Research and Special Programs Admin., DOT 180.

209

(i) The cylinder meets a condition for inder, the cylinder is known to have
condemnation under the visual inspec- been or shows evidence of having been
tion requirements of paragraph (f) of over-heated.
this section. (2) When a cylinder must be con-
(ii) The cylinder leaks through its demned, the requalifier must stamp a
wall. series of Xs over the DOT specification
(iii) Evidence of cracking exists to number and the marked pressure or
the extent that the cylinder is likely to
stamp CONDEMNED on the shoulder,
be weakened appreciably.
top head, or neck using a steel stamp.
(iv) For a DOT specification cylinder,
Alternatively, at the direction of the
other than a DOT 4E aluminum cyl-
inder or an exemption cylinder, perma- owner, the requalifier may render the
nent expansion exceeds 10 percent of cylinder incapable of holding pressure.
total expansion. In addition, the requalifier must notify
(v) For a DOT 3HT cylinder the cylinder owner, in writing, that the
(A) The pressure test yields an elas- cylinder is condemned and may not be
tic expansion exceeding the marked re- filled with hazardous material and of-
jection elastic expansion (REE) value. fered for transportation in commerce
(B) The cylinder shows evidence of where use of a specification packaging
denting or bulging. is required.
(C) The cylinder bears a manufacture (3) No person may remove or oblit-
or an original test date older than erate the CONDEMNED marking.
twenty-four years or after 4380 pressur-
izations, whichever occurs first. If a [67 FR 51660, Aug. 8, 2002, as amended at 68
cylinder is refilled, on average, more FR 24662, May 8, 2003; 68 FR 75764, Dec. 31,
2003]
than once every other day, an accurate
record of the number of rechargings 180.207 [Reserved]
must be maintained by the cylinder
owner or the owners agent. 180.209 Requirements for requalifica-
(vi) For a DOT 4E aluminum cyl- tion of specification cylinders.
inder, permanent expansion exceeds 12
percent of total expansion. (a) Periodic qualification of cylinders.
(vii) For a DOT exemption cylinder, (1) Each specification cylinder that be-
permanent expansion exceeds the limit comes due for periodic requalification,
in the applicable exemption, or the cyl- as specified in the following table,
inder meets another criterion for con- must be requalified and marked in con-
demnation in the applicable exemp- formance with the requirements of this
tion. subpart. Requalification records must
(viii) For an aluminum or an alu- be maintained in accordance with
minum-lined composite exemption cyl- 180.215. Table 1 follows:
TABLE 1REQUALIFICATION OF CYLINDERS 1
Specification under which cylinder was Minimum test pressure Requalification period
made (psig) 2 (years)

DOT 3 ........................................................ 3000 psig ................................................. 5


DOT 3A, 3AA ............................................ 5/3 times service pressure, except non- 5, 10, or 12 (see 180.209(b), (f), (h),
corrosive service (see 180.209(g)). and (j)
DOT 3AL ................................................... 5/3 times service pressure ...................... 5 or 12 (see 180.209(j))
DOT 3AX, 3AAX ........................................ 5/3 times service pressure ...................... 5
3B, 3BN ..................................................... 2 times service pressure (see 5 or 10 (see 180.209(f))
180.209(g)).
3E .............................................................. Test not required.
3HT ............................................................ 5/3 times service pressure ...................... 3 (see 180.209(k) and 180.213(c))
3T .............................................................. 5/3 times service pressure ...................... 5
4AA480 ...................................................... 2 times service pressure (see 5 or 10 (see 180.209(h))
180.209(g)).
4B, 4BA, 4BW, 4B240ET ........................ 2 times service pressure, except non- 5, 10, or 12 (see 180.209(e), (f), and
corrosive service (see 180.209(g)). (j))
4D, 4DA, 4DS ............................................ 2 times service ........................................ 5
DOT 4E ..................................................... 2 times service pressure, except non- 5
corrosive (see 180.209(g)).
4L ............................................................... Test not required.
8, 8AL ........................................................ .................................................................. 10 or 20 (see 180.209(i))

1077

VerDate Aug<04>2004 14:12 Dec 15, 2004 Jkt 203206 PO 00000 Frm 01077 Fmt 8010 Sfmt 8010 Y:\SGML\203206T.XXX 203206T
180.209 49 CFR Ch. I (10104 Edition)

TABLE 1REQUALIFICATION OF CYLINDERS 1Continued


Specification under which cylinder was Minimum test pressure Requalification period
made (psig) 2 (years)

Exemption cylinder .................................... See current exemption ............................ See current exemption
Foreign cylinder (see 173.301(j) of this As marked on cylinder, but not less than 5 (see 180.209(l) and 180.213(d)(2))
subchapter for restrictions on use). 5/3 of any service or working pressure
marking.
1 Any cylinder not exceeding 2 inches outside diameter and less than 2 feet in length is excepted from volumetric expansion
test.
2 For cylinders not marked with a service pressure, see 173.301a(b) of this subchapter.

(b) DOT 3A or 3AA cylinders. (1) A cyl- every 10 years instead of every five
inder conforming to specification DOT years, provided it is first requalified
3A or 3AA with a water capacity of 56.7 and examined as prescribed by
kg (125 lb) or less that is removed from 173.302a(b) (2), (3) and (4) of this sub-
any cluster, bank, group, rack, or vehi- chapter.
cle each time it is filled, may be re- (3) Except as specified in paragraph
qualified every ten years instead of (b)(2) of this section, if a cylinder,
every five years, provided the cylinder marked with a star, is filled with a
conforms to all of the following condi- compressed gas other than as specified
tions: in paragraph (b)(1)(ii) of this section,
(i) The cylinder was manufactured the star following the most recent test
after December 31, 1945. date must be obliterated. The cylinder
(ii) The cylinder is used exclusively must be requalified five years from the
for air; argon; cyclopropane; ethylene; marked test date, or prior to the first
helium; hydrogen; krypton; neon; ni- filling with a compressed gas, if the re-
trogen; nitrous oxide; oxygen; sulfur quired five-year requalification period
hexafluoride; xenon; chlorinated hydro- has passed.
carbons, fluorinated hydrocarbons, liq- (c) DOT 4-series cylinders. A DOT 4-se-
uefied hydrocarbons, and mixtures ries cylinder, except a 4L cylinder, that
thereof that are commercially free at any time shows evidence of a leak or
from corroding components; permitted of internal or external corrosion, dent-
mixtures of these gases (see 173.301(d) ing, bulging or rough usage to the ex-
of this subchapter); and permitted mix- tent that it is likely to be weakened
tures of these gases with up to 30 per- appreciably, or that has lost five per-
cent by volume of carbon dioxide, pro- cent or more of its official tare weight
vided the gas has a dew point at or must be requalified before being re-
below minus (52 F) at 1 atmosphere. filled and offered for transportation.
(iii) Before each refill, the cylinder is (Refer to CGA Pamphlet C6 or C6.3,
removed from any cluster, bank, group, as applicable, regarding cylinder weak-
rack or vehicle and passes the hammer ening.) After testing, the actual tare
test specified in CGA Pamphlet C6 weight must be recorded as the new
(IBR, see 171.7 of this subchapter). tare weight.
(iv) The cylinder is dried imme- (d) Cylinders 5.44 kg (12 lb) or less with
diately after hydrostatic testing to re- service pressures of 300 psig or less. A cyl-
move all traces of water. inder of 5.44 (12 lb) or less water capac-
(v) The cylinder is not used for un- ity authorized for service pressure of
derwater breathing. 300 psig or less must be given a com-
(vi) Each cylinder is stamped with a plete external visual inspection at the
five-pointed star at least one-fourth of time periodic requalification becomes
an inch high immediately following the due. External visual inspection must be
test date. in accordance with CGA Pamphlet C6
(2) If, since the last required requali- or C6.1 (IBR, see 171.7 of this sub-
fication, a cylinder has not been used chapter). The cylinder may be proof
exclusively for the gases specifically pressure tested. The test is successful
identified in paragraph (b)(1)(ii) of this if the cylinder, when examined under
section, but currently conforms with test pressure, does not display a defect
all other provisions of paragraph (b)(1) described in 180.205(i)(1) (ii) or (iii).
of this section, it may be requalified Upon successful completion of the test

1078

VerDate Aug<04>2004 14:12 Dec 15, 2004 Jkt 203206 PO 00000 Frm 01078 Fmt 8010 Sfmt 8010 Y:\SGML\203206T.XXX 203206T
Research and Special Programs Admin., DOT 180.209

and inspection, the cylinder must be suitable corrosion resistant coating


marked in accordance with 180.213. (such as galvanizing or painting) and
(e) Proof pressure test A cylinder made internally by a suitable corrosion re-
in conformance with specifications sistant lining (such as galvanizing)
DOT 4B, 4BA, 4BW, or 4E used exclu- may be tested every 10 years instead of
sively for: liquefied petroleum gas that every five years, provided a visual in-
meets the detail requirement limits in ternal and external examination of the
Table I of ASTM D 1835, Standard cylinder is conducted every five years
Specification for Liquefied Petroleum in accordance with CGA Pamphlet C6.
(LP) Gases (IBR see 171.7 of this sub- The cylinder must be examined at each
chapter) or an equivalent standard con- filling, and rejected if a dent, corroded
taining the same limits; anhydrous di- area, leak or other condition indicates
methylamine; anhydrous methylamine; possible weakness.
anhydrous trimethylamine; methyl (g) Visual inspections. A cylinder con-
chloride; methylacetylene-propadiene forming to a specification listed in the
stabilized; or dichlorodifluoromethane, table in this paragraph and used exclu-
difluoroethane, difluorochloroethane, sively in the service indicated may, in-
chlorodifluoromethane,
stead of a periodic hydrostatic test, be
chlorotetrafluoroethane,
given a complete external visual in-
trifluorochloroethylene, or mixture
spection at the time periodic requali-
thereof, or mixtures of one or more
fication becomes due. External visual
with trichlorofluoromethane; and com-
mercially free from corroding compo- inspection must be in accordance with
nents and protected externally by a CGA Pamphlet C6 or C6.3, as applica-
suitable corrosion-resistant coating ble (IBR, see 171.7 of this subchapter).
(such as galvanizing or painting) may When this inspection is used instead of
be requalified by volumetric expansion hydrostatic pressure testing, subse-
testing every 12 years instead of every quent inspections are required at five-
five years. As an alternative, the cyl- year intervals after the first inspec-
inder may be subjected to a proof pres- tion. After May 31, 2004, inspections
sure test at least two times the marked must be made only by persons holding
service pressure, but this latter type of a current RIN and the results recorded
test must be repeated every seven and maintained in accordance with
years after expiration of the first 12- 180.215. Records must include: date of
year period. When subjected to a proof inspection (month and year); DOT spec-
pressure test, the cylinder must be ification number; cylinder identifica-
carefully examined under test pressure tion (registered symbol and serial num-
and removed from service if a leak or ber, date of manufacture, and owner);
defect is found. type of cylinder protective coating (in-
(f) Poisonous materials. A cylinder cluding statement as to need of refin-
conforming to specification DOT 3A, ishing or recoating); conditions
3AA, 3B, 4BA, or 4BW having a service checked (e.g., leakage, corrosion, goug-
pressure of 300 psig or less and used ex- es, dents or digs in shell or heads, bro-
clusively for methyl bromide, liquid; ken or damaged footring or protective
mixtures of methyl bromide and ethyl- ring or fire damage); disposition of cyl-
ene dibromide, liquid; mixtures of inder (returned to service, returned to
methyl bromide and chlorpicrin, liquid; cylinder manufacturer for repairs or
mixtures of methyl bromide and petro- condemned). A cylinder passing re-
leum solvents, liquid; or methyl bro- qualification by the external visual in-
mide and nonflammable, nonliquefied spection must be marked in accordance
compressed gas mixtures, liquid; com- with 180.213. Specification cylinders
mercially free of corroding compo- must be in exclusive service as shown
nents, and protected externally by a in the following table:
Cylinders conforming to Used exclusively for

DOT 3A, DOT 3AA, DOT 3A480X, DOT 4AA480 ...................... Anhydrous ammonia of at least 99.95% purity.
DOT 3A, DOT 3AA, DOT 3A480X, DOT 3B, DOT 4B, DOT Butadiene, inhibited, that is commercially free from corroding
4BA, DOT 4BW. components.
DOT 3A, DOT 3A480X, DOT 3AA, DOT 3B, DOT 4AA480, Cyclopropane that is commercially free from corroding compo-
DOT 4B, DOT 4BA, DOT 4BW. nents.

1079

VerDate Aug<04>2004 14:12 Dec 15, 2004 Jkt 203206 PO 00000 Frm 01079 Fmt 8010 Sfmt 8010 Y:\SGML\203206T.XXX 203206T
180.209 49 CFR Ch. I (10104 Edition)

Cylinders conforming to Used exclusively for

DOT 3A, DOT 3AA, DOT 3A480X, DOT 4B, DOT 4BA, DOT Chlorinated hydrocarbons and mixtures thereof that are com-
4BW, DOT 4E. mercially free from corroding components.
DOT 3A, DOT 3AA, DOT 3A480X, DOT 4B, DOT 4BA, DOT Fluorinated hydrocarbons and mixtures thereof that are com-
4BW, DOT 4E. mercially free from corroding components.
DOT 3A, DOT 3AA, DOT 3A480X, DOT 3B, DOT 4B, DOT Liquefied hydrocarbon gas that is commercially free from cor-
4BA, DOT 4BW, DOT 4E. roding components.
DOT 3A, DOT 3AA, DOT 3A480X, DOT 3B, DOT 4B, DOT Liquefied petroleum gas that meets the detail requirements lim-
4BA, DOT 4BW, DOT 4E. its in Table 1 of ASTM 1835, Standard Specification for Liq-
uefied Petroleum (LP) Gases (incorporated by reference;
see 171.7 of this subchapter) or an equivalent standard
containing the same limits.
DOT 3A, DOT 3AA, DOT 3B, DOT 4B, DOT 4BA, DOT 4BW, Methylacetylene-propadiene, stabilized, that is commercially
DOT 4E. free from corroding components.
DOT 3A, DOT 3AA, DOT 3B, DOT 4B, DOT 4BA, DOT 4BW .. Anhydrous mono, di,trimethylamines that are commercially free
from corroding components.
DOT 4B240, DOT 4BW240 ......................................................... Ethyleneimine, stabilized.

(h) Cylinders containing anhydrous am- (i) Requalification of DOT8 series cyl-
monia. A cylinder conforming to speci- inders. (1) Each owner of a DOT8 series
fication DOT 3A, 3A480X, or 4AA480 cylinder used to transport acetylene
used exclusively for anhydrous ammo- must have the cylinder shell and the
nia, commercially free from corroding porous filler requalified in accordance
components, and protected externally with CGA Pamphlet C13 (IBR, see
by a suitable corrosion-resistant coat- 171.7 of this subchapter). Requalifica-
ing (such as paint) may be requalified tion must be performed in accordance
every 10 years instead of every five with the following schedule:
years.
Shell (visual inspection) requalification Porous filler requalification
Date of cylinder manu-
facture Initial Subsequent Initial Subsequent

Before January 1, 1991 Before January 1, 2001 10 years ....................... Before January 1, 2011 Not required.
On or after January 1, 10 years 1 ..................... 10 years ....................... 3 to 20 years 2 ............. Not required.
1991.
1 Years from date of cylinder manufacture.
2 For a cylinder manufactured on or after January 1, 1991, requalification of the porous filler must be performed no sooner than
5 years, and no later than 20 years, from the date of manufacture.

(2) Unless requalified and marked in (1) A DOT 4B, 4BA, 4B240ET or 4BW
accordance with CGA Pamphlet C13 cylinder may be tested as follows:
before October 1, 1994, an acetylene cyl- (i) For a cylinder with a water capac-
inder must be requalified by a person ity of 5.44 kg (12 lb) or less, by volu-
who holds a current RIN. metric expansion test using the water
(3) If a cylinder valve is replaced, a jacket method or by proof pressure
cylinder valve of the same weight must test. A requalification must be per-
be used or the tare weight of the cyl- formed by the end of 12 years after the
inder must be adjusted to compensate original test date and at 12-year inter-
for valve weight differential. vals thereafter.
(4) The person performing a visual in-
(ii) For a cylinder having a water ca-
spection or requalification must record
pacity over 5.44 kg (12 lb)
the results as specified in 180.215.
(5) The person performing a visual in- (A) By proof pressure test. A requali-
spection or requalification must mark fication must be performed by the end
the cylinder as specified in 180.213. of 12 years after the original test date
(j) Cylinder used as a fire extinguisher. and at 7-year intervals; or
Only a DOT specification cylinder used (B) By volumetric expansion test using
as a fire extinguisher and meeting Spe- the water jacket method. A requalifica-
cial Provision 18 in 172.102(c)(1) of this tion must be performed 12 years after
subchapter may be requalified in ac- the original test date and at 12-year in-
cordance with this paragraph (j). tervals thereafter.

1080

VerDate Aug<04>2004 14:12 Dec 15, 2004 Jkt 203206 PO 00000 Frm 01080 Fmt 8010 Sfmt 8010 Y:\SGML\203206T.XXX 203206T
Research and Special Programs Admin., DOT 180.211

(2) A DOT 3A, 3AA, or 3AL cylinder (b) General repair requirements. Each
must be requalified by volumetric ex- repair of a DOT 4-series cylinder must
pansion test using the water jacket be made in accordance with the fol-
method. A requalification must be per- lowing conditions:
formed 12 years after the original test (1) The repair and the inspection of
date and at 12-year intervals there- the work performed must be made in
after. accordance with the requirements of
(k) 3HT cylinders. In addition to the the cylinder specification.
other requirements of this section, a (2) The person performing the repair
cylinder marked DOT3HT must be re- must use the procedure, equipment,
qualified in accordance with CGA C8 and filler metal or brazing material as
(IBR, see 171.7 of this subchapter). authorized by the approval issued
(l) Requalification of foreign cylinders under 107.805 of this chapter.
filled for export. A cylinder manufac- (3) Welding and brazing must be per-
tured outside the United States, other formed on an area free from contami-
than as provided in 171.12a of this sub- nants.
chapter, that has not been manufac- (4) A weld defect, such as porosity in
tured, inspected, tested and marked in a pressure retaining seam, must be
accordance with part 178 of this sub- completely removed before re-welding.
chapter may be filled with compressed Puddling may be used to remove a weld
gas in the United States, and shipped defect only by the tungsten inert gas
solely for export if it meets the fol- shielded arc process.
lowing requirements, in addition to (5) After removal of a non-pressure
other requirements of this subchapter: attachment and before its replacement,
the cylinder must be given a visual in-
(1) It has been inspected, tested and
spection in accordance with 180.205(f).
marked (with only the month and year
(6) Reheat treatment of DOT 4B, 4BA
of test) in conformance with the proce-
or 4BW specification cylinders after re-
dures and requirements of this subpart
placement of non-pressure attachments
or the Associate Administrator has au-
is not required when the total weld ma-
thorized the filling company to fill for- terial does not exceed 20.3 cm (8
eign cylinders under an alternative inches). Individual welds must be at
method of qualification; and least 7.6 cm (3 inches) apart.
(2) It is offered for transportation in (7) After repair of a DOT 4B, 4BA or
conformance with the requirements of 4BW cylinder, the weld area must be
173.301(l) of this subchapter. leak tested at the service pressure of
[67 FR 51660, Aug. 8, 2002, as amended at 68 the cylinder.
FR 24662, May 8, 2003; 68 FR 55544, Sept. 26, (8) Repair of weld defects must be
2003; 68 FR 48572, Aug. 14, 2003; 68 FR 75764, free of cracks.
Dec. 31, 2003] (9) When a non-pressure attachment
with the original cylinder specification
180.211 Repair, rebuilding and re- markings is replaced, all markings
heat treatment of DOT4 series must be transferred to the attachment
specification cylinders. on the repaired cylinder.
(a) General requirements for repair and (10) Walls, heads or bottoms of cyl-
rebuilding. Any repair or rebuilding of a inders with defects or leaks in base
DOT 4-series cylinder must be per- metal may not be repaired, but may be
formed by a person holding an approval replaced as provided for in paragraph
as specified in 107.805 of this chapter. (d) of this section.
A person performing a rebuild function (c) Additional repair requirements for
is considered a manufacturer subject to 4L cylinders. (1) Repairs to a DOT 4L
the requirements of 178.2(a)(2) and cylinder must be performed in accord-
subpart C of part 178 of this subchapter. ance with paragraphs (a) and (b) of this
The person performing a repair, re- section and are limited to the fol-
build, or reheat treatment must record lowing:
the test results as specified in 180.215. (i) The removal of either end of the
Each cylinder that is successfully re- insulation jacket to permit access to
paired or rebuilt must be marked in ac- the cylinder, piping system, or neck
cordance with 180.213. tube.