Вы находитесь на странице: 1из 12

RT Offering List

Reliance
Project: J3 Area/Unit: DTA/PCG Offer no:
Name of Contractor: SHARP TANKS & STRUCTURALS (P) LTD

Type of
Line No. / Spool No. / Film Size
Sr. Line Joint Welder Weld Thk - 1 Thk - 2 Full Joint/
Structural Drg. / Mark No. / MOC (D2, D4 / (Inch Lot No.
No. Class No. No. Process (mm) (mm) Segments
Equipment No. / Nozzle No. D5 / D7, dia. / RM)
others)

STS/WQT/RT/2G/STS/WPS2014/00
1
1 - A 36 RM 2G SMAW D7 0.3 - 16 16 Full Joint

STS/WQT/RT/3G/STS/WPS2014/00
2
1 - A 36 RM 3G SMAW D7 0.3 - 16 16 Full Joint

STS/WQT/RT/2G/STS/WPS2014/00
3
1 - A 36 RKM 2G SMAW D7 0.3 - 16 16 Full Joint

STS/WQT/RT/3G/STS/WPS2014/00
4
1 - A 36 RKM 3G SMAW D7 0.3 - 16 16 Full Joint

STS/WQT/RT/2G/STS/WPS2014/00
5
1 - A 36 SKG 2G SMAW D7 0.3 - 16 16 Full Joint

STS/WQT/RT/3G/STS/WPS2014/00
6
1 - A 36 SKG 3G SMAW D7 0.3 - 16 16 Full Joint

STS/WQT/RT/2G/STS/WPS2014/00
7
1 - A 36 BM 2G SMAW D7 0.3 - 16 16 Full Joint

STS/WQT/RT/3G/STS/WPS2014/00
8
1 - A 36 BM 3G SMAW D7 0.3 - 16 16 Full Joint

Note:-
1. Surface preparation is complete for the above joints to facilitate NDT 2. RT films to be reviewed along with RT offer. 3. All repair / retake segments are to b
and reviewed along with films of the complete joint. 4. Two thickness need to be mentioned in case of differential thickness of the mating components. 5. Equ
of films for D2, D4, D5 & D7 are DR500, MX125, T200 & A400, respectively.
Legend: BW: Butt Weld, MOC: Material of Construction, NDT: Non-Destructive Testing, QMD: Quality Management Department, RT:Radiography Testing , RM: Runnin
Thickness
Contractor Reliance QMD
Signature
Name
Date
RT Technician
Name of the technician : Area / Unit

Radiography Camera : Agency :


Total Inch Dia. /
Total No. of Joint:
Running Meter :
Format No. EPCMD-2-QM00-FMT-ME-244, Rev.-00, Date :- 29.07.2014
RT Offering List

Date: 11-Jul-17

Acceptance
Standard
Fresh/
& Fluid
Repair/
Category
Penalty/
(Normal
Retake
/High
Pressure)

Fresh

Fresh

Fresh

Fresh

Fresh

Fresh

Fresh

Fresh
o be reviewed along with RT offer. 3. All repair / retake segments are to be submitted
ntioned in case of differential thickness of the mating components. 5. Equivalent type

MD: Quality Management Department, RT:Radiography Testing , RM: Running Meter, Thk.:

Reliance QMD
RT Offering List
Reliance
Project: J3 Area/Unit: DTA/PCG Offer no: STS/RIL/010
Name of Contractor: SHARP TANKS & STRUCTURALS (P) LTD

Type of
Line No. / Spool No. / Film Size
Sr. Line Joint Welder Weld Thk - 1 Thk - 2 Full Joint/
Structural Drg. / Mark No. / MOC (D2, D4 / (Inch Lot No.
No. Class No. No. Process (mm) (mm) Segments
Equipment No. / Nozzle No. D5 / D7, dia. / RM)
others)

Note:-
1. Surface preparation is complete for the above joints to facilitate NDT 2. RT films to be reviewed along with RT offer. 3. All repair / retake segments are to be
and reviewed along with films of the complete joint. 4. Two thickness need to be mentioned in case of differential thickness of the mating components. 5. Equiv
of films for D2, D4, D5 & D7 are DR500, MX125, T200 & A400, respectively.
Legend: BW: Butt Weld, MOC: Material of Construction, NDT: Non-Destructive Testing, QMD: Quality Management Department, RT:Radiography Testing , RM: Running
Thickness
Contractor Reliance QMD
Signature
Name
Date
RT Technician
Name of the technician : Area / Unit

Radiography Camera : Agency :


Total Inch Dia. /
Total No. of Joint:
Running Meter :
Format No. EPCMD-2-QM00-FMT-ME-244, Rev.-00, Date :- 29.07.2014
t

Date:

Acceptance
Standard
Fresh/
& Fluid
Repair/
Category
Penalty/
(Normal
Retake
/High
Pressure)

are to be submitted
5. Equivalent type

Running Meter, Thk.:


RT Offering List
Reliance
Project: J3 Area/Unit: DTA/PCG Offer no:
Name of Contractor: SHARP TANKS & STRUCTURALS (P) LTD

Type of
Line No. / Spool No. / Film Size
Sr. Line Joint Welder Weld Thk - 1 Thk - 2 Full Joint/
Structural Drg. / Mark No. / MOC (D2, D4 / (Inch Lot No.
No. Class No. No. Process (mm) (mm) Segments
Equipment No. / Nozzle No. D5 / D7, dia. / RM)
others)

STS/WQT/RT/2G/STS/WPS2014/00
1
1 - A 36 RB 2G SMAW D7 0.3 - 16 16 Full Joint

STS/WQT/RT/3G/STS/WPS2014/00
2
1 - A 36 RB 3G SMAW D7 0.3 - 16 16 Full Joint

STS/WQT/RT/2G/STS/WPS2014/00
3
1 - A 36 SK 2G SMAW D7 0.3 - 16 16 Full Joint

STS/WQT/RT/3G/STS/WPS2014/00
4
1 - A 36 SK 3G SMAW D7 0.3 - 16 16 Full Joint

STS/WQT/RT/2G/STS/WPS2014/00
5
1 - A 36 SKR 2G SMAW D7 0.3 - 16 16 Full Joint

STS/WQT/RT/3G/STS/WPS2014/00
6
1 - A 36 SKR 3G SMAW D7 0.3 - 16 16 Full Joint

STS/WQT/RT/2G/STS/WPS2014/00
7
1 - A 36 MA 2G SMAW D7 0.3 - 16 16 Full Joint

STS/WQT/RT/3G/STS/WPS2014/00
8
1 - A 36 MA 3G SMAW D7 0.3 - 16 16 Full Joint

Note:-
1. Surface preparation is complete for the above joints to facilitate NDT 2. RT films to be reviewed along with RT offer. 3. All repair / retake segments are to b
and reviewed along with films of the complete joint. 4. Two thickness need to be mentioned in case of differential thickness of the mating components. 5. Equ
of films for D2, D4, D5 & D7 are DR500, MX125, T200 & A400, respectively.
Legend: BW: Butt Weld, MOC: Material of Construction, NDT: Non-Destructive Testing, QMD: Quality Management Department, RT:Radiography Testing , RM: Runnin
Thickness
Contractor Reliance QMD
Signature
Name
Date
RT Technician
Name of the technician : Area / Unit

Radiography Camera : Agency :


Total Inch Dia. /
Total No. of Joint:
Running Meter :
Format No. EPCMD-2-QM00-FMT-ME-244, Rev.-00, Date :- 29.07.2014
RT Offering List

Date: 11-Jul-17

Acceptance
Standard
Fresh/
& Fluid
Repair/
Category
Penalty/
(Normal
Retake
/High
Pressure)

Fresh

Fresh

Fresh

Fresh

Fresh

Fresh

Fresh

Fresh
o be reviewed along with RT offer. 3. All repair / retake segments are to be submitted
ntioned in case of differential thickness of the mating components. 5. Equivalent type

MD: Quality Management Department, RT:Radiography Testing , RM: Running Meter, Thk.:

Reliance QMD