CALCULO DEL DIMETRO MAS ECONMICO DE LNEA DE CONDUCCIN

CABALLAJE
% HF (5%) Q HFT 76 N HP=Q*HFT/76*N
DIMETRO DIMETRO REA EN m2 GASTO EN VELOCIDAD LONGITUD Q2COEF. FRICC. CTE. DE PERD. FRICC. OTRAS HFT=HF+%HF (Q EN lps) N=60% HP
INTERIOR NOMINAL (A) m3/seg. EN m/seg. LINEAL MANNING MANNING EN m PERDIDAS
m Pulg. (Q) (V) en m. (L) (N) (K)
0.08160 3 0.0052 0.00800 1.530 610.20 0.000064 0.009 531.338 20.750 1.0375 21.79 174.30 45.6 3.8224
0.10500 4 0.0087 0.00800 0.924 610.20 0.000064 0.009 138.476 5.408 0.2704 5.68 45.43 45.6 0.9962
0.15450 6 0.0187 0.00800 0.427 610.20 0.000064 0.009 17.651 0.689 0.0345 0.72 5.79 45.6 0.1270

GOLPE DE ARIETE
145V Ead E te SOBREPRESION SOBREPRESION SOBREPRESION PRESIN TOTAL
PRESIN DE DIAM. INT. ESPESOR VEL. Ead 1+ Ead 1+ Ead h= 145 V ABSORBIDA POR ABSORBIDA POR CARGA NORMAL 20% h+CARGA
TRABAJO KG/CM2 (D) PARED DE m/seg. E te E te E te 1+ Ead VLVULA TUBERA DE OPERACIN NORMAL DE
cm TUBO (e) cm E te 80% h 20 % h (EN m) OPERACIN
11.2 8.16 0.365 1.530 221.81 168,667 10,257 16.44 17.44 4.18 53.11 42.49 10.62 80.42 91.04
11.2 10.50 0.465 0.924 133.96 217,035 13,067 16.61 17.61 4.20 31.92 25.54 6.38 64.31 70.69
11.2 15.45 0.690 0.427 61.87 319,352 19,389 16.47 17.47 4.18 14.80 11.84 2.96 59.35 62.31

ANLISIS DE COSTOS MATERIALES Y M.O.


CONCEPTO DIMETRO: 3" CLASE: PVC-26 DIMETRO: 4" CLASE: PVC-26 DIMETRO: 6" CLASE: PVC-26 CEA
CANTIDAD U. P/U IMPORTE CANTIDAD U. P/U IMPORTE CANTIDAD U. P/U IMPORTE ANLISIS DEL DIMETRO
EXCAVACIN MAT. COMN 292.90 M3 25.88 7,580.15 307.54 M3 25.88 7,959.16 375.88 M3 25.88 9,727.86 MAS ECONMICO
EXCAVACIN MAT. III 73.22 M3 242.93 17,788.31 76.89 M3 242.93 18,677.72 93.97 M3 242.93 22,828.33
PLANTILLA APISONADA 25.63 M3 114.22 2,927.28 36.61 M3 114.22 4,181.82 42.71 M3 114.22 4,878.79 LOCALIDAD:
RELLENO COMPACTADO 138.60 M3 102.82 14,250.49 145.42 M3 102.82 14,952.33 186.45 M3 102.82 19,171.30 SANTIAGUITO
RELLENO A VOLTEO 198.11 M3 40.51 8,025.34 196.13 M3 40.51 7,945.25 227.11 M3 40.51 9,200.24 MUNICIPIO:
INSTALACIN DE TUBERA 610.20 ML 5.20 3,173.04 610.20 ML 7.04 4,295.81 610.20 ML 10.77 6,571.85SAN JUANITO DE ESCOBEDO
SUMINISTRO DE TUBERA 610.20 ML 44.16 26,946.43 610.20 ML 73.09 44,599.52 610.20 ML 159.78 97,497.76 FECHA:
VAL. CONTRA GOLPE DE ARIETE 0.00 PZA 0.00 PZA 0.00 0.00 PZA 0.00 AGOSTO DE 2013
ELABORO:
COSTO TOTAL DE CONDUCCIN 80,691.03 102,611.60 169,876.13 ING. J.S.M.C.

DIMETRO MAS ECONMICO


PRESIN DE TRABAJO DIMETRO HP Kwh. COSTO POR HR. CARGO ANUAL COSTO TOTAL DE CARGO ANUAL DE AMORT. COSTO ANUAL PARA
1 2 5 7
TUBERA KG/CM2 MM pulg. BOMBEO $ 3 DE BOMBEO 4 CONDUCCIN COND. No. DE AOS 6 OPERACIN 365 DIAS
7
11.2 76.2 3 3.82 2.850 4.28 14,045.22 80,691.03 20,408.05 34,453.26
11.2 101.6 4 1.00 0.743 1.11 3,660.44 102,611.60 25,952.11 29,612.55
11.2 152.4 6 0.13 0.095 0.14 466.58 169,876.13 42,964.38 43,430.95

GASTO (LPS) 8.00 ANUALIDAD 0.253


DESNV. TOPOGRA (m) 58.63 I. ANUAL BANCARIO 25.0% NOTA:
LONGITUD (m) 610.20 AOS DE PROYECTO 20
COSTO DE KW/HOR. 1.50 HORAS DE BOMBEO 9
MOD. ELAST. MATERIAL 28,100 MOD. ELAST. AGUA 20,670

2 = 1 x 0.7457 3 = 2 x $ KWH 4 = 3 x 8760 6 = 5 x ANUALIDAD 7 = 4 + 6

NOTA : EL DIMETRO MAS ECONMICO ESTA DADO POR EL MENOR COSTO DETERMINADO EL LA COLUMNA 7

(8) 360006121.xls 1 de 1
CALCULO DEL DIMETRO MAS ECONMICO DE COLUMNA Y TREN DE DESCARGA.
CABALLAJE
% HF Q HFT 76 N HP=Q*HFT/76*N
DIMETRO DIMETRO REA GASTO VELOCIDAD LONGITUD Q2 COEF. FRICC. CTE. DE PERD. FRICC. OTRAS HFT=HF+%HF (Q EN lps) N = 60% HP
INTERIOR NOMINAL m2 m3/seg. m/seg. LINEAL m3/seg. MANNING MANNING m PERDIDAS m
m Pulg. (A) (Q) (V) en m. (L) (N) (K) m
0.06271 2 1/2 0.0031 0.00800 2.590 61.00 0.00006 0.014 5236.326 20.443 1.0221 21.46 171.72 45.6 3.76575
0.07792 3 0.0048 0.00800 1.678 61.00 0.00006 0.014 1644.480 6.420 0.3210 6.74 53.93 45.6 1.18264
0.10226 4 0.0082 0.00800 0.974 61.00 0.00006 0.014 385.827 1.506 0.0753 1.58 12.65 45.6 0.27747

ANLISIS DE COSTOS MATERIALES Y M.O.


CONCEPTO DIMETRO 2.5" CLASE: FoGo C-40 DIMETRO 3" CLASE: FoGo C-40 DIMETRO 4" CLASE: FoGo C-40 CEA
CANTIDAD U. P/U IMPORTE CANTIDAD U. P/U IMPORTE CANTIDAD U. P/U IMPORTE LOCALIDAD:
SANTIAGUITO
INSTALACIN DE TUBERA 61.00 ML 22.28 1359.08 61.00 ML 28.97 1767.17 61.00 ML 41.38 2524.18 MUNICIPIO:
SUMINISTRO DE TUBERA 61.00 ML 259.46 15827.06 61.00 ML 327.93 20003.73 61.00 ML 483.50 29493.50 SAN JUANITO DE ESCOBEDO
FECHA: AGOSTO DE 2013
COSTO TOTAL DE CONDUCCIN 17186.14 21770.90 32017.68 ELABORO: ING. J.S.M.C.

COLUMNA MAS ECONMICA


PRESIN DE TRABAJO DIMETRO HP Kwh. COSTO POR HR. CARGO ANUAL COSTO TOTAL DE CARGO ANUAL DE AMORT. COSTO ANUAL
5 7
TUBERA KG/CM2 MM pulg. 1 2 BOMBEO $ 3 DE BOMBEO 4 COLUMNA COND. No. DE AOS 6 DE OPERACIN 7
176 63.5 2 1/2 3.77 2.8081 4.21 13,836.99 17,186.14 4,346.65 18,183.64
176 76.2 3 1.18 0.8819 1.32 4,345.54 21,770.90 5,506.21 9,851.75
155 101.6 4 0.28 0.2069 0.31 1,019.55 32,017.68 8,097.78 9,117.33

TREN DE DESCARGA MAS ECONMICO


DIMETRO NOMINAL GASTO EN long. EQUIVALENTE PERD. FRICC. Q HFT 76 N HP=Q*HFT/76*N Kwh. COSTO POR HR. CARGO ANUAL C. TOTAL TREN C. ANUAL DE AMORT. COSTO ANUAL
5 7
PULG. m3/seg. EN m EN m (Q EN lps) N=60% HP 1 2 BOMBEO $ 3 DE BOMBEO 4 DE DESC. SUM. E INST. COND. No. DE AOS 6 DE OPERACIN 7
3.0 0.00800 22.2 2.763 22.108 45.6 0.48482 0.362 0.542 1781.43 12938.00 3272.23 5053.65
4.0 0.00800 24.7 0.663 5.303 45.6 0.11630 0.087 0.130 427.34 15367.00 3886.56 4313.90
6.0 0.00800 38.8 0.120 0.957 45.6 0.02099 0.016 0.023 77.12 29005.00 7335.83 7412.95

NOTA: EL POZO PROFUNDO YA CUENTA CON EL EQUIPAMIENTO, LA COLUMNA DE BOMBEO, TREN DE DESCARGA, SUBESTACION, ARRANCADOR, CERCO PERIMETRAL TIPO Y CASETA DE CONTROLES Y CLORACION,
FALTANDO UNICAMENTE EL EQUIPO DE CLORACION.

2 = 1 x 0.7457 3 = 2 x $ KWH 4 = 3 x 8760 6 = 5 x ANUALIDAD 7 = 4 + 6

NOTA : EL DIMETRO MAS ECONMICO ESTA DADO POR EL MENOR COSTO DETERMINADO EL LA COLUMNA 7

(8) 360006121.xls 2 de4


DIRECCIN TCNICA
DEPARTAMENTO DE ESTUDIOS Y PROYECTOS

CALCULO DE EQUIPO DE BOMBEO

LOCALIDAD: SANTIAGUITO MUNICIPIO: SAN JUANITO DE ESCOBEDO

1.- DATOS BSICOS

1.1.- CAPTACIN

TIPO POZO PROFUNDO NIVEL ESTTICO SIN DATO M.


PROFUNDIDAD TOTAL 160 m CALIDAD DEL AGUA SIN DATO
DIMETRO DE ADEME 10 PULG. ARENA SIN DATO
GASTO MAX. AFORADO 8.00 L.P.S. TEMPERATURA SIN DATO 0 C
NIVEL DINMICO 28.00 m
FECHA DE AFORO MAYO 2013

1.2.- CONDICIONES DE SERVICIO REQUERIDAS

GASTO A EXTRAER: 8.00 LPS POBLACIN BENEFICIADA: 915 HAB.


NIVEL DINMICO: 28.0 m DOTACIN: 205 L.P.S.
LONG. DE COLUMNA: 61.0 m DIAM. DE COLUMNA: 3.0 PULG.
LONG. LNEA DE COND. 610.20 m DIAM. DE LNEA DE COND.: 4.0 PULG.

NOTA: SE INSTALARA VLVULA DE ALIVIO DE PRESION, SOSTENEDORA DE PRESIN Y AMORTIGUADORA DE


GOLPE DE ARIETE DE 2" DE DIMETRO , CON RANGO DE PRESIN DE 3.5 A 12.6 Kg/cm2, CALIBRADA A
9.481 Kg/cm2.

1.3.- CARGA DINMICA TOTAL:

POR DESNIVEL TOPOGRFICO 58.63 m


POR ALTURA DE TANQUE 2.84 m
POR NIVEL DINMICO 28.00 m
POR PERDIDAS POR FRICCIN EN LNEA DE CONDUCCIN 6.84 m
POR PERDIDAS POR FRICCIN EN COLUMNA DE BOMBEO 6.74 m
POR PERDIDAS POR FRICCIN EN ACCESORIOS 0.34 m
OTRAS PERDIDAS (TREN DE DESCARGA) 4" DE DIAMETRO. 0.66 m

SUMA 104.05 m.c.a.

CROQUIS DE SISTEMA DE BOMBEO TANQUES EXISTENTES


INTERCONECTADOS DE 40 Y
85 M3 DE CAPACIDAD
.00 m
POZO PROFUNDO
BOMBEO Qb=8.00 L.P.S.

DT= 58.63 m

TUBERA DE PVC Y Fo.G.o. DE 4" . LONG. = 610.20 m


FORMULO: ING. J.S.M.C. FE CHA: AGOSTO DE 2013

360006121.xls
TUBERA DE PVC Y Fo.G.o. DE 4" . LONG. = 610.20 m
FORMULO: ING. J.S.M.C. FE CHA: AGOSTO DE 2013