PROJECT PROPOSAL
Sir/Madam:
It is a great honor and pleasure to submit our proposal; we offer our service under the following
terms, conditions and specifications:
1. Well Parameters
a. Drilling Method rotary operated with diamond drilling bit (mini rotary)
b. Size of Pilot Hole 2 diameter hole
c. Reaming of Borehole 3 - 56 from 0 to ground
d. Use of 6 diameter PVC orange pipes series 1000 for Blanking Casing
e. Use of 4 diameter PVC for well Casing (orange pipe)
f. Use of 1 GI Pipes fro Rise Line
2. Scope of Work
a. Mobilization of Drilling equipment and personnel
b. Site preparation and set up of equipment
c. Preparation of water supply for drilling
d. Pilot hole drilling
e. Reaming of surface casing
f. Continuation of pilot drilling
g. Well logging and formation sampling
h. Application of Benthonite powder / Bonthonite powder
i. Reaming of production holes
j. Well design, preparation of casing / screen
k. Installation of permanent casing, screen and centralizer
l. Well developing application / surging
m. Installation of submersible pump of pumping test
n. Pump test / GPM record, duration and drawdown
o. Installation of compatible pump
p. Installation of pipe and permanent wiring and control
r. Demobilization and site clean up
3. Duration of Work:
Above all scope of work shall be completed within 25 days. However should be there
caving or losing if the underground which may be encountered; the contractor has the right to extend the
time to finish the work depending upon the nature extent of wok required for the reason or the said
circumstance.
4. Labor, Cost and Materials:
6. Other conditions:
a. Please provide water and electricity during the drilling operation for our crew and make the
drilling site accessible for us.
b. In case of dry drilling or if the well is not suitable to be quipped 50% of labor cost shall be
borne by your good self.
c. Drilling operation will stop when sufficient source of water is already met for the required
deep because it might penetrate beyond the water bed that will cause loose water of deep well
(case to case basis only)
Hoping our drilling proposal may meet your requirement for the construction of one unit deep
well.
Respectfully yours,
Arch. Donald M. Jarquio
Contractor /Driller
CP# 09084003881
If the above quotation is acceptable, kindly affix your signature to the space provide below together with