bardeaux rectangulaires de la mme couleur pour raliser fatage. Laration minimale dun plafond isol (P) doit tre de 33 cm2 par m2 pour
les artiers et les fates. Pour le Dynasty, vous commanderez Dynasty Hip & Ridge Strips. une pente de toit allant de 15 25 et de 16 cm2 par m2 pour une pente de toit
allant de 26 85, elle peut tre rpartie rgulirement entre le bord et le fatage.
(Pour plus dinformation, demandez la brochure Ventilation dIKO).
Type de bardeaux Pente de toit Pureau Couverture/Paquet kg/m2
Cambridge 20- 85 15,5 cm 3,10 m2 12,2 III.SOUS-COUCHE
Armourglass 15- 25 12,5 cm 2,62 m2 12,5
26- 85 14,3 cm 3,00 m2 10,9 A poser de manire la plus platte possible afin dviter toute ingalit qui serait
Victorian 15- 25 11,5 cm 2,41 m2 13,1 visible la surface des bardeaux.
26- 85 13,0 cm 2,75 m2 11,5 La sous-couche est gnralement pose paralllement au chneau !
BiberShield 15- 90 13,0 cm 2,47 m2 12,1
Diamant 15- 25 9,7 cm 2,62 m2 12,0
26- 85 11,2 cm 3,00 m2 10,5 Pentes de 15-20
DiamantShield 15- 90 11,2 cm 2,46 m2 11,2 Possibilit 1: (Figure 4a I)
ArmourShield 15- 90 13,4 cm 3,00 m2 9,4
Superglass - 3 Tab 15- 25 12,5 cm 2,62 m2 11,0 Il est conseill de couvrir entirement le toit avec IKO Armourgard Ice & Water
26- 85 14,3 cm 3,00 m2 9,7 Protector ou une membrane modifie similaire. Les joints verticaux doivent tre de
Superglass - Biber 15- 25 11,5 cm 2,65 m2 11,4 15 cm et les horizontaux de 8 cm .
26- 85 13,0 cm 3,00 m2 10,1
Dynasty 15- 85 12,7 cm 2,32 m2 13,7 Possibilit 2: (Figure 4a II)
Monarch 15- 25 12,5 cm 2,25 m2 13,5 Utilisez une IKO Armourbase PRO ou une membrane similaire mais avec
26- 85 14,3 cm 2,58 m2 12,1 un double recouvrement du toit. Coupez une bande de dpart de 50 cm de large et
Monarch - Diamant 15- 25 9,7 cm 2,13 m2 13,5
26- 85 11,2 cm 2,46 m2 11,7 posez les bandes suivantes avec des joints horizontaux de 50 cm et des joints verticaux
de 30 cm.

Pentes de 21-85 (Figure 4b)


La totalit du toit doit tre recouverte par une Armourbase 30 ou dune autre sous-
Exemple de calcul de matriaux: Type de bardeaux: Armourglass couche pour bardeaux. La sous-couche doit tre installe paralllement au bord avec
Pente de toit: 32 des joints horizontaux de 5 cm et des joints verticaux de 10 cm. Assurez la
Surface: 240 m2 sous-couche par un clouage suffisant. Mise en uvre a plat en vitant les
Calcul: Pente 26- 85 = 3,00 m2/paquet dformations qui se rpercuteraient sur la surface des bardeaux.
240 m2/ 3,00 = 80 paquets
Pentes de 85- 90
On ne requiert pas de sous-couche, seul lArmourShield, DiamantShield &
BiberShield peut tre utilis.

40 41
IV.NOUES VII.LIGNES DE CRAIE (Figure 7)
Pour la pose de bardeaux dans les noues, on Les lignes de craie offrent un repre visuel lalignement horizontal et vertical des
peut opter pour la mthode noue-ouverte, la 5 bardeaux. Elles alignent galement les bardeaux de chaque ct dune fentre de toit
mthode noue-croise ou la mthode noue- ou dune chemine. Les lignes horizontales peuvent tre traces pour 4 ou 5 rangs (1)
ferme/coupe. et une ligne verticale (2) doit tre utilise en cas de grande longueur de pose, partant
La prparation de la noue dpendra de la dune ligne centrale, on posera les bardeaux gauche et droite de celle-ci.
mthode. Toutes les lignes doivent tre considres comme des guides et non comme des lignes
Prparation pour mthode noue ouverte de pose.
(Figure 5)
Placez dans la noue une Armourbase 30 dun APPLICATION DES BARDEAUX
mtre de large comme sous-couche (1). I. CLOUAGE ET COLLAGE
Les joints doivent re colls ou souds et Une fixation correcte est essentielle pour avoir un bon toit. Plantez le clou
seront de 30 cm (2). Le joint de finition verticalement avec la tte arrivant au ras de la surface du bardeau afin quelle
venant du pan du toit doit tre de 15 cm (3). ne soit pas endommage (Figure 6a).
Habillez la noue avec lIKO Armour Valley ou Les clous seront toujours appliqus 2,5 cm au dessus de lchancrure et 2,5 cm de
avec un profil mtallique (4). Clouez le Armour Valley tous les 40 cm et 2,5 cm chaque bord. Pour les positions et les quantits de clous par type de bardeau et par
Les matriaux mtalliques seront fixs tous les 25cm et les recouvrements de 30 cm pente de toit, voir la Figure 6b I. Notez que pour une forte pente (>60) ou une zone
seront colls. fortement venteuse, un supplment de clous et un collage avec IKO Shingle Stick sera
Prparation pour mthode noue-croise ou noue-ferme/coupe ncessaire comme montr la Figure 6b II.
Prparez la noue avec une couche d IKO ArmourGard Ice & Water Protector avec Par temps froid un collage complmentaire peut galement tre envisag.
des joints de 30 cm. Alternativement, vous pouvez utiliser une Armourbase 30 En rgion trs venteuse, au moins toutes les jupes des 5 derniers rangs suprieurs
(ou quivalent), clou 2,5 cm du bord . Les joints doivent avoir 30 cm et tre colls. doivent tre colles. Tous ces points de colle supplmentaires doivent tre appliqus
modrment ne dpassant pas un diamtre de 25 mm.
V. PROTECTION DES BORDS (Figure 4c)
En regions o la temprature moyenne de janvier est inferieur -1C, les bords du PARTIE COURANTE Doublis (Figure 7)
toit doivent tre protgs contre les amas de glace qui peuvent entraner des Prparez le doublis en coupant les jupes le long de la partie pleine du bardeau.
remontes deau sous les bardeaux. Appliquez IKO ArmourGard Ice & Water Recoupez le doublis dune demi-jupe afin que les joints ne correspondent pas ceux
Protector partir du bord jusqu une distance de 60 cm au del de la limite du mur du premier rang de bardeaux. Ce doublis doit dpasser du bord du toit de 6 10 mm.
intrieur. Les joints horizontaux auront 8 cm et les verticaux 15 cm. Pour le Dynasty et le Cambridge, utilisez des bardeaux rectangulaires.
Vous pouvez galement utiliser une Armourbase 30 en excutant une double
recouvrement. Commencez par une premire bande de 50 cm, les roulaux suivant PREMIER RANG & PROCEDURE DAPPLICATION (Figure 7)
sont poss jusqua 60 cm au dessus de la limite intrieure du mur extrieur, avec un Premier rang (4):
recouvrement de 50 cm qui sera coll ou soud en plein. Les recouvrements verticaux Commencez avec un bardeau complet pos fleur de la bande de dpart la rive
doivent tre 30 cm. (Figure 4a II) et au bord. Clouez comme indique (Figure 6) et continuez avec des bardeaux entiers.
Deuxime rang (5):
VI.PROFILS DE BORDS (Figure 4b) Coupez une demi ardoise et commencez la rive. Clouez le bardeau afin que le
Les profils pour les rives et les bords doivent tre faits en matriaux rsistant la bas des ardoises se trouvent fleur de la limite de la partie pleine du bardeau du
rouille. Ils doivent avoir une largeur sur le pan de toit dau moins 8 cm et tre plis premier rang. (Ajustez si la pente requiert un recouvrement diffrent).
vers le bas le long du ct. Les profils doivent tre appliqus par dessus la Troisime rang et suivants (6):
sous-couche pour les rives (4) et en dessous pour les bords (5). Commencez avec un bardeau emput dune ardoise entire. Coupez une demi
ardoise supplmentaire pour chaque rang suivant. Pour une protection maximale
contre le vent et les remonte deau, collez le bardeau le long de la rive.
Attention:Pour lapplication du Cambridge et du Dynasty, partez de la gauche du
premier rang et coupez respectivement 25, 50, 75... cm pour le deuxime (5),
le troisime (6), le quatrime (7), ... rang.

42 43
III.POSE DES BARDEAUX DANS LES NOUES V. SOLINS
Mthode noue-ouverte (Figure 8a) Pour chemines (Figure 10a)
Tracez deux lignes de craie du fatage vers le bord 8 cm de chaque ct de la Pour pied de mur (Figure 10b)
ligne noue et accroissez la distance de 1 cm par mtre en allant vers le bord (1).
Coupez le bardeau sur cette ligne et coupez un triangle de 5 cm dans le coin
suprieur afin de diriger leau vers la noue (2). Collez les derniers 5 cm au moyen
10a 10b
d IKO Shingle Stick (3). Ne placez pas de clous dans les derniers 5 cm (4).

Mthode noue-croise (Figure 8b)


Posez le bardeau en travers de la noue. Le dernier bardeau doit dpasser la ligne
de noue dau moins 30 cm (1) et fix par un clou supplmentaire au coin suprieur (2).
Pressez le bardeau dans la noue avant le clouage. Ne pas clouer endans les 15 cm
par rapport la ligne de noue.

Mthode noue-ferme/coupe (Figure 8c) (pour des pentes 23)


Pour la meilleure application: commencez la pose sur le pan de toit ayant la pente la
plus faible. Le doublis (1) doit dborder de 25 cm sur lautre pan. Ne clouez pas
endans les 15 cm par rapport au centre de la noue. Mettez un clou supplmentaire
(2) la fin de chaque bardeau croisant la noue. Aprs avoir complt ce pan, tirez
une ligne de craie (3) sur le pan non encore couvert 5 cm du centre de la noue.
Posez les bardeaux sur le second pan, ajustez le bardeau la ligne et coupez un
triangle de 5 cm (4) du coin suprieur afin de diriger leau vers la noue.
Enfoncez la fin du bardeau dans une bande large de 5 cm dIKO Shingle Stick (5). Renovation avec les bardeaux Cambridge ou Dynasty.
IV.ARETIERS ET FAITIERES (Figure 9a & 9b)
Veillez ce que le dernier rang soit plac de faon quivalente de chaque ct, afin
que la fatire couvre de manire gale et quaucun clou ne soit visible. Coupez des
bardeaux rectangulaires en pice individuelle (1). Placez les avec redoublement,
pliez les par deux afin dviter les crevasses. Par temps froid, il est conseill de
chauffer un peu larrire du bardeau. Clouez comme montr dans lillustration:
16 cm du ct de lardoise (2) et 2,5 cm du bord (3). Commencez partir du
ct oppos la direction des vents dominants (Figure 9b).

44 45
INHOUD

Bitumenleien Verleggingsinstructies

48 Algemene regels
48 Benodigde materialen
49 Begrippen
54 Benaderende berekening van
de nodige bitumenlei-hoeveelheden
55 Voorbereiding van het dak
57 Verleggen van de bitumenleien

46 47
ALGEMENE REGELS BEGRIPPEN
IKO geeft geen garantie bij lekkage veroorzaakt door foutieve toepassing van Afbeelding 1a. Afbeelding 1b
bitumenleien of gebrekkige voorbereiding van het dakoppervlak. 1.Zichtbare gedeelte 1.Zijrand
De bitumenleien mogen niet rechtstreeks op een isolatielaag aangebracht worden. 2.Bedekt gedeelte 2.Onderrand
Tussen de isolatielaag en het vernagelbaar dakoppervlak moet een algemene 3.Tabinsnede 3.Kil
verluchting voorzien en toegepast worden. 4.Zelfkleefstrip 4.Hoekkeper
Op nzelfde dakvlak mogen geen bitumenleien van verschillende produktiedata door 5.Tab 5.Nok
mekaar verlegd worden.
Kleurvariaties zijn bij bitumenleien mogelijk maar komen nooit als produktiefout in aan
merking. Om deze kleurafwijkingen te vermijden moet men tijdens de verwerking
bitumenleien uit verschillende pakken mengen. Verleg de bitumenleien in een halfsteens 1a 4a I
verband, diagonaal over het dakvlak, van rand naar nok.
De anti-kleef folie aan de achterzijde dient niet verwijderd te worden bij de verlegging.
Zij heeft enkel een funktie in de verpakking.
Verwijder de plasticfolie aan de achterzijde van de ArmourShield, DiamantShield en
BiberShield bitumenleien tijdens het aanbrengen. (Afbeelding 7 - 7)
De tijdens de produktie aangebrachte kleefstrips zullen na het verleggen, onder invloed

8
1b

cm
cm
15
van zonnestralen, hun funktie vervullen. Bij koud weer moeten de bitumenleien
handmatig, door middel van koudlijm, extra verkleefd worden.
Let wel, de koudlijm moet met de IKO-bitumenleien verenigbaar zijn !
4a II
Bij warm weer is het aan te raden de bundels te buigen alvorens te openen, dit om de
bitumenleien beter van elkaar te krijgen.
Opgelet: Om beschadiging door voetindrukken te voorkomen, vermijdt tijdens zonnige,

50
cm
hete periodes op de zonnekant van het dak te lopen.

50
cm
BENODIGDE MATERIALEN 2 30 cm

Bitumenleien:
IKO biedt een breed gamma geoxideerde en gemodificeerde glasvliesbitumenleien aan,
4b
met een ruime keuze uit 60 verschillende type / kleur kombinaties.

Onderlagen: niet allemaal noodzakelijk - volg de aanwijzingen


IKO Armourbase PRO.
IKO Armourbase 30, een 3,0 mm geoxideerd membraan met glasvliesinlage. 3
IKO Armourbase 15, een 1,5 mm geoxideerd membraan met glasvliesinlage.

5
IKO ArmourGard Water & IJs Bescherming, een SBS gemodificeerd, zelfklevend membraan.

cm
cm
10

Kilafdichting: voor het toepassen van open kil principe


IKO Armour Valley, een 4,0 mm APP gemodificeerd membraan met een aan de 4c
bitumenlei-kleur aangepaste bestrooiing (of een metalen keelafdichting).
Dakrandprofielen:
Profielen uit metaal voor de onderrand en uit metaal of kunststof voor de zijranden.
Bevestigingsmiddelen:
Corrosiebestendige nagels: 25 mm lang en een nagelkopdoorsnede van 10 mm.
De nagelschacht moet opgeruwd zijn. Voor Cambridge bitumenleien en voor het
vernagelen van nok- en/of hoekkeperafdekking gebruikt men nagels van 30 mm lengte.
Koude kleefstof:
IKO Shingle Stick of een andere door IKO toegelaten koudlijm.
Verluchters:
Voldoende verluchting, genoeg om aan de minimum verluchtingsnormen te voldoen.

48 49
7

6a
Superglass - 3 Tab

6b I 6b II 50 mm
25 mm 25 mm

25 mm 25 mm

Superglass-3 Tab

25 mm 50 mm 25 mm

25 mm 25 mm

Monarch / Armourglass

25 mm 25 mm

25 mm 25 mm Armourglass - 4 Tab
Monarch - APP
Victorian / Superglass-Biber

25 mm 50 mm 25 mm

25 mm 25 mm

Monarch-Diamant / Diamant

25 mm 25 mm
25 mm

25 mm 25 mm Cambridge
Dynasty
ArmourShield

25 mm 50 mm 25 mm

155 mm 155 mm

Cambridge

25 mm 50 mm 25 mm -75 cm

-50 cm

127 mm 127 mm -25 cm

Dynasty

50 51
7 8a 9a

ArmourShield

8b

Diamant
Monarch - Diamant
DiamantShield

Victorian
Superglass - Biber
BiberShield 8c 9b

52 53
BENADERENDE BEREKENING VAN DE NODIGE BITUMENLEI HOEVEELHEDEN VOORBEREIDING VAN HET DAK
I. Voor volle dakvlakken I. DAKVLAK (Afbeelding 2)
De hoogte van het zichtbare gedeelte van de verschillende bitumenleitypen bij Het dakvlak moet glad, stevig, droog en goed aan de onderconstructie bevestigd zijn.
verschillende dakhellingen kan U aflezen uit de tabel. Hieruit kan U dan de te bestellen Het moet uit multiplex (18 mm), OSB (min.klasse 3) of volkantig vol houten delen,
hoeveelheid berekenen. Gebruik ieder type op de voorgeschreven dakhelling zoals (max. 150 mm breedte) opgebouwd zijn. Alle houten delen moeten voldoende droog zijn.
vermeld. In sommige landen kunnen hiervoor andere, afwijkende regels bestaan. Om de werking (scheluw trekken) van de dakbeschot te voorkomen moeten de delen voldoende
Kontroleer steeds de plaatselijke normen en verplichtingen ! bevestigd en verspringend aangebracht worden. Bij het niet naleven van deze regels kunnen
constructiebewegingen optreden met mogelijke beschadiging van de bitumenleien tot gevolg.
II. Voor nok- en hoekkeperafdekking
Voor het bedekken van nok, hoekkeper en aanvangsstrip moet men 10-15 % mr II. VERLUCHTING (Afbeelding 3)
materiaal incalculeren (verschillend naar de hoeveelheid van de dakdetails). Het is van het allergrootste belang dat warme en vochtige lucht met behulp van een daartoe
Wanneer men Victorian, Superglass-Biber of Cambridge bitumenleien verlegt, moet men berekende verluchting afgevoerd wordt. Hiertoe moet buitenlucht vrij kunnen circuleren, van dak
voor het bedekken van nokken en hoekkepers de nodige rechthoekige bitumenleien in rand naar nok, tussen de isolatie en het dakbeschot. De berekening van deze verluchting gebeurt
de aangepaste kleur bestellen. aan de hand van het totaal gesoleerde dakoppervlak. Voor daken met een helling tussen 15-25
Voor Dynasty bitumenleien bestel je Dynasty Hip & Ridge Strips. moet er 33 cm2 ventilatieopening per m2 gesoleerd dakoppervlak (P) voorzien worden. Bij
daken tussen 25-85 kan dit teruggebracht worden tot 16 cm2 . De openingen dienen
gelijkmatig verdeeld te worden over dakrand en nok.
Bitumenleitype Dakhelling Zichtbare deel Dakbedekking/Pak kg/m2 ( Zie ook: IKOs verluchtingsbrochure.)
Cambridge 20- 85 15,5 cm 3,10 m2 12,2
Armourglass 15- 25 12,5 cm 2,62 m2 12,5 III. ONDERLAAG
26- 85 14,3 cm 3,00 m2 10,9 Verleg onderlagen zo vlak en strak mogelijk, oneffenheden kunnen later zichtbaar blijven in het
Victorian 15- 25 11,5 cm 2,41 m2 13,1 afgewerkte bitumenleidak !
26- 85 13,0 cm 2,75 m2 11,5
De dakbanen steeds evenwijdig aan de dakrand verleggen !
BiberShield 15- 90 13,0 cm 2,47 m2 12,1
Diamant 15- 25 9,7 cm 2,62 m2 12,0
26- 85 11,2 cm 3,00 m2 10,5 Dakhellingen 15-20
DiamantShield 15- 90 11,2 cm 2,46 m2 11,2 Mogelijkheid 1: (Afbeelding 4a I)
ArmourShield 15- 90 13,4 cm 3,00 m2 9,4 Het is aan te bevelen om het gehele dakvlak met IKO ArmourGard Water & IJs Bescherming of
Superglass - 3 Tab 15- 25 12,5 cm 2,62 m2 11,0 een gelijkwaardig gemodificeerd membraan te bedekken.
26- 85 14,3 cm 3,00 m2 9,7
Verticale overlappingen moeten 15 cm zijn, horizontale 8 cm.
Superglass - Biber 15- 25 11,5 cm 2,65 m2 11,4
26- 85 13,0 cm 3,00 m2 10,1 Mogelijkheid 2: (Afbeelding 4a II)
Dynasty 15- 85 12,7 cm 2,32 m2 13,7 Gebruik de IKO Armourbase PRO of een gelijkwaardig produkt zodanig dat er een
Monarch 15- 25 12,5 cm 2,25 m2 13,5 dubbele onderlaag ontstaat. Begin hiervoor met een strook van 50 cm breedte, hierop legt U
26- 85 14,3 cm 2,58 m2 12,1 stroken met 50 cm horizontale overlapping. De verticale overlapping moet 30 cm bedragen.
Monarch - Diamant 15- 25 9,7 cm 2,13 m2 13,5
26- 85 11,2 cm 2,46 m2 11,7
Dakhellingen 21- 85 (Afbeelding 4 b)
Het gehele dakvlak moet met IKO Armourbase PRO of een gelijkwaardig produkt bedekt
worden. Deze onderlaag moet evenwijdig aan de dakrand verlegd worden met horizontale over
Berekeningsvoorbeeld: Bitumenleitype: Armourglass lappingen van 5 cm en verticale van 10 cm. Gebruik slechts zoveel nagels als nodig om de
Dakhelling: 32 onderlaag op zijn plaats te houden. Let op: oneffenheden in dit stadium kunnen later in het
Dakoppervlak: 240 m2 bitumenleivlak zichtbaar worden.
Berekening: Dakhelling 26- 85 = 3,00 m2/pak
240 m2/ 3,00 = 80 pakken Dakhellingen 85- 90
Geen onderlaag noodzakelijk, alleen ArmourShield, DiamantShield en BiberShield
bitumenleien mogen toegepast worden.

54 55
IV:KILLEN VERLEGGEN VAN DE BITUMENLEIEN
Voor het verleggen van bitumenleien in killen kan
geopteerd worden voor de open kil methode, 5 I. VERNAGELING EN VERKLEVING
de ingebonden of nzijdig afgesneden methode.
Een correcte bevestiging van de bitumenleien is van essentieel belang voor het goed funktioneren
De voorbereiding van de kil hangt van de
van de dakbedekking onder alle weersomstandigheden. Sla nagels altijd recht in tot de nagelkop
gekozen methode af.
vlak op het shingleoppervlak drukt maar er niet indringt, zodat hij deze laatste niet beschadigt
Voorbereiding van de open kil methode
(Afbeelding 6a).
(Afbeelding 5).
Nagel steeds 2,5 cm boven de tabinsnijding en 2,5 cm van de rand vandaan. De juiste positie
Leg in de kil Armourbase 30 als onderlaag (1), van
en hoeveelheid nodig voor de verschillende shingletypes en dakhellingen vindt U in Afbeelding
nok naar dakrand. Horizontale
6bI. Let op dat bij steile dakhellingen (> 60) en ook bij grote windbelasting meer nagels en extra
overlappingen moeten 30 cm zijn en gekleefd of
koude kleefstof nl. IKO Shingle Stick noodzakelijk zijn (Afbeelding 6bII). Bij verlegging in koude
gebrand worden (2). De onderlaag
weersomstandigheden dient men op dezelfde wijze extra kleefstof aan te brengen.
van de dakvlakken moet de onderlaag in de kil met
In sterk winderige gebieden is het raadzaam om bij minstens de bovenste vijf rijen elke
15 cm overlappen (3). Dicht nu de kil af met de IKO
shingletab extra manueel te verkleven. Al deze extra kleefpunten dienen spaarzaam aangebracht
Armour Valley of met een voorgevormde metaalstrip
te worden en mogen niet groter zijn dan 25 mm in doormeter.
(4). Nagel deze Armour Valley op 2,5 cm van de kant en met 40 cm tussenafstand. Wanneer
Nagelpositie voor Cambridge en Dynasty: WITTE LIJN = NAGELLIJN
overlappingen niet te vermijden zijn moeten deze 30 cm bedragen en volledig
gekleefd of gebrand worden (5). Metaalstrips moeten elke 25 cm bevestigd worden.
VERLEGGING OP HET DAKVLAK
Ook hier werkt men met overlappingen van 30 cm en volledig verkleven.
Aanvangsstrip (Afbeelding 7)
Voorbereiding van de ingebonden en/of nzijdig afgesneden kil methode
Dit is de strook die men bekomt door het doorsnijden van de bitumenlei ter hoogte van de
Als onderlaag in de kil kan men opteren voor een laag IKO ArmourGard Water & IJs
tabinsnijdingen en over de volle lengte van de shingle. Kort tevens de uiterst linkse (of rechtse)
Beschermer of een laag Armourbase 30 (of een gelijkwaardig produkt), waarbij de
strook met een halve tab in. Dit om een verspringing van de aanstootvoegen bij de volgende rij
eventuele overlappingen 30 cm moeten bedragen en volledig gekleefd worden.
te bekomen. Laat deze strook 6-10 mm over de dakranden steken (3).
De vernageling gebeurt op 2,5 cm van de rand. De onderlaag van de dakvlakken moet
Bij het verleggen van Cambridge of Dynasty kan men ook rechthoekshingles gebruiken.
deze onderlaag met 15 cm overlappen.
VERLOOP VAN HET VERLEGGINGSPATROON (Afbeelding 7)
V. BESCHERMING VAN DE DAKRANDEN (Afbeelding 4c)
Eerste rij (4):
Wanneer de klimatologische omstandigheden zo zijn dat er een gemiddelde januari temperatuur
Begin met een volledige bitumenlei die aan zijkant en onderrand gelijk wordt gelegd
heerst van -1C dan moet men de dakranden beschermen tegen ijsstuwing (fenomeen waarbij,
met de aanvangsstrip. Vernageling dient te gebeuren zoals in Afbeelding 6
door de dooi / vriescyclus, water onder de bitumenleien omhoog gestuwd kan worden). Breng
aangegeven. Vervolledig verder met complete bitumenleien.
hiertoe een laag IKO ArmourGard Water & IJs Beschermer aan, die tot minstens 60 cm voorbij
Tweede rij (5):
de binnenkant van de buitenmuur komt. Noodzakelijke overlappingen moeten horizontaal 8 cm
Snij een halve tab af en start aan de zijkant. De overlapping van de eerste rij wordt als
zijn en verticaal 15 cm. In de plaats van dit membraan kan men ook een dubbele Armourbase
volgt bepaald: verleg zodanig dat de onderzijde van de tabs van de tweede rij ter
30 toepassen. Begin hiervoor met een strook van 50 cm breedte, hierop legt U stroken met
hoogte van de bovenzijde van de tabuitsnijding van de eerste rij komt te liggen.
50 cm horizontale overlapping, die volledig gekleefd of gebrand moeten worden (Afbeelding 4a II).
(Pas de hoogte van de overdekking aan aan de vereiste volgens de te bedekken
De verticale overlapping moet 30 cm bedragen. Ook hier dient men tot minimum 60 cm voorbij
dakhelling en aan de plaatselijke normen / regels, zie pag.8 tabel).
de binnenkant van de buitenmuur te verleggen.
Derde en volgende rijen (6):
Begin de derde rij met een bitumenlei waarvan een volledige tab werd afgesneden.
VI.KANT- / RANDPROFIELEN (Afbeelding 4b)
Voor de volgende rijen kort U telkens de eerste bitumenlei met een halve tab extra in.
Profielen gebruikt aan zijkant en onderrand moeten uit korrosiebestendig materiaal bestaan. Ze
Voor het bekomen van een optimale waterdichtheid moet men de bitumenleien langs de
moeten voldoende op het dakvlak rusten en over de rand naar beneden geplooid zijn. Aan de
dakranden met extra koude kleefstof verkleven.
zijkant moet de onderlaag onder het profiel verlegd worden (4) terwijl dat aan de onderrand
Opgelet :Bij het verleggen van Cambridge en Dynasty bitumenleien moet men de eerste
over het profiel moet gebeuren (5).
bitumenlei van de tweede (5), de derde (6) en de vierde rij (7),... telkens met
respectievelijk 25, 50 en 75 cm,... inkorten.
VII.KRIJTLIJNEN (Afbeelding 7)
Krijtlijnen dienen als visuele ondersteuning bij het horizontaal en verticaal recht verleggen van de
bitumenleien. Tevens zijn ze een goede hulp bij het passeren van verticale dakdoorvoeringen (vb.
schoorstenen, dakvensters,). Het horizontaal uitlijnen (1) gebeurt ongeveer elke vier rijen. Voor
het verticaal uitlijnen begint men met een loodlijn (2) vanuit het midden van de dakrand, van
waaruit men dan links en rechts hulplijnen kan bepalen. De bitumenleiverlegging start dan ook
vanuit het midden.
Alle krijtlijnen zijn te beschouwen als hulplijnen en niet als strikte verleggingslijnen.

56 57
II. BITUMENLEIVERLEGGING AAN DE KIL V. LOODSLABBEN
Open kil methode (Afbeelding 8a)
Trek twee krijtlijnen, n aan elke zijde van de kilmiddellijn. Aan de nok bedraagt de Schoorsteen met loodslabben ingewerkt. (Afbeelding 10a)
afstand van de lijn tot de kilmiddellijn 8 cm. Deze afstand dient met 1 cm per meter kil Verticale wand met loodslabbenaansluiting. (Afbeelding 10b)
naar de dakrand vergroot te worden (1). Verleg de bitumenleien volgens deze lijn en
snij tevens de bovenste hoek van de bitumenlei af (driehoek van ongeveer 5 cm) om het
regenwater naar de kil te leiden (2). Kleef tevens de laatste 5 cm met behulp van IKO 10a 10b
Shingle Stick aan de kilafdichting (Armour Valley of metaalstrip) (3). Sla geen nagel
in de laatste 5 cm (4).
Ingebonden / gevlochten kil methode (Afbeelding 8b)
Verleg de bitumenleien door de kil tot minstens 30 cm op het andere dakvlak (1).
Vergeet tevens de extra nagel bovenaan de bitumenlei niet (2). Druk vr het bevestigen
de bitumenlei goed in de kil. Sla geen nagels binnen 15 cm aan beide zijde van de kilnaad.

Enzijdig afgesneden kil methode (Afbeelding 8c) (voor dakhellingen > 23)
Voor het beste resultaat: start met verleggen van het dakvlak met de kleinste helling of
met het grootste oppervlak.
Alleen de startstrip moet doorgedekt worden (1). Sla geen nagels 15 cm links en rechts van de
kilnaad. Gebruik een extra nagel in de bovenhoek van het bitumenleideel dat doorgedekt
wordt (2). Na verleggen van het eerste dakvlak, breng een krijtlijn aan 5 cm van de kilnaad op
het nog niet verlegde dakdeel (3). Snij de bitumenleien tijdens het indekken van het tweede
dakvlak aan deze lijn af. Snij tevens de bovenste hoek (4) (driehoek van 5 cm) af. Om waterdicht
aan te sluiten kleef de laatste 5 cm met behulp van koude kleefstof (5).

IV. NOK- EN HOEKKEPERAFDEKKING (Afbeelding 9a & 9b)


Zorg er voor dat de bitumenleien op beide dakzijden voldoende bedekt zijn, zodat geen nagels
zichtbaar blijven. Snij voor het afdekken van nok- en hoekkeper stukken uit rechthoekige
Renovatie met Cambridge of Dynasty bitumenleien.
bitumenleien (1) of uit het gebruikte bitumenleitype. ArmourShield: (A) is het zichtbare gedeelte
(B) is het afgedekte gedeelte (Afbeelding 9a).
Voor Diamant: zie Afbeelding 9a.
Verleg ze met dubbeldekking, plooi ze per twee om barsten te voorkomen. Bij koud weer is het
raadzaam om de bitumenleien aan de achterzijde een weinig te verwarmen met een kleine
brander. Vernagel zoals aangegeven in de tekening: 16 cm van de kant van de tab (2)
en 2,5 cm van de rand (3). Begin steeds op de heersende windrichting. (Afbeelding 9b)

58 59
60

Вам также может понравиться