Академический Документы
Профессиональный Документы
Культура Документы
NNT +0.00
1.00x1.20 m. (h=0.60m.)
NFZ -1.40
8 5/8 h =1.50 0.80
a =1.00
0.60
6 5/8
h =0.60
0.10
b = 1.20 m L
5/8 L = 20 cm
3/4 L = 25 cm
Metrado de zapatas
PLANTILLA PARA METRADOS
ELEMENTO PARTIDA a (m) b (m) perim (m) h (m) Area (m2) Vol (m3)
ZAPATA 1 Excavacin 1.00 1.20 1.50 1.80
Solado 1.00 1.20 1.20
Encofrado 1.00 1.20 4.40 0.60 2.64
Concreto 1.00 1.20 0.60 0.72
Excavacin: 1.80 m3
Solado: 1.20 m2
Encofrado: 2.64 m2 (slo si fuera necesario)
Concreto: 0.72 m3
Metrado de zapatas
PLANTILLA PARA METRADOS DE ACERO
ELEMENTO Despiece N elem l (m) n Ltotal (m) 1/4" 3/8" 1/2" 5/8" 3/4" 1"
1
ZAPATA 1 (1.00x1.20) 1 0.86 8 6.88 6.88
2
1 1 1.06 6 6.36 6.36
85/8
65/8 2
r
8 5/8
Para 1 : l = 1.00 2x0.07 = 0.86m
6 5/8
Para 2 : l = 1.20 2x0.07 = 1.06m
Metrado de columnas
Columna C1: (25x50 cm.) DETALLE DE NUDOS
43/4+45/8
COLUMNA
3/8 @ .20
1@ .05 + 5@.10
N pisos: 2
1@ .05 + 5@.10
H entrepiso: 2.60 m.
NFP 1er piso: +0.10
resto segn cuadro
EMPALME DEL REFUERZO EN COLUMNAS
H/6
Le
H 2H/3
Le
H/6
LOS ESTRIBOS
N +3.25
6
N +2.70
VIGA
4
(.25x.50)
N +2.20
6
N +1.65
2.60
4
N +0.65
6
NFP +0.10
0.90 9
0.60
NFZ -1.40
Metrado de columnas
PLANTILLA PARA METRADOS
ELEMENTO PARTIDA a (m) b (m) perim (m) h (m) Area (m2) Vol (m3)
COLUMNA 1 Concreto 0.25 0.50 6.10 0.76
Encofrado 0.25 0.50 1.50 5.10 7.65
Metrado de columnas
PLANTILLA PARA METRADOS DE ACERO
ELEMENTO Despiece N elem l (m) n Ltotal (m) 1/4" 3/8" 1/2" 5/8" 3/4" 1"
1
COLUMNA 1 (.25x.50) 1 7.10 4 28.4 28.40
2
1 2 1 7.10 4 28.4 28.40
3 1 2.32 49 113.68 113.68
43/4" 45/8"
3
.13
.17
7
.42
P L A N T IL L A P A R A M E T R A D O S
EL EM EN TO P A R T ID A a (m ) b (m ) p e rim (m ) L (m ) Are a (m 2 ) V o l (m 3 )
V IG A V - 2 C o n c r e to 0 .2 5 0 .5 0 7 .2 0 0 .9 0
En c o f ra d o 0 .2 5 0 .3 0 0 .8 5 7 .8 5 6 .6 7
Concreto: 0.90 m3
Encofrado: 6.67 m2
Mtodo aproximado para encofrado
Metrado de vigas
PLANTILLA PARA METRADOS DE ACERO
ELEMENTO Despiece N elem l (m) n Ltotal (m) 8mm 3/8" 1/2" 5/8" 3/4" 1"
1
VIGA V-2 (.25x.50) 2 9.94 2 39.76 39.76
25/8" 2
2 6.27 2 25.08 25.08
1
3 2 9.74 2 38.96 38.96
15/8"
2
4
2 1.52 34 103.36 103.36
25/8"
3 2 1.52 7 21.28 21.28
.19
4
.13 .44
3.80
1
O
PA
3.90 m
Metrado de losas aligeradas
Metrado de losas aligeradas
EJEMPLO: LOSA ALIGERADA h=0.20 m.
.05
Factores para metrado
.15
concreto = 0.0875 m3 / m2 de losa
0.40 0.40 0.20
Ladrillos= 8.33 und / m2 de losa
Metrado de losas aligeradas
CLCULO DE METRADOS:
Area de losa: 29.64 m2
pao1 = (3.90 x 3.80)x2 = 29.64 m2
Encofrado = 29.64 m2
NOTA:
Para el metrado del concreto de losas, se considera el
rea interior, entre las caras de las vigas que definen
los paos.
Metrado de losas aligeradas
PLANTILLA PARA METRADOS DE ACERO
ELEMENTO Despiece N elem l (m) n Ltotal (m) 8mm 3/8" 1/2" 5/8" 3/4" 1"
1
LOSA ALIGERADA 1 8.49 9 76.41 76.41
11/2" 2
1 1 1.07 9 9.63 9.63
13/8" 3 1 1.55 9 13.95 13.95
2
4
13/8" 1 2.15 9 19.35 19.35
3
5 1 1.07 9 9.63 9.63
13/8"
4
13/8"
5