10 Replacement of a pole

10.1 General Instructions

Never separate the control Each pole has its own Replacement operations
mechanism from the circuit reference. The replacement described in this instruction
breaker part. pole absolutely must bear the same manual have been carried out on
reference as the pole being the leading" pole. The same
Never dismantle the linkages replaced. simplified process applies to led"
from the poles. On certain circuit breakers, poles (See 10.3).
this replacement operation
It is forbidden to replace requires specific training or
several poles on the same intervention by our After Sales
circuit breaker. Dept. (See 1.1).
Intervention Duration Busbar Cables Load Break Switch Earthing switch
Possible 4 h 00* energized de-energized open closed
Normal 4 h 00* de-energized de-energized open closed
* Variable depending on the circuit
breaker's equipment.
Apply the General Safety Greases: (See 2.6) Parts required:
Instructions for Electrical Tools required: The replacement kit contains:
Applications and the particular - Open-ended spanners size - 1 pole (identical characteristics),
regulations for the network 10, 13, 16, 17, 19 - 1 bag of new fasteners,
concerned for locking out - 1 ratchet handle - 1 bottle of thread lock,
procedures. + 10, 16, 17 mm sockets - 1 operating lever,
- Allen keys for hexagonal screws - 1 plug gauge,
size 5 - 1 adjustments sheet 470133,
- Tape mesure + rule - 1 instruction manual AMTNoT055.
- Pin punch + hammer
- Flat-nose pliers
- Flat headed screwdriver

10.2 Preparation of the circuit breaker

De-energize the circuit Before lifting off the cover of Bring the pressure on the pole
breaker, power circuit and the control mechanism: being replaced to 0.5 bar.
auxiliaries (disconnect the circuit - cut off the motor power circuits,
breaker from its surrounding - operate the operating button
environment). several times, in both directions, in
order to ensure that the springs
have been released,
- cut off all of the other auxiliaries
power circuits,

22
10.3 Lay-out of the poles on the circuit breaker's frame

The leading" pole is the pole The led" pole is a pole which is
directly connected to the control driven by the leading" pole.
mechanism;

Led" poles

Leading" poles

Longitudinal lay-out Front view lay-out (front face)

10.4 Remove the accessories for the wthdrawable circuit breakers

The accessories are to be


kept aside to equip the new
pole.
Screens

Whenever a moving part is Square insulating nuts can


provided with screens, it is under no circumstances be
necessary to remove them. replaced by steel nuts.

4 square insulating nuts,


10 mm spanner

8 steel bolts,
13 mm spannner

 Fixing point for the screens.

23
Beam Insulating bar Pressure switch

 For circuit breakers povided with an insulating beam or bar,  If the circuit breaker is provided
remove only the 2 nuts of the pole to be dismantled (16 or 17 mm with pressure switches,
spanner). disconnect the power supply
Never completely dismantle the insulating beam or bar. wiring (accessible under the
device's frame).

Deflectors and connectors

In all cases and before Depending on the type of pole, it


dismantling, note down the may be necessary to remove the
connectors positioning dimensions. deflector and the connector.

 Between phases.  Between layers.

24
First type of pole equipment

Cotter pin
Pin

 Unclip and lift off the deflector.  Unscrew the 2 fixing bolts, then The 6x35mm cotter pin and
remove the upper connector the positioning
(13mm spanner). pin remain
fixed on the connector.

Pin punch

Cotter pin

 Extract the 6x35 cotter pin from  Unscrew the 2 fixing bolts, then
the connector (pin punch and remove the lower connector (13
hammer or flat-nosed pliers). mm spanner).

Second type of pole equipment

 Remove the maintaining bolt for  Unscrew the 3 fixing bolts, then  Unscrew the fixing bolt then
the upper deflector remove the upper connector remove the spacer from the
(5 mm Allen key). (16mm spanner). lower connector
 Remove the deflector. (16 or 17 mm spanner).

25
 Remove the maintaining bolt  In the same way as for the
from the lower deflector upper connector, remove the 3
(5 mm Allen key). fixing bolts from the lower
 Laterally displace the deflector connector (16 mm spanner).
to gain access to the
connector's fixing bolts.

Third type of pole equipment

 Remove the maintaining bolt  Remove the deflector.  Remove the spacer and the
from the upper deflector support washer.
(5 mm Allen key).

Washer

Spacer

 CAUTION, on re-assembly,  Unscrew the 2 fixing bolts, then  Proceed with the same
scrupulously respect their remove the upper connector operation for the lower
position on the current terminal. (13mm spanner). connector
(2 bolts, 13 mm spanner).

26
Other types of equipment

 Remove the upper connector  Remove the lower connector


(2 bolts, 13 mm spanner). (2 bolts, 13 mm spanner).

10.5 Removal of a leading" pole (example in a longitudinal lay-out)

Take all necessary When being removed, the In the case of a circuit
precautions. pole must be handled with breaker having connections
BEWARE OF PARTS IN MOTION ! care (no shocks to the araldite). ensured by 2 tie-rods, only remove
the pin and the clamp from the pole
being replaced.

1 2

 1 - Remove the clamp from the  2 - Release the tie-rod. It


tie rod of the control remains connected to the
mechanism. operating lever of the control
Never dismantle the pin mechanism.
supporting this clamp.

27
L3 L2 L1

Top view

3 3 3

Unclamp Release
 3 - Remove the 3 clamps from the
poles' drive rod.
 Release this rod.
The poles' levers absolutely must
remain in their
initial position

Leading"
pole

6
Oblong hole
5
4

 4 - Remove the poles' drive rod.  5 - Unscrew the 4 nuts fixing  6 - Remove the pole from the
Note down its position: the the pole on to the frame frame and lay it on its side, on
oblong hole is opposite the (access is by the slots on both an anti-shock protection mat.
leading pole. sides of the frame, 16 or 17mm Leave in place any possible
spanner). shimming washers
on the frame.

10.6 Removal of the drive lever plate on the pole

The drive levers have several If the contrary is the case, you
bore sizes (multiple uses). absolutely must note down
Before dismantling, if the pole precisely as possible the position of
crank handles are equipped with a the pins on the drive plate.
means of foolproofing, it is not
necessary to make a note of the
pin holes.

28
 Remove the drive lever pin (17  Remove the 2 plate-maintaining  Remove the plate from the drive
mm and 19 mm open-ended bolts (ratchet wrench + 10 mm lever.
spanners). open-ended spanner).

Pin not to be
removed

 Detail of the constituent parts.

10.7 Removal of a led" pole

Follow the same operations as


those indicated for the leading pole
(10.5).
10.8 Essential verifications before mounting the new pole

In order: 2 Check its nominal pressure The exchange pole must bear the
1 Check the general state of the which must be equal to 0.5 bar. same technical reference as the
new pole, in particular the absence original pole (See 5.2).
of traces of shocks on the araldite. 3 Check its reference.
10.9 Installation of the new pole

It is essential that you use the Scrupulously respect the


new parts supplied with the order for the following
exchange pole. operations.
Identify these parts in contrast with
those for the original pole and only
use rigorously identical parts in the
same place.

29
C
262

 Degrease the pin and the  For the leading" pole,  Apply a film of thread lock over
special nut for the pole's drive reposition the drive lever plate all of the threading on the pin
lever with solvent and refit the two bolts (ratchet whilst taking care to hold it by
(See 2.6). wrench + 10 mm open-ended its smooth part (without
spanner). touching the threading).

In order to obtain a high During maintenance, it is


quality bonding, this operation forbidden to retighten the
must be carried out at an ambient nuts marked with red nail
temperature higher than +15C. varnish.

3.5 3.5

Leading" pole Led" pole

 Leading" pole: Fit the pin and the shoulder nut. Tighten
to the indicated torque (19 mm open-ended spanners,
torque wrench with a 17 mm socket).
 Led" pole: Fit the pin, the washer and the nut. Tighten to
the indicated torque (17 mm open-ended spanner, torque
wrench with a 17 mm socket).

30
 Present the new pole on to the  Under the frame, fit in place 4  Mount the connector into the
frame whilst taking care not to new Nylstop nuts. power supply terminal.
displace the shimming washers.  Proceed with a pre-tightening of  Check that the dimensions
the 4 nuts. between phases and between
layers are identical to those
noted during dismantling (See
10.4). If this is not the case,
please contact our After-Sales
Department ( 1.1).

Fixing the pole

2.4 2.4
C C
1 262 262
3

4 2

 1 - Base plate.  2 - Upper linkage with the


Progressively block the nuts insulating spacer or beam
with a torque wrench and  Degrease the bolts.
diagonally:  Apply a film of thread lock to
- 10 --> each bolt.
2.4
 In all cases, the positioning of
- 12 -----> 4.2 the fixing bolts must be made
without any stress on the pole
(respect the original shimming).

31
10.10 Re-assembly of the equipment

Fitting the upper connector


 First case: for fitting the cotter pin,
drill a 6 mm H11 hole through the
connector hole:
maximum depth 40 mm.
CAUTION: this operation is not to be
carried out for the second and third
cases, nor for a fixed" circuit breaker.

 Fit the new 6x35 mm cotter Close-up of the


pin supplied with the power supply
accessories. terminal on an
40 mm exchange pole
 Check the presence of the
connector's positioning pin.

Pin

 Using a rule, check the  In the same way, realign the


alignment of the replaced pole connectors if needed.
in terms of depth, by taking the
two other poles as a reference.

Fitting the lower connector

Proceed with operations in the


reverse order to those described in
10.4.

32
Re-assembly of the drive rods for the poles

 With the aid of the lever Supplied lever


supplied with the parts, without
forcing it, bring the new pole
into position in the tripped
stop" position.

Led pole
Leading pole

01
S

Example:
S < 6 mm for FP61, 62, 63, 71, 72
 Grease the pins for each  Check the positioning in  Connect the control
articulation. accordance with the instructions mechanism's linkage rod.
 Position the drive rod for the on the adjustments sheet ref.
poles, the oblong hole opposite 470133: the plug gauge must not
the leading pole. penetrate into the passageway
for the pin.
If this is the case, consult our
After Sales Dept. (See 1.1).

Check the position of the pins All of the existing clamps


in relation to the markings must be replaced by the new
made when dismantling. ones supplied.
10.11 Re-assembly of the accessories

- If needed connect the pressure deflectors and screens where


switch wiring. needed.
- Re-assemble the accessories,
10.12 Resetting the pole under nominal pressure

Proceed with filling the pole with compliance with the value indicated
SF6 gas to its nominal pressure in on the rating plate (See 7).
10.13 Commissioning the circuit breaker

Proceed with a thorough cleaning clamps on the linkages and of the been forgotten and left on the
of the insulators with a dry clean free functioning of the assembly. circuit breaker.
cloth.
Proceed with a mechanical
Check the presence of safety Ensure that no tool or object has operation test.