Subject:- i) The deposit estimate for depositing the share cost for total load of
10.8MW with CD 12MVA at 33KV level by M/S J.K. Cement, Village Jharli,
Distt. Jhajjar emanating from 132KV S/Stn from 132KV S/Stn, HVPNL,
Bahu.
ii) The deposit estimate for depositing the share cost for total load of
10.8MW with CD 12MVA at 33KV level by M/S Ultra-Tech Cement, Village
Jharli, Distt. Jhajjar emanating from 132KV S/Stn from 132KV S/Stn,
HVPNL, Bahu.
Please refer to your office endst. No. Ch-87/DR-3786 dated 20.09.16 on the
subject sited above.
1. The estimate has already been framed as per approval accorded vide
Chief Engineer/Planning office memo no- R-1243/Ch-27/NCR/RTK-393
dated 06.11.2013, memo R-1279/Ch-51/NCR/RTK-393 dated
27.06.2014 and memo no- R-1293/Ch-63/NCR/RTK-393 dated 11.08.14.
2. History is self-explanatory.
3. The copy of Chief Engineer/Planning office memo no- R-1243/Ch-
27/NCR/RTK-393 dated 06.11.2013 is attached.
The estimate is resubmitted for your kind consideration please.
DA/ As attached
(2 nos. estimate)
Executive Engineer
Transmission System Division
HVPNL, Rohtak
H A RY A N A VID Y U T P RA S A RA N N IG A M L IM IT E D
(A Govt. of Haryana Undertaking)
Office of the
Ex ec ut iv e E n g i ne e r,
T r a n sm i s s io n S y st em , D iv i s io n Ro ht ak .
HVPN L Tel. No. - 01262- 247901
To
Kind Attention- Mr. Gyan Chand
M/s Svam Power Plants Pvt. Ltd.
BB-09 & BB-10, Shyanji Complex,
Bahadurgarh-124507
Parts.fbd@svampower.com
Executive Engineer
Transmission System Division
HVPNL, Rohtak
Cc:-
1. SE/TS Circle, HVPNL, Rohtak.
2. SSE, 220KV S/Stn HVPNL, Bhadana
To
H A RY A N A VID Y U T P RA S A RA N N IG A M L IM IT E D
(A Govt. of Haryana Undertaking)
Office of the
Ex ec ut iv e E n g i ne e r,
T r a n sm i s s io n S y st em , D iv i s io n Ro ht ak .
HVPN L Tel. No. - 01262- 247901
To
Kind Attention- Mr. Gyan Chand
M/s Svam Power Plants Pvt. Ltd.
BB-09 & BB-10, Shyanji Complex,
Bahadurgarh-124507
Parts.fbd@svampower.com
Executive Engineer
Transmission System Division
HVPNL, Rohtak
Cc:-
1. SE/TS Circle, HVPNL, Rohtak.
2. Divisional Accoutant, HVPNL, Rohtak.
3. SSE, 220KV S/Stn Bhadana w.r.t your office memo no-77/MPT-1 dated
21.11.16.
H A RY A N A VID Y U T P RA S A RA N N IG A M L IM IT E D
(A Govt. of Haryana Undertaking)
Office of the
Ex ec ut iv e E n g i ne e r,
T r a n sm i s s io n S y st em , D iv i s io n Ro ht ak .
HVPN L Tel. No. - 01262- 247901
To
SE/TS Circle,
HVPNL, Rohtak
Please refer to SSE, 132KV S/Stn HVPNL. Jhajjar office memo no-
23/MPJH-1 dated 30.01.17 regarding issue of work order for repairing/recreation
of trench culvert which was got damaged during the augmentation of 132/33KV,
40/50MVA transformer T-3 at 132KV S/Stn Jhajjar. The said trench culvert is
existing at the entrance way of yard due to which the entrance of any kind of
vehicle is not possible in the yard in emergent conditions. The said work for
repairing/ recreation of trench culvert has to be done in emergency. Accordingly
it is requested that the following list of contractors may be approved in order to
float the limited tender enquiry.
1. KADIAN CONSTRUCTION PVT. LTD., H NO-801 SECTOR 2(P),
ROHTAK(MOBILE NO-9812585291)
2. SAJJAN SINGH (GOVT CONTRACTOR), 1120/12, NIRMAL NAGAR,
ROHTAK-124001( MOBILE NO- 9992103162)
3. BILLU SINGH (GOVT CONTRACTOR) 777/35. JANTA COLONY, ROHTAK (
MOBILE NO-9992019111)
4. KRISHAN GOPAL (APPROVED BY- PWD B&R, 266/23, DLF COLONY,
ROHTAK ( MOBILE NO- 8684895895)
5. THE MAHAVIR COLONY CO-OP, L/C SOCIETY, AANAND PURA, NEAR BAL
BHAWAN, ROHTAK (MOBILE NO- 9896461952)
6. THE MODEL CO-OPERATIVE LABOUR & CONSTRUCTION SOCIETY LTD.
H. O. 1084/22, MANSAROVAR COLONEY, ROHTAK(MOBILE NO-
9416495823)
Executive Engineer
Transmission System Division
HVPNL, Rohtak
H A RY A N A VID Y U T P RA S A RA N N IG A M L IM IT E D
(A Govt. of Haryana Undertaking)
Office of the
Ex ec ut iv e E n g i ne e r,
T r a n sm i s s io n S y st em , D iv i s io n Ro ht ak .
HVPN L Tel. No. - 01262- 247901
To
SE, TS, Circle,
HVPNL, Rohtak.
Subject:- The deposit estimate for depositing the share cost for total load
of 10.8MW with CD 12MVA at 33KV level by M/S J.K. Cement,
Village Jharli, Distt. Jhajjar emanating from 132KV S/Stn from
132KV S/Stn, HVPNL, Bahu.
Please refer to CE/TS Circle, HVPNL, Panchkula office memo no. Ch-
19/CETS/SSB/R-125 dated 06/12/2016 endorsed to this office vide endst. No.
Ch-90/DR-3786 dated 22/12/16 vide which the said estimate was returned with
observation that provision may be made as per approval accorded vide Chief
Engineer/ Planning, HVPNL, Panchkula office memo no- R-1293/Ch-
63/NCR/RTK/393 dated 11.08.2014.
In this regard said the estimate is submitted after attending the
observation as per approval accorded vide Chief Engineer/ Planning, HVPNL,
Panchkula office memo no- R-1293/Ch-63/NCR/RTK/393 dated 11.08.2014. So
the same estimate is resubmitted for getting sanctioned from the competent
authority.