Production Data Management

Dramatically Increases Performance


Case study: PDMS reduces data reporting costs by USD 2 million per year
for Oil & Gas Development Company Ltd. (OGDCL) of Pakistan

Challenge Develop workflow to improve regulatory framework, and stay abreast


data management of the Global Depository Receipt (GDR)
Enable direct data capture and
validation from field locations; Existing methods of production data man- listing requirements for enrollment at the
motivate and train user base agement at the Pakistan-based Oil & Gas London Stock Exchange.
at field level and head office to Development Company Ltd. (OGDCL) were
Deliver solutions through proven technology
implement consistent workflows manual and inconsistent. Incomplete data
and methodology
for production data collection, resulted in time-consuming and unreliable
generation of reports and graphs. An effi- OGDCL awarded a contract for an
allocation, and reporting.
cient workflow was required that included enterprise-wide PDMS solutionthe first
Solution of its kind in Pakistanto Schlumberger
I network and facility visualization Information Solutions. The initial step
Implement production data
I data entry from field locations was to enable direct data entry from
management system (PDMS)
field locations using third-party remote
to collect, transmit, and store I data validation
application-sharing software. Avocet* Data
production- and operations- I standard back allocation methods Manager production software was selected
related data.
I reporting capabilities to model and graphically visualize field
I an interface to other applications. facilities, load data, and set the stage for
Results
accurate reporting and back allocation.
Reduced production data report- The system also needed to motivate person-
ing and search times by 50%, nel and train them in order to enhance A quality control and validation system
increased accuracy in data governance systems and decision-making applied checks in different data
by more than 99%, and improved practices, correspond to the countrys entry fields in the form of thresholds.
production workflows.

Facility modeling, back allocation, and network visualization of OGDCLs fields.

Schlumberger Information Solutions


Case study: PDMS reduces data reporting costs by USD 2 million per
year for Oil & Gas Development Company Ltd. (OGDCL) of Pakistan

Providing a road map for


real-time decision making
by bridging the gap between
operations and management,
adding value to the data gener-
ated, and assisting in optimiz-
ing production through effective
monitoring are some of the key
features of [the OGDCL] PDMS.
On-the-fly surveillance key performance indicators and reporting capabilities.

Back-allocation processes across production workflows provided more accurate measures Amjad Yazdani
of actual versus estimated production and losses, and production reports were standardized Manager, Production Surveillance
for daily generation from the PDMS system. Production Department, OGDCL

The production database enabled a painless querying and reporting process to identify and
control costly issues such as downtime, production variances, and pressure anomalies. A central
Although the project business
production datastore was provided by links to other production surveillance applications such
as OFM* well and reservoir analysis software and Merak* planning, risk, and reserves software. case aimed to reduce data
The entire PDMS project was executed under PRINCE2 professional project management search time by 50%, we wit-
methodology, which provided a framework for the wide variety of disciplines and activities
nessed that this target fell far
required within the project. Project deliverables, quality expectations, and adherence to the plan
and business case were monitored and documented throughout the project to assure success. short of the gain that was
actually achievedraw data
PDMS surpasses expectations
entered into the system was
The PDMS reduced projected data collection and reporting costs by USD 2 million per year.
97.5% accurate, which we
More than 200 users were trained, and efficient project management enabled on-time and
on-budget delivery. The system further improved and now

I reduced by 50% data searching and reporting time stands at approximately


99.99%. This is well above
I provided 99.5% data accuracy and confidence
the objectives set forth in
I standardized improved production workflows across OGDCL
the project business case.
I rectified years of inaccurate production data
I standardized reporting formats.
Mohammad Kaleem
The PDMS surpassed expectations, and a second phase is planned to include key i-field elements Deputy Chief Engineer
including real-time data access, production optimization, engineering, and portal integration. Production Department
The new system solved production problems resulting from ineffective data management, OGDCL
and continues to advance OGDCLs vision of becoming a leading oil company.

www.slb.com/sis

*Mark of Schlumberger
Other company, product, and service names are the properties of their respective owners.
Copyright 2007 Schlumberger. All rights reserved. 07-IS-399