LE BEL AIR HOTEL PROJECT

BILL OF QUANTITIES - GABION WALL

PROJECT: Le Bel Air Hotel Date: 05/06/17


SUBJECT: Construction Bill of Quantity Location:...................

QUANTITY UNIT PRICE (USD)


ITEM No. DESCRIPTION TYPE UNIT TOTAL PRICE (US$)
per building material LABOUR
1 SDP.01
1.1 Soil excavation work (do not take out to dump site) / m3 144.90 $ -

1.2 Surface preparation for bedding of Gabions including sand backfill under Gabions Block thicknes 50mm LS m2 92.00 $ -

Supply and install 3 layer GABIONS Wall (Including stones minimum size 150mm diamter, Steel cage box size
1.3 / m3 138.00 $ -
1.0m x 1.0m x 1.0m with standard heavy galvanize or Galfan coated size 100x100mm Dia 3.0mm)

1.4 Supply and install filter fabric (Geotextile) see detail in drawing / m2 285.20 $ -

Soil backfil - per layer of 30cm thick - well compactied - slope 23 degree as indicate in drawing (until building B*
1.5 / m3 306.00 $ -
ground floor balcony level)

2 SDP.02
1.1 Soil excavation work (do not take out to dump site) / m3 78.75 $ -

1.2 Surface preparation for bedding of Gabions including sand backfill under Gabions Block thicknes 50mm LS m2 50.00 $ -

1.3 Supply and install 2 layer GABIONS Wall (Including stone material size 120x120, Steel cage box size 1.0m x 1.0m x 1.0m with / m3 75.00 $ -
standard heavy galvanize or Galfan coated size 80 x 100mm Dia 3.0mm)
1.4 Supply and install filter fabric (Geotextile) see detail in drawing / m2 155.00 $ -
Soil backfil - per layer of 30cm thick - well compactied - slope 25 degree as indicate in drawing (until building C1
1.5 / m3 50.00 $ -
ground floor balcony level)

3 SDP.03
1.1 Soil excavation work (do not take out to dump site) / m3 37.80 $ -

1.2 Surface preparation for bedding of Gabions including sand backfill under Gabions Block thicknes 50mm LS m2 24.00 $ -

1.3 Supply and install 1 layer GABIONS Wall (Including stone material size 120x120, Steel cage box size 1.0m x 1.0m x 1.0m with / m3 36.00 $ -
standard heavy galvanize or Galfan coated size 80 x 100mm Dia 3.0mm)
1.4 Supply and install filter fabric (Geotextile) see detail in drawing / m2 74.40 $ -

Soil backfil - per layer of 30cm thick - well compactied - slope 38 degree as indicate in drawing (until building A1
1.5 / m3 22.80 $ -
ground floor balcony level)

GRAND TOTAL $ -

For the Owner : For the Contractor :


Company name: Treasure Group Le Bel Air Construction Co., Ltd. Name:
Director: Mr Sisombath DOUANGVILAYKEO
Address:
Address:
1 Old Bridge, Ban Muang Nga Village, Luang Prabang, LAO P.D.R
Tel: (+856)
Tel: (+856) 020 5557 0567
...........................................
...........................................................
(Date, Stamp & Signature)
(Date, Stamp & Signature)

Witness: Official owner representative Witness: Architect


Mr. Rodolphe GAY Mr. Francois GRECK
(Date, Stamp & Signature) (Date, Stamp & Signature)

Witness: Project Manager


Mr.Jean Charles CARA
(Date, Stamp & Signature)

Le Bel Air Hotel Project - Bill of Quantity Page 1 of 2


ml
SDP.01 34.5
SDP.02 36
SDP.03 19