68120 Federal Register / Vol. 67, No.

217 / Friday, November 8, 2002 / Notices

DEPARTMENT OF ENERGY 4. Nordic Energy of Ashtabula, L.L.C. effective date of a Transmission Control
[Docket No. EG03–11–000]
Agreement acceptable to Banning.
Federal Energy Regulatory Comment Date: November 21, 2002.
Commission Take notice that on October 30, 2002,
Nordic Energy of Ashtabula, L.L.C. 7. California Independent System
[Docket Nos. EC03–7–000, et al.] (NEA), filed with the Federal Energy Operator Corporation Investigation of
Regulatory Commission (Commission) Wholesale Rates Of Public Utility
Georgia Power Company, et al.; Sellers of Energy and Ancillary
an application for determination of
Electric Rate and Corporate Filings Services In the Western Electricity
exempt wholesale generator status
pursuant to part 365 of the Coordinating Council
November 1, 2002.
The following filings have been made Commission’s regulations. [Docket Nos. ER02–1656–008 and EL01–68–
with the Commission. The filings are NEA states that it will be engaged 024]
listed in ascending order within each either directly or indirectly and Take notice that on October 29, 2002,
docket classification. exclusively in the business of owning the California Independent System
and operating electric generation Operator Corporation (ISO) submitted a
1. Georgia Power Company facilities. Specifically, NEA is filing in compliance with the
[Docket No. EC03–7–000] developing an electric generating unit in Commission’s October 11, 2002 ‘‘Order
Take notice that on October 29, 2002, the vicinity of Ashtabula, Ohio. On Rehearing And Compliance Filing,’’
Georgia Power Company filed with the Comment Date: November 22, 2002. 100 FERC ¶ 61,061 (2002), and the
Federal Energy Regulatory Commission Commission’s October 24, 2002 ‘‘Notice
5. City of Riverside, California of Extension of Time’’ extending the
(Commission) an application pursuant
to section 203 of the Federal Power Act [Docket No. EL03–20–000] date for submitting the instant
requesting all necessary authorizations Take notice that on October 29, 2002, compliance filing, issued in the above-
for the transfer of certain transmission the City of Riverside, California referenced dockets.
facilities from the Municipal Electric (Riverside) submitted a Petition for a The ISO has served this filing upon
Authority of Georgia to Georgia Power Declaratory Order (1) determining that the Public Utilities Commission of the
Company in exchange for certain real Riverside’s proffered Transmission State of California, the California Energy
property. Revenue Requirement (TRR) is Commission, the California Electricity
Comment Date: November 29, 2002. appropriate under the California Oversight Board, all parties with
Independent System Operator effective Scheduling Coordinator
2. EPCOR Energy (U.S.), G.P., EPCOR Service Agreements under the ISO
Corporation’s Tariff on file at the
Merchant and Capital (US) Inc. EPCOR Tariff, and all parties in Docket Nos.
Commission for purposes of Riverside’s
Power Development, Inc. EPDC, Inc., EL00–95 and ER02–1656. In addition,
becoming a Participating Transmission
and Frederickson Power L.P. the ISO has posted a copy of the filing
Owner; (2) approving Riverside’s
[Docket No. EC03–8–000] Transmission Owner (TO) Tariff; (3) on its Home Page.
waiving the filing fee otherwise Comment Date: December 2, 2002.
Take notice that on October 29, 2002,
EPCOR Energy (U.S.), G.P., EPCOR applicable to a petition for declaratory 8. Sun River Electric Cooperative, Inc.
Merchant and Capital (US) Inc., EPCOR order; and (4) granting any other relief
[Docket No. ES03–9–000]
Power Development, Inc., EPDC, Inc., or waivers necessary or appropriate for
approval or implementation of Take notice that on October 28, 2002,
and Frederickson Power L.P. (the
Riverside’s TRR and TO Tariff effective Sun River Electric Cooperative, Inc.
Applicants) filed with the Federal
as of the later of January 1, 2003 or the (Sun River) submitted an application
Energy Regulatory Commission
effective date of a Transmission Control pursuant to section 204 of the Federal
(Commission) an application pursuant
Agreement acceptable to Riverside. Power Act seeking authorization to
to Section 203 of the Federal Power Act
make long-term borrowings under a loan
for authorization of an intracorporate Comment Date: November 21, 2002.
agreement with the National Rural
reorganization of the Applicants under 6. City of Banning, California Utilities Cooperative Finance
a to-be-established U.S. parent, EPCOR
[Docket No. EL03–21–000] Corporation in an amount not to exceed
Energy (U.S.), G.P.
$13,700,812 at any one time over a two-
Comment Date: November 29, 2002. Take notice that on October 29, 2002, year period.
3. Twin Oaks Power, LP the City of Banning, California Sun River also requests a waiver from
(Banning) submitted a Petition for a the Commission’s competitive bidding
[Docket No. EG03–10–000] Declaratory Order (1) determining that and negotiated placement requirements
Take notice that on October 28, 2002, Banning’s proffered Transmission at 18 CFR 34.2.
Twin Oaks Power, LP (Twin Oaks) filed Revenue Requirement (TRR) is Comment date: November 22, 2002.
with the Federal Energy Regulatory appropriate under the California
Commission (Commission) an Independent System Operator Standard Paragraph
application for determination of exempt Corporation’s Tariff on file at the Any person desiring to intervene or to
wholesale generator status pursuant to Commission for purposes of Banning’s protest this filing should file with the
part 365 of the Commission’s becoming a Participating Transmission Federal Energy Regulatory Commission,
regulations. Owner; (2) approving Banning’s 888 First Street, NE., Washington, DC
Twin Oaks will acquire, own, and Transmission Owner (TO) Tariff; (3) 20426, in accordance with Rules 211
operate a two unit, 300 MW lignite-fired waiving the filing fee otherwise and 214 of the Commission’s Rules of
electric generating plant known as the applicable to a petition for declaratory Practice and Procedure (18 CFR 385.211
TNP One Generating Station, located in order; and (4) granting any other relief and 385.214). Protests will be
Robertson County, Texas. Twin Oaks’ or waivers necessary or appropriate for considered by the Commission in
principal business offices are located at approval or implementation of determining the appropriate action to be
101 Ash Street, San Diego, California. Banning’s TRR and TO Tariff effective taken, but will not serve to make
Comment Date: November 22, 2002. as of the later of January 1, 2003 or the protestants parties to the proceeding.

VerDate 0ct<31>2002 16:24 Nov 07, 2002 Jkt 200001 PO 00000 Frm 00035 Fmt 4703 Sfmt 4703 E:\FR\FM\08NON1.SGM 08NON1
Federal Register / Vol. 67, No. 217 / Friday, November 8, 2002 / Notices 68121

Any person wishing to become a party for filing with the Federal Energy commissions within the region and has
must file a motion to intervene. All such Regulatory Commission (Commission) electronically posted this filing on the
motions or protests should be filed on an application for Commission Midwest ISO’s website
or before the comment date, and, to the determination of exempt wholesale www.midwestiso.org under the heading
extent applicable, must be served on the generator status pursuant to part 365 of ‘‘Filing to FERC’’ for other interested
applicant and on any other person the Commission’s regulations. parties in this matter. The Midwest ISO
designated on the official service list. Wolfskill, a Delaware limited liability will provide hard copies to any
This filing is available for review at the company, proposes to own and operate interested partied upon request.
Commission or may be viewed on the a nominally rate 45 MW natural gas- Comment Date: November 1, 2002.
Commission’s web site at http:// fired, simple cycle electric generating 5. Southern Company Services, Inc.
www.ferc.gov, using the ‘‘FERRIS’’ link. facility to be located in Solano County,
Enter the docket number excluding the California. Wolfskill intends to sell the [Docket No. ER03–38–000]
last three digits in the docket number output at wholesale to an affiliated Take notice that on October 15, 2002,
filed to access the document. For marketer. Southern Company Services, Inc. (SCS)
assistance, call (202) 502–8222 or TTY, Comment Date: November 7, 2002. filed with the Federal Energy Regulatory
(202) 502–8659. Protests and Commission (Commission) a Tariff for
3. Appalachian Power Company the Sale, Assignment or Transfer of
interventions may be filed electronically
via the Internet in lieu of paper; see 18 [Docket No. ER01–3122–003] Transmission Rights (Tariff). The Tariff
CFR 385.2001(a)(1)(iii) and the Take notice that on October 11, 2002, would allow SCS to reassign
instructions on the Commission’s web the American Electric Power Service transmission rights to other eligible
site under the ‘‘e-Filing’’ link. The Corporation (AEPSC) tendered for filing transmission customers. An effective
Commission strongly encourages in compliance with the Letter Order date of October 16, 2002 has been
electronic filings. issued in this Docket on May 6, 2002, requested.
an executed amended Interconnection Comment Date: November 1, 2002.
Linwood A. Watson, Jr.,
and Operation Agreement between 6. Midwest Independent Transmission
Deputy Secretary.
Appalachian Power Company and Duke System Operator, Inc.
[FR Doc. 02–28440 Filed 11–7–02; 8:45 am]
Energy Wythe, LLC . The agreement is [Docket No. ER03–39–000]
BILLING CODE 6717–01–P
pursuant to the AEP Companies’ Open
Take notice that on October 15, 2002,
Access Transmission Service Tariff
the Midwest Independent Transmission
(OATT) that has been designated as the
DEPARTMENT OF ENERGY System Operator, Inc. (Midwest ISO)
Operating Companies of the American
tendered for filing proposed revisions to
Federal Energy Regulatory Electric Power System FERC Electric
Attachment T of the Midwest ISO Open
Commission Tariff Second Revised Volume No. 6,
Access Transmission Tariff (OATT),
effective June 15, 2000.
[Docket No. EG03–3–000, et al.] FERC Electric Tariff, Second Revised
AEP requests an effective date of
Volume No. 1, which reflect that the
November 26, 2001. A copy of the filing provisions in Attachment T concerning
Sithe/Independence Power Partners,
was served upon the Virginia State Michigan Retail Access only apply to
L.P., et al.; Electric Rate and Corporate
Corporation Commission. American Transmission Company, LLC
Regulation Filings
Comment Date: November 1, 2002. load (i.e.,Edison Sault Electric Company
October 17, 2002. 4. Midwest Independent Transmission and Upper Peninsula Power Co.) located
The following filings have been made System Operator, Inc. in the Upper Peninsula of Michigan and
with the Commission. The filings are not generically to the Lower Peninsula
listed in ascending order within each [Docket No. ER02–488–003]
of Michigan. The Midwest ISO has
docket classification. Take notice that on October 11, 2002, requested an effective date of November
the Midwest Independent Transmission 25, 2002.
1. Sithe/Independence Power Partners,
System Operator, Inc., (Midwest ISO) The Midwest ISO has electronically
L.P.
tendered for filing certain revisions to served a copy of this filing upon all
[Docket No. EG03–3–000] its Operating Protocols for Existing Midwest ISO Members, Member
Take notice that on October 15, 2002, Generators, FERC Electric Tariff, representatives of Transmission Owners
Sithe/Independence Power Partners, Original Rate Schedule No. 4, pursuant and Non-Transmission Owners, the
L.P. (Sithe Independence) filed with the to the Commission’s Order, Midwest Midwest ISO Advisory Committee
Commission an application for Independent Transmission System participants, Policy Subcommittee
determination of exempt wholesale Operator, Inc., 100 FERC 61,262. The participants, as well as all state
generator (EWG) status pursuant to part Midwest ISO has requested an effective commissions within the region. In
365 of the Commission’s regulations. date of April 16, 2002. addition, the filing has been
Sithe Independence requested that the The Midwest ISO has served a copy electronically posted on the Midwest
Commission determine that Sithe of its filing on each person whose name ISO’s website at www.midwestiso.org
Independence is an EWG on and as of is listed on the official service list under the heading ‘‘Filings to FERC’’ for
the future date that the Qualifying maintained by the Secretary in this other interested parties in this matter.
Facility status of its 1,060 MW electric proceeding. In addition, the Midwest The Midwest ISO will provide hard
generating facility in Oswego County, ISO has electronically served a copy of copies to any interested parties upon
New York is terminated. this filing, with attachments, upon all request.
Comment Date: November 7, 2002. Midwest ISO Members, Member Comment Date: November 5, 2002.
representatives of Transmission Owners
2. Wolfskill Energy Center, LLC 7. Accent Energy Midwest LLC
and Non-Transmission Owners, the
[Docket No. EG03–4–000] Midwest ISO Advisory Committee [Docket No. ER03–40–000]
Take notice that on October 15, 2002, participants, Policy Subcommittee Take notice that on October 15, 2002,
Wolfskill Energy Center, LLC tendered participants, as well as all state Accent Energy Midwest LLC (Accent

VerDate 0ct<31>2002 16:24 Nov 07, 2002 Jkt 200001 PO 00000 Frm 00036 Fmt 4703 Sfmt 4703 E:\FR\FM\08NON1.SGM 08NON1