Вы находитесь на странице: 1из 2
-\ f Ne) / ness Neo Powem Plan 4” Gon, 3085-09, (REVISED COURS! VR-5256 (3 hours) [ Total Marks : 400 N.B. (1) Question No. 1 is compulsory. (2) Answer any four out of remaining six questions. (3) Assume suitable data wherever necessary, (4) Draw ngat sketches to Iypstate thy MEMEO os 915704 FET) TE Rey a ot 1. Write short notes on (any three) — Cor (@) Pumped storage hydro electric power plant. Mw ea (ii) Nuclear waste disposal. (ili) Rainwater measurement, (lv) Green House Effects. (v) Electrostatic precipitator. (vi) Selection of site for the thermal power plant 2. (aj The incremental {uel costs for two generating units A and B of a power plant 12 are given as — aFa SES _ 0.065Pa + 25 Pa SEP _ o.0gPb +20 Pb Where F is the cost in rupees per hour and P is power output in MW. Find: (I) The economic loading of the two units when the total load supplied by the power plants is 160 MW. (ii) The loss in fuel cost per hour if the load is equally shared by both Units. (b) Explain BWR with neat sketch. 8 3. (2) Define the following :-— 10 (i) Load factor (il) Utiisation factor (iit) Diversity Factor (iv) Demand factor. {b) Write short notes (any two) :— 10 (i) Advantages of Diesel Power plants (i) Surge tanks (ii) Fluidised bed combustion. 4. (a) Prove thal for economic loading of different units and obtaining maximum System 10 efficiency the required condition is — thse dls Bla gly dlp dls “dha [TURN OVER 752: Hem. Con, 3085-VR-5256-09. 2 (b) From the following data caleulate cost of generation per unit delivered irom the power plant :— Installed capacity of power plant = 200 MW. Annual Load Factor = 04 Capital cost of power plant = Rs. 280 Lacs Annual cost of fuel, cil, salaries etc. - As. 60 Lacs Interest and depreciation = 19% (a) (b) (a) (o) Assume maximum demand is equal to installed capacity. Describe with neat sketches layout of coal handiing plant Explain in detail components of nuclear power plant Describe different methods of tariff, Draw neat figures to explain What are the differant methods of ash disposal 7 Explain any one of them. Write short notes on any two -— (a) Load curve and Load duration curve {b) Base load plants and peak load plants (c)_ Methods to Improve efficiency of gas turbine cycle () Prime movers for hydro-power plant. 10 10 40 20

Вам также может понравиться