WI/OPR - E018
METHOD OF STATEMENT FOR GENERATOR Rev 0
SET SYSTEM WORKS
Date -
CONTENTS :
1. SCOPE
1.1. General Rules and Information
1.2. Work Coverage
1.3. Override
1.4. Recognition
2. MATERIALS
2.1. Resources and Specifications
2.2. Procurement, Handling and Storage
2.3. Check and Inspection
7. DRAWING
8. FORMS
8.1 Inspection Control Sheet FM/OPR E021
8.2 Material Delivery Receiving Inspection Report FM/OPR E026
8.3 Request for Inspection FM/OPR E027
Page 2 of 12
WI/OPR - E018
METHOD OF STATEMENT FOR GENERATOR Rev 0
SET SYSTEM WORKS
Date -
Project
Location
Owner
Designer/Engineer
Contractor
Sub-Contractor
Number of Storey
Building Height
Page 3 of 12
WI/OPR - E018
METHOD OF STATEMENT FOR GENERATOR Rev 0
SET SYSTEM WORKS
Date -
1. SCOPE
1.3. Override
For any instance that there are some changes of works occur that are not mentioned in this
Method of Statement shall be properly discussed immediately and the outcome of
discussion shall be absolutely followed and the agreed procedures may override.
1.4. Recognition
To avoid any inherent mistakes during execution of this particular work, the contents of this
Method of Statements shall be thoroughly verified. A copy shall be distributed and
recognized by all concerns prior to the commencement of works.
2. MATERIALS
Table 1
Submittal Approval
Item Description
Reference Date
Page 4 of 12
WI/OPR - E018
METHOD OF STATEMENT FOR GENERATOR Rev 0
SET SYSTEM WORKS
Date -
Table 2
Page 5 of 12
WI/OPR - E018
METHOD OF STATEMENT FOR GENERATOR Rev 0
SET SYSTEM WORKS
Date -
Preparation :
Material Approval SM / PM/ENG SM : Site Manager
Shop Drawing PM : Project Manager
Method Statement ENG : Engineer
No Customer
2. Approved ?
Yes
3. Material ;
Vendor Selection Purchasing
Procurement
4. Material On site
Inspection material
Warehouse control /Stock S M / Staff SM : Site Manager
Card
5. Installation Staff
7. Repair
Not Good
* 6. * Item 6 Inspection :
Inspection ?
Internal Inspection by PT.
Good Kinden Indonesia
External Inspection by
Owner / Main Con
If found deviation, should
8. Completion
repaired by Project Team
Photograph for Report
At Inspection event
Page 6 of 12
WI/OPR - E018
METHOD OF STATEMENT FOR GENERATOR Rev 0
SET SYSTEM WORKS
Date -
Page 7 of 12
WI/OPR - E018
METHOD OF STATEMENT FOR GENERATOR Rev 0
SET SYSTEM WORKS
Date -
4.3. References
Page 8 of 12
WI/OPR - E018
METHOD OF STATEMENT FOR GENERATOR Rev 0
SET SYSTEM WORKS
Date -
H. Fasten sling rope (guyline) to the generator set and the other end of the rope must
be held firmly by the workers in order to prevent or minimized swinging of the
equipment during lifting process.
I. Carefully the rigger makes a signal to crane operator through hand gesture
signalling or through handheld VHF radio, to start lifting the equipment slowly.
J. Put the heavy lift equipment to the chill roller, the roller must be manned with expert
and professional to avoid any untoward incident during installation.
Page 9 of 12
WI/OPR - E018
METHOD OF STATEMENT FOR GENERATOR Rev 0
SET SYSTEM WORKS
Date -
Personnel
used hand gloves
cut and hand injury and
1 Drilling and extra care for
injury lost of
cutting is advised
time
barricade the
fall of working area,
equipments, cable must be
Damage
Lifting of crane drop, foot checked properly,
2 of life and
generator set and hand pinch, workers are not
property
hit to other cars allowed to stay
during swinging under the lifted
equipments
Personnel
injury and
3 Scaffoldings Fall from heights Wear safety belts
lost of
time
Page 10 of 12
WI/OPR - E018
METHOD OF STATEMENT FOR GENERATOR Rev 0
SET SYSTEM WORKS
Date -
7. DRAWING
Page 11 of 12
WI/OPR - E018
METHOD OF STATEMENT FOR GENERATOR Rev 0
SET SYSTEM WORKS
Date -
8. FORMS
8.1. Inspection Control Sheet FM/OPR E021
8.2. Material Delivery Receiving Inspection Report FM/OPR E026
8.3. Request for Inspection FM/OPR E 027
Page 12 of 12