QUALITY CONTROL TESTS- LAB Kurinjipadi Sub Division - CRIDP Works P35

Reconstruction of
Improvements to Improvements to Construction of Retaining culvert at km 3/10, 4/8,
Improvements to Bhuvanagiri
Pethanayakkankuppam - Kurinjipadi - wall at km 9/8, 10/4 & 10/10 7/8, 7/10 of
NAME OF WORK - Kurinjipadi road Km.9/0-
Melapudupettai road Kalkunam Road km of Bhuvanagiri - Kurinjipadi Bhuthavarayanpettai -
14/0 including CD works
Km.0/0-4/0 1/0 -4/0 road (R.S) (MD816) Krishnapuram road
(R.S)
SL. Frequency as per
Item of Work Total No. of Tests Total No. of Tests Total No. of Tests Total No. of Tests Total No. of Tests
NO. MORTH
III WMM 36.00 2062.00 1500.00 ----- 82.50
1 Water Absorption A-13 - I As required 2 2 1
2 Aggregate Impact value A-16-I 1/1000 cum
2 2 1
Combined Flakiness and
3
Elongation Index Test A-16-II
1/500 cum 4 3 1
4 Gradation Test A-20 -I 1/200 cum 8 8 1
5 Atterbeg Limits A-20-II 1/200 cum 8 8 ----- 1
6 Proctor Density A-20-III 1/1000 sq.m 3 2 1
IV DBM 1540.00 750.00 562.50 18.52

1 Bitumen Penetration Test B-3-I As required 4 2 2 1


2 Softening Point Test B-3-II As required 4 2 2 1
Coating and Stripping Test of One test for each
3
Aggregates B-3-III source of supply 2 2 2 1

One test for each


4 Water Absorption B-4-I
source of supply 2 2 2 1

5 Aggregate Impact value B-4-II 1/350 cum 4 2 2 1


Combined Flakiness and
6
Elongation Index Test B-4-III
1/350 cum 4 2 2 1
V BC 1100.00 450.00 337.50 ----- 11.20

1 Bitumen Penetration Test B-3-I As required 3 2 2 1


2 Softening Point Test B-3-II As required 3 2 2 1
Coating and Stripping Test of One test for each
3
Aggregates B-3-III source of supply 2 2 2 1
One test for each
4 Water Absorption B-4-I
source of supply 2 2 2 1

5 Aggregate Impact value B-4-II 1/350 cum 3 2 2 1


Combined Flakiness and
6
Elongation Index Test B-4-III
1/350 cum 3 2 2 1
QUALITY CONTROL TESTS- LAB Kurinjipadi Sub Division - CRIDP Works - P36

Reconstruction of Reconstruction of culvert Construction of RCC slab


Widening from Non Standard Improvements to Improvements to Reconstruction of
Improvements to culvert at km 3/6 of at km 3/6 and 3/10 and culvert at km 4/2 of culvert at km 0/4 & 0/10
to SL & Improvements to Karaimedu- Thaiyalgunampattinam Vadakkumelur - Construction of Retaining
Rasakuppam Puduchatiram - of road branching at km
NAME OF WORK Sathapadi - Vayalamoor - Maruthur -
-Arangamangalam
- Renganathapuram - Keezhur - wall at km 1/8 & 1/10 of 0/4 of Periyapattu -
Poovalai roadkm 0/0-4/8 Kolagudi road km Kannady road km 6/0- Poovalai road
Road km 0/0 - 2/0 Pacharapalayam Karaimedu - Marudhur - Poochimedu road to
including CD works 1/2-3/6 8/0
road (R.S) Kolakudi road (R.S) (R.S) Thatchampalayam road

SL. Frequency as Total No. of Total No. of


Item of Work Total No. of Tests Total No. of Tests Total No. of Tests Total No. of Tests Total No. of Tests Total No. of Tests
NO. per MORTH Tests Tests
II GSB 1044.00 - - - - - - 27.75
1 Water Absorption A-5(I) As required 3 - - - 1
2 Atterbeg Limits A-8-I 1/400 cum 3 - - - 1
3 Gradation Test A8-I 1/400 cum 3 - - - 1
4 Proctor Density A-8-II 1/1000 sq.m 3 - - - 1
5 CBR A-8-III As required 2 - - - 1
III WMM 2340.00 1031.25 638.00 1125.00 17.35 34.69 23.13 23.13
1 Water Absorption A-13 - I As required 3 2 2 2 1 1 1 1
2 Aggregate Impact value A-16-I 1/1000 cum 3 2 2 2 1 1 1 1
Combined Flakiness and Elongation
3
Index Test A-16-II
1/500 cum 5 2 2 3 1 1 1 1

4 Gradation Test A-20 -I 1/200 cum 11 5 3 6 1 1 1 1


5 Atterbeg Limits A-20-II 1/200 cum 11 5 3 6 1 1 1 1
6 Proctor Density A-20-III 1/1000 sq.m 3 2 2 2 1 1 1 1
IV DBM 990.00 687.50 375.00 375.00 3.50 6.84 4.63 4.63
1 Bitumen Penetration Test B-3-I As required 3 3 2 2 1 1 1 1
2 Softening Point Test B-3-II As required 3 3 2 2 1 1 1 1

Coating and Stripping Test of One test for each


3
Aggregates B-3-III source of supply 2 2 2 2 1 1 1 1

One test for each


4 Water Absorption B-4-I
source of supply 2 2 2 2 1 1 1 1

5 Aggregate Impact value B-4-II 1/350 cum 3 2 2 2 1 1 1 1


Combined Flakiness and Elongation
6
Index Test B-4-III
1/350 cum 3 2 2 2 1 1 1 1

V BC/CGPC 540.00 412.50 225.00 225.00 2.10 4.16 2.78 2.75


1 Bitumen Penetration Test B-3-I As required 3 2 2 2 1 1 1 1
2 Softening Point Test B-3-II As required 3 2 2 2 1 1 1 1

Coating and Stripping Test of One test for each


3
Aggregates B-3-III source of supply 2 2 2 2 1 1 1 1

One test for each


4 Water Absorption B-4-I
source of supply 2 2 2 2 1 1 1 1

5 Aggregate Impact value B-4-II 1/350 cum 2 2 2 2 1 1 1 1


Combined Flakiness and Elongation
6
Index Test B-4-III
1/350 cum 2 2 2 2 1 1 1 1
QUALITY CONTROL TESTS- LAB
Kurinjipadi Sub Division - Non Plan Works

Special Repairs to
Special Repairs to
Thaiyalkunampattinam
Vadakkumelur - Keelur
NAME OF WORK - Renganathapuram -
- Pacharapalayam Road
Kannady Road
Km 6/0-9/1
Km 0/0-2/0

SL. Frequency as per


Item of Work Total No. of Tests Total No. of Tests
NO. MORTH
III WMM
1 Water Absorption A-13 - I As required 2 2
2 Aggregate Impact value A-16-I 1/1000 cum 2 2
Combined Flakiness and
3
Elongation Index Test A-16-II
1/500 cum 2 2
4 Gradation Test A-20 -I 1/200 cum 2 2
5 Atterbeg Limits A-20-II 1/200 cum 2 2
6 Proctor Density A-20-III 1/1000 sq.m 2 2
IV DBM
1 Bitumen Penetration Test B-3-I As required 2 2
2 Softening Point Test B-3-II As required 2 2
Coating and Stripping Test of One test for each
3
Aggregates B-3-III source of supply 2 2

One test for each


4 Water Absorption B-4-I
source of supply 2 2

5 Aggregate Impact value B-4-II 1/350 cum 2 2


Combined Flakiness and
6
Elongation Index Test B-4-III
1/350 cum 2 2
V BC
1 Bitumen Penetration Test B-3-I As required 2 2
2 Softening Point Test B-3-II As required 2 2
Coating and Stripping Test of One test for each
3
Aggregates B-3-III source of supply 2 2
One test for each
4 Water Absorption B-4-I
source of supply 2 2

5 Aggregate Impact value B-4-II 1/350 cum 2 2


Combined Flakiness and
6
Elongation Index Test B-4-III
1/350 cum 2 2

Вам также может понравиться