Вы находитесь на странице: 1из 36

Check List

MEP
Sanitary Ware Installation

Project:

Name of Tower : Floor Name:


Reference Drawing no:

(Please tick mark in appropriate column i.e. mark for 'OK' & for 'Not OK' work)
Check points Flat No. Remarks
1 2 3 4
Type of sanitary ware installation
Installed positioning (Height,
distance , Orientation)
Stability & regidibility
Check for defects
Check for damage
Protection
Fuctional.

Remarks of quality assurance engineer:

Signature Contractor Site Engineer Consultant Remarks/ Comments


Checked By
Date
Dated

oor Name:

ot OK' work)
Remarks

Remarks/ Comments
Check List
MEP
Sanitary Fixtures

Project:

Name of Tower : Floor Name:


Reference Drawing no:

(Please tick mark in appropriate column i.e. mark for 'OK' & for 'Not OK' work)
Check points Flat No. Remarks
1 2 3 4
Gyser angle valve height
Wash basin angle valve height
Washing machine tap height
RO tap height
Concealed valve height
Helalth faucet height
Wall hung WC height
Floor Mounted WC Point distance
Flush height
Head shower height
Wall Mixer height
Bottle Trap Height
Waste Trap Sizes
Pipe testing at 10 kg/cm2
Pipe testing at 4 kg/cm2
Mirror
C P fittings

Remarks of quality assurance engineer:


Signature Contractor Site Engineer Consultant Remarks/ Comments
Checked By
Date
Dated

Floor Name:

& for 'Not OK' work)


Remarks
Remarks/ Comments
Check List
MEP
Cold Water & Drainage Pipe Work

Project:

Name of Tower : Floor Name:


Reference Drawing no:

(Please tick mark in appropriate column i.e. mark for 'OK' & for 'Not OK' work)
Check points Flat No. Remarks
1 2 3 4
Used Pipe materials
Proper glue Used
Pipe joints
Line , Alignment & position
Ball Valves & fitting connections
Support bracket, horizontal &
vertical
Waste pipe for required size and
type
Soil pipe for required size and
type
Vent pipe for required size and
type
Traps installed properly
Ceiling drain pipes are supported
Check slope 1:100 where water
pipe escaped
Incoming supply pipes connected
Water Charged
Drainage and vent water test,
filling stack with water
Inspected system for leaks and
workmanship
PRV installed with Pressure Gauge
PRV & Valves to be located and
installed as to provide access for
observation, maintenance,
servicing and replacement
Check water pressure with a
gauge
Kudda Packing
Debris Removal
Protection of system from others

Remarks of quality assurance engineer:


Signature Contractor Site Engineer Consultant Remarks/ Comments
Checked By
Date
Dated

Floor Name:

for 'Not OK' work)


Remarks
emarks/ Comments
Check List
MEP
Shaft Work

Project:

Name of Tower : Floor Name:


Reference Drawing no:

(Please tick mark in appropriate column i.e. mark for 'OK' & for 'Not OK' work)
Check points Flat No.
1 2 3
T1 T2 T3+K T4 T1 T2 T3+K T4 T1 T2 T3+K
Used Pipe materials
Proper glue Used
Pipe joints
Line , Alignment & position
Ball Valves & fitting connections
Support bracket, horizontal &
vertical
Waste pipe for required size and
type
Soil pipe for required size and type
Vent pipe for required size and
type
Traps installed properly
Check slope 1:100 where water
pipe escaped
Drainage and vent water test,
filling stack with water
Inspected system for leaks and
workmanship

PRV installed with Pressure Gauge

PRV & Valves to be located and


installed as to provide access for
observation, maintenance,
servicing and replacement
Check water pressure with a gauge

Kudda Packing
Debris Removal
Protection of system from others

Remarks of quality assurance engineer:

Signature Contractor Site Engineer


Checked By
Date
Dated

Remarks
3 4
T4 T1 T2 T3+K T4
Consultant Remarks/ Comments
Check List
MEP
Flats Water Charging

Project:

Name of Tower :
Reference Drawing no:

(Please tick mark in appropriate column i.e. mark for 'OK' & for 'Not OK' work)
Floor Details. Flat No. Remarks
1 2 3 4
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1

Remarks of quality assurance engineer:


Signature Contractor Site Engineer Consultant Remarks/ Comments
Checked By
Date
Dated

for 'OK' & for 'Not OK' work)


Remarks
Remarks/ Comments
Che
M
PRV

Project:

Name of Tower :
Reference Drawing no:

(Please tick mark in appropriate column i.e. mark for 'OK' & for 'Not OK' work)
Floor No. F
1 2
T1 T2 T3 T4 K T1 T2 T3
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1

Remarks of quality assurance engineer:


Signature Contractor Site Engineer
Checked By
Date
Check List
MEP
PRV Status

ork)
Flat No.
2 3 4
T4 K T1 T2 T3 T4 K T1 T2 T3 T4 K
Site Engineer Consultant
Dated

Remarks
Remarks/ Comments
Project:

Name of Tower :
Reference Drawing no:

Time Period
Signature
Checked By
Date
PROGRESS REPORT
MEP
PLUMBING WORK

Tower :
e Drawing no:

Progress Status
Site Engineer
Dated

Remarks
Check List
MEP
Tower Rain Water

Project:

Name of Tower :
Reference Drawing no:

(Please tick mark in appropriate column i.e. mark for 'OK' & for 'Not OK' work)
Floor No. Flat No.
1 2 3
B-1 B-2 B-3 B-4 B-1 B-2 B-3 B-4 B-1 B-2 B-3 B-4
Connected with Main Sewer

Leakage observed in
Basement

Leakage Rectified

Remarks of quality assurance engineer:

Signature Contractor Site Engineer


Checked By
Date
Dated

Remarks
4
B-1 B-2 B-3 B-4

Consultant Remarks/ Comments

Вам также может понравиться