GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

SPECIFICATIONS
FOR
ELECTRICALWORKS

SR.NO PARTICULARS PAGENO


1 GeneralInstructionsforElectricalWorks 210
2 GeneralInstructionsforHTpanel. 1023
3 GeneralInstructionsforHTCable. 2328
4 TechnicalSpecificationforDryTypeTransformer. 2835
5 TechnicalSpecificationforDieselGenerator. 3542
6 TechnicalSpecificationforLTPanels. 4252
7 TechnicalSpecificationforAPFCRPanels. 5255
8 TechnicalSpecificationforLDBs&PDBs. 5558
9 TechnicalSpecificationforLTCables&CableTray. 5866
10 TechnicalSpecificationforInternalWiring. 6672
11 TechnicalSpecificationforLightingFixtures 7276
12 TechnicalSpecificationforData,TV&Telephonewiring. 7682
13 TechnicalSpecificationforEarthingSystem. 8287
14 TechnicalSpecificationforPAsystem. 8790
15 TechnicalSpecificationforCCTV&WifiSystem. 90106
16 TechnicalSpecificationforFireAlarmSystem. 106134
17 TechnicalSpecificationforUPSSystem. 134137
18 TechnicalSpecificationforLightningProtectionsystem. 137140
Technical Specification for External lighting poles and High
19 140143
Mast
20 MakeofMaterialsforElectricalworks. 143147

Page1
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

1 GENERALINSTRUCTIONSFORELECTRICALWORKS

1) PREAMBLE:

Thescopeofthissectionistodescribematerialsandsystems forelectricalinstallationworks
which form together with the project documents, a complete volume of work and quality
description.

Allelectricalinstallationsshallbeofhighquality,safe,completeandfullyoperationalincluding
allnecessaryitemsandaccessorieswhetherornotspecifiedindetails.Allelectricalworksshall
be completed in accordance with the regulations and standards as per the statutory
requirementtothesatisfactionoftheEmployer.Thegeneralprovisions,specialprovisionsand
generalrequirementsapplytoallitemsofthisspecification.

Theworkshallbecarriedoutsimultaneouslywithbuildingwork,civilwork,etc.andshallbe
continued tillitiscompleted satisfactorilyalong withthecompletion of essential portions of
thebuildingworks.

Duringtheprogressofwork,completedportionofthebuildingmaybeoccupiedandbeputto
use by Employer but the contractor will remain fully responsible for the maintenance of
electricalinstallationstilltheentireworkcoveredbythiscontractissatisfactorilycompleted
byhimandhandedovertoEmployer.

Itistheintentionofthespecificationanddrawingstocallforfinishedwork,testedandready
for operation. Whenever the words Supply or Provide are used, it shall mean delivery of
materialasspecifiedinanassembledmanner,readyforinstallation.Anyapparatus,materialor
worknotshownondrawingsbutmentionedinthespecificationorviceversa,oranyincidental
accessories necessary to make the work complete and perfect in all respects and ready for
operation,evenifnotparticularlyspecified,shallbefurnished,deliveredandinstalledbythe
contractor without additional expenses to Employer. Minor details not usually shown or
specified,butnecessaryfortheproperinstallationandoperation,shallbeincludedinthework
andinthecontract.

Electricalcontractor shallbeClassAlicensedContractorregisteredwithR&BDepartmentof
GujaratandshallhavecompletioncertificateofthreesimilarprojectElectricaljobscompleted
ofsamecostinlast3years.

Civil Contractor shall provide the MOU signed with Electrical contractor (Class A) with
Technicalbidduringbiddingprocess.

2) INTERPRETATIONOFPROJECTDOCUMENTS:

TheSpecification,DrawingsandBillofquantityshallbeinterpretedinaccordancewithgood
installationpracticedefinedintheappropriateregulationsandstandardswhetherspecifically
referred to or not. If there are any discrepancies or shortfall in the application of the
regulations to any aspect of this contract or the contractor considers there is anything
detrimental to the standards or inconsistent with his obligations and guarantees, Employer
shallbeinformedpriortosigningthecontractandthereafterinformthecontractorinwriting
thecoursetobefollowed.Wherethedrawingsaretoasmallscaleorareexpressedinsymbolic
termsorareintheformofadiagram,thenexactlocationofitemsshallnotbeinferredandin
allcases,theworkshallbefullyintegratedwiththeworkofothertradersandwiththefabricof
the building. The contractor shall appraise the duties of all plants and equipments taking
accountofanyadditionsorvariationsandshallinformtheEmployerofanymatterswhichmay
affectthedesign.Inallcasestheequipmentinstalledshallbeofappropriateratingfortheduty
itperforms.

Page2
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

TheSpecificationsandbillofquantityshallbeconsideredaspartofthiscontractandanywork
ormaterialshownonBOQandnotcalledforinthespecificationorviceversa,shallbeexecuted
asifspecificallycalledforinboth.Thedrawingsindicatetheextentandgeneralarrangementof
theTransformer,L.T.panel,H.T.&L.T.cableroutelayoutetc.andareessentiallydiagrammatic.

Theworkshallbeinstalledasindicatedonthedrawings,however,anyminorchangesfound
essentialtocoordinatetheinstallationsofthisworkwithotherservicesshallbemadewithout
anyadditionalcosttotheEmployer.Thedrawingsarefortheguidanceofthecontractor,exact
locations,distancesandlevelswillbegovernedbythebuilding.Thecontractorshallexamine
allstructuraland electricaldrawings beforestartingthework,and reporttoEmployerorits
representative,anydiscrepancies,whichinhisopinionappearonthem,andgetthemclarified.

If any discrepancy is noticed between General Conditions of Contract, specification, Bill of
quantity and Drawings, the most stringent of the above shall apply. Bill of quantities, for
electricalitems,shallbereadinconjunctionwithrespectivespecification.However,incaseof
conflictbetweenbillofquantitiesandthespecification,formershallgovern.

3) SYSTEMPARTICULARS:

LV : 433V,3Phase,4wire,50Hz.
Neutralearthing : Solid

4) ABBREVIATIONS:

Thefollowingabbreviationshavebeenusedintheaccompanyingspecifications,drawingsand
billofquantity.

IS : IndianStandard

BS : BritishStandard

HRC : HighRupturingCapacity

GI : GalvanisedIron

CU : Copper

MS : MildSteel

MV : MediumVoltage

LV : LowVoltage

PVC : PolyvinylChloride

AMP : Amperes

V : Volts

KV : KiloVolts

HV : HighVoltage

KW : KiloWatt

Page3
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

KVA : KiloVoltAmpere

PF : PowerFactor

Hz : Frequency

KWH : KiloWattHour

XLPE : CrossLinkedPolyethelene

ACB : AirCircuitBreaker

LED : LightEmittingDiode

PLC : ProgrammableLogicController

UPS : UninterruptedPowerSupply

DP : DoublePole

IEE : InstituteofElectricalEngineers,London

MCB : MiniatureCircuitBreaker

TPN : TriplePoleandNeutral

SP : SinglePole

MCCB : MouldedCaseCircuitBreaker

VCB : VacuumCircuitBreaker

CT : CurrentTransformer

DB : DistributionBoard

DG : DieselGenerator

BOQ : Billofquantity

SITC : Supply,Installation,TestingandCommissioning

L.O.I. : LetterofIntent/Acceptanceletter

ELV : ExtraLowVoltageSystem

MP : MegaPixels

CCTV : CloseCircuitTelevision

PA : PublicAddressSystem

FACP : FireAlarmControlPanel
NVR : NetworkVideoRecorder

NVMS : NetworkVideoMonitoringSoftware

Page4
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

5) REGULATIONSANDSTANDARDS:

TheinstallationshallconforminallrespectstoIndianStandardCodeofPracticeforElectrical
Wiring Installation IS : 7321983 and IS : 2214 1983 (Silver Nitrate Pure and analytical
reagent). It shall also be in conformity with the current Indian Electricity, Rules, Indian
ElectricityAct,NationalElectricalCodeandRegulationsoftheLocalElectricalSupplyAuthority
insofarasthesebecomeapplicabletotheinstallation.Whereverthisspecificationcallsfora
higher standard of material and/or workmanship than those required by any of the above
regulations then this specification shall take precedence over the said regulations and
standard.Ingeneral,thematerialsequipmentandworkmanshipnotcoveredbytheaboveshall
conformtotherelevantIndianStandards.

The electrical installation work shall follow Codes, Indian Standard specifications and rules
(Withinthebestmeaningofthesame)underthiscontract.

Thefollowinglistisgivenforgeneralguidanceonlyinadditiontolistgivenineachindividual
section, however all other latest editions of Codes, Indian Standard specifications and Rules
shallalsobefollowedwhenitisrequired.

IS:8623 Lowvoltageswitchgear&controlgearassemblies

IS:10118 CodeofPracticeforselection,installationandmaintenance
ofswitchgearandcontrolgear

IS:4237 Generalrequirementforswitchgearandcontrolgearfor
voltagenotexceeding1000VoltA.C.or1200VoltD.C.

IS:13947 Lowvoltageswitchgearandcontrolgear

IS:9224 Lowvoltagefuses

IS:8828 Circuitbreakersforoutprotectionforhouseholdand
similarinstallations

IS:12640 Earthleakagecircuitbreaker

IS:1248 Directactingindicatinganalogelectricalmeasuring
instruments

IS:2705 Currenttransformers

IS:4201 Applicationguideforvoltagetransformers

IS:6875 Controlswitchesforvoltageuptoandindicating1000V
A.C.and1200VD.C.

IS:5578 Guideformarkingofinsulatedconductors

IS:11353 Guideforuniformsystemofmarkingandidentificationof
conductorsandapparatustransmission

IS:8197 Terminalmarkingsforelectricalmeasuringinstruments
andtheiraccessories

Page5
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

IS:694 SpecificationsforPVCinsulatedcablesforworking
voltageuptoandincluding1100volts

IS:2551 Dangernoticeplates

IS:3043 Codeofpracticeforearthing

IS:5216 Guideforsafetyproceduresandpracticesinelectricalwork

IS:1646 Codeofpracticeforfiresafetyofbuilding:Electrical
Installation

IndianElectricityActasamendeduptodate

IndianElectricityRulesasamendeduptodate

RulesandRegulationsofBombayRegionalCouncilofFireInsurance&Associationof
IndiaforElectricalwiring.

6) FEES,PERMITSANDTESTS:

TheContractorsshallpayforanyandallfeesandobtainpermitsrequiredfortheinstallation
work. On completion of the work, the contractor shall obtain and deliver to the Employer,
certificates of final inspection and approval by the local electric supply authority and the
ElectricalInspector.

7) ACTUALROUTEOFCABLE:

The location of the cables, panel boards etc. is only indicative, therefore, the actual route of
cablesandthelocationofpanelboardsmaydifferfromtheplansaccordingtothedetailsofthe
buildingconstructionandtheconditionsofexecutionsoftheinstallations.

The contractor shall supply and install at his expense all secondary materials and special
fittingsfoundnecessarytoovercometheinterferenceandtosupplythemodificationsonthe
route of cables and conduits that are found necessary during the work, to the complete
satisfactionoftheEmployersrepresentative.

8) MATERIALANDEQUIPMENT:

All material and equipment shall conform to the relevant standards and shall be new, good
quality, of the approved make and design. The materials and equipment shall confirm to
relevant Indian Standards. The Contractor shall be responsible for the safe custody of all
materialsandshallinsurethemagainsttheft,damagebyfire,earthquakeetc.Alistofitemsof
materials and equipment, together with sample of each shall be submitted to the Employer
within10daysoftheawardofthecontract.Anyitemwhichisproposedasasubstitute,shallbe
accompaniedbyalltechnicaldetailsgivingsizes,particularofmaterialsandthemanufacturers
nameandshallbesubmittedalongwiththetenderorbidoffer.Atthetimeofthesubmissionof
proposed substitute the Contractor shall state the credit, if any due to the Employer. In the
eventthesubstitutionisapproved,allchangesandsubstitutionsshallberequestedinwriting
andapprovalsobtainedinwritingfromEmployer.Employersdecisioninthemattershallbe
final.

All materials of the same kind of service shall be identical and made by the same
manufacturers. Any deviation to this rule shall be approved by the Consultant. Top priority
shall be given to the products that have a permanent agent providing spare parts and
maintenancefacilitiesinthesamecitywheretheprojectissituated.

Page6
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC


The makes of electrical equipments, components, accessories etc. have been mentioned in
Tenderdocument.However,Client/ElectricalConsultantreservestherighttoselectfromthe
specified make. Contractor shall clearly indicate in the bid document, the make they have
considered. No extra claim shall be applicable if client / consultant suggests from the
alternativemakespecifiedinthetenderdocument.

9) MANUFACTURERS:

Wheremanufacturershavefurnishedspecificinstructionsrelatingtothematerialsusedinthis
job,coveringpointsnotspecificallymentionedinthesedocuments,theseinstructionsshallbe
followedinallcases.

Wheremanufacturersnamesand/orcataloguenumbersaregiven,thisisanindicationofthe
quality,standardsandperformancerequired.

Wheninterfacingoccurs,equipmentshallbemutuallycompatibleinallrespects.

10) RATING:

Ratingofallitemsshallbeappropriatefortheconditionson theparticularsiteonwhichthe
items will be used. All the equipment shall be fit for continuous work under the worst
conditionsofsiteandshallberatedforthefollowingambientcondition.

Outdoortemperature50deg.c.
Temperatureundershed45deg.c.
Salty,dustyandhumid
Coastalarea

11) INSPECTIONANDTESTING:

Employers representative reserves the right to request inspection and testing at
manufacturers works at all reasonable times for this contract. Tests on site of completed
worksshalldemonstrate,amongotherthings:

1. Thattheequipmentinstalledcomplieswithspecificationinallparticularsandisofthe
correctratingforthedutyandsiteconditions.

2. Thatallitemsoperateefficientlyandquietlytomeetthespecifiedrequirements.

3. That all circuits are correctly fused and protected and that protective devices are
properlycoordinated.

4. Thatallnoncurrentcarryingmetalworkisproperlyandsafelygroundedinaccordance
withthespecifications.

5. The contractor shall provide all necessary instruments and labour for testing, shall
makeadequaterecordsoftestproceduresandreadings,shallrepeatanytestsrequested
by the Employer and shall provide test certificates signed by a properly authorised
person.Suchtestcertificatesshallcoverallworks.

6. Iftestsfailtodemonstratethesatisfactorynatureoftheinstallationoranypartthereof
then no claims for the extra cost of modifications, replacements or retesting will be
considered.Employersdecisionastowhatconstitutesasatisfactorytestshallbefinal.

Page7
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

7. The above general requirements as to testing shall be read in conjunction with any
particularrequirementsspecifiedelsewhere.

12) TESTCERTIFICATES:

The contractor shall submit test certificates for all the electrical material / system installed.
These shall be issued by a government recognized inspection office certifying that all
equipment, materials, construction and functions are in agreement with the requirements of
thesespecifications,ISIandwhenISIisnotapplicableotherapprovedcertifyingagencies.

13) INSTRUCTIONMANUAL:

Thecontractorshallprepareandproduceinstruction,operationandmaintenancemanualsin
English for the use, operation and maintenance of the supplied equipment and installations,
andsubmit3setstoEmployer,atthetimeofhandingover.

14) SAMPLESANDCATALOGUES:

Before ordering the material necessary for these installations, the contractor shall submit to
Employerforapproval,asampleofeverykindofmaterialsuchascables,conductors,conduits,
switches,socketoutlets,circuitbreakers,lightingfixtures,boxesetc.alongwiththecatalogues.

For big items such as switchboards, the submission of catalogues shall be enough. Prior to
orderinganyelectricalequipment/material/system,thecontractorshallsubmittoEmployer,
the catalogues, alongwith the samples, atleast from three different manufacturers. After the
selectionofmanufacturerbyEmployer,thecontractorshallarrangeinspectionandtestingat
themanufacturersfactoryorassemblyshopforfinalapproval.Nomaterialshallbeprocured
priortotheapprovaloftheElectricalconsultant&Datasheetsshallbesignedandstampedby
consultantandonecopytobesubmittedtoClient.

15) VENDORANDSHOPDRAWINGS:

The contractor shall prepare and submit to Employer, for his approval, two sets of vendor
detaileddrawingsofalldistributionboards,switchboards,outletboxes,specialpullboxesand
otherlikewisematerial,equipmenttobefabricatedbythecontractor,orothervendorwithin
15daysofsigningofthecontract.

Before starting the work, the contractor shall submit to Employer for his approval in the
prescribedmanner,theshop/executiondrawingsfortheentireinstallation,speciallythemain
connections and junctions, the route of conduits and cables, no. and size of wires drawn
through the conduits, location of all the outlet points, and switch boards and distribution
boardsandanyotherinformationrequiredbyEmployer.Employerreservestherighttoalter
or modify these drawings if they are found to be insufficient or not complying with the
established technical standards or if they do not offer the most satisfactory performance or
accessibilityformaintenance.

16) ASBUILTDRAWINGS:

At the completion of work and before issuance of certificate of virtual completion the
contractorshallsubmittoEmployer,threesetsoflayoutdrawingdrawnatappropriatescale
indicating the complete wiring system as installed. These drawings must provide (in plan,
foldedelevationandsection)

a. Locationanddetailsofdistributionboards,mainswitches,switchgearandother
particulars.

Page8
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

b. Location of all earthing stations, route and size of all earthing conductors,
manholesetc.

c. Routeandparticularsofallcables.

d. Lighting layout plans with conduit routing layout/cable tray for all the floors
alongwithcircuitdistributiondetails.

e. ExternalAreaLightingPlan

17) GUARANTEE:

At the close of the work and before issuance of final certificate of virtual completion by
Employer, the contractor shall furnish written guarantee indemnifying Employer against
defectivematerialsandworkmanshipforaperiodofoneyearaftercompletion.Thecontractor
shallholdhimselffullyresponsibleforreinstallationorreplacement,freeofcosttoEmployer,
thefollowing:

a. Anydefectiveworkormaterialsuppliedbythecontractor.

b. AnymaterialorequipmentsuppliedbyEmployer,whichisdamagedordestroyedasa
resultofdefectiveworkmanshipbythecontractor.

c. Anymaterialorequipmentdamagedordestroyedasaresultofdefectiveworkmanship
bythecontractor.

18) SPECIALNOTESFORBIDDER:

a. AllthemajorelectricalcomponentslikeTransfomers,DGs,HTMVLTswitchgears,DBs,
UPS, etc including the external & internal electrical distribution system, earthing
systems&variousequipments(whichissupplied&/orinstalledbythecontractor)shall
bemaintainfor2yearsfromthedateofvirtualcompletionofworkatfreeofcost.

b. Thecontractorshouldcooperate&coordinateforLTconnectionstoLTpanelboardof
variousblocks,sothatdaytodayworkshouldnotsuffer.

c. ItisinthescopeofContractortopreparingnecessarydrawingsubmittingtoauthorities
(i.e. Local supply co., pollution control board, Electrical Inspector, etc), getting their
approval/senctionandfinalcertificatetoenergizethesubstationequipments.Filling
the necessary application to supply co. following up and getting the supply filling the
necessarytestreporttothesupplyco.inclusive.Allofficial/statutoryfeesshallbepaid
by clients & all other required expenses shall be on the contractors account; no extra
paymentshallbepaidtocontractorforsaidjob.

d. LTPanelsshallbeapprovedonsitebyEngineerinCharge&ElectricalConsultant.

e. Contractor shall submit Shop drawings for approval to Electrical consultant based on
tenderdrawingsbeforeexecutionwhichshallnotbeonchargeablebasis.

f. TheMCBandMCBDBsmustbeofsamemake.

g. Make of components required to be used by contractor to complete the installation, if


not mentioned anywhere, shall be required to GOT IT APPROVED by
Client/Architect/Consultantbeforeinstallationinwritingmanner.

Page9
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

h. Within a week of work order, the contractor shall submit the sample of each item /
component of above mentioned approved make for the approval of the
Client/Architect/Consultant.

2 TECHNICALSPECIFICATIONFORHTPANEL

1) DESIGNCONDITIONS&SCOPEOFWORK:

The said panel is Four Way HT VCB breaker panel. All equipment and materials will be
selectedandratedforuseatthefollowingsiteconditions.

Ambientairtemperature. 50C.

Groundtemperature. 30C.

Solargain 1100w/m2

Earthresistivity 200deg.C.cm/w

RelativeHumidity. 95%Max.

Atmosphericcondition Noncorrosive,HumidandDusty

2) GENERALREQUIREMENTS

1. Thescopegenerallydescribestodesign,manufacture,assemble,connect,wire,supply,testand
commission11kvvacuumcircuitbreakerpanel.

2. The unit shall consist off tee off spring assisted three position , three pole vacuum circuit
breaker.

3. All equipment and materials shall be designed, manufactured and tested in accordance with
the latest applicable Indian Standards (IS) except where modified and/or supplemented by
thisspecification.

4. The equipment shall meet the requirements of Indian Electricity Rules as amended up to
dateandrelevantISCodesofPractice.Inaddition,otherrulesandregulationsasapplicable
totheworkshallbefollowed.Incaseofanydiscrepancy,the morerestrictiveruleshallbe
binding.

3) COMPLETENESSOFSUPPLY

1. It is not the intent to specify completely herein all details of the equipment. Nevertheless,
theequipmentshallbecompleteandoperativeinallaspects andshallconformtohighest
standardofengineering,designandworkmanship.

2. Any material or accessory which may not have been specifically mentioned but which is
necessary or usual for satisfactory and trouble free operation and maintenance of the
equipmentshallbefurnishedwithoutanyextracharge.

4) DESIGNCRITERIA

The Switchgear shall be capable of continuous operation at specified rating under the
followingcondition:

Voltagevariation : +/10%

Page10
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC


Frequencyvariation : +3%,6%

Combinedvoltage&frequencyvariation : 10%

1. Thederatingoftheequipmentsshallbedonetaking50degCasanambienttemperatureif
it is designed at lower temperature. The maximum temp. in any part of the equipment at
specifiedratingshallnotexceed85degCconsideringreferenceambienttemperatureas50
degC.

2. Thesystem faultlevelfor 11KVsystemis350MVA. Thebreakers of therespectivesystem
shallhavethebreakingcapacitycorrespondingtoabovefaultlevelsspecified.

3. ThebreakershallbeVacuumtype.Thecircuitbreakershallbefittedwithmicroprocessor
basedselfpoweredrealyinsidethefrontco

4. ver.

5. Thebreakerratingsshallbeasperdrawingandbillofquantity.

6. The cable termination shall be done by heat shrinkable termination method. The
compartmentshouldhavesufficientheightspaceforproperTermination/Bondingofcable
leads.

5) SPECIFICREQUIREMENTS

1. The switchgear enclosure shall conform to the degree of protection IP4X. The minimum
thicknessofsheetsteelusedshallbe2mmCRCAsteel.

2. Theswitchgearassemblyshallcompriseacontinuous,deadfront,lineupoffreestanding,
verticalcubicles.Eachcubicleshallhaveafronthingeddoor withlatchesandaremovable
back cover. All covers and doors shall be provided with recessed neoprene gaskets. All
doorsshallhavepadlockingarrangement.Switchgearshallbefireretardanttype.

3. Circuit breakers, instrument transformers, busbars, cable compartment etc., shall be


housed in totally isolated air tight separate compartments within the cubicle. The design
shall be such that failure of one equipment shall not affect the adjacent units. Suitable
venting arrangement shall be provided to release the gas pressure developed due to the
operationofthebreakerorduetolivearcoffault.

4. Eachcubicleshallbeseparatedfromadjacentonebygroundedsheetsteelbarrierandbus
sealingarrangement.

5. The switchgear panel shall be of arc proof version. Test report as per DIN VDE 0670 part
601,IEC694/IEC298shallbefurnished.

6. Allrelays,meters,switchesandlampsshallbeflushmountedontherespectivecubicledoor
oroncontrolcabinetbuiltonthefrontofthecubicle.

7. Each switchgear cubicle shall be provided with a thermostat controlled space heater and
singlephaseplugpointoperatedat230VAC.50Hz.

8. Busconnectionfrombuscompartmenttobreakercompartment&breakercompartmentto
cablecompartmentandbuscompartmenttoadjacentpanelsshall bethroughsealedresin
castbushingassembly.

Page11
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

9. Eachbreakercubicleshallbeprovidedwithserviceandtestpositionlimitswitches,each
having at least 4 NO & 4 NC contacts. All fixing bolts, screws, etc. appearing on the panel
shallbesoarrangedastopresentaneatappearance.Theswingofthedoorshallbemore
than90degC.

6) BUSANDBUSTAPS

1. The main buses and connections shall be of high conductivity copper, sized for specified
continuousandfaultcurrentratingswithmaximumtemperaturelimitedto85degC(i.e.35
degCriseover50degCambient).

2. Adequate contact pressure shall be ensured by means of two bolts connection with plain
andspringwashersandlocknuts.

3. Bimetallicconnectorsshallbefurnishedforconnectionsbetweendissimilarmetals.

4. All Busbars, Jumpers and connection shall be fully insulated for working voltage with
adequate phase/ground clearances. Epoxy castresin shrouds for joints shall be provided.
Alljointinghardwareshallhavenyloncaps.Allbusbars,links,jumpersetc.shallbesleeved
with sleeves of Raychem/DSG make and nonin flame able heat shrinkable type. Busbars,
links,livepartsetc.shallhavenonflammableshrouds.

5. No paper/cotton based insulation shall be used any where in the switch gear. Minimum
amountofcombustibleandlowsmokegenerationtypeinsulatingmaterialshallbeused.

6. Safetyshutter,phasebarrier,busbarsealoffbushingplate,supportinsulatorsetc.shallbe
noninflammable high tracking fiber glass/epoxy insulation system of grade 94VO as per
UL.

7. All buses and connections shall be supported and braced to withstand dynamic electro
magneticstressesduetomaximumshortcircuitcurrentandalsototakecareofanythermal
expansion.

8. BusbarsshallbecolourcodedforeasyidentificationandsolocatedthatthesequenceRYB
shall be from left to right, top to bottom or front to rear, when viewed from front of the
switchgearassembly.

9. The successful tenderer shall submit the calculation in support of selection of busbar
conductorsize,spacingandshorttimewithstandcapability.

7) CIRCUITBREAKER

1. Circuitbreakershallbetriplepole,singlethrow,Vacuumtype.

2. Circuitbreakershallbedrawouttype,havingSERVICE,TESTandDISCONNECTEDpositions
withpositiveindicationforeachposition.

3. Circuitbreakersofidenticalratingshallbephysicallyandelectricallyinterchangeable.

4. CircuitbreakershallhavemotorwoundspringchargingfacilitywithMechanical&Electrical
antipumpingfeaturesandshunttrip.Inadditionfacilityformanualchargingofspringshall
beprovided.Themotorshallbesuitableforoperationwithvoltagevariationfrom85%to
110%ofratedvoltage.Springchargingmotorshallbeinastandardenclosure.

Page12
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

5. For motor wound mechanism, spring charging shall take place automatically after each
breaker closing operation. One opencloseopen operation of the circuit breaker shall be
possibleafterfailureofpowersupplytothemotor.

6. Mechanicalsafetyinterlockshallbeprovidedtoprevent:

7. Thecircuitbreakerfrombeingrackedinoroutoftheservicepositionwhenthebreakeris
closed.

8. Rackinginthecircuitbreakerunlessthecontrolplugisfullyengaged.

9. Closing&openingofthebreakerinanintermediatepositionbetweenservice&testand
betweenTestandDisconnectedposition.

10. Automaticsafetyshuttersshallbeprovidedtofullycoverthefemaleprimarycontactswhen
thebreakeriswithdrawnfromserviceposition.

11. Each breaker shall be provided with an emergency manual trip, mechanical ONOFF
indication, an operation counter and mechanism charge/discharge indicator. The manual
trip deviceshallbelocatedon thefront door.Indicatorswithshrouds willbevisiblefrom
frontdoorevenwhenbreakerisclosed.

12. Suitablepadlockingarrangementshallbeprovidedasstatedbelow:

13. CircuitBreakeroperatinghandleintheOFFposition.

14. EachfeederpaneloperatinghandleinCLOSED,OPEN,EARTHposition.

15. Eachbreakershallbeprovidedwithfollowing:

16. Auxiliary switch, with 6 NO + 6 NC contacts, mounted on the drawout portion of the
switchgear.

17. Position/cellswitchwithminimum3NO+1NCcontacts,oneeachforTESTandSERVICE
position.

18. Auxiliary switch, with 4 NO + 4 NC contacts, mounted on the stationary portion of the
switchgear and operated mechanically by a sliding lever from the breaker in SERVICE
position.

19. Limit/auxiliary switches shall be convertible type that is facility for changing N.O. contact
ton N.C. and viceversa. Switch contact shall be rated 10A A.C. and 2A D.C. at operating
voltage.

20. Circuitbreakershallbedrawouttype,completewithtransfertrucks,selfaligningprimary
andsecondarydisconnects,positiveguidestoensureproperalignment.

21. Eachbreakershallbeprovidedwithsuitableencasedrollers.

22. Thetripcoilsshallbeoperatedsatisfactorilyatvoltagebetween70%and110%ofrated
controlsupplyvoltage.

23. Eachcircuitbreakercubicleshallbeprovidedwithanearthingfacilitytoearththeincoming
or outgoing feeders by the arrangement specified below. Earthing facilities shall be fully
interlockedtopreventfaultyoperatione.g.earthingofliveparts.

Page13
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

24. Separate earthing truck, which can be inserted in place of circuit breakers, one truck
suitableforincomingandtheotherforoutgoingcircuitsshallbeprovided.

25. Positive earthing of circuit breaker frame shall be maintained when it is in the connected
positionandinallotherpositionsinwhichthesafetyshuttersareinopenposition.

26. Insulationusedforauxiliaryswitchesshallbeantitrackingtype.

8) INDICATION&MONITORING

1. Eachbreakercubicleshallbeequippedwithfollowing:

2. One (1) number heavy duty spring return type TRIPNORMALCLOSE control switch with
pistolgriphandle.

3. Three(3)indicatinglightsfrontofcompartments:

3.1. GREEN :BreakerOpen

3.2. RED :BreakerClosed

3.3. Amber :Trip

3.4. Blue :Springcharged/Lowvacuum

Lamp shall be LED type with series resistor, Lamp and lens shall be replaceable from the
front.

9) CURRENTTRANSFORMER

1. Currenttransformersshallbebarprimary,castresintype.Allsecondaryconnectionsshall
bebroughtouttoterminalblockswhereYorDconnectionwillbemade.

1.1. ClassPSfordifferential&restrictedearthfaultrelaying.

1.2. Class5P20forotherrelaying.

1.3. Class1.0andISF<5formetering.

2. The current transformer shall be capable of safely withstanding the short circuit, stresses
corresponding to the fault level as indicated & shall be able to meet the shorttime
requirementspecified.

3. All CT secondary shall be earthed through separate switch link on terminal block. The
secondary terminals of the CTS shall have the provision of shorting and disconnecting
facilitiesbylinks.

4. CTterminals&theirpolaritiesshallbeclearlymarked.

10) VOLTAGETRANSFORMER

1. VoltageTransformershallbecastresin,drawouttypeandshallhaveanaccuracyclassof
1.0,3P.VoltageTransformermountedonbreakercarriageisnotacceptable.

Page14
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

2. High voltage windings of voltage transformer shall be protected by current limiting fuses.
Thevoltagetransformerandfusesshallbecompletelydisconnectedandvisiblygroundedin
fullydrawoutposition.

3. Lowvoltagefuses,sizedtopreventoverload,shallbeinstalledinallungroundedsecondary
leads. Fuses shall be suitably located to permit easy replacement while the switchgear is
energies.

4. The connections from main circuit to PT shall be capable of withstanding short circuit
stresses.

11) RELAYS

1. Protectiverelayshallbemicroprocessorbased.

2. Relaysshall beof drawout design withbuiltin sitetestingfacilities.Smallauxiliaryrelays


maybeinnondrawoutexecutionadmountedwithinthecubicle.

3. Relaysshallberatedforoperationon110Vsecondaryvoltageand5Asecondarycurrentas
shownondrawings.Numberandratingofrelaycontactsshallsuitthejobrequirements.

12) METERS

1. Allmetersaredigitaltypeof96x96mmaccuracyclassof2%.

13) SECONDARYWIRING

1. The switchgear shall be fully wired at the factory to ensure proper functioning of control,
protection,transferandinterlockingschemes.

2. Fuse and links shall be provided to permit individual circuit isolation from bus wires
without disturbing other circuits. All spare contacts of relays, switches and other devices
shallbewireduptoterminalblocks.

3. Wiringshallbedonewithflexible,650Vgrade,FRLSPVCinsulatedswitchboardwireswith
stranded copper conductors of 1.5 mm2 for control and current circuits and 1.5 mm2 for
voltagecircuits.Allpowerwiringlikespaceheatersupplyetc.shallbecarriedoutwithmin.
4mm2Cu,conductor,Wiringoftripcircuitshallbewithfluroplasticwires.

4. Each wireshallbeidentified, atbothends, withdependent&crossaddressingpermanent


markersbearingwirenumbersasperContractorsWiringDiagrams.Tripcircuitshallhave
redcolourferrule.

5. Wireterminationshallbemadewithcrimpingtyperingconnectorswithinsulatingsleeves.
Wiresshallnotbesplicedbetweenterminals.

6. Thewiresshallrunpreferablythroughmetallicthroughadequatelysupportedalongitsrun
topreventsaggingduetoflexibilityorvibration.Thecontrol&powerwiresshallberouted
throughseparatetroughs.

7. Interpanel wiring trough shall be furnished for wiring between switchgear cubicles. All
wiringrequiredforinterlockingbetweenthecubiclesofanyswtichgearshallbefurnished
and installed. Wherever wires are passing through cutouts or openings they shall be
protectedbyprovidingsuitablegrommetorgasketaroundtheopenings.Interpanelwiring
atshippingsectionsshallbethroughterminalblocksplacedsuitablyatintersectionpoints.

Page15
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

8. Thecolourofwireshallbetakenasfollows:

8.1. ACSystemBlack

8.2. DCSystemGrey

8.3. EarthingSystem

8.4. CT&PTWiringSystemRed,Yellow,Bluecolourcode.

14) TERMINALBLOCKS

1. Terminalblocksshallbe660VgradeboxclamptypewithmarkingstripsELMEX10mm2or
equal. Terminal for C.T. Secondary leads shall be disconnecting link type and shall have
provision for shorting. Terminal for P.T. Secondary lead shall also be disconnecting link
type.

2. Not more than two wires shall be connected to any terminal. Spare terminals equal in
number to 20% active terminals shall be furnished. Multi connection terminal strip to be
usedifrequired.

3. Terminal blocks shall be located to allow easy access. Wiring shall be so arranged that
individualwiresofanexternalcablecanbeconnectedtoconsecutiveterminals.

4. Terminalblocksforinterpanel/external/SpaceHeaterwiringshallbeseparatefrominter
panelwiring.

5. Allcontrolwireshallbeterminatedwithringtypeinsulatedlugonly.

6. Theterminalblockshallbegroupedaccordingtocircuitfunctionsandindividualterminals
ineachblockshallbeseriallynumberedinaccordancewiththedrawings.Suchnumbering
shallbelegible,permanentandindelible.

7. Theterminalblocksofdifferentvoltageclassesshallbesegregated.

8. Similartypeofterminalblockshallbeusedforinterpanelwiringatshippingsections.

15) CABLETERMINATION

1. Switchgearshallbedesignedforcableentryfromthetop.Sufficientspaceshallbeprovided
foreaseofterminationandconnection.

2. Power cables shall be XLPE insulated, armored, overall PVC sheathed with stranded
Aluminum/capperconductor.

3. Control cables shall be PVC/XLPE insulated, armored, overall PVC sheathed with 1.5mm2
strandedcopperconductor.

4. Allprovisionsandaccessoriesshallbefurnishedforterminationandconnectionofcables,
includingremovablealuminiumglandplates,cablessupportsetc.

5. The gland plates shall be minimum 4mm thick aluminium sheet. The gland plate and
supporting arrangement for 1/C power cables shall be such as to minimise flow of eddy
current.

Page16
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

6. Sufficient space shall be provided between the power cable termination (endboxes) and
gland plate. Core balance C.T.s, wherever specified, shall be accommodated within this
space.

16) GROUNDBUS

1. A ground bus, rated to carry maximum fault current, shall extend full length of the
switchgear.

2. ThegroundbusshallbeprovidedwithtwoboltdrillingwithG.I.boltsandnutsateachend
toreceive50x6mmG.I.flat.

3. Eachstationaryunitshallbeconnecteddirectlytothegroundbus.Theframeofeachcircuit
breaker and drawout P.T. unit shall be grounded through heavy multiple contacts at all
timesexceptwhentheprimarydisconnectingdevicesareseparatedbyasafedistance.

4. Wherevertheschematicdiagramsindicateadefinitegroundattheswitchgear,asinglewire
foreachcircuitthusgroundedshallberunindependentlytothegroundbusandconnected
thereto.

5. C.T. andP.T.secondary neutralsshall beearthed through removablelinkssothatearthof
onecircuitmayberemovedwithoutdisturbingother.

6. Suitable groundterminal, directly connected with thegroundbusshall beprovided in the
cablechamberforgroundingconnectionofcablescreen/armour.

7. All hinged doors shall be grounded using sliver plated and braided copper flexible of
adequatesize.

17) NAMEPLATES

1. Nameplatesofapproveddesignshallbefurnishedatfront&backsideofeachcubicleandat
eachinstruments&devicemountedonorinsidethecubicle.

2. Thematerialshallbe3plylamicoldorapprovedequal,3mmthickwithwhiteletteronblack
background.Thelettersofthenameplatesshallbeengraved.

3. Thenameplateshallbeheldbyselftappingscrews.Nameplatesizeshallbeminimum20x
75mmforinstrument/deviceand40x150mmforpanels.

4. Cautionnoticeonsuitablemetalplateshallbeaffixedatthebackofeachverticalpanel.

Followingplatesize&lettersizeshallbeconsideredfornameplate.

PLATESIZE
LETTERSIZE
SR.NO. NAMEPLATENO.
(mmmm)
(mmmm)

1.0 Mainnameplate 40150 2525

2.0 Equipment&device(Front) 2075 55

3.0 Equipment&device(Internal) 620 33


Page17
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

18) SPACEHEATERSANDPLUGSOCKETS

1. Eachcubicleshallbeprovidedwiththermostatcontrolledspaceheatersand10A,3pinplug
socket.

2. Cubicleheater,Plug/socketcircuitsshallhaveIndividualMCBs.

19) A.C.POWERSUPPLY

1. Thefollowingpowersupplieswillbemadeavailabletotheswitchgear:A.C.supply:Double
Feederwithmanualchangeoverswitch.

2. IsolatingMCBwillbeprovidedattheswitchgearfortheincomingsupplies.

3. Buswiresofadequate(minimum4sq.mmcopper)capacityshallbeprovidedtodistribute
theincomingsuppliestodifferentcubicles.IsolatingMCBshallbeprovidedateachcubicle
forA.C.supplies.

4. A.C. load shall be so distributed as to present a balance loading on threephase supply
system.

20) TROPICALPROTECTION

1. All equipment, accessories and wiring shall have fungus protection involving special
treatmentofinsulationandmetalagainstfungus,insects&corrosion.

2. Screens of stainless steel shall be furnished on all ventilating louvers to prevent the
entranceofinsects.

21) PAINTING

1. Allsurfacesshallbesandingblasted,pickledandgroundedasrequiredtoproduceasmooth,
cleansurfacefreeofscale,greaserustandforeignadheringmatter.

2. Aftercleaning,thesurfacesshallbe given aphosphatecoatingfollowedby2coatsofhigh


qualityprimerandstavedaftereachcoat.

3. Theswitchgearshallbefinishedinpowdercoat,shadeRAL7032MATTfinish.

4. Sufficient quantity of touchup paint (approx. 5 ltrs.) shall be furnished for application at
site.

22) ACCESSORIES

1. ThefollowingaccessoriesshallbefurnishedalongwiththeSwitchgear:

2. Earthingequipmentsuitableforearthingthebusoroutgoingcable.

3. BreakercarriertrolleyifC.B.isofthatdesign.

4. Cubicledooropeningkey(1foreachpanel).

5. Withdrawalhandlesforbreaker.

6. Commissioningspares(Providelistofsparesalongwithoffer)

Page18
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

23) TESTS

1. Theswitchgearshallbecompletelyassembled,wired,adjustedandtestedatthefactoryas
pertherelevantstandards.

24) ROUTINETEST

1. Thetestsshallincludebutnotnecessarilylimitedtothefollowingforswitchgear:

2. Operation under simulated service condition to ensure accuracy of wiring, correctness of


controlscheme&properfunctioningoftheequipment.

3. AllwiringandcurrentcarryingpartshallbegivenappropriateHighVoltagetest.

4. Testformeter/relaysfortherespectivefunction.

5. Primarycurrentandvoltageshallbeappliedtoallinstrumenttransformers.

6. Routine test shall be carried out on all equipment such as circuit breakers, instrument
transformers,metersetc.

7. OneminutepowerfrequencywithstandsinsulationtestasperrelevantIS.

25) TESTCERTIFICATE

1. Certifiedreportsofallthetestscarriedoutattheworksshallbefurnishedinsix(6)copies
forapprovaloftheOwner.

2. The equipment shall be dispatched from works only after receipt of Owner's written
approvalofthetestreports.

3. The test report shall furnish complete identification of the equipment such as serial no.,
rating,equipmentdesignationasperschematicetc.&dateoftest.

26) SPARES

1. TheBiddershallsubmitalistofrecommendedsparepartsfortwo(2)yearssatisfactoryand
trouble free operation, indicating the itemized price of each item of the spares in the
appropriateannexure.Selflifeofconsumablespareswouldbeindicatedspecifically.

27) DRAWINGS,DATA&MANUALS

1. Drawings, Data & Manuals shall submitted in triplicate with the bid and in quantities and
procedures as specified in General Conditions of contract and/or elsewhere in the
specificationforapproval&subsequentdistributionaftertheissueofLetterofintent.

1.1.1.Drawing/Documenttobesubmitted:

2. Outlinedimensionaldrawingoftheswitchgearshowinggeneral arrangement,space
requirementsandcableentrypoints,locationofbreaker,CT,Ptbusbarchamber,grounding
arrangementetc.

2.1. BillofMaterials.

2.2. Typicalfoundationplan.

Page19
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

2.3. Typicalbreakercontrolschematic.

2.4. Testreportsoncircuitbreaker/CT/PT.

2.5. Technicalleafletson&completespecifications&OEMaddressforboughtoutitems.

2.6. Busbar&circuitbreakersizingcalculationalongwithrelevantTestReports.

3. Instruction manuals of switchgear & individual equipment. The manual shall clearly indicate
thattheinstallationmethod,checkupandteststobecarriedoutbeforecommissioningofthe
equipmentaswellasmonitoringtests,theirinterval&maintenance/overhaulingprocedure&
schedule.

TECHNICALDATASHEETFORH.V.INDOORSWITCHGEAR:

Sr.
DESCRIPTION
No.

1.0 GENERAL:
1.1 Ambienttemperature 50c.
1.2 Atmosphere Noncorrosive,HumidandDusty
1.3 Location Indoor
1.0 ELECTRICALDATA:
1.1 Typeofbreaker Vacuum Circuit Breaker (4 Breaker
Panel)
1.2 Service Continuous
1.3 Voltage ASPERTENDER
1.4 Systemearthing Solidlyearthed
1.5 Frequency 50Hz.+/3%
1.6 No.ofphase 3
1.7 Systemfaultlevel ASPERTENDER
1.8 Faultcurrent ASPERTENDER
1.9 Max.systemvoltage ASPERTENDER
1.10 Auxiliarysupply: 24VD.Cderivedfrombatteries
1.11 Ratedshorttimecurrent ASPERTENDER
1.12 Makingcapacity ASPERTENDER
ASPERTENDER
1.13 BusbarcurrentratingandMaterial
ASPERTENDER
1.14 Cableentry
1.15 Cablesize ASPERTENDER

1.16 Breakerparticulars:
(a) Operatingduty 03MCO3MCO

Page20
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

Sr.
DESCRIPTION
No.

(b) Operatingmechanism Motorchargedspring/manualtrip&


close
(c) Springchargingmotor 230VAC,200W
(d) Trip/Closingcoil 24VDC,180W
(e) Antipumpingfeature Tobeprovided
(f) Latchingrequirement Tripfree
(g) Emergencytrippushbutton Required
(h) Spaceheaterandcubiclelamp Required
1.17 Constructionalrequirements SimplexType
(a) Thickness of sheet steel for frame, CRCA sheet 2 mm, hinge type door
enclosure,doors,covers&partitions withneoprenerubbergasket
(b) Degreeofprotection IP44X
(c) Colour PowdercoatingRAL7032MATT
(d) Earthbussize 506mmGI
(e) Foundationframe ISMC75, Suitable for five breakers
with necessary bed plate and
foundationsbolt.
1.18 Annunciation:
(1) MainincomingTrip TobeProvided
1.19 PANELACCESSORIES
(a) Toggle switch for space heater and 230VA.C,10A
socket
(b) Socket 3pin10A
(c) MCB for spring charging motor 6A,DPMCB
circuit
(d) MCBforON/OFF Double pole,16 A, 110 V D.C for D.C
ckt.
Double pole, 16 A, 230 V A.C for A.C
ckt.
(e) Local/Remoteselectorswitch 4 ways, 2 positions, lockable in any
position, angular movement, stay put,
levertypehandle.
(f) AutoOffManualswitch 18 ways, 3 positions, lockable in all
position,stayput,wingtypehandle.
(g) Breaker control switch (Trip 6 ways, 3 position, spring return to
NeutralTrip) neutral,angularmovement,pistolgrip
typehandle.

Page21
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

Sr.
DESCRIPTION
No.

(h) LEDindicatinglamp(230VA.C) BreakerRYBOnRedcolour


BreakerRYBOffGreencolour
AutotripAmbercolour
TripckthealthyAmbercolour
SpringchargedBluecolour
LowvacuumBluecolour
100ohm,3/4Wresistor
(i) FilamentBulb 2 / 3 W bulb for R, Y, B, Healthy
indication
(j) SpaceHeater 230VA.C,100W
(k) Limit switch for test and service Notapplicable
position
1.0 RELAY
1.1 Instantaneous Phase Over Current TobeProvided
Relay:50/50n
1.2 AC Inverse Definite Minimum Phase TobeProvided
OverCurrentRelay:51/51n
1.3 Lockoutrelay:86 TobeProvided
1.4 UnderVoltageRelay:27C TobeProvided
1.5 Buchholzrelay:63GP&Aux.Relay TobeProvided
foralarm&trip63GPX1&X2
1.6 Oil Temperature Indicator : 492 & TobeProvided
Aux. Relay for alarm & trip 492 X1
&X2

4.0 METERING

4.1 Digital Multi Function Meter TobeProvided


including parameters Amp., Voltage,
KW, KWH, KVAR, KVARH, PF,
Frequencyetc.
5.0 CURRENT TRANSFORMER /
POTENTIALTRANSFORMER
5.1 CTForMetering. CastResintype
AccuracyClass 1.0
VAburdon 15VA
5.2 CTForProtection. CastResintype
AccuracyClass 5P15/PS
VAburdon 15VA

Page22
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

Sr.
DESCRIPTION
No.

5.3 PTForMetering. CastResintype


AccuracyClass 1.0
VAburdon 100VA
5.4 PTForProtection. CastResintype
AccuracyClass 5P15
VAburdon 100VA


28) METHODOFMEASUREMENT
AlltheitemswillbemeasuredasmentionedinBillofquantity.

3 TECHNICALSPECIFICATIONFORHTCABLE
1) SCOPE
1. The scope shall cover supplying, laying, testing and commissioning of 3 core H.T cables
which shall be capable of operating at a sustained conductor temperature of 90C and
suitableforamaximumconductorshortcircuittemperatureof250C.

2. Thisspecificationgivesthegeneralrequirementofcables.However,itistheresponsibilityof
thevendortotakethejointmeasurementandobtainclientsapprovalbeforetheplacement
oforderstothemainsupplier/manufacturer.Cutlengthswillnotbeaccepted.

2) REFERENCECODES&STANDARDS:

1.1. IS:81301984 ConductorsofInsulatedCables.

1.2. IEC:228 ConductorsofInsulatedCables.

1.3. IS:10810 Methodsofvarioustestsoncablesandtheiraccessories

1.4. IEC:502 Extrudedsoliddielectricinsulatedpowercablesforratedvoltage
from1KVupto30KV.

1.5. IEC:287 Calculationsofcontinuouscurrentratingofcables(100%load

factor).

1.6. IS:7098(PartII) CrosslinkedpolyethyleneinsulatedPVCsheathedcablefor
Voltagefrom1.3KVupto33KV.

1.7. IS:58311984 PVCinsulation&sheathofelectricalcables.

3) OPERATINGCONDITIONS

Electricsystem
SystemVoltage : 11KV/1.6KV
Frequency : 50Hz.

Page23
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

Environment
Groundtemperature : 40C.
Ambientairtemperature : 50C.
Solargain : 1100w/m
Earthresistivity : [ThebiddershallconfirmtheEarth
ResistivityTest]
Atmosphericconditions : Humid,saltyanddusty

CONSTRUCTION

4) CONDUCTORS

1. TheconductorshallbeofcircularstrandedAluminiumtoIS:8130&IEC:228.Itshallbe
clean, reasonably uniform in size & shape smooth & free from harmful defects. Any other
formofconductormayalsobeacceptedifinlinewithmoderntrends.

5) CONDUCTORSCREEN

1. The conductor screen shall consist of an extruded layer of thermosetting semiconducting


compoundwhichshallbeextrudedsimultaneouslywiththecoreinsulation.

6) INSULATION

1. TheinsulationshallbesupercleanXLPEcompoundappliedbyextrusionandvulcanizedto
formacompacthomogenousbody.

7) INSULATIONSCREEN

1. Eachinsulationhaveaninsulationscreenintwopartsconsistingof:

2. Nonmetallicsemiconductingcompoundtapepartandametallicscreenpart.

3. The nonmetallic part shall be directly applied upon the insulation of each core and may
consist of an extruded semiconducting material extruded simultaneously with the
conductorscreenandinsulation(tripleextrusion).

4. Thesemiconductor shallbe readily strippable and must not be bonded in such a manner
thatithastobeshavedorscrapedtoremove.

5. Themetallicpartshallconsistofacoppertapehelicalappliedwitha10%overlap.Abinder
tapeofcoppershallbeappliedoverthecopperwiremetallicscreen.

8) LAYINGUP

1. The cores shall be identified on the nonmetallic part of the insulation screen by legible
printingonthelengthofeachconductoror,bytheinclusionofamarkertape.

2. Thecoresshallbelaidupwitharighthanddirectionoflay.

3. Nocablesshallbedirectlyburiedintheground.Theyshallbelaidintrenches,trays,racks
orinconduitsorpipes.Thecablesofdifferentvoltagegradeshallbelaidindifferenttrays.2
mtrlooptobeprovidedonboththesides.

Page24
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

Bindertape/Moisturebarrier:

4. During lay up, a suitable open spiral binder may be applied, at the manufacturers
discretion,beforetheapplicationofanextrudedinnercovering.

9) FILLERS

1. FillersshallbePVC.

10) INNERCOVERING/SHEATH

1. The inner covering shall be extruded over the laid up cores to form compact and circular
beddingforthemetalliclayer.

11) METALLICLAYER

1. Themetalliclayershallbegalvanizedsteelwire.

12) OUTERSHEATH

1. Thetoughoutersheath,blackcolouredbestresistingPVCpolyethylenecompoundtypeST2
as per IS : 5831 for the operating temperature of the cable shall be provided over the
armourasspecifiedinrelevantstandardsbyextrusionprocess.

13) CABLEMARKING

Embossingonoutersheath:

1. ThePVCoutersheathshallbelegiblyembossedwiththelegend:ELECTRICCABLE11000
VOLTetc.

2. The letter and figures shall be raised and shall consist of upright block characters. The
maximum size of the characters shall be 13 mm. And the minimum size 15% of the cable
circumference or 3 mm. whichever be the greater. The gap between the end of one set of
embossedcharactersasaboveandthebeginningofthenextshallnotexceed150mm.

IdentificationofManufacturerandyearofmanufacture:

3. An identification of the manufacturer, the year of manufacturing, cable size shall be


embossed at regular intervals on the PVC outer sheath. This shall not affect the spacing
betweenrepetitionsofthelegendasgivenabove.

14) SEALINGANDDRUMMING
1. Aftertestsatthemanufacturersworks,bothendsofthecableshallbesealedtopreventthe
ingressofmoistureduringtransportationandstorage.

2. Cable shall be supplied in lengths of 500 mtrs. or as required in nonreturnable drums of


sufficientlysturdyconstruction.

3. Thespindleholeshallbe110mm.minimumdiameter.

4. Eachdrumshallbearontheoutsideflange,legiblyandindeliblyintheEnglishlanguage,a
distinguishing number, the manufacturers name and particulars of the cable viz. voltage,

Page25
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

length, conductor size, cable type, insulation type and gross weight shall also be clearly
visible.Thedirectionforrollingshallbeindicatedbyanarrow.
15) TESTING
1. Type tests and Routine tests shall be carried out in accordance with the relevant IEC
standards / IS.Thecopiesof routinetestresultsshallbesubmittedalongwitheach drum
lengthorpartthereof.

16) TRANSPORTATION&DELIVERY
1. Thecableshallbesuppliedintheactuallengthasperjointmeasurementatsite.

2. Thecableshallbedispatchedatclientsstoreoratsiteasperdetailedinstructionsgivenby
Clientatlaterstage.

3. Thecables shallbe loaded from the main vendorsstore, transported,unloaded atClients
storesandproperlystockedasperinstructionofclientslocalrepresentative.

TECHNICALDATASHEETFORH.T.XLPECABLE:

Sr.No. Particulars Description

1.0 ENVIRONMENTDETAILS
1.1 AmbientTempInDegreeCelsius 50DegreeCelsius
1.2 GroundTempInDegreeCelsius 35DegreeCelsius
1.3 RelativeHumidity 90%At35DegreeCelsius
1.4 Altitude <1000MeterAboveMSL
1.5 Atmosphere NonCorrosive,HumidandDusty
1.0 SYSTEMDETAILS
ASPERTENDER
1.1 SystemVoltage
ASPERTENDER
1.2 SystemFrequency
ASPERTENDER
1.3 Grounding
ASPERTENDER
1.4 FaultLevel
ASPERTENDER
1.0 CABLE
1.1 No.ofCores 3(Three)
1.2 CABLECONDUCTOR
1.1.1 SizeOfConductor AsperBOM
1.1.2 Material HighPurityAluminium
1.1.3 Construction Stranded
1.1.4 Shape CompactedCircular
1.1.5 ConfirmingTo Is8130
1.3 ConductorScreen ExtrudedSemiconductingMaterial
1.4 CONDUCTORINSULATION
1.4.1 Material High Purity Void And Moisture Free Cross

Page26
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

Sr.No. Particulars Description


Linked Polyethylene (XLPE) Using Gas Curing
Process
1.4.2 Thickness >=5.5mm
1.5 INSULATIONSCREEN EXTRUDED SEMICONDUCTING MATERIAL
HAVINGCOPPERTAPEOVERIT
1.6 COREIDENTIFICATIONTAPE YesRequired
1.7 CORELAYING RightHandDirection
1.8 INNERSHEATH/COVER Extruded
1.9 ARMOURING
1.9.1 Material FlatSteelGIStrip
1.9.2 NoOfStrip 4
1.9.3 SizeOfStrip 0.8mm
1.10 OUTERSHEATH
1.10.1 Material PVC
1.10.2 Type St2AsPerIs58311984
1.10.3 Thickness >=1.4Mm
1.10.4 Colour Black
1.11 MARKINGONOUTERSHEATH YES
1.11.1 VoltageGrade Yes
1.11.2 No.ofCores/SizeofConductor/ Yes
MaterialofConductor
1.11.3 TypeOfInsulation Yes
1.11.4 DetailsAboutArmour Yes
1.11.5 DetailsOfStandards Yes
1.11.6 YearOfManufacturer Yes
1.11.7 AnyOtherDetails Yes
4.0 TESTING
4.1 TypeTestAsPerIs CertificateToBeProvidedforeachdrum
4.2 RoutineTestAsPerIs YesToBeWitnessedByClient
4.3 AcceptanceTest YesToBeWitnessedByClient
5.0 CABLEDRUM NonReturnable
5.1 Material Wooden/Steel
5.2 MarkingOnCableDrum AsPerManufacturer'sStandard

17) MODEOFMEASUREMENTS
1. The cables will be measured in meters. The unit rate shall include cutting the cable into
required lengths, packing, loading, unloading, insurance, transportation, delivery to

Page27
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

stores/siteasperworkorder,stockinginstores,testingofcablesatstoresetc.ofmedium
voltagecable.Totalquantityinmetersshallbemeasuredlugtolugbasis.

4 TECHNICALSPECIFICATIONFORDRYTYPETRANSFORMER

RESINIMPERGNATEDDRYTYPETRANSFORMER

1) SCOPEOFWORK

CoversthegeneralrequirementsfortheDesign,manufacture,testingandsupplyofindoorCAST
RESINDRYTYPETRANSFORMERincludinginstallation,testingandcommissioningatsite.(having
generalrequirementslistedinthefollowingparagraphs).Thisspecificationisaccompaniedbythe
transformerdatasheet.

2) CODES&STANDARDS

The dry type transformer shall comply with the applicable clauses of the latest editions of the
followingstandards.Incaseofanyconflict,therequirementsofthesestandardsshallprevail.

Sr. Item RelevantIS RelevantIEC

1 Powertransformer IS2026 IEC726

2 Drytypetransformer IS11171

3 Fittings&Accessories IS3639

4 Classification of Insulating IS2026


Materials

5 Bushings IS8603 IEC144

6 DegreeofProtection IS2147 IEC76

7 Testing, Tolerances on IS2026 IEC726


guaranteedParticulars

3) DESIGNBASIS&SITECONDITIONS

TECHNICALREQUIREMENTS

GENERALCONSTRUCTIONALFEATURES

The Transformer shall be resin impregnated dry type. Air Natural cooled suitable for indoor
installation.Thisshallbeprovidedwithweldedsheetsteel,freestandingenclosureswithexpanded
metalscreensofsuitablesizeorlouversbackedbywiremesh.Transformerandupperbodyshall
besuitablyreinforcedtopreventdistortionduringhandling.Basechannelsshallbeprovidedwith
skidsandpullingeyestofacilitatehandling.

Allthefastenersandboltsshallbehotdipgalvanizedorzincpassivated.

The Transformer shall be double wound core type with cold rolled grain oriented silicon steel
laminationsperfectlyinsulatedandclampedtominimizevibrationsandnoise.Corefasteningbolts
shall be insulated to reduce losses and avoid hot spots. All parts of the magnetic circuit shall be
effectivelyconnectedtoearthsystem.

Page28
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

Thewindingshallbeofcopperandshallbedesignedforfullloadcurrenttowithstandthethermal
and electromagnetic stresses arising due to maximum fault level. The current carrying winding
jointsshallbeelectricallybrazed.

ThewindingsshallbeprovidedwithClassFinsulationtemperature1400C.(Asapplicabletoresin
impregnateddrytypetransformersasperIS11171partIIfordrytypepowertransformers.

Thetransformershallbedesignedwithparticularregardstosuppressionofharmonicvoltages.

4) TERMINALSANDMARSHALLINGBOX

Windingshallbebroughtoutandterminatedonoutdoorbushing,cableboxesorbusductchamber
whichwillbelocatedasspecifiedondatasheet.

Cable boxes shall be supplied with cable lugs and glands. H.T. cable box shall be suitably
dimensionedtoacceptterminationsofXLPEcablespecifiedindatasheet.

The H.V./L.V. terminal boxes shall be located on the side/top respectively and at right angle or
oppositetoeachotherasspecifiedinthedatasheet.Suitableflangeshallbeprovidedforbusduct
onLVsidewherespecifiedintheDatasheet.

ForL.T.PVCcontrolcablescompressionglandsshallbesupplied.Glandplateshallberemovable
type.Forsinglecorecables,glandplateshallbeofnonmagneticmaterial.Suchcableboxesshall
havearrangementsforgroundingthearmourorunrmouredcables.

Cablelugsshallbenonsolderingcrimpingtype.

Terminal chamber for bus duct termination shall have a gasketted cover plate bolted to it. A
separatecoverplateshallbeprovidedtofacilitatetheconnectionandinspection.Phasesequence
ofbusbarshallbeasspecifiedinMRordatasheet.

Marshallingboxshallbeweathertight.AllprospectivedevicesandneutralCTsshallbewiredby
meansofPVCinsulatedarmouredcableuptomarshallingbox.TerminalsshallbeElmextypeor
approvedequal.Removableglandplatewithcompressiontypecableglandsshallbeasdescribed
earlier.
FortransformershavingprovisionsforterminatingTPNbusducton433Vsideneutralofthestar
connectedsecondarywindingshallbebroughtouttoasecondaryterminalchamber.A.C.T.shallbe
mounted(ifspecified)ontheneutralterminalwithC.T.Secondarywireduptomarshallingbox.

5) TAPSANDTAPCHANGEGEAR

TapingsshallbeOnLoad/OffLoad(whereeverapplicableasmentionindatasheets)andbrought
out from HV winding and terminated in an external motor operated tap switch with position
indicator.Transformeroutputshallremainunaffectedforanytapposition.

6) ONLOADTAPCHANGEGEAR(ASAPPLICABLEASPERTENDERBOQDESCRIPTION)

The tap changers shall be of ON circuit type mechanically rugged and arranged to provide for
convenientinspectionandmaintenancewithoutnecessityforuntanking.

The position indicators shall be positive and there shall not be any ambiguity resulting into
incompletetapchangewithrespecttothemechanicaltappositionindication.

Theoperatinghandleoftapexchangershallbebroughtoutofthetankatthesideatanaccessible
heightfromgroundlevel.

Page29
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

Tapchangeroperatingswitchmountedonthetopofthetransformertankswillnotbeacceptable.

Provision of padlocking the tap changers without interfering with visual tap position indicator
shallbeprovided.

7) LOSSES.

Bidswillbeevaluatedbasedontheformulafurnished.

ForthepurposeofevaluationofBids,thequotedloadlossesandironlossesshallbeincreasedto
takeintoconsiderationtoleranceaspermittedbyapplicablestandards.

Incaseofnonachievabilityofthelossesatthetimeoftesting,thecontractorshallbepenalizedat
therateofRs.298308.97perKWforironlosses&Rs.184951.5perKWforCuloss(asperCBIP).

8) REJECTION

The client may reject any transformer if during tests or service any of the following conditions
arise:

Noloadlossexceedstheguaranteedvalueby20%ormore.

Loadlossexceedstheguaranteedvalueby20%ormore.

Impedancevalueexceedstheguaranteedvalueby+or10%ormore.

Impedancevalueexceedstheguaranteedvalueby+or10%ormore

Thedifferenceinimpedancevaluesofanytwophasesduringsinglephaseshortcircuitimpedance
testexceeds2percentoftheaveragevalueguaranteedbytheBIDDER

Windingtemperatureriseexceedsthespecifiedvalueby5Deg.Cent.

Transformerfailsonimpulsetest.
Transformerfailsonpowerfrequencyvoltagewithstandtest.

Transformerisprovedtohavebeenmanufacturednotinaccordancewithagreedspecification.

Theclientreservestherighttoretaintherejectedtransformerandtakeitintoserviceuntilthe
BIDDERreplace,atnoextracost,thedefectivetransformerbyanewtransformer.Alternatively,
theBIDDERshallrepairorthereplacethetransformerwithinareasonableperiodtothe
clientsatisfactionatnoextracost.

9) LOADINGCAPABILITY

ContinuousoperationatratedKVAonanytapwithvoltagevariationof10%correspondingtothe
voltageofthetapaswellasinaccordancewithIEC354.

10) FLUXDENSITY

Nottoexceed1.9teslaatanytappositionwith10%voltagevariationfromvoltagecorresponding
to the tap. Transformer shall also withstand following over fluxing conditions due to combined
voltageandfrequencyfluctuations.

1. 10%forcontinuousrating

Page30
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

2. 25%foratleastoneminute

3. 40%foratleastfiveseconds
11) NOISE

Noise level shall be between 57 DB to 66 DB depending on the rating of transformers as per
IEEE141

ACCESSARIES
Accessories as specified in the attached data sheet shall be included in the scope of supply.
TappingsandcontrolgearsshallbeprovidedontheH.V.side.Tapchangershallbeasspecifiedin
data sheet. The tap changing equipment shall be suitable for carrying the fault current under
conditionofexternalorinternalfaults.

1. Windingtemperatureindicator(WTI)shallbePlatinumresistancetypetemperature
detectorineachlimb

2. Thermistorsshallbeembeddedineachlimbwithalarmandtripcontactsforremote
annunciation.
12) PAINTING

Allmetalpartsshallbethoroughlycleanedtoremoverust,scale,greaseetc.andpaintedwithtwo
coatsofapprovedcolourshadeoveronecoatofrustresistingprimer.

The paint shall not scaleoff crinkle or removed due to normal handling. All metal surfaces not
accessibleforpaintingshallbemadeorcorrosionresistantmaterial.

13) RATINGPLATEDETAILS

EachtransformershallbeprovidedwitharatingplategivingthedetailsasperIS:2026(Pt.I).The
markingshallbeindelibleandthe ratingplateshallbelocated onthe fronttheside.Exactvalue
Transformer%impedance,asdeterminedduringtestsshallbemarkedonitandalsoonthefinal
submissionofnameplatedrawing.

14) DRAWINGS&INFORMATION

ALONGWITHOFFER
ThebiddershallsubmitcompletelyfilleddatasheetasperthegivenformatalongwithGAdrawing
indicatinglistofaccessories.
SubmitlistofsparepartsrequiredforsafeoperationofequipmentforTwoyears.

15) HANDINGOVERDOCUMENTS
Thesuppliershallsubmitfollowing:

1. GAdrawing

2. HV/LVCableBox

3. Foundationlayout

4. RatingandDiagramPlate

5. Datasheetindicatingresultsoftests

Page31
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

6. Testreports

7. O&Mmanuals
16) INSPECTIONANDTESTING

Purchaser'srepresentativeshallbegivenfreeaccessintheworksfromtimetotimeforstagewise
inspectionandprogressreporting.

ThefollowingroutineandtypetestshallbeperformedonthetransformersasperIS2026inthe
presence of purchaser's representative and certified test reports submitted. About three week's
noticeshallbegiventothepurchasertowitnessthetestsatthevendor'sworks.

17) ROUTINETEST

The routine tests, including but not limited to the following shall be performed on each of the
transformers,aspertherelevantstandards

Measurementofwindingresistance

Measurementofvoltageratioandcheckofvoltagevectorrelationship

Measurementofimpedancevoltage/shortcircuitimpedance,loadlossandNoloadloss

18) TYPETEST

TypetestasindicatedinIS:2026shallbeconductedonthetransformers.Onetransformerofeach
ratingshallbesubjectedtoheatruntestsifspecified.

19) TRANSFORMERSRATEDFORUPTO2MVA

TheContractorshallsubmitforClientsapprovalthereportsofallthetypetestsaslistedinthis
specification and carried out within last five years from the date of bid opening. These reports
shouldbeforthetestsconductedontheequipmentsimilartothoseproposedtobesuppliedunder
thiscontractand the test(s)shouldhavebeeneitherconductedatanindependentlaboratory or
shouldhavebeenwitnessedbyaclient.IncasetheContractor isnotabletosubmitreportofthe
typetest(s)conductedwithinlastfiveyearsfromthedateof bidopening,orincasethetypetest
report(s)arenotfoundtobemeetingthespecificationrequirements,theContractorshallconduct
allsuchtestsunderthiscontractfreeofcosttotheClientandsubmitthereportsforapproval.

20) LISTOFTYPETESTS
1. Shortcircuittest

2. Temp.risetest

3. Lightningimpulsevoltagetestonallthreelimbs

4. Partialdischargetestondrytypetransformers

5. TankPressuretestonoilfilledtransformers

6. TankvacuumTestonoilfilledtransformers

Page32
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

7. Noiselevel

8. Degreeofprotectiontestformarshallingbox

9. ZerosequenceImpedance


21) METHODOFMEASUREMENT

Supply of the transformer including transport to site, loading and unloading at site store or
directly to the place of installed etc. as specified will be treated as one unit for measurement
and payment.

22) TRANSPORT,DELIVERYANDSTORAGE

ThepricesshallbeF.O.R.sitebasisincludingpacking&forwardingcharges.Thequotedpricemust
includeallthecostsfornecessarymodeoftransportationuptothefinallocationoftransformeror
site store. All incidental expenses during transportation shall be part of quoted prices including
transitinsurance.Thechargesforloadingandunloadingofequipmentsatsiteshouldformpartof
offer.

Thetransportationforanyauxiliaryitemordetachablepartofequipmentshouldbesimultaneous
andcarrynecessaryinstructionsforassemblingandstoragerequirements.
23) GUARANTEEANDWARRENTY
Thequotesvaluesofparametersshallbewithingiventoleranceforgivenperiodofservicelife.
24) SPARES
Thebiddershallquoteforminimumsparesrequiredfortwoyearssafeoperationoftransformer
alongwiththeofferseparately.
25) MAKEOFCOMPONENTS
The bidder should indicate the list of manufactures for bought out items. The client /Consultant
reservetherighttoselectorchangethemakeofmaterialfromthesubmittedlist.

DATASHEET

SR. PARTICULAR DETAILS


1.0 GENERALFEATURES
1.1 Make AsperMakeListofPIU
1.2 Installation Indoor
1.3 Service Continuous
1.4 Climate Tropical
1.5 Typeofcooling Airnatural
1.7 Allowabletemperaturerise Winding 55deg.c.
1.8 Painting Epoxy,shadeno.631asperIS:5
1.9 Position Floormounted
2.0 ELECTRICALDATA:
2.1 Earthing:
L.V.side Solid
2.2 No.ofwindings Two
2.3 Phase 3
2.4 Frequency 50Hz.
2.5 Voltageratio 11/0.433V

Page33
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

SR. PARTICULAR DETAILS


2.6 Phaseconnection Delta Star
2.7 Vectorgroup Dyn 11
2.8 %impedence Max.5.0%withoutIStolerance
2.9 RatinginKVA 750KVA&500KVA
2.10 Windinginsulationclass "F"
2.11 Terminations:
2.11.1 H.V.side Cablebox
HV&LVseparation:180Degree Size:1No.,3cx240mm.ALHTXLP
(E)CABLE.

2.11.2 L.V.side Size : 4 No., 3.5 c x 400 mm. AL L
XLPE(E)CABLE
3.0 TAPCHANGER:
3.1 Tapings H.V.
3.2 Tapchanger ONload
3.3 Tappingrange +5to10%
3.4 No.ofsteps instepsof1.25%
4.0 Limit for transformer operation under oveRequired
loadconditionasperIS
5.0 ACCESSORIES:
5.1 1. Marshallingbox Required
2. Samplingvalve Required
3. Bidirectionalrollers
4. DoublediaphragmExplosionvent Required
5. Silicagelbreather
6. Airreleaseplug
5.2 1. Separateneutralbushing Required
2. Jackingpads
3. Liftinglug Required
4. Earthingterminal
5. 1 set of detachable radiator wit
shutoffvalve(above1000kva)
6. Winding temp. indicator with alar Required
&tripcontacts(above500kva)
7. Ratinganddiagramplate
HV&LVglands Required
6.0 PERFORMANCEDATA:
6.1 RatedguaranteedloseswithoutIStolerance
6.1.1 Noloadat100%voltage Required
6.1.2 Noloadat110%voltage Required
6.1.36 FullloadCu.Loss Required
6.2 RatedNoloadcurrent Required
6.2.1 Noloadat100%voltage
6.3 Ratedefficiencyat0.8P.F. Required
6.3.1 Atfullload
6.3.2 At75%load
6.3.3 At50%load
6.4 Ratedregulation Required
6.4.1 At0.9P.F.lag
6.4.2 At0.8P.F.lag
6.4.3 AtunityP.F.
6.5 Impedancevoltage Required
6.5.1 PrimarySecondary

Page34
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

SR. PARTICULAR DETAILS


6.6 Loadatwhichmax.efficiencyoccurs Required
6.7 Maximumefficiency Required
6.8 Maximumfluxdensity Required
6.9 Currentdensity Required
7.0 MECHANICALDATA: Required
7.1 Weight: Required
7.1.1 Core&windings
7.1.2 Oil(Weight&QtyinLiters)
7.1.3 Total
7.2 Dimensions(mm.): Required
(Dimensions should beconsideredincluding a
accessories)

5 TECHNICALSPECIFICATIONFORDIESELGENERATORSET.

1) SCOPE:

1. Thisspecificationcoversthedesign,constructionfeatures,manufactureandperformanceof
emergency diesel generator. The scope includes supply, installation, testing and
commissioning of D.G. set along with fuel pipeline, residence type exhaust pipe insulation
andalltheaccessoriesrequiredfortroublefreeoperation.

2) CODESANDSTANDARDS:

TheDGsetshallmeettherequirementsofthefollowingstandardsandrules:

IS:2253 Designation for type of construction and mounting arrangement of


rotatingelectricalmachines.

IS:4691 Degree of protection providing by enclosures of rotating electrical
machinery.

IS:4728 Terminalmarkingofrotatingelectricalmachines.

IS:7132 Guidefortesting3PhaseSynchronousMachines.

IS:5422 Turbinetypegenerators.

IS:4889 Methodsofdeterminationofefficiencyofrotatingelectricalmachines.

IS:1271 Insulating materialsforElectric machinery andapparatusinrelationto
theirthermalstabilityservice,classification.

IS:4722 Specificationforrotatingelectricalmachines.

IS:13947 ACcircuitbreakers.

3) DESIGNCONDITIONS:

All equipment and materials will be selected and rated for use at the following site
conditions.

Summeroutdoordesigntemperature 50C.
Surfacetemperature 80C.

Page35
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

RelativeHumidity 95%Max.

CONSTRUCTION

4) GENERAL:

1. Thedieselengineofferedshallbeoftheregularproductionmodelsofthemanufacturerfor
industrialapplicationsandalreadytypetestedeitheratthemanufacturersworksoroutside.
Thetypetestreportshallbefurnishedtothepurchaserforhisreviewifsodesired.

2. Incasetheproposedenginemodelhasnotbeentypetested,vendorshallfurnishwiththe
offer,areferencelistofitsexistingindustrialinstallationandatleastthreeoftheseengines
shouldhavecompleted,5000hoursofrunningatsite.

3. Unlessotherwisespecifiedintheequipmentdatasheets,thedieselengineshallbeprovided
withclassA1governingasperthelatesteditionofB.S.5514.

4. The Cyclic irregularity of the diesel engine for direct coupling to an electric generator,
angulardeviationofA.C.generatorsgivenbydieselengineforparalleloperation,andthe
engine governor speed droop characteristics, shall be restricted to the values specified
underthelatesteditionofB.S.5514.

5. Thevendorshallberesponsibleforcarryingouttorsionalanalysisofthedynamicsystemas
specifiedinthelatesteditionofBritishStandard5514.Theresultsintheformofareport
shallbesubmittedtothepurchaserforscrutinyandreference,ifdesired.

6. Vendorshallprovidetheflexibleexhaustconnectionstoconnecttheengineexhausttothe
exhaust piping. The required size of the exhaust piping should be clearly specified by the
vendor.

7. Thecommonbaseplateformountingthedieselengineandthedrivenequipmentaswellas
theflexiblecoupling,shallbesuppliedbythevendor.

8. Vendor shall indicate in the bid, the IS Noise Level rating of the diesel engine with the
offeredexhaustsilencer,whichshouldnotexceedmorethan75dbat1Mtr.distance.

5) ENGINESTARTING:

1. Dieselenginesshallbecapableofstartingwithouttheuseof coldstartingaidssolongthe
ambienttemperatureatthesiteisnotbelow4c.

2. Wherethedieselengineisspecified/offeredwithbatterystartingarrangement,thestarter
motor shall be capable of starting the engine without having to disengage the driven
machinewiththehelpofaclutch.Wherethedieselengineisequippedwithadualstarter
thesynchronizingswitchandthecorrespondingwiring/connectionwiththestartermotor
shallbeprovidedbythevendor.

3. Incaseofdieselenginesdrivingtheenginemountedbatterychargingalternator,theVendor
shallalsoprovideBattery,automaticElectronicsfloat&boosttypebatterychargersuitable
fortakingpowerfromsupplyauthorityspowersourceandmountedonafreestandingtype
ofapanel.

4. Thebatterychargerasspecifiedintheequipmentdatasheet,shallbecapableofdeliveringa
currentequalto100%ofthe20hourdischargerateofthebatteryandalsoequippedwith
chargingrateselectordevice.

Page36
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

5. Asspecified inthedata sheets,the dieselengine isrequiredtostart/stopautomatically,


thevendorshallprovidethenecessarycontrols(automaticcummanual)intheengine
panelandtheinterconnectingwiringandpipingfromthepaneltotheengineandstarting
equipment.Apilotlampshallbeprovidedinthelinesideofthestartingequipmentcircuit
toindicatethatthecontrollerisintheautomaticposition.Intheeventtheenginedoesnot
startafterthreeattemptshavebeenmade,thecontrollershallstopallfurthercrankingand
operatethe audiovisualalarm.Shaftdrivenlubricationsystemisacceptable, alternatively
D.C.motordrivenlubricationpumpwithtimersuitablyinterlockedwiththestartingsystem
isaccetable.

6) ENGINECOOLING:

1. Vendorshallsupplyradiatorbasedcoolingsystem.

7) ENGINEFUELSYSTEM:

1. Enginefuelsystemshallbecompleteinallrespectsbutnotlimitedtofollowing:

2. Thedailyservicefueltankcapacity990litersshallbeequippedwithshieldedlevelgauge,
strainer and a hand hole of not less than 150mm diameter, besides the required fuel
connectionsandadrainplug.Onetanksofsuitablecapacitytobeprovided.

3. Theinsidesurfacesofthefueltankandthefloattankshallbecoated withEnamelRedor
Black of I.C.I. or its equivalent and the outside surface to be given two coats of the oil
resistant primer paint. The fuel tank shall be hydrostatically tested at a pressure not less
than0.35Kg./Cm.

4. Fueloiltransferpumptotransferoilfrombarrelstodaytankshallalsobeprovided.

5. Allpiping,valves,fittingsandsupportsinsideD.G.houseshallbepartofsupply.

8) INSPECTION&TESTING:

1. The vendor shall have the responsibility of providing purchasers representative with all
requisitefacilities/equipmentforcarryingoutsatisfactorytesting.

2. Thedieselenginesshallbetestedinthepresenceofpurchasersrepresentativeaccordance
with latest edition of B.S. 5514 or any other equipment standard as agreed to with the
purchaserbeforethefinalizationoforder.

3. Theroutineloadandfuelconsumptiontestshallbeofthe4hours.

4. Unlessotherwisespecified,10%overloadprovisionshallbekeptwhilesettingthefuellimit
forthesiterunning.

5. The engine control panel/s after assembly and wiring, shall be functionally tested in the
presenceoftheclients/consultantsrepresentative.

9) ALTERNATOR:

1. Thisspecificationdefinetherequirementsofdesign,manufacture,testingandsupplyofself
excited emergency generator complete with automatic voltage regulator, control panel,
isolatorandotheraccessoriesasspecifiedinthematerialrequisition.

2. Unlessotherwisespecifiedtheemergencygeneratorshallbesuppliedcompletewith:

Page37
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

2.1 BrushlessexcitationsystemcompletewithAVR.
2.2 Electricpanelincludingcontrolcubicleandassociatedauxiliarydevices,relaypaneland
generatorbreaker/isolator,batteryandbatterycharger.
2.3 Air inlet and outlet for generator cooling (inlet shall be oriented to suit total plant
layout).
2.4 Liftingarrangementforthemachine.
2.5 Foundation frame complete with foundation bolts to install alongwith engine on
commonbaseframe.
2.6 Lub.oilsystemintegralwiththeprimemoverlub.oilsystem.
2.7 Sparesforcommissioning.
2.8 Sparesfortwoyearsofoperationandmaintenance.
2.9 Anyotherpart/accessoriesnotspecificallymentionedabovebutconsiderednecessary
forsafeandreliableoperation.

10) DESIGNANDCONSTRUCTION:

1. Thealternatordesignshallmeettherequirementspecifiedindatasheetandshallbe
suitableforthesiteconditionsspecifiedtherein.

1.1 Thealternatorshallbemountedonacommonbaseframetogetherwiththerimemover
unless otherwise agreed. The generator shall be provided with necessary lifting hooks
andtwoearthterminalsforconnectiontomainearthgrid.

1.2 ThealternatorwindingshallbeclassFinsulationwithtemperaturelimitationtoClass
"B".

1.3 The stator windings shall be brought out to six insulated terminals in two separate
terminalboxes.Thealternatorshall,therefore,beprovidedwiththreeseparateterminal
boxes i.e. for the line and neutral stator connection and for control connection. The
terminal box for the line terminal shall have 40 % free space and each segregated for
easycableendconnectionofcablesizespecifiedindatasheet.Theneutralboxshallin
additiontothespaceforneutralearthingcableshallhavesufficientroomforthecurrent
transformersusedfortheprotectionofthegenerator.Starconnectionshallbeformedin
the neutral side of terminal box. The terminal box for control cable shall contain
properly marked terminals for all internal equipments e.g. embedded temp. detectors
etc.Allterminalsshallbestudtype.Theterminalboxesshallbecompletewithlugsand
doublecompressiontypecableglands.Currenttransformersshallbeasspecifiedindata
sheet.

1.4 All parts and accessories shall be suitable to withstand stresses due to over speed /
overload/shortcircuitconditionsspecified.

1.5 Bearings shall be double shielded and prelubricated. Grease in the bearing enclosure
shall provide additional lubrication to bearings as well as provide sealing against dust
andmoisture.Onlinegreasingfacilitywithexcessgreaseexpulsionsystemshallalsobe
provided.

1.6 Thealternatorshallbeaircooledunlessotherwiseagreed,alternatorenclosureshallbe
asspecifiedindatasheet.

1.7 Thedirectionofrotationoftherotorofthemachineshallbecompatiblewiththatofthe
primemover.Aclearindicationofthedirectionofrotationshallbegivenoneitherend
ofthemachine.

Page38
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

1.8 Field winding shall have class H insulation with excellent electrical and mechanical
properties. The field winding shall be capable of operating at a field voltage with
Exitation capacity Emax / En = 1.6 for at least two minute to meet improved stability
requirements.

1.9 A rating plate of S.S material shall be fixed on the generator frame and shall give the
followinginformation:

1.9.1 Manufacturersname.
1.9.2 SerialNumber,Typeandframereference
1.9.3 RatedoutputinKVA&KW
1.9.4 Ratedpowerfactor,frequencyandvoltage
1.9.5 RatedstatorcurrentandspeedinRev./Min.
1.9.6 Classofinsulation
1.9.7 Phaserotation(CWorCCW)
1.9.8 Customersindentno.
1.9.9 Yearofmanufacture
1.9.10 WeightofrotorandstatorinKg.

11) EXCITATIONSYSTEM:

1. Thegeneratorshallbeprovidedwithbrushlesstypesolidstateexcitationsystem.Thefield
oftheexcitershallbeeitherpermanentmagnettypeorexternallyexcitedthroughexternal
power, transformer and AVR. AC voltage generated in the exciter shall be rectified by the
rotaryrectifierassemblyandfeedpowertothemainfieldcircuitsofthegenerator.

1.1 Theexcitercapacityshallbeatleast20%morethanthemaximumrequirementatany
time.TheexciterwindingshallbeinsulatedwithclassFinsulation.

1.2 Automatic solid state voltage shall be provided with the following features as a
minimum.
Shortcircuitprotection.
Manualvoltagecontrolswitchwithadjuster.
Crosscurrentcompensationforparalleloperation.
Voltagebuildupcircuitry.
Statorcurrentlimiter.
Fieldcurrentlimiter.

The current and potential transformers required to feed the AVR from the generator
terminalshallbeadequatelyrated.

12) SYSTEMOPERATION:

1. Theemergencygeneratorsetshallnormallybeinanunattended area.Thecontrolsystem
shalloperateinfailsafemodeandshallincludeallcontrolsandprotectionnecessaryforthe
safeoperationofthepackage.Thegeneratorsetshallfunctionasperoneof the following
schemes:
o Manualstartinservicemode.
o Manualtestmode.

13) PAINTING,PACKINGANDTRANSPORT:

1. Allmetalsurfacesshallbethoroughlycleanedofscale,rustandgreaseetc.Priortopainting.
Cleaned surfaces shall be given two coats of primer and prepared for final painting. Final
finishshallbefreefromallsortsofblemishes.

Page39
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

2. The equipment shall be shipped to site suitably packed to prevent any damage. Each
package shall have labels to show purchasers name, purchase order and equipment no.
suitableliftinglugs etc. shall beprovided and lifting pointsshall beclearly marked on the
package.Packingshallbesuitableforstorageatsiteforaminimumperiodof6months.

14) TESTSANDINSPECTION:

1. The owner or his authorised representative may visit the works during manufacture of
equipment to assess the progress of work as well as to ascertain that only quality raw
materialsareusedforthesame.Heshallbegivenallassistancetocarryouttheinspection.

2. Detailed test procedure alongwith the facilities available at vendors works shall be
furnished along with the bid Owners representative shall be given minimum four weeks
advance notice for witnessing the final testing. Test certificates including test records and
performancecurvesetc.shallbefurnishedforthecompleteD.G.,individualtestcertificates
ofengine/alternator/commonpanelshouldbesubmitted,onlythereaftercompleteD.G.
wouldbetested.

15) TESTS:

1. Equipmentshallbetestedtoconformtotheappropriatestandardsandthefollowingtests
shallbeconductedinthepresenceofpurchasers:
2. Functional tests, continuity tests and high voltage test on control panel to establish the
performancecalledforinthespecification.
3. Powerfrequencyvoltagetestonswitchgearandmechanical/electricaloperationalcheck.
4. RoutinetestsforalternatorasperIS:4721.
5. Overspeedtest(1.2timestheratedspeedfor2minutes.)
6. Transientresponsetestsforsudden applicationandrejectionofloadsof25%,50%,75%
and100%ofratedcapacity.
7. Phasesequencetest.
8. Vibrationtest.
9. Noiseleveltest.
10. Dimensionalandalignmenttest.
11. Wavefromtest.

Page40
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

DATASHEETFORDIESELGENERATORSET

SR. PARTICULARS REQUIREDDATA
NO.
1.0 Primemover DieselEngine
1.0 Quantityrequired ASPERTENDER

1.0 Service Primemoverforgeneratingset


4.0 Rating ASPERTENDER
5.0 RPM ASPERTENDER
6.0 Voltage ASPERTENDER
7.0 Voltagevariation/regulation 1%orless
Steadystateslowvariation
Inload(0.0%to100%atP.F.0.8)
8.0 Voltage deep (sudden load application 0.0% 5%,recoverytime 0.25sec.
to100%atP.F.0.8)
9.0 Frequency 50Hz.
10.0 Frequencyvariation/regulation 0.5Hz.
11.0 Temperaturerise Class'F'usedasClass'B'
11.0 AlternatorInsulationMaterial VPIInsulationpreferred
11.0 Flywheel Required
14.0 Vibrationdamper Required(fluidtypeonly)
15.0 Fuelpumpaircleaner Required
16.0 Fuelpump Required
17.0 Oilfilter,fuelfilteretc. Required
18.0 Luboilpump Required
19.0 24VDCelectricalsystemconsisting ofSMF Required
leadacidbatterysetandsuitable
charger
20.0 Safetycontrols Required
21.0 ResidentialtypeSilencer Required
21.0 AcousticHood Required
21.0 AMFpanelwithMCCB Required
24.0 Coupling Required
25.0 Instrumentpanelconsistof Required
a)Starterswitchwithkey Required
b)Luboiltemp.gauge Required
c)Watertemp.gauge Required
d)Luboilpressuregauge Required
e)TachocumHourmeter Required
Required
26.0 Fueltank Required(Capacity990LitresMax.)
27.0 Batterycharger Required(Electronicsfloat&boosttype)
28.0 Enginetesting Required
a)Atshop
b)Atsite
28.0 Toolkits Required
29.0 Literature(Twosetseach)
a)Operation&maintenancemanual Required
b)Partscatalogue/list Required


Page41
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

16) Note:

1. TheengineH.P.shouldbeselectedsoastoachieverequired KWratingtobegeneratedat
siteconditionandderatedconsideringtemperatureinsideacousticenclosure..
2. D.G.setshouldbeabletostartbypushbuttonAMFrelay,orremotecommand.
3. TheenginetestshallbewitnessedbytheOWNERsrepresentative.
4. The engine should have automatic belt tensioning arrangement for battery charging
alternatorsystem.
5. Theengineshouldhavefacilityfortheindicationofoillevelinoilsumpduringrunningof
theengine.
6. Thenoiselevelshouldnotbemorethan75dbat1Mtr.distanceandengineexhaustsmoke
emissionlevelshouldbelessthan1bosch.
7. Engine should be preferably from the engine manufacturers who maintain quality
assurancetointernationalstandardofISO9001.
8. Engineshouldbefittedwithelectronicgovernoronly.
9. The engine water circular pump should be directly driven by engine gear system. Vbelt
drivensystemshouldnotbeadopted/accepted.

17) MODEOFMEASUREMENT

1. SupplyoftheDGSETincludingtransporttosite,loadingandunloading,exhaustetc.as
specifiedwillbetreatedasoneunitformeasurementandpayment.

6 TECHNICALSPECIFICATIONFORPCC,MCC,LTPANELS

1) SCOPEOFWORK

1. MainDistributionPanels,SubDistributionPanelsandFinalDistributionshallbecoveredunder
this section. Panels/Boards shall be suitable for operation on 3 Phase/single phase,
415/240volts,50cycles,4wiresystemwithneutralgroundedattransformer.AllDistribution
panels shall be CPRI tested design and manufactured by an approved manufacturer. CPRI
certificateshallbemadeavailable.

2. DistributionpanelsshallcomplywiththelatestRelevantIndianStandardsandElectricityRules
andRegulationsandshallbeasperIS139471991.

2) CONSTRUCTIONFEATURES:

1. Distributionpanelsshallbe2mmthicksheetsteelcabinetforindoorinstallation,deadfront,
floormounting/wallmountingtypeandshallbeformaspersiteconstructionrequirements.

2. TheDistributionpanelsshallbetotallyenclosed,completelydustandverminproofandshall
bewithhingeddoorsandfoldedcovers,Neoprenegasket,padlockingarrangementandbolted
back.

3. Allremovable/hingeddoorsandcoversshallbegroundedbyflexiblestandardconnectors.

4. Distribution panel shall be suitable for the climatic conditions as specified in Special
Conditions.SteelsheetsusedintheconstructionofDistributionpanelsshallbe2mmthickand
shallbefoldedandbracedasnecessarytoprovidearigidsupportforallcomponents.

5. Jointsofanykindinsheetmetalshallbeseamwelded,allwelding,slagshallberoundedoffand
weldingpitswipedsmoothwithplumbermetal.

6. The general construction shall confirm to IS86231977 (Part1) for factory built assembled
switchgear&controlgearforvoltageuptoandincluding1100VAC.

Page42
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC


7. Allpanelsandcoversshallbeproperlyfittedandsquarewiththeframe,andholesinthepanel
correctlypositioned.

8. Fixing screws shall enter into holes tapped into an adequate thickness of metal or provided
withwingnuts.

9. SelfthreadingscrewsshallnotbeusedintheconstructionofDistributionpanels.

10. A base channel of 75 mm x 40 mm x 5 mm thick shall be provided at the bottom for floor
mountedpanels.

11. Minimumoperatingclearanceof300mmshallbeprovidedbetweenthefloorofDistribution
panelsandthelowestfeedercompartment.

12. Distributionpanelsshallbeofadequatesizewithaprovisionofspareswitchgearasindicated
ontheSingleLineDiagram.Feedersshallbearrangedinmultitier.

13. KnockoutholesofappropriatesizeandnumbershallbeprovidedintheDistributionpanelsin
conformitywiththelocationofcable/conduitconnections.

14. Removable sheet steel plates shall be provided at the top to make holes for additional cable
entryatsiteifrequired.

15. EverycabinetshallbeprovidedwithTrifoliateorengravedmetalnameplates.

16. AllpanelsshallbeprovidedwithcircuitdiagramengravedonPVCsheet.

17. Allliveaccessibleconnectionsshallbeshroudedandshallbefingertouchproofandminimum
clearancebetweenphaseandearthshallbe20mmandphasetophaseshallbe25mm.

3) BUSBARCONNECTIONS:

1. Bus bar and interconnections shall be of highconductivity electrolytic grade aluminium /
copperasindicatedinthebillofquantitiescomplyingwithrequirementofIS:50821981
and of rectangular cross section suitable for carrying the rated full load current and short
circuitcurrentandshallbeextendableoneitherside.

2. Busbarsandinterconnectionsshallbeinsulatedwithheatshrinkablesleeveof1.1KVgrade
andshallbecolourcoded.

3. Busbarsshallbesupportedonglassfiberreinforcedthermosettingplasticinsulatedsupports
atregularintervalstowithstandtheforcearisingfromincaseofshortcircuitinthesystem.

4. All bus bars shall be provided in a separate chamber and all connections shall be done by
bolting.

5. Additionalcrosssectionalareatobeaddedtothebusbartocompensatefortheholes.

6. All connections between bus bars and breakers shall be through solid copper / aluminium
stripsofpropersizetocarryfullratedcurrentandinsulatedwithinsulatingsleeves.

7. Maximum current density for the bus bars shall be 0.81A/sq.mm for aluminium and 1.4
A/sq.mmforcopperbusbars.

Page43
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

8. The busbar shall be housed in a separate compartment. The busbar shall be isolated with 3
mm. thick bakelite sheet to avoid any accidental contact. The busbar shall be arranged such
thatminimumclearancebetweenthebusbararemaintainedasbelow:

Betweenphases : 25mm.minimum
Betweenphasesandneutral : 25mm.
Betweenphasesandearth : 25mm.
Betweenneutralandearth : 20mm.minimum

MaximumallowabletemperaturefortheBusbartoberestrictedto85degC

4) TEMPERATURERISELIMIT

1. Unless otherwise specified, in the case of external surface of enclosures of bus bar
compartmentwhichshallbeaccessiblebutdonotneedtobetouchedduringnormaloperation,
an increase in the temperature rise limits of 25 C above ambient temperature shall be
permissibleformetalsurfaceandof15Caboveambienttemperatureforinsulatingsurfaces
asperIS8623(Part2)1991.

2. All main distribution panels and sub distribution panels shall be provided with MCCB of
appropriatecapacityasperSingleLineDiagram.

3. AllfinalDistributionboardsshallbeprovidedwithMiniatureCircuitBreakers.

4. Final Single Phase Distribution boards shall be connected to the incoming supply through
doublepoleMCBunits&earthleakagecircuitbreakers.

5. Allwiringforfinaldistributionboardsshallbeconcealedbehind5mmthickbakelitesheetor
MSsheetcover.

6. AllDistributionboardsshallbecompletelyfactorywired,readyforconnection.

7. All the terminals shall be of proper current rating and sized to suit individual feeder
requirements.

8. Eachcircuitshallbeclearlynumberedfromlefttorighttocorrespondwithwiringdiagram.

9. Alltheswitchesandcircuitsshallbedistinctlymarkedwithasmalldescriptionoftheservice
installed.

10. Continuousearthbussizedforprospectivefaultcurrentshall beprovidedwitharrangement
forconnectingtostationearthattwopoints.Hingeddoors/framesshallbeconnectedtoearth
throughadequatelysizedflexiblebraids.

5) CABLECOMPARTMENTS

1. Cable compartment of adequate size shall be provided in the Distribution panels for easy
clamping of all incoming and outgoing cables entering from the top/bottom. Adequate
supportsshallbeprovidedincablecompartmenttosupportcables.

6) SWITCHGEARS


6.1 MOULDEDCASECIRCUITBREAKER(MCCB)

Page44
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

6.1.1 TheMCCBshouldbecurrentlimitingtypewithtriptimeoflessthan10msecundershort
circuitconditions.TheMCCBshouldbeeither3or4polesasspecifiedinBOQ.MCCBshall
complywiththerequirementsoftherelevantstandardsIS13947Part2/IEC609472and
shouldhavetestcertificatesforBreakingcapacitiesfromindependenttestauthoritiesCPRI
/ERDAoranyaccreditedinternationallab.

6.1.2 MCCBshallcompriseofQuickMakebreakswitchingmechanism,arcextinguishingdevice
andthetrippingunitshallbecontainedinacompact,highstrength,heatresistant,flame
retardant, insulating moulded case with high withstand capability against thermal and
mechanicalstresses

6.1.3 ThebreakingcapacityofMCCBshallbeasspecifiedinthescheduleofquantities.

6.1.4 The rated service breaking capacity (Ics) should be equal to rated ultimate breaking
capacities(Icu).

6.1.5 MCCBsformotorapplicationshouldbeselectedinlinewithType2Coordinationasper
IEC609472,1989/IS139471.

6.1.6 ThebreakerassuppliedwithROMshouldmeetIP54degreeofprotection.


6.2 CURRENTLIMITING&COORDINATION

6.2.1 The MCCB shall employ maintenance free minimum letthrough energies and capable of
achievingdiscriminationuptothefullshortcircuitcapacityofthedownstreamMCCB.The
manufacturer shall provide both the discrimination tables and letthrough energy curves
forall.

ProtectionFunctions

6.2.2 MCCBs with ratings up to 200 A shall be equipped with Thermalmagnetic (thermal for
overloadandmagneticforshortcircuitprotection)tripunits(asperSinglelinediagram).

6.2.3 Microprocessor MCCBs with ratings 250A and above shall be equipped with
microprocessorbasedtripunits(asperSinglelinediagram).

6.2.4 Microprocessorandthermalmagnetictripunitsshallbeadjustableanditshallbepossible
tofitleadsealstopreventunauthorisedaccesstothesettings

6.2.5 Microprocessor trip units shall comply with appendix F of IEC 609472 standard
(measurementofrmscurrentvalues,electromagneticcompatibility,etc.)

6.2.6 Protectionsettingsshallapplytoallpolesofcircuitbreaker.

6.2.7 AllMicroprocessorcomponentsshallwithstandtemperaturesupto125C.

6.2.8 RotaryhandlestobeprovidedforoperationwhereeverrequiredasindicatedinSingleline
diagram.

6.3 TESTING

6.3.1 OriginaltestcertificateoftheMCCBasperIEC609471&2orIS13947shallbefurnished.

Page45
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

6.3.2 PrecommissioningtestsontheswitchboardpanelincorporatingtheMCCBshallbedone
asperstandardspecifications.

6.4 INTERLOCKING

6.4.1 Moulded,casecircuitbreakersshallbeprovidedwiththefollowinginterlockingdevicesfor
interlockingthedoorofaswitchboard.

o Handleinterlocktopreventunnecessarymanipulationsofthebreaker.

o DoorinterlocktopreventthedoorbeingopenedwhenthebreakerisinON
position.

o DefeatinterlockingdevicetoopenthedoorevenifthebreakerisinONposition.

o PLC controller to operate the Motorised Breakers in sequence as indicated logic
diagraminSLD.

6.4.2 The MCCB shall be current limiting type and comprise of quick make Break switching
mechanism.MCCBsshallbecapableofdefinedvariableoverloadadjustment.AllMCCBs
rated200Ampsandaboveshallhaveadjustableoverload&shortcircuitpickupbothin
ThermalmagneticandMicroprocessorTripUnits.

6.4.3 All MCCB with microprocessor based release unit, the protection shall be adjustable
Overload,Shortcircuitandearthfaultprotectionwithtimedelay.

6.4.4 Thetripcommandshalloverrideallothercommands.

6.5 MINIATURECIRCUITBREAKER(MCB)

6.5.1 MiniatureCircuitBreakershallcomplywithIS88281996/IEC8981995.Miniaturecircuit
breakers shall be quick make and break type for 240/415 VAC 50 Hz application with
magneticthermalreleaseforovercurrentandshortcircuitprotection.

6.5.2 Thebreakingcapacityshallnotbelessthan10KAat415VAC.MCBsshallbeDINmounted.
The MCB shall be Current Limiting type (Class3). MCBs shall be classified (B, C, D ref IS
standard)aspertheirTrippingCharacteristiccurvesdefinedbythemanufacturer.

6.5.3 The MCBshall have the minimumpowerloss (Watts)per pole defined as pertheIS/IEC
and the manufacturer shall publish the values.MCB shall ensure complete electrical
isolation&downstreamcircuitorequipmentwhentheMCBisswitchedOFF.

6.5.4 Thehousingshallbeheatresistantandhavinghighimpactstrength.Theterminalsshallbe
protectedagainst finger contacttoIP20Degreeof protection. AllDP, TP,TPNand 4Pole
miniature circuit breakers shall have a common trip bar independent to the external
operatinghandle.

6.6 RESIDUALCURRENTCIRCUITBREAKERCURRENTOPERATEDTYPE(RCCB)

SystemofOperation

6.6.1 Residual Current Circuit Breaker shall confirm to IEC 61008.RCCB shall work on the
principleofcorebalancetransformer.

Page46
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

6.6.2 Theincomingshallpassthroughthetorroidalcoretransformer.Aslongasthecurrentsin
thephaseandneutralshallbethesame,noelectromotiveforceshallbegeneratedin
thesecondarywindingofthetransformer.

6.6.3 Intheeventofaleakagetoearth,anunbalanceshallbecreatedwhichshallcausea
currenttobegeneratedinthesecondarywinding,thiscurrentshallbefedtoahighly
sensitiveminiaturerelay,whichshalltripthecircuitiftheearthleakagecurrentexceeds
a predetermined critical value. RCCB shall be current operated independent of the line
voltage, current sensitivity shall be of 30 mA at 240/415 volts AC and shall have a
minimumof20,000electricaloperations.

MechanicalOperation

6.6.4 The moving contacts of thephases shallbe mounted on a common bridge, actuated by a
ruggedtogglemechanism.Hence,theclosing/openingofallthethreephasesshalloccur
simultaneously. This also shall ensure simultaneous opening of all the contacts under
trippingconditions.

NeutralAdvanceFeature

6.6.5 Theneutralmovingcontactshallbesomountedonthecommonbridgethat,atthetimeof
closing,theneutralshallmakecontactFirstbeforethephases;andatthetimeofopening,
the neutralshallbreakslast afterallowingthephases toopenfirst.Thisisanimportant
safetyfeaturewhichisalsorequiredbyregulations.

TestingProvision

6.6.6 Atest device shall be incorporated to check the integrity of the earth leakage detection
systemandthetrippingmechanism.Whentheunitisconnectedtoservice,pressingthe
test knobshalltriptheELCB /RCCB andtheoperating handleshall moveto the "OFF"
position.

6.7 AIRCIRCUITBREAKER

6.7.1 Construction:

TheACBsshallhavefollowingfeatures:

Motorisedwith230VA.C.motor.

230VA.Cclosingandshunttripcoil

Drawouttypewith"service","test","isolated"and"maintenance"position.

Safety shutter of Fibre glass/polycarbonate sheet of 2mm thickness shall


beprovided

Mechanicallytripfreeplusantipumpingfeatureistobeprovided.

Electrical trip free plus anti pumping shall be provided with relay ONLY
andnotbycontactors.

Electrical/Mechanicaloperationcountershallbeprovided.

Door interlock with defeat features to be provided & shall be electrically

Page47
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

drawouttype

ACBshallbelockableinisolationposition.

6.7.2 Release:

Thermal Magnetic release shall be direct acting type, tripping ACB


mechanically.

Shortcircuit,overloadandearthfaultprotectionshallbeprovided.

Vendor to suggest release type for feeders of supply range characteristic


andaccuracy.

6.7.3 ACBPerformance:

ACBperformanceinsidepanelsatambient50Degree.

IthSymmetricalbreaking,50KA

Makingcapacitypeak87.5KA

Shorttimerating,1sec.50KA

7) ELECTRICALPOWERANDCONTROLWIRINGCONNECTION:

1. Terminalforbothincomingandoutgoingcableconnectionsshallbesuitablefor1100Vgrade,
aluminium / copper conductor PVC insulated and sheathed, armoured cable and shall be
suitableforconnectionsofsolderlesssocketsforthecablesizeasindicatedontheappended
drawingsforthePanels.

2. PowerconnectionsforincomingfeedersofthemainPanelsshallbesuitablefor11000Vgrade
aluminiumconductor(XLPE)cables.

3. Both control and power wiring shall be brought out in cable alley for ease of external
connections,operationandmaintenance.

4. Bothcontrolandpowerterminalsshallbeproperlyshrouded.

5. 10% spare terminals shall be provided on each terminal block. Sufficient terminals shall be
providedoneachterminalblock,sothatnotmorethanoneoutgoingwireisconnectedtoper
terminal.

6. Terminal strips for power and control shall preferably be separated from each other by
suitablebarriersofenclosures.

7. Wiring inside the modules for power, control, protection and instruments etc. shall be done
withuseof660/1100Vgrade,PVCinsulatedcopperconductorcablesconformingtoIS:694
andIS:8130.Powerwiringinsidethestartermoduleshallbe ratedforfullcurrentraringof
respectivecontactor,butnotlessthan4.0sq.mm.crosssectionarea.Forcurrenttransformer
circuits, 2.5 sq.mm. copper conductor wire shall be used. Other control wiring shall be done
with1.5sq.mm.copperconductorwires.Wiresforconnectionstothedoorshallbeflexible.All
conductorsshallbecrimpedwithsolderlesssocketsattheendsbeforeconnectionsaremade
totheterminals.AllwiresshallbeFRLSgrade.

Page48
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

8. Control power for the Motor starter module shall be taken from the respective module
switchgearoutgoing.Controlpowerwiringshallhavecontrolfuses,(HRCfusetype)forcircuit
protection.AllindicatinglampsshallbeprotectedbyHRCfuses.

9. Particular care shall be taken to ensure that the layout of wiring is neat and orderly.
Identificationferrulesshallbefilledtoallthewireterminationforeaseofidentificationandto
facilitatecheckingandtesting.

10. CUPALwashersshallbeusedforallcopperandaluminiumconnections.

11. Final wiring diagram of the Panels power and control circuit with ferrules numbers shall be
submittedalongwiththePanelsasoneofthedocumentsagainstthecontracts.

8) TERMINALS:

1. Theoutgoingterminalsandneutrallinkshallbebroughtouttoacablealleysuitablylocated
andaccessiblefromthepanelfront.Thecurrenttransformersforinstrumentsmeteringshall
be mounted on the disconnecting type terminal blocks. No direct connection of incoming or
outgoing cables to internal components of the distribution board is permitted, only one
conductormaybeconnectedinoneterminal.

9) WIREWAYS:

1. A horizontal PVC wire way with screwed covers shall be provided at the top to take
interconnectingcontrolwiringbetweendifferentverticalsections.

10) LABELS:

1. EngravedPVClabelsshallbeprovidedonallincomingandoutgoingfeeders.Singlelinecircuit
diagramshowingthearrangementsofcircuitinsidethedistributionboardshallbepastedon
insideofthepaneldoorandcoveredwithtransparentlaminatedplasticsheet.

11) NAMEPLATE:

1. A name plate with the Panels designation in bold letters shall be fixed at top of the central
panel. A separate name plate giving feeder details shall be provided for each feeder module
door.

2. Inside the feeder compartments, the electrical components, equipments, accessories like
switchgear,controlgear,lamps,relaysetc.shallsuitablybeidentifiedbyprovidingstickers.

3. Engraved name plates shall preferably be of 3 ply,(RedWhiteRed or BlackWhiteBlack)


lamicold sheet. However, black engraved perpex sheet name plates shall also be acceptable.
Engravingshallbedonewithsquaregroovecutters.

4. Nameplateshallbefastenedbycountersundscrewsandnotbyadhesives.

12) DANGERNOTICEPLATES:

1. ThedangernoticeplateshallbeaffixedinapermanentmanneronoperatingsideofthePanels.

2. ThedangernoticeplateshallindicatedangernoticebothinHindiandEnglishandwithasign
ofskullandbones.

3. Thedangernoticeplate,ingeneral,meettherequirementsoflocalinspectingauthorities.

Page49
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

4. Overalldimensionsofthedangernoticeplateshallbe200mm.widex150mm.high.

5. Thedangernoticeplateshallbemadefromminimum1.6mm.thickmildsteelsheetandafter
duepretreatmenttotheplate,thesameshallbepaintedwhitewithvitreousenamelpainton
bothfrontandrearsurfaceoftheplate.

6. Theletters,thefigures,theconventionalskullandbonesetc.shallbepositionedonplateasper
recommendationofIS:25511982.

7. Thesaidletters,thefiguresandthesignofskullandbonesshallbepaintedinsignalredcolour
asperIS:51978.

8. The danger plate shall have rounded corners. Location of fixing holes for the plate shall be
decidedtosuitdesignofthePanels.

9. Thedangernoticeplate,ifpossible,beofISIcertificationmark.

13) EARTHING

1. EarthingshallbeprovidedasperIS:30431987.

14) PAINTING

12. Allsheetsteelworkshallundergoaprocessofdegreasing,picklinginacid,coldrinsing,
phosphating, passivaiting (seven tank processing) and then painted with electrostatic paint
(Powdercoating).

13. Theshadeofcolourofpanelinside/outsideshallbeasperBOQconfirmingtoISCodeNo.5.

15) LABELS

1. EngravedPVClabelsshallbeprovidedonallincomingandoutgoingfeeder.

2. Circuitdiagramshowingthearrangementsofthecircuitinsidethedistributionpanelsshallbe
pastedoninsideofthepaneldoorandcoveredwithtransparentplasticsheet.

16) METERS

1. AllvoltmetersandindicatinglampsshallbethroughMCBs.
2. Metersandindicatinginstrumentsshallbeflushtype.
3. AllCTsconnectionformetersshallbethroughTestTerminalBlock(TTB).
4. CTratioandburdensshallbeasspecifiedontheSinglelinediagram/BOQ.

17) CURRENTTRANSFORMERS

1. CurrenttransformersshallbeprovidedforDistributionpanelscarryingcurrentinexcessof
60amps.

2. All phase shall be provided with current transformers of suitable VA burden with 5 amps
secondariesforoperationofassociatedmetering.

3. TheCTsshallconfirmtorelevantIndianStandards.Thedesign andconstructionshallbedry
type,epoxyresincastrobusttowithstandthermalanddynamicstressesduringshortcircuits.

Page50
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

4. Secondary terminals of CTs shall be brought out suitable to a terminal block which shall be
easilyaccessiblefortestingandterminalconnections.

5. TheprotectionCTsshallbeofaccuracyclass5P10andmeasurementCTsshallbeofaccuracy
classI.

18) POTENTAILFREECONTACTS

1. Potential free contacts shall be provided for connection to Building Automation System in
panelsindicatedinScheduleofQuantities.

19) INDICATINGPANEL

1. AllmetersandindicatinginstrumentsshallbeinaccordancewithrelevantIndianStandards.
Meters shall be flush mounted type. Indicating lamps shall be of low burden, and shall be
backedupwith2ampsMCB/MPCBasperrelevantfaultlevelandtoggleswitch.

20) TESTING

1. Testingofpanelsshallbeasperfollowingcodes:

I. IS: 8623 (Part I) 1977 for factory built assemblies of switch gear for voltages
uptoandincluding1000VAC.
II. IS:13947:1993Degreeofprotection
III. IS:5578&11353:1985Arrangementofbusbars.

21) WIRING

1. In wiring a distribution panel it shall be insured that total load of various distribution panel
and/orconsumingdevicesisdividedevenlybetweenthephasesandnumberofwaysasper
Consultantsdrawing.

22) INSTALLATION

1. Installation of all LT panels shall include but not limited to the following to complete the
installation,testingandcommissioning:

2. Transportingmaterialsfromstorestoexactlocationofinstallation.

3. SupplyandinstallationofrequiredbaseframemadeofMSangleorchannelsectionsandduly
paintedwithblackpaint.

4. Positioning,aligning,fixing,assembling,andinstallationofLTpanelissuedfreeofcostbyClient
aftercarryingoutpropercleaningandinspection.

5. Sitesupervision,testingforproperfunctioning/operation,andprecommissioningtests.

23) COMMISIONING&ONSITETESTING

1. Allswitchboardsshallbetestedfordielectrictestwith1000Vmegger.
2. Allearthconnectionsshallbecheckedforcontinuity.

3. Allbusbarconnectionsshallbecheckedandtightenedproperly.

4. Allcableterminationsandterminalshroudingshallbecheckediftheyareproperlydone.

Page51
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

5. Theoperationofprotectivedevicesshallbetestedbysecondaryinjectiontest.

6. Theoperationofcircuitbreakershallbetestedforallinterlocks.

7. FunctionaltestshallbedoneforallACBs,MCCBsandothercomponents.

8. Indicatinglampsandmetersshallbecheckedforproperworking.
24) WORKMANSHIP:

1. Thecontractorshallerectthepanelatsiteincoordinationwiththesupplierifrequired.

2. He should check for loose ends on the part of the supplier and shall inform client and
consultantforthesame.

3. Physicalandcontinuitytestsshallbecarriedoutbycontractor.

4. Alsothefieldtestscarriedoutbythesuppliershallberecordedbythecontractor.
25) MODEOFMEASUREMENT:

1. ContractorshallbepaidforonepanelerectionasperBOQQuantitiespart.

7 TECHNICALSPECIFICATIONFORTHYRISTORBASEDAPFCRPANEL

1) SCOPE

Thisspecificationcoversdesign,manufacture,andsupply,testingofcapacitorbankandautomatic
powerfactorcorrectionpanelwithcapacitorbankssuitableforcontinuousduty.

2) CODESANDSTANDARDS

1. The design manufacture and performance of power factor improvement capacitor /


capacitorbanksshallcomplywithallcurrentlyapplicablestatutes,regulationsandsafety
codes in the locality where the equipment will be installed. The equipment shall also
confirmtothelatestapplicableIndian/British/IECstandards.Inparticulartheequipment
shallconformtothelatestrevisionsofthefollowing:

2. When the above standards are in conflictwith the stipulation of this specification, this
specificationsupercedesthem.

3) CONSTRUCTION

3.1 CapacitorBank

Capacitor banks shall comprise of identical delta connected three phase units. The individual
capacitor unit shall bemanufactured out of mixed dielectric design comprising of bi axially
orientedpolypropylenefilmandcapacitortissuepaper.

Eachindividualelementofthecapacitortissueunitshallbeprovidedwithsilverfusewire.

The capacitor unit shall consist of many such elements in series / parallel combinations for
gettingthedesiredKVARoutput.

The capacitor shall be thermal stability & MPP/APP TYPE AS SPECIFIED IN SINGLE LINE
DIAGRAM.

Page52
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

Thedielectriclossesofthecapacitorshallberestrictedto2wattsperKVAR.

The phase terminal connections of the capacitor unit shall be brought out at the top through
metalinsulators,whichshouldbesolderedtothefabricatedtopcover.

Thecapacitorshallbeprovidedwithsuitablyrateddischargeresistors.

Thecapacitorshallbedesignedtowithstandtheelectrodynamicsandthermalstressescausedby
transientovercurrentduringswitching.

3.2 BusbarChamber

Capacitorbankshallbeprovidedwithabusbarchamber.Thechambershallbedustandvermin
proof in construction, fabricated from 2mm.thick sheet steel. Continuous neoprene
rubbergasketsshallbecopperonallmatingsurfaces.TPNBusbarsshallbeofcopper
supportedonepoxyinsulatorsofadequateratingandstrips.

Thebusbarsizesandclearanceshallbesuitableforconnectionofcablesthroughcrimpingtype
cablelugs.Busbarchambershallbeextendedsuitablyononesidetocableandboxattheend
ofbusbarchamberundrilledremovableglandplateandaccesscoverstobeprovidedforcable
entryasrequired.

4) EARTHING

Theenclosureofindividualcapacitorunitshallbeprovidedwith2nos.10mmdia.earthterminals,
eachcompletewithtwoplainandonespringwasher,nutsetc.Theseterminalsshallbeeffectively
bondedtothecommonsheetsteelframework.Eachbankwillhavetwoexternalearthterminals
inthebusbarchamberscompletewithhardware.

5) PAINTING

Allsheetsteelshallbethoroughlycleaned,degreasedandphosphated,paintedwithtwocoatsof
paint.ThetypeandshadeofpaintbeasspecifiedinDataSheet.

6) DRAWINGS

Thefollowingdrawingsshallbesubmittedalongwiththebid:

a. General arrangement drawing showing overall dimensions, weight, internal


arrangementandmountingdetails.

b.Terminalchamber,showingbusbararrangementwithalldimensions.

7) TEST&TESTCERTIFICATES:

7.1. VendorshallcarryoutallroutinetestsasspecifiedinIS:2834andshallfurnishthe
testcertificates.

7.2. The vendor shall also carry out the thermal stability test on the units in the
presenceofpurchaserrepresentatives.

7.3. ThecapacitorunitsshallbetestedfromelectricsupplyauthoritieslikeG.E.Board/A.
E.Co.andthetestcertificatesinduplicateshallbefurnishedtoclientandalsothecopy
shallbesubmittedtotheelectricsupplyauthoritywhilegettingthepowersupply
releasedfromthem.

Page53
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

8) CAPACITORPANEL

CapacitorcontrolpanelshallbeautomaticifspecifiedintheDatasheet.

Thepanelforcapacitorshallbefabricatedfrom2.0mmthicksheetsteelandshallbefinishedas
perclauseno.5.0.Earthingterminalsshallbeprovidedasperclauseno.4.0.Thepanelshallbe
provided suitably rated TPN copper busbar supported on epoxy insulators and with heat
shrinkable type sleeves. Each capacitor unit shall be connected to main bus bar through
contactorsofsuitablerating(9Nos.ofdoubletheratingofcapacitorcurrent)withsafetymargin.
Eachunitshallbeof10/15/20/25/50KVArALLPP(APP)asspecified.

ProtectiveMCCB/HRCswitchfusesofsuitableratingshallbeprovidedwithbase/holders.
ConnectionsshallbemadewithPVCinsulatedflexiblecoppercableshavingcrimpedcopperlugs.

Continuous earthing conductor/ strip of G.I. shall run through and all capacitor units shall be
earthed.

Sufficientventilationshallbeprovidedinthecapacitorcompartmenttolimitthetemperature
rise.CoolingfansshallbeprovidedwithONOFFswitchesasperrequirements.

The main busbar shall be terminated on suitably rated MCCB as per data sheet. vertical
compartment with detachable gland plate shall be kept for incoming cable connections from
bottomortopasspecified.

Capacitorsunitsshallbemountedonangleframeofstrongconstruction.

ThepanelshallbemountedonM.S.channelsectionatbottomforwasyinstallation.

Thepanelshallbeprovidedwithliftinghooks/Eyeboltsforhandling.

Automatic power factor correction sensing relays (APFCR) shall be provided with all related
circuitsandcontactorsforcontrollingthepowerfactortomax.0.98byenergisingthecontactor
andrelatedcapacitorbank"ON"or"OFF"asperloadconditions.

Thecontrollershallbesetfortimelagof45secondssothatonsensingtheloworhighpower
factoritenergisesordeenergisesthecontactorafter45seconds.

The Dust and vermin proof switching compartment shall be isolated from capacitor mounting
compartment.

Thepanelshallbeprovidedwith:

a. MCCBofadequatecapacityasspecified.

b. 100x100mm.flushtype0500Vdigitalvoltmeterwithselectorswitch.

c. 100x100mm.flushtypedigitalAmmeterwithsuitableratedC.T.andselectorswitch.

d. Supply"ON"indicationlamp(RYB).

e. Powerfactormeter0.5lagto0.5lead.

f. KVARmeterofsuitablerating.

g. "ON""OFF"pushbuttonwithsuitablethyristorbasedsizecontactor.

Page54
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

h. Bypassswitchforeachcapacitorunitformanualoperation.

i. AutomaticPowerFactorcorrectionrelayunitwithONOFFmodeselectorswitch.

j.CapacitorHeavyDutyContactors(Thyristorbased).

Thecapacitorpanelshallbeinstalledawayfromwallwithsufficientdistanceforbetter
coolingandeaseofmaintenance.

The following drawings shall be submitted before procurement for approval from
theConsultants..

1. GeneralarrangementandFabricationdetails.

2. Powerwiringdiagramofcapacitorpanel.

3. Contorlwiringdiagramofcapacitorpanel/

4. C.T.connection.

9) MODEOFMEASUREMENT:

1. TheAPFCRPanelshallbemeasuredinNosasperBOQQuantities.

8 TECHNICALSPECIFICATIONFORLDB&PDB

1) SCOPEOFWORK

1. DistributionBoards(DBs)shallbesuitableforoperationon3Phase/singlephase,
415/240 volts, 50 cycles, neutral grounded at transformer. The DB shall be minimum di
electric strength of 1.5 KV / Sec. All Distribution Boards shall manufactured by a
manufacturerlistedinAppendixI.

2. LDBs shall comply with the latest Relevant Indian Standards and Electricity Rules and
RegulationsandshallbeasperIS139471991.

2) CONSTRUCTIONFEATURES

1. DBs shall be made out of 1.6 mm thick high quality CRCA sheet steel and shall be pre
treatedandpowdercoatedsheetsteelusedintheconstruction ofLDBshallbefoldedand
bracedasnecessarytoprovidearigidsupportforallcomponent.

2. DBshallbesuitableforindoor/outdoorinstallation,wallmountingfreestandingtype,in
doubledoorconstruction.

3. The Final Distribution Boards shall be totally enclosed, completely dust and vermin proof
andshallbewithhingeddoors,Neoprenegasket,padlockingarrangement.

4. All removable/ hinged doors and covers shall be grounded by 1.0 sqm tinned stranded
copperconnectors.

5. FinalDistributionBoardsshallbesuitablefortheclimaticconditions.Jointsofanykindin
sheet metal shall be seam welded, all welding, slag shall be rounded off and welding pits
wipedsmoothwithplumbermetal.

Page55
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

6. ThegeneralconstructionshallconfirmtoIS86231977(Part1)forfactorybuiltassembled
switchgear&controlgearforvoltageuptoandincluding1100VAC.

7. All panels and covers shall be properly fitted and square with the frame, and holes in the
panel correctly positioned. Fixing screws shall enter into holes tapped into an adequate
thickness of metal orprovided withwing nuts. Self threading screwsshallnotbeusedin
theconstructionofLDBs.

8. KnockoutholesofappropriatesizeandnumbershallbeprovidedintheLDBsinconformity
withthelocationofcable/conduitconnections.Detachablesheetsteelglandplatesshallbe
providedatthetop/bottomtomakeholesforadditionalcableentryatsiteifrequired.


3) DISTRIBUTIONBOARDSSHALLCOMPRISEOFTHEFOLLOWING:

3.1 A panel for mounting where appropriate incoming supply circuit breaker & other
auxiliariesforControl&distributionasrequired.

3.2 Installations accessories shall be part of the DB for fixing conductor and rails for
mountingMCBsandRCCBsetc.Neutralbusbars&earthingbusbarsrequiredinthe
circuit.AllbusbarsintheLDBshallbeinsulatedtype.

3.3 Servicecable/interconnectionshallbepartoftheDistributionBoards.

3.4 Theboardshallbeinstalledataheightsuchthattheoperatingiswithinreachofthe
normalhumanheighti.e.1.2to1.8metersfromfinishfloorlevel.

3.5 DegreeofprotectionshallbeIP52forindoorapplication,IP54forkitchen&laundry
andIP55foroutdoorapplication.

3.6 All three phase distribution boards shall have 4 rows and single phase distribution
boards shall have single rows for housing of MCBs and RCCBs unless noted
otherwise.

3.7 Phasesegregationtobemaintainedinallthreephasedistributionboards.

3.8 EarthingshallbeprovidedineachLDBs.

3.9 MINIATURECIRCUITBREAKER(MCB)

3.9.1 MCB'sshallhavequickmakeandbreaknoweldingselfwipingsilveralloycontacts
for10KAshortcircuitbothonthemanualandautomaticoperation.

3.9.2 Eachpoleofthebreakershallbeprovidedwithinversetimethermaloverloadand
instantaneousovercurrenttrippingelements,withtripfreemechanism.

3.9.3 In case of multipole breakers, the tripping must be on all the poles and operating
handleshallbecommon.BreakersmustconfirmtoBS3871withfacilityforlocking
inOFFposition.

3.9.4 Pressureclampterminalsforstranded/solidconductorinsertionareacceptableupto
4sq.mm.Aluminiumor1.5sq.mm.

3.9.5 Copper and for higher ratings, the terminals shall be suitably shrouded. Wherever
MCBisolatorsarespecifiedtheyarewithoutthetrippingelements.

Page56
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

3.10 RESIDUALCURRENTCIRCUITBREAKERCURRENTOPERATEDTYPE(RCCB)

3.10.1 TheRCCBshouldsufficesalltherequirementsofISaspercodeIS126401988.The
RCAshouldbecurrentoperatedandnotonlinevoltage.

3.10.2 TheRCCBshouldensuremainlythefollowingfunctions:

o Measurementofthefaultcurrentvalue.

o Comparisonofthefaultcurrentwithareferencevalue.

o TheRCCBshouldhaveatorroidaltransformerwhichhasthemainconductorsof
primary(PN)whichcheckthesumofthecurrentclosetozero.

o All metal parts should be inherently resistant to corrosion and treated to make
themcorrosionresistant.

o Itshouldbetrulycurrentoperated.

o Itshouldoperateoncorebalancetorroidaltransformer.

o Itsaccuracyshouldbe5%.

o Itshouldoperateevenincaseofneutralfailure.

o Itshouldtripatapresentleakagecurrentwithin100mA

o ItsenclosureshouldbeasperIP30.

o Itsmechanicaloperationlifeshouldbemorethan20,000operations.

o ItshouldprovidefullprotectionasenvisagedbyIErules61A,71ee,73ee,
1985andalsorule50ofIErule1956.

o Itshouldconform to allnationalandinternationalstandardslikeIS:88281993,
IS:126401988,BS42931983,CEE27(InternationalcommissionRulesforthe
approvedofelectricalequipment).

4) EARTHING
1. EarthingshallbeprovidedasperIS:30431987.

5) PAINTING
1. Allsheetsteelworkshallundergoaprocessofdegreasing,picklinginacid,coldrinsing,
phosphating,passivaiting(seventankprocessing)andthenpaintedwithelectrostaticpaint
(Powdercoating).Theshadeofcolourofpanelinside/outsideshallbeofSiemensgraypaint
shadeno.RAL7032ofISCodeNo.5.

6) LABELS
1. EngravedPVClabelsshallbeprovidedonallincomingandoutgoingfeeder.Circuitdiagram
showing the arrangements of the circuit inside the distribution panels shall be pasted on
insideofthepaneldoorandcoveredwithtransparentplasticsheet.

Page57
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

7) TESTING
1. Testingofpanelsshallbeasperfollowingcodes:

i. IS:8623(PartI)1977forfactorybuiltassembliesofswitch gearforvoltagesupto
andincluding1000VAC.
ii. IS:13947:1993Degreeofprotection

8) WIRING

1. Inwiringadistributionpanelitshallbeinsuredthattotalloadofvariousdistributionpanel
and/orconsumingdevicesisdividedevenlybetweenthephasesandnumberofwaysasper
Consultantsdrawing.

9) WORKMANSHIP:

1. The D.B. shall be properly grouted in the wall in concealed manner taking care that the
powdercoatingisnotscratchedanddentsarenotformedontheD.B.,MCBsandELCBs.

2. Inthedistributionboardsshallbefixedasperthecircuitdetailsprovided.

3. AllthewiresterminatingintheMCBsandtheELCBsshallbeluggedforpropercontactand
ferrules depicting the circuit nos shall be provided. D.B.s mounted in concealed manner
shallhaveagroovearounditsoastosavethefinishoftheplasterandcolourduringfuture
openingofthedoor.

4. Thedistributionboardsshallhavecircuitcharttaggedonthedoorforfuturemaintenance.
Dangernoticeplatesshallbefittedtothedistributionboardswithscrewsandnotstuckso
astoassureitspresenceforalongerduration.

10) MODEOFMEASUREMENT:

2. ThedistributionboardsshallbemeasuredinNosasperBOQQuantities.

9 TECHNICALSPECIFICATIONFORLTCABLES&CABLETRAY.

1) SCOPEOFWORK

1. The Mediumvoltagecables shallbe supplied, laid, connected, tested and commissionedin


accordance with the drawings, specifications, relevant Indian Standards specifications,
manufacturersinstructions.Thecablesshallbedeliveredatsiteintheoriginaldrumswith
manufacturersname,sizeandtypeclearlywrittenonthedrums.

2. All cables shall be adequately protected against any risk of mechanical damage to which
they may be liable in normal conditions of handling during transportation, loading,
unloadingetc.

3. Thecableshallbesuppliedinsinglelengthi.e.withoutanyintermediatejointorcutunless
specificallyapprovedbytheclient.

4. Thecableendsshallbesuitablysealedagainstentryofmoisture,dust,wateretc.withcable
compoundasperstandardpractise.

Page58
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC


2) MATERIAL

1. The MV cables shall be cross linked polyethylene (XLPE) insulated PVC sheathed of 1100
voltsgradeasaskedforinthescheduleofquantities.Cablesupto10sq.mmshallbewith
copperconductorand16sq.mmandaboveshallbewithaluminiumconductor.

3) TechnicalRequirements:

1. All XLPE Aluminium/Copper Power cables shall be 1100 Volts grade, multi core
constructedasperIS:7098PartIof1988asfollows:

1.1 Stranded Aluminium /Copper conductor in case of 10 sq.mm. and above whereas solid
conductorincaseof10sq.mm.andbelow.

1.2 Coreslaidup.

1.3 The inner sheath should be bonded over with thermoplastic material for protection
againstmechanicalandelectricaldamage.

1.4 Armoringshouldbeprovidedovertheinnersheathtoguardagainstmechanicaldamage.
Armouring should be Galvanised steel wires or galvanised steel strips. (In single core
cables used in A.C. system armouring should be nonmagnetic hard aluminium
Wires/Strips. Round steel wires should be used where diameter over the inner sheath
doesnotexceed13mm;above13mmflatsteelarmourshouldbeused.Roundwireof
differentsizesshouldbeprovidedagainstspecificrequest.)

1.5 The outer sheathshouldbespeciallyformulatedheatresistantblackPVCcompound


conformingtotherequirementoftypeST2ofIS:58311984extrudedtoformtheouter
sheath.

2. ConductorshallbeofelectrolyticAluminium/CopperconformingtoIS:8130andare
compactcircularorcompactshaped.

3. Insulation shall be of XLPE type as per latest IS general purpose insulation for
maximumratedconductortemperature70degreecentigrade.

4. In Inner sheath laid up cores shall be bonded over with thermoplastic material for
protectionagainstmechanicalandelectricaldamage.

5. Insulation, inner sheath and outer sheath shall be applied by extrusion and lapping up
processonly.

6. Uncoated, annealed copper / aluminium, of high conductivity, upto 4 mm2 size the
conductorshallbesolidandabove4mm2theconductorsshallbeconcentricallystranded
asperIEC:228.

7. Repairedcablesshallnotbeused.

8. CurrentratingsofthecablesshallbeasperIS:3961.

9. TheXLPEinsulatedcablesshallconformtolatestrevisionofISandshallbereadalongwith
this specifications. The Conductor shall be stranded Aluminium/Copper circular/ sector
shapedandcompacted.Inmulticorecablesthecoreshallbeidentifiedbyred,yellow,blue
andblackcoloringofinsulation.

Page59
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

10. Thecablesshallbesuitableforlayinginracks,ducts,trenches,conduitsandunderground
buriedinstallationwithuncontrolledbackfillandchancesoffloodingbywater.

11. Progressiveautomaticinlinesequentialmarkingofthelengthofcablesinmetersatevery
onemetershallbeprovidedontheoutersheathofallcables.

12. CablesshallbesuppliedinnonreturnablewoodendrumsasperIS:10418.

13. Both ends of the cables shall be properly sealed with PVC/Rubber caps so as to eliminate
ingressofwaterduringtransportation,storageanderection.

14. TheproductshouldbecodedasperIS:7098PartIasfollows:

AluminiumConductor A
XLPEInsulation 2X
Steelroundwirearmour W
Steelstriparmour F
SteelDoubleroundwirearmour WW
SteelDoublestriparmour FF
Nonmagnetic(Al.)roundwirearmourWa
Nonmagnetic(Al.)striparmour Fa
PVCoutersheath Y

4) CoreIdentifications:

Twocore : RedandBlack
Threecore : Red,YellowandBlue
Fourcore : Red,Yellow,BlueandBlack
Singlecore : Green,Yellowforearthing.

Blackshallalwaysbeusedforneutral.

5) Inspection

1. All cables shall be inspected by the contractor upon receipt at site and checked for any
damageduringtransit.

6) JointsinCables

1. TheContractorshalltakecaretoseethatallthecablesreceivedatsiteareapportionedto
various locations in such a manner as to ensure maximum utilization and avoid cable
jointing.

2. ThisapportioningshallbegotapprovedbytheOwnerssiterepresentativebeforethecables
arecuttolengths.

3. Wherejointsareunavoidableheatshrinkabletypejointsshallbemade.

4. ThelocationofsuchjointsshallbegotapprovedfromtheOwnerssiterepresentative
andshallbeidentifiedthroughamarker.

7) JointingBoxesforCables

1. Cable joint boxes shall be installed with heat shrinkable sleeve and of appropriate size,
suitableforXLPEarmouredcablesofparticularvoltagerating.

Page60
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

8) JointingofCables

1. All cable joints shall be made in suitable, approved cable joint boxes and the filling in of
compoundshallbedoneinaccordancewithmanufacturesinstructionsandinanapproved
manner.Allstraightthroughjointsshallbedoneinepoxymouldboxeswithepoxyresin.

2. Allcablesshallbejoinedcolourtocolourandtestedforcontinuityandinsulationresistance
beforejointingcommence.

3. Thesealsofcablesmustnotberemoveduntilpreparationsforjointingarecompleted.

4. Joints shall be finished on the same day as commenced and sufficient protection from the
weathershallbearranged.

5. Theconductorsshallbeefficientlyinsulatedwithhighvoltageinsulatingtapeandbyusing
ofspreadersofapprovedsizeandpattern.

6. Thejointsshallbecompletelytoppedupwithepoxycompoundsoastoensurethatthebox
isproperlyfilled.

9) CableEndTerminations

1. Cable end termination shall be done in cable terminal box using crimping sockets and
propersizeofglandsofdoublecompressiontype.

2. SolderiesscrimpingtypeAluminium/CulugsconformingtoISsuitableforcablesizeevenly
crimpedwithhighpressuretool&connectedtoswitchgearterminalswithbrass/cadmium
platednutboltsinanapprovedmanner.

10) BondingofCables

1. Whereacableentersanypieceofapparatus,itshallbeconnectedtothecasingbymeansof
anapprovedtypeofarmourclampandgland.

2. Theclampsmustgripthearmouringfirmlytotheglandorcasing,sothatnounduestressis
passedontothecableconductors.

11) CableInstallationinCableTraysandCableTrenches.

1. Cables shall be laid by skilled and experienced workmen using adequate rollers to
minimizestretchingofthecable.

2. Thecabledrumsshallbeplacedonjacksbeforeunwindingthecable.Greatcareshallbe
exercisedinlayingcablestoavoidformingkinks.

12) LayingofCablesonCableTrays

1. Therelativepositionofthecables,laidonthecabletrayshallbepreservedandthecables
shallnotcrosseachother.

2. Atallchangesindirectioninhorizontalandverticalplanes, thecableshallbebentsmooth
witharadiusasrecommendedbythemanufacturers.

3. Allcablesshallbelaidwithminimumonediametergapandshallbeclampedateverymeter
tothecabletray.

Page61
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

4. Cablesshallbetaggedforidentificationwithaluminiumtagandclampedproperlyatevery
20M.

5. Tagsshallbeprovidedatbothendsandallchangesindirectionsbothsidesofwallandfloor
crossings.

6. Allcableshallbeidentifiedbyembossingonthetagthesizeofthecable,placeoforiginand
termination.

7. AllcablespassingthroughholesinfloororwallsshallbesealedwithfireretardantSealant
andshallbepaintedwithfireretardantpaintuptoonemeteronalljoints,terminations
andbothsidesofthewallcrossingsbyVIPERCABLERETARD.

8. Thismethodmaybeadoptedinplaceslikeindoorsubstations,airconditioningplantrooms,
generator rooms etc. or where long horizontal runs of cables are required withinthe
buildingandwhereitisnotconvenienttocarrythecableinopenducts.

9. Thismethodispreferredwhereheavysizedcablesoranumberofcablesarerequiredtobe
laid.Thecabletraysmaybeeitherofperforatedsheettypeorofladdertype.

PERFORATEDTYPECABLETRAY

10. Thecabletrayshallbefabricatedoutofslotted/perforated MSsheetsaschannelsections,


singleordoublebended.Thechannelsectionsshallbesuppliedinconvenientlengthsand
assembledatsitetothedesiredlengths.Thesemaybegalvanishedorpaintedasspecified.
Alternatively, where specified, the cable tray may be fabricated by two angle irons of
50mmX50mmX6mm as two longitudinal members, with cross bracings between them by
50mmX5mm flats welded/bolted to the angles at 1 m spacing. 2mm thick MS perforated
sheetshallbesuitablywelded/boltedtothebaseaswellasonthetwosides.

11. Typically,thedimensionsdetailstobeconsideredasperBOQ.

12. The jointing between the sections shall be made with coupler plates of the same material
andthicknessasthechannelsection.Twocouplerplates,eachofminimum200mmlength,
shallbeboltedoneachofthetwosidesofthechannelsectionwith8mmdiaroundheaded
bolts,nutsandwashers.Inordertomaintainproperearthcontinuitybond,thepaintonthe
contact surfaces between the coupler plates and cable tray shall be scraped and removed
beforetheinstallation.

13. Thewidthofthecabletrayshallbechosensoastoaccommodateallthecablesinonetier,
plus 30 to 50% additional width for future expansion. This additional width shall be
minimum100mm.Theoverallwidthofonecabletrayshallbelimitedto800mm.

14. Factory fabricated bends, reducers, tee/cross junctions, etc. shall be provided as per good
engineeringpractice.(Detailsaretypicallyshowninfigure3).Theradiusofbends,junctions
etc.shallnotbelessthantheminimumpermissibleradiusofbendingofthelargestsizeof
cabletobecarriedbythecabletray.

15. The cable tray shall be suspended from the ceiling slab with the help of 10mm dia MS
roundsor25mmX5mmflatsataspanspacingof1mtr.

16. Flattypesuspendersmaybeusedforchannelsupto450mmwidthboltedtocabletrays.

17. Roundsuspendersshallbethreadedandboltedtothecabletraysortoindependentsupport
angles 50mmX50mmX5mm at the bottom end as specified. These shall be grouted to the
ceiling slab at the other end through an effective means, as approved by the Engineerin
Charge,totaketheweightofthecabletraywiththecables.

Page62
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

18. Theentiretray(exceptinthecaseofgalvanizedtype)andthesuspendersshallbepainted
withtwocoatsofredoxideprimerpaintafterremovingthedirtandrust,andfinishedwith
twocoatsofspraypaintofapprovedmakesyntheticenamelpaint.

19. ThecabletrayshallbebondedtotheearthTerminaloftheswitchbondsatbothends.

20. The cable trays shall be measured on unit length basis, along the center line of the cable
tray,includingbends,reducers,tees,crossjoints,etc.andpaidforaccordingly

LADDERTYPECABLETRAY

21. The ladder type of cable tray shall be fabricated of double bended channel section
longitudinalmemberswithsinglebendedchannelsectionrungsofcrossmemberswelded
tothebaseofthelongitudinalmembersatacentertocenterspacingof250cm.

22. Alternatively, where specified, ladder type cable trays may be fabricated out of
50mmX50mmX6mm(minimum)angleironforlongitudinalmembers,and30mmX6mmflat
forrungs.

23. Typicaldetailsoffabricationanddimensionsofboththetypesoftraysareshowninfigure
4A,B,CandD.

24. The maximum permissible loading, jointing of channel sections, width of the cable tray,
provisionofelbows,bends,reducers,horizontaltee/crossjunctionsetc.suspensionofcable
trayfromtheceilingslab;paintingandmeasurementofthecabletrayshallbeaspersub
clauses(ii)to(x)belowclause2.6.11.2,exceptthattheoverallwidthofonecabletraymay
belimitedto800mm.
13) LayingofCablesinGround

1. Cabletrenchshallbedugtotheminimumdepthof1mtrandthewidthshalldependenton
thenoofcablestobekeptwiththelayerofbrickinbetweentwocables.

EXCAVATIONOFTRENCHES:

2. Thetrenchesshallbeexcavatedinreasonablystraightlines.

3. Whereverthereisachangeindirection,suitablecurvatureshallbeprovided.

4. Wheregradientsandchangesindepthareunavoidable,theseshallbegradual.

5. Theexcavatedsoilshallbestackedfirmlybythesideofthetrenchsuchthatitmaynotfall
backintothetrench.

6. Thebottomofthetrenchshallbelevelledandshallbemadefreefromstone,brickbatsetc.
The trench shall then be provided with a layer of clean, dry sand cushion of not less than
100mmindepth.

7. Priortolayingofcables,thecoresshallbetestedforcontinuityandinsulationresistance.
Thecabledrumshallbeproperlymountedonjacks,atasuitablelocation,makingsurethat
thespindle,jacketc.arestrongenoughtocarrytheweightofthedrumandthespindleis
horizontal.

8. Cableshallbepulledoverrollersinthetrenchsteadilyanduniformlywithoutjerks
andstrains.Theentiredrumlengthshallbelaidinonestretch.

9. However,wherethisisnotpossibletheremainderofthecableshallberemovedby`Flaking
i.e.bymakingonelongloopinthereversedirection.

Page63
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

10. Afterthecablehasbeenuncoiledandlaidintothetrenchovertherollers,thecableshall
beliftedofftherollersbeginningfromoneendbyhelpersstandingabout10metersapart
andlaidinareasonablystraightline.

11. Cablelaidintrenchesinasingletierformationshallhavea coverofclean,drysandofnot


lessthan150mm.abovethebasecushionofsandbeforetheprotectivecoverislaid.

12. In the case of vertical multitier formation after the first cable has been laid, a sand
cushionof300mmshallbeprovidedovertheinitialbedbeforethesecondtierislaid.

13. Finally the cables shall be protected by second class bricks before back filling the trench.
Theburieddepthofuppermostlayerofcableshallnotbelessthan750mm.

14. BackFilling:Thetrenchesshallbebackfilledwithexcavatedearthfreefromstonesor
othersharpedgeddebrisandshallberammedandwatered,ifnecessary,insuccessive
layersnotexceeding300mm.Unlessotherwisespecified,a crownofearthnotlessthan
50mminthecentreandtaperingtowardsthesidesofthetrenchshallbelefttoallowfor
subsidence.

14) RouteMarker

1. Routemarker shallbe providedalongstraight runs ofthecables not exceeding 30meters


alsoforchangeinthedirectionofthecablerouteandundergroundjoints.

2. Routemarkershallbeofcastironpaintedwithaluminiumpaint.

3. Thesizeofmarkershallbe100mmdiawithCableandvoltagegradeinscribedonit.

15) TestingofCables

1. Cables shall be tested at works for all routine tests as per IS including the following tests
beforebeingdispatchedtositebytheprojectteam.

a) InsulationResistanceTest.
b) Continuityresistancetest.
c) Sheathingcontinuitytest.
d) Earthtest.(inarmouredcables)
e) HiPotTest.

2. Testshallalsobeconductedatsiteforinsulationbetweenphasesandbetweenphaseand
earthforeachlengthofcable,beforeandafterjointing.

3. Oncompletionofcablelayingwork,thefollowingtestsshallbeconductedinthepresenceof
theOwnerssiterepresentative.

f) InsulationResistanceTest(Sectionalandoverall)
g) Continuityresistancetest.
h) Sheathingcontinuitytest.
i) Earthtest.

4. All tests shall be carried out in accordance with relevant Standard Code of Practice and
ElectricityRules.

5. The Contractor shall provide necessary instruments, equipment and labour for
conductingtheabovetestsandshallbearallexpensesinconnectionwithsuchtests.

Page64
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

6. AlltestsshallbecarriedoutinthepresenceoftheOwnerssiterepresentative,resultswill
benotedandsignedbyallpresentandrecordbemaintained.

16) WORKMANSHIP

1. Cablesshallbelaidintheroutesmarkedinthe drawings. Wherethe routeisnotmarked,


theContractorshallmarkitoutonthedrawingsandalsoonthesiteandobtaintheapproval
oftheCLIENTAND/ORITSARCHITECTbeforelayingthecable.

2. Procurementofcablesshallbeonthebasisofactualsitemeasurementsandthequantities
showninthescheduleofworkshallberegardedasaguideonly.

3. Cablesshallbelaidonwalls,cabletrays,insideshaftsortrenches.

4. Saddlingorsupportforthecableshallnotbemorethan500mmapart.Plasticidentification
tagsshallbeprovidedatevery30m.

5. Cablesshallbebenttoaradiusnotlessthan12(twelve)timestheoveralldiameterofthe
cableorinaccordancewiththemanufacturer'srecommendationswhicheverishigher.

6. In the case of cables buried directly in ground, the cable route shall be parallel or
perpendiculartoroadways,wallsetcunlessmarkedondrawingbyarchitect/consultant.

7. Cables shall be laid on an excavated, graded trench, over a sand or soft earth cushion to
provideprotectionagainstabrasion.

8. Cables shall be protected with brick or cement tiles on all the three sides as shown on
drawings.Widthofexcavatedtrenchesshallbeasperdrawings.

9. Backfilloverburiedcablesshallbewitha minimumearthcoverof750 mmto1000mm.


Thecablesshallbeprovidedwithcablesmarkersatevery10metersandatalllooppoints.

10. Allcablesshallbefullrunsfrompaneltopanelwithoutanyjointsorsplices.

11. Cables shall be identified at end termination indicating the feeder number and the
Panel/Distributionboardfromwhereitisbeinglaid.

12. Cableterminationforconductorsupto4sq.mm.maybeinsertiontypeandallhighersizes
shallhavecompressiontypelugs.

13. Cableterminationshallhavenecessarybrassglands.Theendterminationshallbeinsulated
withaminimumofsixhalflappedlayersofPVCtape.Cablearmouringshallbeearthedat
bothends.

14. Incaseofcablesenteringthebuildings.Itwouldbedonedulyonlythroughpipes.Thepipes
shallbelaidinslantposition,sothatnorainwatermayenterthebuilding.

15. AfterthecablesaretestedthepipesshallbesealedwithM.seal&thentarpaulin,shallbe
wrappedaroundthecableformakingtheentrywatertight.

16. Testing:MVcablesshallbetesteduponinstallationwitha500VMeggarandthefollowing
readingsestablished:
16.1 Continuityonallphases.
16.2 InsulationResistance.
16.3 betweenconductors.
16.4 allconductorsandground.

Page65
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

16.5 All test readings shall be recorded and shall form part of the completion
documentation.
16.6 Cable joints shall be done as per regular practice and check shall be carried out for
looseconnections and leakages. Insulationcutting shallbe done properlytakingcare
thatnoareaoftheconductorremainsexposed.Crimpingshallbedonewiththehelpof
hydraulictool.Properinsulationtapeshallbeappliedatthecableandlugjoint.
17. Formatforcabletestingcertificate:

a.Drumno.fromwhichcableistaken:
b.Cablefrom_________to_________
c.Lengthofrunofthiscable______mtr
d.Insulationresistancetest
betweencore1toearth_______megaohm
betweencore2toearth_______megaohm
betweencore3toearth_______megaohm
betweencore1tocore2_______megaohm
betweencore2tocore3_______megaohm
betweencore1tocore3_______megaohm
durationused:
e.Highvoltagetest:VoltageDuration
betweencoreandearth
betweenindividualcores

18. Thecableshallbelaidsidebysideintrenchwithbrickcoveringonallthethreesides.

19. Thetrenchshallbesuchthatsharpbendsshallbeavoidedwhilelayingthecable.

20. Thebeddingoffinesandunderthecableshallbenotlessthan6mm.Thetrenchshallbe
terminatedinManholeswithspecifiedsizeofR.C.C.humepipesasshownindrawing.Cable
markersshallbeprovidedthroughouttherouteofcableat10mtrsdistance.

21. ThetrenchesshallberefilledafterthecablearelaidandtheGroundlevelshallbedoneas
per original after pressing the same. The cables shall be checked for insulation resistance
andcontinuitytestsshallbecarriedout.

17) MODEOFMEASUREMENT:

17.1 ModeofMeasurementforCableTrench&CableTray.

The cable laying shall be measured in rmt. The trenches dug and refilled shall be
measuredincu.Mtr.Thebricksandsandbeddingshallbemeasuredinrmt.Thecable
traysshallbemeasuredinrmt.

17.2 ModeofMeasurementforCableandCableEndTerminations.

Thecablesshallbemeasuredinrmtandterminationsonunitbasis.

10TECHNICALSPECIFICATIONFORINTERNALWIRING.

1) SYSTEMOFWIRING

1. The system of wiring shall consist of PVC insulated copper stranded conductor flexible
FRLSwiresinmetallic/nonmetallic(Rigidheavy/MediumDutyISImarkedfireretarded
PVC Conduits of minimum 2mm Wall thickness and Sizes of conduits shall be 25 mmdia.

Page66
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

conduitsforbothmainsandpointwiringandshallbeconcealedorsurfacemountedabove
falseceilingascalledfor.

2) GENERALDESCRIPTION

1. Priortolayingandfixingofconduits,thecontractorshallmarktheconduitroute,carefully
examinetheworkingdrawingspreparedbyhimandapprovedbytheConsultantindicating
thelayout,satisfyhimselfaboutthenoninterferenceintheroute,sufficiencyofnumberand
sizesofconduits,locationofjunctionboxes,sizesandlocationofswitchboxesandother
relevantdetails.

2. AnydiscrepancyfoundshallbebroughttothenoticeoftheOwnerssiterepresentative.

3. Anymodificationssuggestedbythecontractorshouldgetwrittenapprovalbeforetheactual
layingofconduitsiscommenced.

4. Inlayingofconduitsitisimportantthatnotmorethantworightanglebendsareprovided
foreachcircuitwithoutapullbox.

5. Nojunctionboxshallbeprovidedintheentirelengthofconduitrunfordrawingofwires.

6. Only switch outlets, lighting fixture outlets, equipment power outlets and socket outlets
shallbeconsideredfordrawingofwires.

3) LIGHTING&POWERWIRING

1. All final branch circuits for lighting and appliances shall be single conductor/ stranded/
flexiblewiresruninsideconduits.

2. Theconduitshallbeproperlyconnectedorjointedintosockets,bends,andjunctionboxes.

3. Branch circuit conductor sizes shall be as shown in the schedule of quantities and or
drawings.

4. Allcircuitsshallpreferablybekeptinaseparateconduit up totheDistributionBoard.No
other wiring shall be bunched in the same conduit except those belonging to the same
phase.

5. Eachlightingbranchcircuitshallnothavemorethantenoutletsor800wattswhicheveris
lower.Eachconduitshallnotholdmorethanthreebranchcircuits.

6. Flexible cords for connection to appliances, fans and pendants shall be 650/1100 V grade
(three or four cores i.e. with insulated neutral wire of same size) with tinned stranded
copper wires, insulated, twisted and sheathed with strengthening cord. Colour of sheath
shallbesubjecttotheCLIENTAND/ORITSARCHITECTSapproval.

7. Looping system of wiring shall be used. Wires shall not be jointed. Where joints are
unavoidable,theyshallbemadethroughapprovedmechanicalconnectors.

8. Nosuchjointsshallbemadeunlessthelengthofthesubcircuit,submainormainismore
thanthelengthofthestandardcoil.

9. Control switches shall be connected in the phase conductors only and shall be `ON' when
knobisdown.Switchesshallbefixedin3mm.thickpaintedorgalvanizedsteelboxeswith
coverplatesasspecified.Cadmiumplatedbrassscrewsshallbeused.

10. Power wiring shall be distinctly separate from lighting wiring. Conduits not less than 25
mm.andwiresnotlessthan1.0sq.mm.coppershallbeused.

Page67
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

11. Every conductor shall be provided with identification ferrules at both ends matching the
drawings.

4) TESTING

1. Theentireinstallationshallbetestedfor:

Insulationresistance.
Earthcontinuity.
Polarityofsinglepoleswitches.

2. Allthewiringswitchboard,outletpointsshallbedoneinaconcealedmannerinwall&slab
in PVC conduit of minimum 25 mm dia. (medium gauge) & with 650v / 1100v grade PVC
insulatedflexiblecopperconductorwire.

3. Theswitchesshouldbemodularwithmouldedcoverplates,blankplatesforoutletboxes.

4. Theaccessories,connectors,sockets,shouldbefixedwithbrasschrome/cadmiumplated
machinescrew.Forfanpointstheratesshouldbewithhumfreetype300Wregulatorsas
requiredtocompletethepointwiring.

5. ThewiringshallbeasperIS:732andIS:4648.Thewiringshallbedoneinaloopingmanner
soastoavoidjunctionboxesatanyplace.

6. Alltheloopingshallbedoneonlyintheswitchboardandoutletpoints.Thesizeofthewire
shallbeasperthespecification.Colourcodeshallbestrictlyfollowed.

7. ThesizeofwiresshallasfollowasperBOQandasperclientsrequirements:

8. Light,fans,exhaustfan,5Amp.Onboardplugpoint,twowaylightpoints,bellpointetcfrom
switchtooutlet.
Phase/Neutral 1.5mm2
Earth 1.5mm2

9. FromD.B.toswitchboardlighting/5Asocketetci.e.circuitmainspartofpointwiring
Phase/Neutral 2.5mm2
Earth 1.5mm2
10. FromD.B.to16Apowerpointetci.e.circuitmainspartofpointwiring
Phase/Neutral 4.0mm2
Earth 1.5mm2

11. Separatepipesshallbelaidforoffwiresandcircuitmains.

12. Circuit mains of same phase shall be drawn in one pipe with prior permission/discussion
withtheconsultant.

13. Separate phase, neutral and earthing wire of sizes recommended by consultant shall be
drawnforeachandeverycircuitmains.

14. Mainsforlightingandonboardplugpointsshallbeofonesizehigherwiresthanthoseused
inoff.

5) COMPUTERWIRING:

Page68
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC


1. Wiring for short extensions to outlets in hung ceiling or to vibrating equipments, motors
etc.,shallbeinstalledinflexibleconduits.Otherwiserigidconduitsshallbeused.Noflexible
extensionshallexceed1.25m.

2. Conduits run on surfaces shall be supported on metal 12 mm. thick G.I. pressure saddles
whichinturnareproperlyscrewedtothewallorceiling.Saddlesshallbeatintervalsofnot
morethan500mm.

3. Fixing screws shall be with round or cheese head and of rustproof materials. Exposed
conduitsshallbeneatlyrunparalleloratrightanglestothewallsofthebuilding.

4. Unseemly conduit bends and offsets shall be avoided by using fabricated mild steel
junction/pullthroughboxesforbetterappearances.

5. No crossover of conduits shall be allowed unless it is necessary and entire conduit


installationshallbecleanandneatinappearance.

6. Conduitsembeddedintothewallsshallbefixedbymeansofstaplesatnotmorethan500
mm.intervals.Chasesinthewallsshallbeneatlymadeandrefilledafterlayingtheconduit
andbroughttothefinishofthewallbutthebuildingContractorwilldofinalfinish.

7. Conduitsburiedinconcretestructureshallbeputinposition andsecurelyfastenedtothe
reinforcement and got approved by the CLIENT AND/OR ITS ARCHITECT, before the
concreteispoured.

8. Propercareshallbetakentoensurethattheconduitsareneitherdislocatednorchokedat
the time of pouring the concrete suitable fish wires shall be drawn in all conduits before
theyareembedded.

9. Whereconduitpassesthroughexpansionjointsinthebuilding,adequateexpansionfittings
shallbeusedtotakecareofanyrelativemovement.

10. Inspection boxes shall be provided for periodical inspection to facilitate withdrawal and
removalofwires.Suchinspectionboxesshallbeflushwiththewallorceilinginthecaseof
concealed conduits. Inspection boxesshall bespaced atnot morethan 12metersapartor
two90solidbendsorequal.

11. All junction and switch boxes shall be covered by 6 mm clear plate. These junction boxes
shall form part of point wiring or conduit wiring as the case may be including the cost of
removingthecoverforpaintingandrefixing.Noseparatechargesshallbeallowedexcept
wherespeciallymentioned.

12. Conduitsshallbefreefromsharpedgesandburrsandthethreadingfreefromgreaseoroil.
The entire system of conduits must be completely installed and rendered electrically
continuousbeforetheconductorsarepulledin.Conduitsshouldterminateinjunctionboxes
ofnotlessthan32mm.deep.

13. Aninsulatedearthwireofcopperratedcapacityshallberunineachconduit.

The point definition shall be conduiting and wiring from D.B. to S.B. and there
from tofinal outlet point includingswitches and accessories, junction boxes, fan
boxes,zarriworkwithcementsandetcofapprovedmake.

6) CONDUCTORS
1. All PVC insulated copper conductor flexible FRLS wires shall conform in all respects to
Standards as listed under subhead Indian Standards and shall be IS approved and ISI
marked.

Page69
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC


7) BUNCHINGOFWIRES
1. Wires carrying current shall be so bunched that the outgoing and return wires are
drawnintothesameconduit.

2. Wiresoriginatingfromtwodifferentphasesshallnotruninthesameconduit.Allwiresshall
haveferrulesforidentification.

3. Lightingandpowercircuitsshallbeseparate.EachPower/LightCircuitsNeutralshallbe
individualperCircuitandshallnotbeloopedfromanyotherCircuit.

8) LOADBALANCING
1. BalancingofcircuitsinthreephaseinstallationshallbeasplannedbytheConsultantsinthe
tenderdrawingsandshallbecheckedbythecontractorbeforethecommencementofwiring
andshallbestrictlyadheredto.

9) COLOURCODEOFCONDUCTORS
1. Colour code shall be maintained as indicated by the Consultant for the entire wiring
installations. Red, yellow, blue shall be for three phases, black for neutral and green with
yellowbandshallbeforearthing.

10) WORKMANSHIP

DrawingConductors

1. Thedrawing andjointing ofPVC insulatedcopperconductor wiresshall be executed with


dueregardtothefollowingprecautions.

2. While drawing wires through conduits, care shall be taken to avoid scratches and kinks
whichmaycausebreakageofconductors.

3. There shall be no sharp bends. Wire reel stands to be used for pulling of wires to avoid
kinks.

4. Careshallbeexercisedwhiledrawingthewiresfromreels,bytakingappropriatemeasures
toensurethatwires are notspread on ground,causing dust and dirt accumulationon the
newwires.

5. Maximumpermissiblenumberof1100voltgradePVCinsulated wiresthatmaybedrawn
intorigidnonmetallicorPVCConduitsaregivenbelow:
Size of wires Nominal Maximum number of wires within conduit
Cross size(mm)
SectionArea(Sq.mm.) 20 25 32 40 50
1.5 7 12 16
1.5 5 10 14
4 4 8 12
6 3 6 8
10 4 5 6
16 3 3 6 6
25 2 4 6
35 3 5

6. Insulationshallberemovedbyinsulationstripperonly.FewStrandsofwiresshallnotbe
cut/reducedforconvenienceinconnectingintoterminals.

Page70
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

7. The terminals shall have sufficient cross sectional area to take all strands and its
connectingbrassscrewsshallhaveflatsends.

8. All looped joints shall be connected through terminal block/connectors. The pressure
appliedtotightenterminalscrewsshallbejustadequate,neithertoomuchnortoo
less.Alllightpointsshallbeterminatedthroughaconnector.

9. Onlylicensedwiremen(Beforedoingtheworkorbeforeappointinghimonsitecontractor
has to submit his wiring licence to Owner) and cable jointers shall be employed to do
jointingwork.

10. Beforeentrustingcablejointingworktoanytechnician,orbeforeappointingCableJointers
or Wiremen on Site, Contractor has to submit such Technicians / Wiremans /Cable
JointerslicencetoOwner.

11. AllwiresandcablesshallbeembossedwiththemanufacturerslabelwithISImarkandshall
be brought to site inoriginal packing.For all internal wiring. PVCinsulated wires of1100
voltsgrade(FRLS)shallbeused.

12. The subcircuit wiring for point shall be carried out in loop system and no joints shall be
allowedinthelengthoftheconductors.

13. No wire shall be drawn into any conduit until all defective work of conduit installation of
anynaturethatmaycauseinjurytowireiscompleted.

14. Careshallbetakenwhilepullingoutthewiressothatnodamageoccurstoconduits/wire
itself, the conduits shall be thoroughly cleaned of moisture, dust , dirt or any other
obstruction.

15. The minimum size of PVC insulated copper conductor wires for all subcircuit wiring for
light points shall be minimum 1.0 sq.mm copper. Separate neutral to be pulled for each
circuit.

16. Conduits shall be kept at a minimum distance of 100 mm. from the pipes of other
nonelectricalservices.Andmaintainminimum300mmdistancebetweentelephones,TV&
Computerpiping.

17. Separate conduits/raceways shall be used for following points as applicable and as
requirementsofsiteconditions:

17.1 Normallightsand5A3pinsocketsonlightingcircuit.
17.2 SeparateconduitshallbelaidfromD.B.toswitchboard.
17.3 Poweroutlets15A3pin20A/30A,2pinscrapingearthmetalcladsockets.
17.4 Emergencylighting.
17.5 Telephones.
17.6 Firealarmsystem.
17.7 Publicaddresssystem&Musicsystem.
17.8 Forallothervoltageshigherorlowerthan230V.
17.9 T.V.Antenna.
17.10 Waterlevelguard.

11) FISHWIRE

1. Tofacilitatesubsequentdrawingofwiresintheconduit,GIfishwiresof1.0mm(14SWG)
shallbeprovidedalongwiththelayingofrecessedconduit.

Page71
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

12) MODEOFMEASUREMENT

1. TheitemsshallbemeasuredonunitbasisoronmtrbasisasperBOQ.

11TECHNICALSPECIFICATIONFORLIGHTFIXTURES&ACCESSORIES.

1) SCOPE:

1 Thescopeofworkshallcoverthesupply,installationandtestingofvarioustypesoflight
fixtures.Thescopealsoincludesthesupplyofheavydutyexhaustfanandceilingfan.


2) STANDARDS:
Thefollowingstandardsandrulesshallbeapplicable:

(a) IS3646 1960Codeofpracticeforinteriorilluminator.

(b) IS1913 1969GeneralandSafetyrequirementsfor

electriclightingfittings.

(c) IndianElectricityActandRulesissuedthereunder.

1 All codes and standards mean the latest. Where not specified otherwise the installation
shallgenerallyfollowtheIndianStandardCodeofPracticeortherelevantBritishStandard
CodeofPracticeintheabsenceofIndianStandard.


3) GENERALREQUIREMENTS:

1 All fixtures shall be complete with accessories and fixings necessary for installation
whethersodetailedunderfixturedescriptionornot.

2 Fixturehousing,frameorcanopyshallprovideasuitablecoverforthefixtureoutletboxof
fixtureopening.

3 Fixtureshallbeinstalledatmountingheightsasdetailedonthedrawingsorinstructedon
sitebytheclient'srepresentative.

4 Fixturesand/orfixtureoutletboxesshallbeprovidedwithhangerstoadequatelysupport
thecompleteweightofthefixture.Designofhangersandmethodoffasteningotherthan
shownonthedrawingsorhereinspecifiedshallbesubmittedtotheclient'srepresentative
forapproval.

5 Fixture shall be completely wired and constructed to comply with the regulations and
standards for Electric Lighting Fixtures, unless otherwise specified. Fixtures shall bear
manufacturersnameandthefactoryinspectionlabelunlessotherwiseapproved.

6 Wiringwithinthefixtureandforconnectiontothebranchcircuitwiringshallbenotless
than1.5sq.mm.copperfor250Voltapplication.Wireinsulationshallsuitthetemperature
conditionsinsidethefixtureandwiresbypassingthechokeshallbeheatprotectedwitha
heatresistantsleeve.

7 Metal used in lighting fixtures shall be not less than 22 SWG or heavier if so required to
complywithspecificationsorstandards.Sheetsteelreflectorsshallhaveathicknessofnot
lessthan20SWG.Themetalpartsofthefixturesshallbecompletelyfreefromburrsand

Page72
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

tool marks. Solder shall not be used as mechanical fastening device on any parts of the
fixture.

8 Ferrousmetalshallbebonderizedandgivenacorrosionresistantphosphatetreatmentor
otherapprovedrustinhibitingprimcoattoprovidearustproofbasebeforeapplicationof
finish.

9 NonreflectingsurfacessuchasfixtureframesandtrimshallbeAlluminiumdiecast.

10 AllthefixturesareaspertheIP54insulationclass

11 Vendorshallberesponsibleformeasuringthelevelofilluminationafterinstallation.

12 Lightingfixturesshallbedesignedforminimumglareandforcontinuousoperationunder
specifiedatmosphericcondition.

13 Allfixturesshallbecompletewithaccessorieslikepowerfactorimprovementcapacitors,
ballast,ignitoretc.

14 Flourescentfixtureshallbeofsheetsteelcasingwithcorrosionresistancefinish.Itshallbe
provided withseparate wiring channel withcoverplateandan earthterminal. All screw
shallbechromiumbrassonly.Lampandstarterholdersshallbeoftoughmouldedplastic
withspringloadedrotortypeconnector.Condensersshallbelowlosspaperimpregnated
hermatically sealed. Internal wiring shall be neatly clipped and where by passing the
ballast,asuitableheatresistancebarrierorsleeveshallbeprovided.
4) REFLACTOR:

1 Lightreflectingsurfaceshallbemirrorfinishedhavingthereflectionfactorofnotlessthan
80%. All parts of reflector shall be completely covered by finish and free from
irregularities. It shall be capable of withstanding a 6 mm. radius bend without showing
sign of cracking, peeling or loosening from the base metal. Finish shall be capable of
withstanding 72 hours exposure to ultra violet sun lamp placed 10 cm. from the surface
without discoloration, hardening or warping and retain the same reflection factor after
exposure.Testresultshallbefurnishedforeachlotoffixtures.
2 Lightingfixturereflectorsshallgenerallybemanufacturedfromsheetsteelofaluminium
ofnotlessthan20SWG.Theyshallbereadilyremovablefromthehousingforcleaningand
maintenance without disturbing the lamps and without the use of tools. They shall be
securitymountedtothehousingbymeansofpositivefasteningdevicesofacapativetype.

3 Polystyrene eggbox type louvers shall be provided whenever specified. Appropriate
captivetypefixingdevicesshallbeincorporatedforsecuringthese.

5) BALLAST:

1 Lightingfixturesballastsshallbedesignedmanufacturedandsuppliedinaccordancewith
the relevant standard IS 6616 and shall function satisfactorily under site conditions
specified.Theballastsshallhavealongservicelifeandlowpowerloss.

2 Ballasts shall be mounted using selflicking, antivibration fixings and shall be easy to
removewithoutremovingthefittings.

3 Ballastshallcontainathermosettingtypecompoundnotsubjecttosofteningorliquefying
under any operating conditions or upon ballast failure. The ballasts shall be of the
inductiveandheavydutytypeFilledwithpolyesterofequivalent.Theyshallbefreefrom
humandprotectedfromtheatmospheres.Ballstswhichproduceahummingsoundshall

Page73
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

bereplacedfreeofcostbythesupplier.HPMVlampballastsshallbeprovidedwithsuitable
tappings.

6) STARTERS:

1 Lighting fixtures starters shall be of the safety type (i.e. if the lamps fails to ignite at the
firststart,nofurtherstartingmustbepossiblewithoutattendingtothetubelight.Starters
shallhavebimetalelectrodesandhighmechanicalstrength.

2 Startersshallbereplaceablewithoutdisturbingthereflectororlampsandwithouttheuse
ofanytool.Startersshallhavebrasscontactsandradiointerferencecapacitor.

7) CAPACITORS:

1 Lightingfixturecapacitorsshallhaveaconstantvalueofcapacitorsandshallbeconnected
acrossthesupplyofindividuallampcircuits.

2 Eachcapacitorshallbesuitableforoperationat240volts5%singlephase50Hzwitha
suitable value of capzcitorance so as to correct the power factor of lists corresponding
lampcircuittotheextentof0.98lag.

3 The capacitors shall be harmatically sealed preferably in metal container to prevent


seepageofimpregnatingmaterialandingressofmoisture.

8) LAMPHOLDERS:

1 Lampholdersforfluorescenttubesshallbeofthespringloaded,lowcontactresistance,bi
pin rotor type, resistant to wear and suitable for operation at the specified temperature,
without deterioration in insulation valve, contact resistance of lamp holding quality. The
shallholdthelampinpositionundernormalconditionofshockandvibration.

2 Lampholders for incandescent and HPSV lamps shall be of G.L.S. type manufactured in
accordancewithrelevantstandardsanddesignedtogivelongandsatisfactoryservice.

9) LUMINAIRES:
1 Fixture shall be of single die cast aluminium made out of LM6 canopy , anodised high
purity aluminium reflactor, toughened glass at the front and die cast aluminium control
gear box complete with all accessories mention in 3.22 with prewired upto connector
blockandloopinandloopoutfacilities.

2 Street light fixture shall be of single die cast aluminium housing with provision for the
easyremovalofgearboxduringmaintenance.Acrylicbowlshallbelinkedtooneendand
toggle shall be provided. Neoprene rubber and felt gasket shall be provided between
acrylicbowlandfixturetoprevententryofinsectsandmoisture.

3 Industriallowbayfittingshallbeofdiecastaluminiumhousing,highpurityAl.Reflector,
acryliccoverandwireguard.
10) LAMPS:
1 Lampsshallbesuppliedandinstalledinalllightingfixturesfurnishedunderthiscontract.

2 Lampsusedfortemporarylightingserviceshallnotbeusedinthefinallampingoffixture
units.

3 Lampsshallbeofwattageandtypeasshownonthedrawingsandschedules.Wherenot
shown,thedetailsshallbeascertainedfromtheclientbeforeprocurement.

Page74
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

4 Lampsforpermanentinstallationshallnotbeplacedinthefixturesuntilsodirectedbythe
Client's representative, and this shall be accomplished directly before the respective
portionsarereadyforoccupation.

11) TEST:

1 ThefollowingroutinetestsshallbeconductedaspertherelevantIndianStandards:
a) Each fixture shall be tested at 1500 volts r.m.s. 50 Hz for one minute and no
flashoverofbreakdownshalloccurbetweencurrentcarryingpartsandground.
b) Insulationresistanceofeachfixtureshallbetestedat500V.D.C.andtheinsulation
resistances so measured shall not be less than 2 mega ohms between all current
carryingpartsandground.
c) Each fixture complete with its proper lamp/lamps shall be shown to operate
satisfactorilyatitsnormalvoltageandfrequency.
d) Eachfixture shallbe examined visuallyto ensure thatitiscompletein allrespects
andsatisfactorilyfinished.
e) Type and routine test certificates shall be submitted for tests conducted as per
relevantIS/BSforthefixtureandaccessories.

12) DRAWINGSANDDATA:

Asperoftheproposalthebidderfurnishrelevantdescriptive andillustrativeliteratureon
lighting fixtures and accessories and following drawings/ data for the respective lighting
fixtures:

i) DimensionalDrawings.
ii) Mountingdetailscableentryfacilitiesandweights.
iii) Lightdistributiondiagrams(Zonal&Isokandora)
iv) Lightabsorptionandutilisationfactors.
v) LampoutputV/Stemp.curves.

13) WORKMANSHIP:

1 The fixture shall be installed on wall / ceiling as directed and as per manufacturer's
instruction, with necessary accessories for surface, concealed, suspended from ceiling,
bracketmountingetc.

2 The job also includes connection of fixture with respective outlet point with heat
resistantwiresthroughheatresistancesleeveandPVCconnector.Theexhaustfanshall
beinstalledcompletewithM.S.angleironmountingframe/ring,G.I.louvers,wiremesh
andplugattheendofthecordincludingwiring&earthingetc.Properearthingshallbe
providedtothefixtures.

14) MODEOFMEASUREMENT:

Theunitrateshallbeconsideredforfittingonefixture.Therateshallincludefollowing

1 Allfixingaccessories,mountingbracket,ballastcondensersandcontrolgearwherever
applicable.

2 SupplyingandfixingBallandsocketjointswhereverrequired.

3 Earthingoffittings.

Page75
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

4 Electricalconnectionstofittings/fansfromthejunctionbox/ceilingrose.

5 InstallationandinterconnectionofElectronicregulatorsforceilingfans.

6 Supplyingandfixing300mm.GIdownrodforceilingfans.

12TECHNICALSPECIFICATIONFORDATA,TELEVISION&TELEPHONEWIRING.

1) GENERALDESCRIPTION

1. The work shall cover the supply and installation of the TV, Telephone and Computer data
pointsincludinglayingofCablesin19/20mmdiaPVCConduit.

2) SCOPE

TELEPHONECABLESANDWIRES:

1. Thetypeofcablesandtheservicesshallbeasfollows:

2. IndoorMultipairPVCsheatharmoured/unarmouredasspecified0.6mmtinCu.Cable.

3. OutsideMultipairPVCsheatharmoured/jellyfilledasspecified0.6mmtinCu.Cable.

4. Allmulticorecablesandwiresshallbeoftinnedcopperconductorofnotlessthan0.6mm
diaandshallbecolourcodedtwistedpairswithripcord.

5. Theconductorresistanceshallbelessthan150ohmsperKMandtheinsulationresistance
betweentheconductorsnotlessthan50megaohmsandthenominalcapacitanceofabout
0.1microfaradperkilometre.

6. Cableslaidundergroundorlocationssubjecttodampnessandfloodingshallbefilledwith
polyethylene compound and shall have sufficient protection against moisture and water
ingress.

7. Allarmouringshallbeofgalvanizedsteelwiresandprotectedagainstcorrosionbyanouter
sheath ofPVCin thecase of indoor cables andpolyethylene in thecase ofoutdoorcables.
Outersheathingmustbefireretardingandantitermite.

8. Allunarmouredsinglecorecablesandinnersheathofarmouredcablesshallbeprovided
withripcord.

TELEPHONETAGBLOCKS:

9. Thetelephonetagblocksshallbesuitableforthemulticoretelephonecablesandshallhave
two terminal blocks, cross connect type. All incoming and outgoing cables shall be
terminatedonseparateterminalblocksandterminationshallbesilversoldered.Thecross
connectingjumpersshallbeinsulatedwiresofsamediameterandscrewconnected.

10. Thetagblocksshallbemountedinsidefabricatedsheetsteelboxeswithremovablehinged
coversandshallbefullyaccessible.Theenclosureshallbepaintedwith2coatsofredoxide
andstoveenamelled.

TELEPHONEOUTLETSOCKET:

Page76
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

11. Telephoneoutletsocketshallbeofthesamemakeasthatoftheswitchesandaccessories.
Theoutletsocketsshallconsistof2A2PairpolyetheneconnectorinM.S.I/PVCboxeswith
switch plate of the same make as that of switches and telephone socket. The telephone
outletsocketunlessandotherwisespecifiedshallbejacktypeandnotpintype.

EPABX:

TechnicalspecificationofIPPABXserverbasedGatewaysystem
Thesystemhardwareshallhave:
TheSelfsurvivableGatewaysystemshallbeanativeVoIPGateway.ThesystemshallbeIP
enabledtelecomgateway.ThegatewayshouldhaveSessioninitiationprotocol(SIP)for
transmissionofvoiceoverIPnetwork.ItshouldalsosupportG.711,G.723&G.729Aencoding
standards.
ItshouldsupportI.P.VideoTelephony.
PowerSupply:Thesystempowersupplymustbecapableofsupporting220V
1
AC/48VDC.ThesystemtobeprovidedwithDCpowersupply.
SystemshouldbecapableofhavingbuiltinLANconnectivity.Itshouldhave
2 builtin2portLANswitchfornetworkconnectivityor2portLANswitchtobe
suppliedalongwiththesystemfornetworkconnectivity
Thesystemsshallhaveconferencingfacility.IPGatewayshouldalsoworkasaPRI
GatewaytobeusedforinterconnectingexistingPBXsoforganizationtoproposed
VoIPnetwork.TheIPGatewaytobeconnectedtoexistingorganizationPBXs
3 throughPRICardsandintegratedtotheVoIPnetworkthroughIPtrunks.TheseIP
Gatewayshouldbeselfsurvivableremotesystem.Intheeventofnetworkoutage
thelocalgatewayshouldworkasanindependentsystem,alltheAnalogextensions,IP
phones&otherterminalsdeployed.
Generaltechnicalspecifications
SystemFeatures:
A)Multipartyconference:
PresetConferenceCalls:AllGateways&IPPBXshouldbesuppliedwithconference
facility.Itmustbepossibletodialoutapredefinedgroupofparticipants/numbersby
simplypressingthepreassignedkeyonthedigitalphone.Itmustbepossibletohave
multiplesuchgroups.Additionally,eachpresetconferencemusthaveitsownuniquedial
number.
B)NetworkingCapability:Theofferedsystemshouldbecapableofnetworkingwith40
sites(nodes).Thesystemsoftwareshouldhavetheprovisionof40nodeconnectionsina
singlenetwork.Eachnodeshouldbecapableofdefiningitsownnumberingplanand
routingrulessothateachsystemshouldbeabletocommunicatewitheachotherand
identifythenumberingschemeofothersystemsinthenetwork.
Systemshouldofferconnectivityforthefollowing
a.AnalogTrunkcardwithCLIfacility
b.DigitalT1trunkCardc.DigitalE1trunkcard
d.ISDNPRIcard
e.ISDNBRIcard
f.AnalogLine(Extension)cardwithCLIfacilitythroAnalogTrunkline.g.KeyTelephone
setcard/Digitalcard
h.IPDECTInterfacewithbasestationconnectivityoversinglepair.i.TelephonyoverIP
(ToIP)
j.VOIP
k.E&M2/4wirewithTypeItoTypeVSignalingl.CTI(1stParty,3rdParty)
m.InBuiltACDn.VideooverIPo.InSkinSS7
p.InSkinSIPTrunkInterface
ThesystemshouldhaveInternalroutingtabletohandleupto40locationstoget

Page77
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

thecostbenefitthroughLeastCostRouting.SystemshouldbeQSIGSignaling
enabledfornetworkingand feature transparency by using BRI (2B+D),PRI
SystemshouldsupportE&Mtrunkcircuitswhichisindividuallyconfigurable,with
selectable2W/4W,andflexible E &M lead definition and also shouldbe
configurabletoType1toTypeVhardwaresignaling.TheofferedIPPBX/Gateway
shouldhaveE&Mcardwithformfactor4or8.
Systemshouldsupportanalogtwowayloopdialing(LD)toconnectPABXtoother
interfacebyputtingtheinterfacecardintheEPABX.
ThesubscriberlinecardsshallbearrangedonplugintypePCB`s.16/24subscriber
linesmaybehousedinonecard.Allsuchcardsshallbeinterchangeable.
TheinputpowertotheIPPBX&GatewaysistobeDCpoweronly.
SystemshouldhavecapabilitytobeinterfacedwithothertypeofEPABXsystemsto
providenetworkingfeatures.QSIGSoftwaretobeprovidedwithallIPPBXand
gatewaysforfeaturetransparency.
TheIPPBXshouldsupportQSIGoverIPfornetworkfeaturetransparency.
TheAnalogextensionsshouldsupportloopresistanceofminimum1600ohms.
SystemshouldbecapableofhavingbuiltinLANconnectivity.
TheIPPBX&GatewaysshouldprovidealltypesofCallerID.Itshouldbepossible
totransferthecalleridthroughoutthenetwork.
TheIPServer,Gateways,IPPBXofferedshouldsupportOPENSIPterminals.It
shouldbepossibletointegratethirdpartyvendorSIPterminalsseamlesslywiththe
VOIPNetwork.
NetworkingQSIG
ThesoftswitchshouldbeequippedwithQSIGsothatthedifferenttelecommunication
platformstobenetworktogether.Thesoftswitchshouldsupportthefollowingfeatures
inaQSIGnetwork.
NameandANI
MessageWaitingIndicator
CampOn
Conference
Paging
Transfer
TransferRecall
CallForwarding
CentralizedVoicemail
CallBackBusy
CallBackIdle
TandemTrunking
CentralizedAttendant
CallPickup
NetworkingQSIGshouldbeavailableontraditionalISDNPRI
circuitsandbyVoIP.
TheIPPBX&GatewaysshouldprovidealltypesofCallerID.Itshouldbepossible
totransferthecalleridthroughoutthenetwork.
Thecommunicationserver,IPPBX&Gatewaysmustmeettherequirementsofthe
regulatoryauthoritiesfortelecommunications and the recommendationsofthe
ITU/TSandtheETSI.
TheproposedIPCommunicationSystemshould be fullydigital andshould
employbothStoredProgramControl(SPC)usingPulseCodeModulation/Time
DivisionMultiplexing(PCM/TDM) and IP Packet Switching techniqueconforming
tothelatestITUTandCCITTstandards.

Page78
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

ThecommunicationsystemmusthaveCEcertification.Certificatecopytobeprovided
alongwiththetender.
Thesystemshouldprovide complete Nonblocking Digital path forVoiceandData
Communication(IPProtocol).ThesystemshouldalsoofferaninbuiltIPGateway.
Thecommunicationsystemmustsatisfythefollowingstandards:

EN60950:2000(Safety),
EN500821/EN55022 / EN 55024a2:2003,610003
2:2006(EMCImmunityIndustrial),
ETS300/329(DECTAirInterface),
TBR06(DECTAirInterface)/TBR3,4&TBR21(Air
Interface).
ThesuppliedIPPBX&Gatewaymusthavethefollowing:
VoIPprotocols
SIP

IPPBX&GatewayshouldhavethefollowingSIPRFCs:

RFC3261(SIP:SessionInitiationProtocol)
RFC3262(ReliabilityofProvisionalResponsesinSessionInitiation
Protocol(SIP))
RFC3263(LocatingSIPServers)
RFC3264(AnOffer/AnswerModelwithSessionDescriptionProtocol
(SDP))
RFC3265(SpecificEventNotification)
RFC2327(SDPSessionDescriptionProtocol)
RFC1889and1890(RTP/RTCP)
RFC3515(REFER)
RFC2833(DTMFoverIP)
Faxandmodem

Gatewayshouldhavebothfaxandmodemconnections.Itshouldhavesignaling
InternetFaxandModemSupport(T.38)usinganFXSgateway
Telephonyprotocols:To connect the traditional TDM or circuitswitched
communicationssystemsdeployedinprojects,theSoftswitchshouldsupporttraditional
TDMtelephonyprotocolssothattheIPPBX&Gatewaycanintegratewiththelegacy
telecommunicationsequipment.NetworkingQSIGshouldbeavailableeitherby
traditionalISDNPRIcircuitsorbyVoIP.

TheIPPBX&Gatewayshoulduseuniversalprotocolswhicharetheacceptedstandard
thatallowsdifferenttelecommunicationplatformstonetworktogethersothat,PBX
featuresshouldbeextendedacrossdifferentplatforms.NetworkingQSIGsupporttobe
availablebytraditionalISDNPRIcircuitsandVoIP.ThiswillallowtheIPPBX&Gateway
tointeroperatewithmultiplevendors.

Page79
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

PSTN&IPTrunk.TheIPPBXinconjunctionwithVoIPGatewaysshouldsupport
PSTNdigitalandanalogtrunksgatewaysonVoIPnetwork.Itshouldsupportthe
followinggatewaysE1,T1,FXO,PRI,BRI,etc.Itshouldbepossibletousedifferent
protocols,includingCAS(suchasMFC/R2,R2)andCCS(suchasEuro

SIPTrunk.TheIPPBX&GatewayshouldprovideadvancedsupportofSIPtrunks
throughapureIPConnectiontoensureserviceLevelAgreementandQoS.Itshouldbe
possibletouseSIPtrunkstointerconnectto3rdpartyVOIPservers/IPPBX&otherIP
devisesthatarestandardcompliantandsupportSIP.Itshouldbepossibletoconnectthe
currentinstalledlegacyPBXsinstalledinorganizationthroughTDMbasedQSIG
compliedgatewaysasaSIPTrunksothatallPBXsinthenetworkwillcomeina
commonintegratedplatform.TheIPPBX&Gatewayconnectivityshouldsupport
standardClass5servicesoverthenetwork.
IPphoneregistration:
EachIPphoneconnectedtothenetworkshouldregisterstoitsprimaryLocalIP
PBX/Gateway.Duringthisregistrationprocess,theIPphonedeclaresitscurrentaddress.
IncasetheprimaryIPPBX/Gatewayfails,theIPterminalshouldimmediately
registerstothesecondaryIPPBX/Gateway,allowingitsusertoseamlesslyreceiveVoIP
servicesevenwhenitsserverisdown.TheIPphonealsoshouldconductsarefreshment
processaccordingtoapredefinedtimer.AspartoftheIPPBX/Gatewaycapabilities,the
systemshouldallowausertologinthroughaguestIPphoneandapplyalloftheuser's
definitionsonthisphone.Duringthisprocess,theusershouldautomaticallylogoutfrom
thepreviouslyusedphone.IPPhonesshouldhavemultiplelogins,atleast3logins
(primaryat
Gateway,secondaryatMainserver&3rdregistrationonDRserver)perphonefor
multipleredundancies.ItshouldautomaticallyregisterwithanyoftheliveIP
PBX/Gatewayinthenetworktoachievemaximumavailability.
QualityofService:Toensure99.999%uptime,theIPPBX&Gatewaysolution
shoulddesignasadistributedsystem.Theservershouldhavedoublesignaling
processingunitstosupportfullredundancyifoneofthesignalingprocessingunitsis
faulty.
VoiceQuality:

IPPBX&GatewayshoulduseapowerfulhardwarebasedDSP(Digital
SignalingProcessor).Bandwidthsavingmethodologies
TheIPPBX&Gatewayshouldhave:
Mediacompression
RTPheadercompression(routerlevelthroughtheWAN)
MultipleframesperRTPpacket
SilencesuppressionmechanismsusingVoiceActivityDetection(VAD)
Mediacompressionmethods: It should be possible to configuredifferent
compressionmethodsaccordingtothenetworkconditionsandbandwidthavailability.
TheIPPBX&Gatewaysshouldhavecompressionmethods:G.711A,G.711u,
G.723.1_5.3,G.723.1_6.4,andG.729ACSACELP.

Silencesuppressionmechanisms:Gatewayshouldhavesilencesuppression
mechanismsbasedonVoiceActivationDetection(VAD).

Page80
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

Delay:Inordertolimitlatencyand assure superiorperformance,Gateway


shouldusenonblockedpowerfulresourcessuchas hardwarebasedDSPfor
efficientcompression,VAD, DTMF detection, and an RTP Packetstructurecontroller
Echo:Gatewayshouldhavebuiltinechocancellationmechanismstocomplywiththe
G.168standardanditshouldsuccessfullyhandletwoimportantaspectsoftheecho
phenomenon:echotailandreturnloss.

SRLLow:300500HzSRLHigh:22003400HzERL:5601965Hz

Jitter:Inordertoovercomejitter,thesystemshouldhavebuiltinjitterbuffer.To
optimizejitterbuffering,theIPPBX&Gatewayshouldhaveanadaptivedynamic
jitterbuffercontroltechniquewiththefollowingfeaturesandcharacteristics:
Individualengagementofmultiplechannels
Usertuneddynamicsandtradeoffs
Suitableforbothdelaysensitiveanderrorsensitiveapplications
Congestion:InordertominimizeCongestionphenomenon,
TheIPPBX&Gatewayshould worksinconjunctionwithexistingrouters
(ontheVoIPnetwork)
ItshouldincludebuiltinQoSmechanismssuchasMPLS,DiffServe,RSVP,etc.
BytaggingtheRTPpacketsusingTOS(TypeofService),thesystemshoulddefine
packetpriorityandthepropertreatmentbytheQoSmechanism.
Bymatchingthelengthofthepacketstothenetworkconditionsusingmultiframes
perpacket,VoiceCompression,andothermethods,theIPPBX&Gatewayshould
minimizethecongestionphenomenon.
TheofferedServer,IPPBX and Gateway should have onward Qosmechanisms
whicharesoftwarecontrollablefromthemaintenanceterminal.QualityofService
mechanismi.e.Mediacompressionmethods,silencesuppression,latencyparameters,
echo,jitteretc.tobesoftwareconfigurableandshouldbeaninbuiltfeature.The
contractorshouldnotdepend/deployanyexternaldevicetoachieveQoS.OEM
certificationforQosparameterstobesubmittedalongwiththetender.


COMPUTERWIRES:

12. Thecomputerwiresshallbeof4pairenhancedCat6categoryandshallbeofthemakesas
specifiedinthetender.

COMPUTERDATAOUTLETSOCKETS:

13. ThecomputersocketsshallbeofeCat6categoryandofthemakespecifiedinthetender.
The sockets shall be installed in the plates of the modular switches range to be used. The
socketsshallbecrimpedusingcrimpingtoolwiththeCat6ewire.

14. ForcleanroomapplicationtheplatesshallbeofSS316withnosharpedges.

TELEVISIONWIRING&SOCKETS:

15. TheCoaxialcableshallbeofwidebandtypewithoperationcapabilityupto500MHz.asof
Deltontype.

Page81
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

16. The Coaxial cable shall comprise of inner conductor of solid bare copper insulated with
Foam PE & Secondary Conductor made of polyAluminium film bonded Aluminium braids
andhavingcoverageof65%,overallsheathedwithblackPVCInsulation.

17. Twisted cables shall be electrolytic grade annealed copper conductor insulated with PE
insulationtwistedintopairswithcolourcombinationbunchedtogetherinconcentriclayers
so as to minimise crosstalk & wrapped with FR PVC taps and sheathed with FR PVC or
HFFRouterjacketsuitableforindoortelephonewiringandconfirmingtoCDOTS/WS113
/IEC601892,UL1581SECTION1080.

18. TheageingresistanceofthecoaxialcableshallcomplywithDIN47252,Part2,i.e.max.5%
increaseinattenuationat200MHz.measuredbyartificialageing(14daysat80deg.C)

3) WORKMANSHIP

1. Allcablesshallbeoncableracksandneatlystitchedtogether.

2. Theconnectionatthetagblocksshallbesilversolderedsoastoachieveminimumcontact
resistance.

3. Thefinalbranchconnectionswithsinglepaircablesinconduitsandthemaximumnumber
ofcablesineachconduitshallbeasfollows:

Conduit diameter Max.No.ofcables


Inch mm.

3/4" 20 2Nos.singlepair
1" 25 6Nos.singlepair
1" 32 12Nos.singlepair
1" 40 18Nos.singlepair

4. Thetagblocksshallbemountedinsidefabricatedsheetsteelboxeswithremovablehinged
coversandshallbefullyaccessible.Theenclosureshallbepaintedwith2coatsofredoxide
andstoveenamelled.


4) MODEOFMEASUREMENT

1. The wires, conduits and raceways shall be measured in rmt whereas the outlet sockets,
junctionboxesandtagblocksshallbemeasuredinunits.


13TECHNICALSPECIFICATIONFOREARTHINGSYSTEM.

1) GENERALDESCRIPTION

1. All the noncurrent carrying metal parts of the electrical installation and mechanical
equipmentsshallbeearthedproperly.

2. The metal conduits, trunking, cables armour and sheath, electric panels boards, lighting
fixtures,ceilingandexhaustfanandallotherpartsmadeofmetalshallbebondedtogether
andconnectedbymeansofspecifiedearthingsystem.

Page82
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

3. Anearthcontinuityconductorshallbeinstalledwithallthefeedersandcircuitsandshall
beconnectedfromtheearthbarofthepanelboardstotheconduitsystem,earthstudof
theswitchbox,lightingfixture,earthpinofthesocketoutletsandtoanymetallicwall

platesused.

4. Alltheenclosuresofmotorsshallbealsoconnectedtotheearthingsystem.


2) SCOPEOFWORK

1. The scope of work shall cover supply, laying, installation, connecting, testing and
commissioningof:

1.1 Earthingstation.
1.2 EarthingAluminium/copperstripsfromearthingstationtoequipotentialbar.
1.3 Earthing Aluminum / copper strips / wires from equipotential bar to lay feeder
mainsandcircuittoconnectpowerpanels,DBs,switchboardsetc.
1.4 BondingofNoncurrentcarryingparts,andmetallicpartsoftheelectricalinstallation.

3) STANDARDS

1. Thefollowingstandardsandrulesshallbeapplicable:
1) IS:30431966CodeofpracticeforEarthing.

2) IndianElectricityActandRules

All codes and standards mean the latest. Where not specified otherwise the
installation shall generally follow the Indian Standard Code of Practice or the
BritishStandardCodesofPracticeinabsenceofIndianstandard.

4) TYPEOFEARTHINGSTATION

PLATEEARTHINGSTATIONS

1. The equipment neutral earthing shall be with Cast Ironplate earthling station, Cast Iron
Earthplateshallbe30x30x0.35mmforearthing.

2. Theearthresistanceshallbemaintainedwithsuitablesoiltreatment.

3. Theresistanceofeachearthstationshouldnotexceed1ohm.

4. TheearthleadshallbeconnectedtotheearthplatethroughHotDipG.I.bolts.

5. TheearthingconductorsshallbeofcopperstripincaseofGIearthing.

6. G.I.pipewithfunnelofapprovedqualityshallbeusedforwateringtheearthingelectrodes/
stations.

7. Theblockmasonrychamberwithchequeredplateshallbeprovidedforhousingthefunnel
andthepipeforwateringtheearthingelectrodes/stations.

Page83
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

8. Thehardwareandotherconsumablesforearthinginstallationshallbeofcopper/brasin
caseofcopperearthplateandshallbehotdipgalvanisedironmaterialincaseofG.I.earth
plate,.

9. Testlink/testpitcoverthroughchequeredplate.

PIPEELECTRODEEARTHSTATION

1. Theearthstationshallbeasshownonthedrawingandshallbeusedforequipmentearth
gridand/orstreetlightpoleearthing.

2. Theearthelectrodeshallbe150cmslong1.5cmsdiaclass"A",Galvanisedironpipe.

3. The earth resistance shall be maintained with a suitable soil treatment as shown on the
drawing.

4. Theresistanceofeachearthstationshouldnotexceed1ohm.

5. Theearthleadshallbefixedtothepipewithanutandsafetysetscrews.Theclampshall
bepermanentlyaccessible.

6. TheearthinggridandtheearthingconductorshallbehotdipGalvanisedironstripsofthe
sizeasshowninthedrawing.

7. G.I. pipe with funnel of approved quality shall be used for watering the earth electrode \
station.

8. Theblockmasonrychamberwithchequeredplateshallbeprovidedforhousingtheabove
referredfunnelandpipe.

9. ThehardwareandotherconsumablesforearthinginstallationshallbehotdipGalvanised
ironmaterialasshownonthedrawing.

CHEMICALPIPEINPIPEEARTHING

1. The substation earthing shall be with copper plate earthing station unless otherwise
specified&earthpitofminimumboredia.225mmsizeASHorapprovedmakeSafeEarthing
Electrode consisting PipeinPipe Technology as per IS 30431987 made of corrosion free
G.I.Pipes.

2. Theearthingstationshallbe asshownonthedrawing. Thetwoearthelectrodesshallbe
80mm&40mmdiaGIpipesplate.Theearthresistanceshallbemaintainedwithasuitable
crystallineconductivematerialsandbackfillcompound.

3. Theresistanceofeachearthstationshouldnotexceed1ohms.

4. Theearthleadshallbeconnectedtotheearthpipethroughcopper/brassbolts.

5. The pipein pipe earth station shall be as shown on the drawing and shall be used for
equipmentprotectiveearthgrid.

Page84
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

6. Theearthelectrodesshallbegalvanizedpipes3.0longwithouterpipe80mmdia&inner
pipe40mmdia.Theouterpipeshallbeplatedwith80200microns&innerpipeshallbe
platedwith200250micronswithconnectionterminaldiaof14mm.

7. Crystalline Conductive materialMixture of nature minerals and a chemicalcompound,


highly conductive and non corrosive, which prevents the inner pipe from corrosion and
dissipatesthecurrentevenly.

8. Back fill compound Moisture retaining compound having 13 times more (Hygroscopic)
waterretainingcapacitythanitsdryvolume&shallbe2bagsof25kgs.

9. Theearthleadshallbefixedtothepipewithaclampandsafetysetscrews.Theclampsshall
bepermanentlyaccessible.

5) WORKMANSHIP

INSTALLATIONANDCONNECTION

1. The plate/pipe electrode, as far as practicable, shall be buried below permanent moisture
levelbutinnocaselessthan3Mbelowfinishedgroundlevel.

2. Theplate/pipeelectrodeshallbekeptclearofthebuildingfoundationandinnocase,it
shallbenearerbylessthan2Mfromouterfaceoftherespectivebuildingwall/column.

3. Theplateelectrodeshallbeinstalledverticallyandshallbesurroundedwith150mm.thick
layersofCharcoaldustandSaltmixture.

4. 20mm.dia.G.I.pipeforwatering,shallrunfromtopedgeoftheplate/pipeelectrodetothe
midlevelofblockmasonrychamber.

5. TopofthepipeshallbeprovidedwithG.I.funnelandscreenforwateringtheearth/ground
throughthepipe.

6. ThefunnelwithscreenovertheG.I.pipeforwateringtotheearthshallbehousedinablock
masonrychamberasshowninthedrawing.

7. ThemasonrychambershallbeprovidedwithaCastIronhingedcoverrestingovertheCast
Ironframewhichshallbeembeddedintheblockmasonry.

8. Construction ofthe earthingstation shallin generalbe asshown inthe drawing and shall
conform to the requirement on earth electrodes mentioned in the latest edition of Indian
StandardIS:3043,CodeofPracticeforEarthingInstallation.

9. The earth conductors (Strips / Wires, Hot dip G.I.) inside the building shall properly be
clamped / supported on the wall with Galvanised Iron clamps and Hot Dip GI screws /
bolts.Theconductorsoutsidethebuildingshallbelaidatleast600mm.belowthefinished
groundlevel.

10. Theearthconductorsshalleitherterminateonearthingsocket providedontheequipment


or shall be fastened to the foundation bolt and / or on frames of the equipment. The
earthing connection to equipment body shall be done after removing paint and other oily
substancesfromthebodyandthenproperlybefinished.

Page85
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

11. Overlappingofearthconductorsduringstraightthroughinjoints,whererequired,shallbe
ofminimum75mm.long.

12. Theearthconductorsshallbeinonelengthbetweentheearthinggridandtheequipmentto
beearthed.

EARTHLEADSANDCONNECTIONS

1. Earth lead shall be bare copper or Galvanised steel as specified with sizes shown on
drawings.Copperleadshallhaveaphosphorcontentofnotover0.15%.Galvanisedsteel
buriedinthegroundshallbeprotectedwithbitumenandhessianwraporpolythenefaced
hessianandbitumencoating.Atroadcrossingnecessaryhumepipesshallbelaid.Earthlead
runonsurfaceofwallorceilingshallbefixedonsaddlessothatstripisatleast8mmaway
fromthewallsurface.

2. Thecompleteearthingsystemshallbemechanicallyandelectricallybondedtoprovidean
independentreturnpathtotheearthsource.

3. Wherevercrossingisrequired,earthingjumpershallbeofinsulatedwires.

EQUIPMENTEARTHING

1. All apparatus and equipment transmitting or utilising power shall be earthed in the
followingmanner.Copper/G.I.earthstrips/wiresshallbeusedunlessotherwiseindicated
intheSchedule.

6) TEST

1. The entire earthing installation shall be tested as per requirements of Indian Standard
SpecificationIS:3041.

2. Thefollowingearthresistancevaluesshallbemeasuredwithanapprovedearthmeggerand
recorded.
2.1 Eachearthingstation
2.2 Earthingsystemasawhole
2.3 Earthcontinuityconductors

3. Earthconductorresistancefor eachearthed equipmentshall be measuredwhichshallnot
exceed1ohmineachcase.

4. Measurements of earth resistance shall be carried out before earth connections are made
betweentheearthandtheobjecttobeearthed.

5. Alltestsshallbecarriedoutinpresenceoftheconsultant/client.

7) MODEOFMEASUREMENT

1. Provision of earthing station complete with excavation, electrode, watering pipe, soil
treatment, masonry chamber with cast iron cover etc. shall be treated as one unit of
measurement.
2. Thefollowingitemsofworkshallbemeasuredandpaidperunitlengthcoveringthecostof
theearthwires/strips,clamps,labouretc.
a)Mainequipmentearthinggridandconnectiontotheearthingstation.

b) Connectiontotheswitchboard,powerpanels,DBetc.

Page86
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

3. The cost of earthing the boq items shall become part of the cost of the item itself and no
separatepaymentforearthingshallbemade.

14TECHNICALSPECIFICATIONFORPASYSTEM.

1) SCOPEOFWORK

1. ThescopeofworkunderthisheadshallincludedesigningsupplyingandinstallingofPublic
Address System. The work under this system shall consist of furnishing all materials,
equipmentsandappliancesandlabournecessarytoinstallthe saidsystem,completewith
Speakers,Amplifiers,MikeandZoneselectionPanel.

2. The PA System is designed to serve the multi purpose of playing music, making general
announcementortotransmitthefiretoneunderfirecondition.

2) SYSTEMDESIGN

1. The Speakers shall be distributed in the entire floor and shall be configured in different
zones.Theannouncementcanbemadeinzonewiseortoallthespeakerssimultaneouslyin
ALLCALLmode.FireAlarmshallbeannouncedimmediatelyonreceiptofFiresignalfrom
thepaneltoallzones.

GLOSSARYOFTERMS

3) AMPLIFIERS

1. Allamplifiersshallbemixingtypeforcombiningspeechandmusic.

2. The power amplifiers shall have adequate continuous (RMS) power output to meet the
requirementoftheconfiguration.

3. The unit shall be capable of delivering the rated output watts with less than 0.05%
harmonicdistortioninthedesignbandwidth.

4. Theamplifiershallhaveabroadbandfrequencyresponseof20Hzto20KHz.

5. Theoutputvoltageandimpedanceshallmeetwiththesystemrequirements.

6. Amplifiers shall be protected against over loads and output shorts and a special thermal
overloadontheheatsink.

7. Thedistributedaudioamplifiersshallbemagneticallycoupled switchmodetypewithtwo
inputsignalsourcesselectablemanuallyorautomaticallybythefirealarmsystem.

8. Outputwattageshallbeasshowninthescheduleofworkorasrequiredtomeettheneeds
ofthePASystem.

9. Power as well as audio amplifiers shall be mounted in suitable wall mounted / floor
standingenclosures.

4) SPEAKERS

1. Speakers shall be especially designed for broadcasting high quality, integrated emergency
firealarmsignalsandvoicecommunicationsandapprovedbyanappropriateauthorityfor
useinsuchsituations.

Page87
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC


2. SpeakersshallbeceilingorColumnmountedasshowninthescheduleofworkandshallbe
completedwithmountingbracketsaccessoriesetc.

3. Speakersshallbeinwoodenormetalenclosures.

4. Speakersshallbeofhighefficiencyyieldingmaximumoutputatminimumpoweracross200
12000Hzfrequencyranges.

5. Speakers shall have a linematching transformer for direct connection to amplifiers with
multipletaps.

6. Speakersshallbemountedinaruggedmetalhousingwithvandalresistantgrilleifspecified.

7. Speakersshallbeinterconnectedinthezoneconfiguration.

5) ZONESELECTIONPANEL

1. TheuserinterfacetotheentirepublicaddresssystemshallbetheZoneSelectionPanel.It
shallbeabletoaddress20zones.

2. ThePanelshallhaveoneMicrophoneforannouncements.

3. TheselectionofannouncementisdonethroughthePanel.

4. Theannouncement/Firetonecanbemadezonewise.

5. TheControlPanelshallhaveindividualzoneselectionswitchesaswellasALLCALLswitch.

6. The Zone selection panel shall include a tone generator that shall serve the purpose of
generatingauniquefiretoneincaseoffire.

6) PASYSTEMWIRING

1. PA system wiring shall be done with 2 X 0.75sq.mm cable in 19mm dia PVC conduit
includingterminationcompleteasrequired.

2. The speakers in each zone are connected in parallel and are connected to the respective
output.

3. ThecablesfromeachzoneareseparatelyroutedandterminatedinthePanel.

CONTROLLER

OutputExpansionUnit:

SITCofOutputExpanderUnitsforincreasethenumberofsystemoutputsasperthedesign
8AnalogAudioOutputs
EthernetbasedDigitalAudiorouting
ChannelSelectionviaPassiveSwitchontheunit
12VDCExternalPower

PagingStation:

SITCofpublicaddresspagingstation.ThePagingstationshouldhaveminimumofstandard15
buttonswhichcanbefreelyprogrammedasperthesystemdesign.Theextensionunitwith10

Page88
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

buttonseachcanbeusedtoexpandthenumberofpagingbuttons.

SITCofPagingDeliveryController/Servertofeaturearackmountworkstation,preloadedwith
Windows7andthePagingDeliverySoftware.TheControllertoprovidecentralized
managementandloggingofallsystemsconnected.Itshouldsupportupto12pagingstations,
14backgroundmusicchannels,2prerecordedmessagechannelsand96outputchannels.
SystemwillalsoincludeEventSchedulingcapabilityasperCalendarorManualtriggersvia
PagingStations,Controlports.
BaseUnit : DellR5500Workstationorequivalent
Processor : IntelXeonProcessor
Memory : 4GB,DDR3
HardDrive : 250GBSATA
OperatingSystem : Windows7Pro,64bit
Mounting : RackRailkit,2UChassis

ThePagingStationshouldsendandreceivebothAudioandControldatatothecontroller
systemviaaCobraNetinterface.RedundantPrimaryandSecondaryCobraNetportsfacilitate
faulttorelance.ItshouldbePoEenabled,withanoptionofexternalpowersupply.

ItshouldalsohavePowerindicator,systemstatusindicator,functionindicationsalongwith
buttonsandalargePTTbuttonforclearunderstandinganduseofsystem
PowerSource : 12VDCorPowerOverEthernet
GooseneckMicrophone : Cardioidunidirectionaldynamicmicrophone
MicrophoneFrequencyResponse : 90Hz12kHz
SignaltoNoise : Over100dB
GainControls : MicrophonePreampGain

CeilingSpeakers:
SITCofceillingspeakerwith100Wpowerhandlingcaapcity,frequencyresponse55Hz18Hz,
Sensitivity90db,ratedimpedence8ohms.

InputsandOutput:

SITCofPublicAddressProcessoroffering8analoginputsand8analogoutputs,apre
configuredpath,CobraNetaudioandahighbandwidth,faulttolerantdigitalaudiobus.The
processorshouldfeatureCobraNetaudiowithPrimaryandSecondaryportsforfaulttolerance.
ControlviaPCshouldbethroughseparateEthernetport.

PhantomPower,Signalpresentandclipinformationperchannelshouldbeeasilyvisiblefrom
frontpanelLEDindication.

Theprocessorshouldalsoofferinbuiltonboard12ControlInputsand6Logicoutputswhich
canbefreelyconfiguredforactionslikeFireAlarmintegration
FrequencyResponse : +0.5/1dBfrom20Hzto20kHz
THD : <0.01%20Hzto20kHz
DynamicRange : 108dBtypical
Crosstalk : <75dB
ControlPorts : 12inputsand6outputs
ControlNetwork : RJ45EthernetConnector
CobraNetAudioNetwork 2xRJ45EthernetConnectors(PrimaryandSecondary)

Page89
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

Poweramplifier:
SITCof500WAmplifierwithRMSpoweroutputmax600W,frequencyresponse5015000
Outputtapsforspeakermatching2,4ohm&70100Vline.

7) TESTINGANDCOMMISSIONING

1. EntirePAsystemshallbetestedtoestablishthefollowing.

a) FunctionalityofthePAsystem

b) Combinedsystemsshallbetestedfortheoverridingfeatureforprioritizingfire
alarmandlifesafetyrequirements.

c) Acceptable audibility of the public address in all spaces and record sound
pressurelevelsofthePublicaddressvizaviztheambientnoiselevels.

d) Noise level (Decible) output shall be measured and tested on site as per
standards.

8) MODEOFMEASUREMENT

1. Thequanitiesshallbemeasuredinunitsasperboqitems.

15TECHNICALSPECIFICATIONSFORCCTV&WIFISYSTEM.
1) SCOPEOFWORK

1. ThescopeofworkunderthisheadshallincludeInstallation,commissioningofCCTV&Wifi
systemwithallrequiredaccessoriesasbelow.

TechnicalSpecifications

VandalresistantMiniDomeHighDefinitionDayNightVision(HD)NetworkCamera:

2. Thecamerashallutilizea1/3typeprogressivescanExmorCMOSsensor.
3. Thenumberofeffectivepixelsshallbeapprox.1.37MegapixelsOPERATEDAT0LUXWITH
LEDon.
4. TheanalogvideooutputofthecamerashallbeselectablefromeithertheNTSCorPAL
standards.
5. CamerasynchronizationshallbeInternal.
6. Thecamerashallhaveanequivalent130dBwidedynamicrangecapability.
7. Thevideosignaltonoiseratioshallbemorethan50dB(Autogaincontrolmaximumrate0
dB).
8. Thecamerashalllimitthemaximumamountofgaincontrolledautomaticexposurecontrol.
9. Theelectronicshutterspeedshallbesetfrom1to1/10,000second.
10. Thecamerashalladjustthetargetbrightnessfortheautomaticexposuresettingbyselecting
theexposurecorrectionvaluefromthelistboxonthemenu.
11. WhitebalanceshallbeATW(approx.2000Kto10000K),ATWPRO(approx.2500Kto
6000K),Indoor,Outdoor,Fluorescentlamp,Mercurylamp,SodiumVaporlamp,Metal
Halidelamp,WhiteLED,OnepushWB,orManualsettings.
TheR/BgainoffsetcanbesetfortheATWorATWPROsettings.
12. Thecamerashallhavea3XDCautoiristypevarifocallensasastandardaccessory.
13. Thecamerashallalsohave4Xdigitalzoomcapability.
14. Thecamerashallhavethetotalzoomratioof12Xwith3Xopticalzoomand4Xdigitalzoom
capabilities.

Page90
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

15. ThecamerashallhaveanEasyFocusfunction,whichadjuststhecamerafocusviatheEasy
FocusbuttonontherearofthecameraorremotelyviatheGUI.
Whenthecameraisswitchedbetweendayandnightmodes,theEasyFocusfunctionis
automaticallyactivatedtokeepthecamerafocused.
16. ThecamerashallalsohaveaZOOM/FOCUSswitchonthefrontofthecameraunit,whichis
usedformanualadjustmentsofthecamerazoomandfocus.
17. Thecamerashallalsohaveazoom/focusadjustmentcapabilityviatheZOOM/FOCUSswitch
onthecameraunitorremotelyviatheGUI.
18. Thecamerashallbeadjustedallpan,tiltandrotationpositionsbyturningthelenscaseto
rotatethecamera.
19. Theviewinganglein1280x1024mode(5:4aspectratio)shallbe:
Horizontal:93.0to31.6.
Vertical:50.6to17.8.
20. Theranges(typical)shallbe:
Pan:192to+192
Tilt:7to+75
Rotate:99to+99
21. Thefocallengthshallbe3.0to9.0mm.
22. Theaperturerangeforthelens(Fnumber)shallbeF1.2(Wide)toF2.1(Tele).
23. Theminimumobjectdistanceshallbe117/8inches(300mm).

Features:

1. ThecamerashallhaveaTrueDay/Night(D/N)functiontoswitchtoDaymode(color
mode)orNightmode(blackandwhitemode)dependingonthelightlevel.

2. Thecamerashallbecapableofaneflipfunction,afeaturewhenthecamerapassesthe
downposition,electronicallyflipstheimage180.

3. ThecamerashallhaveanImageStabilizerfunction,whichcandisplaywithlessvideosway
whenthecameraisinstalledinaplacewithvibration.

4. Thecamerashallhavepolygonalprivacyzonemaskingwhichblocksoutunwantedor
prohibitedareawithinthevideoimagetoprotectprivacy.
MaskcolorsshallbeBlack,anyof6shadesofGray,White,Green,Yellow,Red,Cyan,
Magenta,andBlue.
Mosaicpattersshallbealsoselectedasmasking.
Thecamerashallbecapableofmaskingupto20areas.
SuchcapabilityshallbeviavendorsuppliedSNCtoolboxutilitysoftwareorthebrowser
basedsetupmenu.

5. ThecamerashallbeIK10ratedinaccordancewiththeIEC62262standardtovandal
resistantfeatureforprotectingthecamerafromdestructivebehaviors.

6. Thecamerashallhavethecapabilitytodisplayawidevarietyofoverlaysinanyof7
positionsonthevideoimage(4corners,top,bottom,orcenteroftheimage).
Thefollowingoverlaysshallbepossible:

CameraIDofupto20alphanumericcharactersoralogoingifformat

Date/Timedatawithselectableformatssuchasyyyymmddhh:mm:ss,mmddyyyy
hh:mm:ss,andddmmyyyyhh:mm:ss

Usersettingframerate(fps)andbitrate(bps)

Page91
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC


EventsensorIN,uniqueintelligentmotiondetection,uniquevideomotionfilters,
cameratamperingdetection

Characterstring

Compressionformatinformation

Thefollowingdisplaystylesshallbeavailable:outlineandtransparent,whitehalf
transparent,blackhalftransparent,white,andblackbackgrounds.Uniqueintelligent
motiondetectionshallnotbeeffectiveintheselectedsuperimposedareas.

Thefollowingfontcolorsareavailable:Black,Blue,Red,Magenta,Green,Cyan,Yellowand
White.

AllofoverlaysexcepttheDate/Timedatacanbesettoblink.

7. Thecamerawebbrowsershallsupportthefollowinglanguages:
English,Japanese,French,Spanish,German,Italian,SimplifiedChinese,TraditionalChinese,
Korean,Portuguese,Russian,Hindi,Vietnamese,andThai.

8. ThecamerashallhaveaSmartphoneviewer,whichcandisplaythecameraimageand
operatePan/Tilt/Zoom(PTZ)onthesmartphone.


FixedtypeHighDefinition(HD)CSmountNetworkCamera:

1. Thecamerashallutilizea1/3typeprogressivescanExmorCMOSsensor.Thenumberof
effectivepixelsshallbeapprox.1.37Megapixels,OPERATEDAT0LUXWITHLEDon..

2. TheanalogvideooutputofthecamerashallbeselectablefromeithertheNTSCorPAL
standards.

3. CamerasynchronizationshallbeInternal.

4. Thecamerashallhaveanequivalent130dBwidedynamicrangecapability.

5. Thevideosignaltonoiseratioshallbemorethan50dB(Autogaincontrolmaximumrate0
dB).

6. Thecamerashalllimitthemaximumamountofgaincontrolledautomaticexposurecontrol.

7. Theelectronicshutterspeedshallbesetfrom1to1/10,000second.

8. Thecamerashalladjustthetargetbrightnessfortheautomaticexposuresettingby
selectingtheexposurecorrectionvaluefromthelistboxonthemenu.

9. ThecamerashallhaveanAutoIrisRespondingSpeedfunction,whichcanadjustthespeed
accordingtoanonstandardlens.

10. WhitebalanceshallbeATW(approx.2000Kto10000K),ATWPRO(approx.2500Kto
6000K),Indoor,Outdoor,Fluorescentlamp,Mercurylamp,SodiumVaporlamp,Metal
Halidelamp,WhiteLED,OnepushWB,orManualsettings.
TheR/BgainoffsetcanbesetfortheATWorATWPROsettings.

Page92
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

11. ThecamerashallhaveaCSmount2.7XDCautoiristypevarifocallensasastandard
accessory.

12. Thecamerashallalsohave4Xdigitalzoomcapability.

13. Thecamerashallhavethetotalzoomratioof10.8Xwith2.7Xopticalzoomand4Xdigital
zoomcapabilities.

14. ThecamerashallhaveanEasyFocusfunction,whichadjuststhecamerafocusviatheEasy
FocusbuttonontherearofthecameraorremotelyviatheGUI.
Whenthecameraisswitchedbetweendayandnightmodes,theEasyFocusfunctionis
automaticallyactivatedtokeepthecamerafocused.

15. Theviewinganglein1280x1024mode(5:4aspectratio)shallbe:
Horizontal:92.5to35.7.
Vertical:72.7to28.6.

16. Thefocallengthshallbe3.0to8.0mm.

17. Theaperturerangeforthelens(Fnumber)shallbeF1.0(Wide)toF1.65(Tele).

18. Theminimumobjectdistanceshallbe77/8inches(200mm).

Features:

1. ThecamerashallhaveaTrueDay/Night(D/N)functiontoswitchtoDaymode(color
mode)orNightmode(blackandwhitemode)dependingonthelightlevelOPERATEDAT0
LUXWITHLEDon.

2. ThecamerashallhaveanImageStabilizerfunction,whichcandisplaywithlessvideosway
whenthecameraisinstalledinaplacewithvibration.

3. Thecamerashallhavepolygonalprivacyzonemaskingwhichblocksoutunwantedor
prohibitedareawithinthevideoimagetoprotectprivacy.
MaskcolorsshallbeBlack,anyof6shadesofGray,White,Green,Yellow,Red,Cyan,
Magenta,andBlue.
Mosaicpattersshallbealsoselectedasmasking.
Thecamerashallbecapableofmaskingupto20areas.
SuchcapabilityshallbeviavendorsuppliedSNCtoolboxutilitysoftwareorthebrowser
basedsetupmenu.

4. Thecamerashallhavethecapabilitytodisplayawidevarietyofoverlaysinanyof7
positionsonthevideoimage(4corners,top,bottom,orcenteroftheimage).
Thefollowingoverlaysshallbepossible:

CameraIDofupto20alphanumericcharactersoralogoingifformat

Date/Timedatawithselectableformatssuchasyyyymmddhh:mm:ss,mmddyyyy
hh:mm:ss,andddmmyyyyhh:mm:ss

Usersettingframerate(fps)andbitrate(bps)

EventsensorIN,uniqueintelligentmotiondetection,uniquevideomotionfilters,
cameratamperingdetection

Characterstring

Page93
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

Compressionformatinformation

Thefollowingdisplaystylesshallbeavailable:outlineandtransparent,whitehalf
transparent,blackhalftransparent,white,andblackbackgrounds.Uniqueintelligent
motiondetectionshallnotbeeffectiveintheselectedsuperimposedareas.

Thefollowingfontcolorsareavailable:Black,Blue,Red,Magenta,Green,Cyan,Yellowand
White.

AllofoverlaysexcepttheDate/Timedatacanbesettoblink.

5. Thecamerawebbrowsershallsupportthefollowinglanguages:
English,Japanese,French,Spanish,German,Italian,SimplifiedChinese,TraditionalChinese,
Korean,Portuguese,Russian,Hindi,Vietnamese,andThai.

6. ThecamerashallhaveaSmartphoneviewer,whichcandisplaythecameraimageand
operatePan/Tilt/Zoom(PTZ)onthesmartphone.

SURVEILLANCESYSTEMSERVER

1. The Surveillance System Server shall support the use of separate networks, VLANs or
switchesforconnectingthecamerastotheRecordingServerstoprovidephysicalnetwork
separationfromtheclientsandfacilitatetheuseofstaticIPaddressesforthedevices.

2. The Surveillance System Server shall support H.264, MPEG4 and MJPEG compression
formatsforthevideostreamfromalldevicesincludinganalogcamerasconnection

3. Multistream Support The Surveillance System Server shall support H.264 / MPEG4 /
MJPEGbandwidthoptimizedmultistreaming.

4. TheVMSshallsupportinteroperabilitywithIPcamerastandardsincluding,ataminimum,
theOpenNetworkVideoInterfaceForum(ONVIF).

5. The VMS recording servers shall support interface to cameras with universal serial bus
(USB)communications.

6. The system shall support specific devices, where the specific supported model numbers
shallbelistedforeachmanufactureronanuptodateonlinewebsite.

7. TheSurveillanceSystemServershallsupportfulltwowayaudiobetweentheVideoclient
viewersandremotecameras/devices.

SERVERSPECIFICATIONS

Server Specifications

2*IntelXEONE526206C2.0GHzorhigher,18MBL3Cacheper
CPU
socket,7.2GT/sdualQPIlink,scalableto2CPUs
Memory 12GBDDR31333MHzECCmemory,upgradableto384GB
MemoryProtection ECC,Chipkill,Memoryranksparing,andMemoryMirroring
Chipset IntelC602J
SAS/SATARAIDcontrollerwithsupportforRAID0/1.OnlineCapacity
HDDController Expansion,OnlineRAIDLevelMigration&GlobalanddedicatedHot
SparewithRevertibleHotSparesupport

Page94
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

HDD 2*146GB2.5"15krpmHS6GbpsSASHDD
HDDbays Uptosixteen2.5inchSmallFormFactor(SFF)hotswapdiskbays
Integratedtwofullgigabitethernetports/MACandPHYlayer
Ethernetports functions/TCP/IPOffloadEngine(TOE)/WakeonLAN/Serialover
LAN/PXE2.0/Failover,adapterfaulttolerance/Loadbalancing.
HBA 2xSingleport8GbFCHBA
6*PCIExpresstoaccommodateadditionalCards,including3full
PCISlots
height,fulllengthslots
GraphicsAdaptor Standardvideowith16MBmemory,SVGAsupport
OpticalDrive InternalDVDRW
Formfactor 2Urack
TwoUSB2.0andoneDB15videoonfront.FourUSB2.0,oneDB15
video,oneDB9serial,oneRJ45systemsmanagement,fourRJ45GbE
I/Oports networkports,twooptionalRJ45orSFP+10GbEnetworkportson
rear.TwointernalUSBports(forembeddedhypervisorandinternal
tapedrive)
N+Nredundantpowersupply.PowersuppliesshouldbeEnergyStar
PowerSupply&Fans
certified
IPMIcompliant.Remotemanagementfacility.PFAshouldbeavailable
forProcessors,memory,VRMs,diskdrives,powersupplies,andfans.
Management
Monitoringofpowerutilisation.Servermanagements/wshouldbe
fromthesameOEMbrandasthatoftheserver
OSCertification WindowsServer2008orhigher,RHEL,SUSE,Vmware
IndustryCertification RoHS,FCCPart15,UL,IEC609501,CISPR22,ClassA
Diagnostics FrontLCD/LEDpanel(persistentwithoutpower)
Poweronpassword,administrator'spassword,TrustedPlatform
Security
Module(TPM)
Warranty 3yearComprehensiveonsite,24x7

NETWORKATTACHEDSTORAGE

ThenetworkstoragemanagershallrecordvideoandaudiostreamsfromIPcamerasandvideo
encodersonthenetwork.

Thenetworkstoragemanagershallincorporatetheserverfunctionsandstorageelementsinto
apurposebuiltchassis.

ThenetworkstoragemanagershalluseRAID6parityacrossthestoragedrivestoprotect
recordeddataagainstaharddiskdrivefailure.

Thenetworkstoragemanagershallonlyuseenterpriselevelharddiskdrivesspecificallyrated
foroperationinRAIDsystems.

Thenetworkstoragemanagerchassisshallbedesignedforvideosurveillancerecording
applicationsandencompassredundancyatallvitalpoints:

Redundant,hotswappablepowersupplymodules
Redundant,hotswappablesystemfans
HotswappableO/Sdrive
HotswappableCPUfans

Page95
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

Thenetworkstoragemanagerchassisshallbedesignedforonlineserviceandmaintenanceand
cannot be removed from the rack when hard disk drives, fans, power supplies, or operating
systemdrivesmustbereplaced.

The network storage manager shall be built upon a reliable and robust Linux operating
system.

The network storage manager shall support a guaranteed recording throughput of 250 Mbps
per storage devicewith aminimum of64 Mbps ofread throughput. This throughputshallbe
guaranteedundernormalanderror(RAIDrebuild)conditions.

The network storage manager shall support any number of cameras so long as the maximum
throughputrequiredislessthan250Mbps.

ThenetworkstoragemanagershallsupporttherecordingofMPEG4andH.264baseline,and
highprofilestreamsfromstandardresolutionandmegapixelcameras.

The network storage manager shall support continuous, scheduled, alarm/event (including
analytics alarms), motion, and manual recording. Pre and postalarm periods shall be
configurableuptothetotalcapacityofthesystem.

The network storage manager shall support bookmarking and locking/unlocking of video
contentonthedrives.

Thenetworkstoragemanagershallsupportprivacytoolsthatallowadministratorstoestablish
maximumretentiontimesfornormal,alarm,andlockedvideo.

The network storage manager shall support an intelligent video grooming protocol that can
reduce the frame rate of recorded video as the video ages. Administrators shall have the
flexibilitytodeterminewhethertogroomalarmvideoorleaveitatitsrealtimelevel.

The network storage manager shall have the ability to report all diagnostic events, including
software status diagnostics to a centralized user interface. In addition, Simple Network
Management Protocol (SNMP) traps shall be available for monitoring through a thirdparty
SNMPmanagementconsole.

Thenetworkstoragemanagershallbefullymanagedfromaremoteworkstation,includingthe
abilitytoconfiguresettingsandupdatefirmwareandsoftware.

ThenetworkstoragemanagershallbecapableofinterfacingwiththeAPCSmartUPSusing
aUSBconnector.Thenetworkvideorecordershallreceivestatusandcontrolsignalsfromthe
uninterruptiblepowersupply(UPS)whenitisinbackupmode.Thisfunctionshallinformthe
operator about the amount of charge remaining and trigger a controlled shutdown when the
chargebecomeszero.

NETWORKSWITCHES

AllnetworkingequipmentshallbeasminimumofLayer2andasaminimumshallsupportIGMP
SnoopingVersion2orlater.Itshouldhaveminimumtwo1000baseTcopperportsandminimumtwo
slotsfor1000baseTfibremodules.

TheIPnetworkshallsupportMulticastingbetweenallportsandshallallowforMulticaststreamsto
beroutedbetweennetworks.

Page96
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

AlltheedgeswitchesshouldbeminimumLayer2.AllLayer2switchesmustfinallybebrought
togetherusing1000baseTportstocentralLayer3switch.Connectiontotheserversandclientsmust
be1000baseTfrom10/100/1000baseTports.ConnectionbetweenLayer2andLayer3switch
shouldusefibrebackbone.

Uplinkportshouldhavesufficientspeedtoavoidnetworkcongestion,preferablynetworkshouldnot
beloadedmorethan70%atanystage.

2) 4PORTPOESWITCH

StandardCompliance:IEEE802.3af/at,
10/100Mbps,
TotalPowerOutputfor4port:65W,
Inbuiltpowersupply,
Endspan:1/2(+),3/6(),
rackmountable.

3) 8PORTPOESWITCH

StandardCompliance:IEEE802.3af/at,
10/100Mbps,
TotalPowerOutputfor8port:150W,
Inbuiltpowersupply,
Endspan:1/2(+),3/6(),
rackmountable.

4) ENVIRONMENTALLYHARDENEDMANAGEDETHERNETSWITCH24PORT

Features:

10/100BASETXcompatible
FlexibleEthernetinterfaceconfigurationviapluginmodules
FullyconfigurablethroughwebbasedorSNMPnetworkmanagement
IGMPSnoopingV1/V2formulticastfilteringandIGMPQueryV1/V2
PortbasedVLAN(IEEE802.1Q)
RapidSpanningTreeprotocol(IEEE802.1w)
InternalPowerSupply100240VACInput
FiveYearWarranty

SystemInterface/Performance
StoreandForwardSwitchingArchitecture
Backplane(SwitchingFabric):48Gbps
6MbitsPacketBuffer
16KMACAddressTable
10KJumboFrame

3SlotGigabitModuleHotSwappable
22x10/100TRJ45
2x1000FXSFP

SpanningTree
SupportIEEE802.1wRapidSpanningTree

VLAN

Page97
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

PortBasedVLAN
Support802.1QTagVLAN
GVRP

SNMP
SNMPv1/v2c
SNMPTrap

BandwidthControl
IngressPacketFilterandEgressRateLimit
PortTrunkwithLACP

Security
PortSecurity:MACaddressentries/filter
IPSecurity:IPaddresssecuritymanagementtopreventunauthorized

intruder
LoginSecurity:IEEE802.1X/RADIUS

QoS(QualityofService)
8PriorityQueues
StrictandWRRpriorityrule
PortBase,TagBase,IPv4TypeofServiceandIPv4Differentservice

IGMP
IGMPv1/v2
256multicastgroupsandIGMPquery

PortMirror:Monitortrafficinswitchednetworks
TXpacketonly
RXpacketonly
BothTXandRXpacket

SystemEventLog
SystemLog(Local/RemoteServer)
SMTPemailAlert

LLDP
IEEE802.1abLinkLayerDiscoveryProtocol

STANDARDCOMPLIANCE
IEEE802.310BaseTEthernet
IEEE802.3u100BaseTX/100BaseFX
IEEE802.3zGigabitfiber
IEEE802.3ab1000BaseT
IEEE802.3xFlowControlandBackPressure
IEEE802.3adPorttrunkwithLACP
IEEE802.1wRapidSpanningTree
IEEE802.1pClassofService
IEEE802.1qVLANTagging
IEEE802.1xUserAuthentication

Page98
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

5) WORKSTATIONFORMONITORING

PARAMETERSPECIFICATIONS
Formfactor SmallformfactororDesktop orTower
CPU QuadcoreIntelXeon2.0GHz,4GBRAM
Operatingsystem MicrosoftWindows7
Professional64bit
NetworkInterface 1GigabitEthernetRJ45port(1000BaseT)

VideoOutputs 2active(1VGA,2DisplayPort,or2DVI)
4active(2VGA,4DisplayPort,or4DVI)(with4
monitoroption)
OpticalDrive 1DVDRW

PowerInput 100to240VAC,50/60Hz,
autoswitching
PowerSupply Singlenonredundant

PowerConsumption 350W

DESKTOPWORKSTATION

Recordingrate Upto10MB/s
Camerachannels Upto64
Recordingimagerate Upto 30 images/second/channel, total of 1920 for 64
channels
Localviewing Yes

Operatingsystems MicrosoftWindowsxpprofessional64bit

Harddiscdriveconfiguration 1sataforOS,12satafordata,jbod

Recordingstoragecapacity Upto3TB

Processor QuadcoreIntelXeon2.0Ghz

Memory 2GBRAM

NetworkInterface 1GigabitEthernetRJ45Port
VideoCard PCI Express direct X 9.0c compliant with 1.8 MB RAM
(intel GMA 900 or better, NVI/DIA 6600 or better, ATI
X1300orbetter)
VideoOutput 2displayportorDVI
OpticalDrive 1DVD RW
Mechanical
FormFactor Desktop
Electrical
PowerInput 100to240vAC
PowerSupply Singlenonreduntant
PowerConsumption 825Watts

Page99
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

6) INDOORWIRELESSACCESSPOINT

Specifications
Antennas 2Integrated(Supports2x2MIMOwithSpatialDiversity)
WiFiStandards 802.11b/g/n*
PowerMethod PassivePoweroverEthernet(1224V)
PowerSupply 24V,0.5APoEAdapterIncluded
MaximumPowerConsumption 6W
MaximumTXPower 27dBm
BSSID UptoFourPerRadio
PowerSave Supported
WirelessSecurity WEP,WPAPSK,WPATKIP,WPA2AES,802.11i
Certifications CE,FCC,IC
Mounting Wall/Ceiling(KitsIncluded)
OperatingTemperature 10to70C
OperatingHumidity 5 80%Condensing
Supported WMM,Voice,Video,BestEffort,andBackground
ConcurrentClients 50+
SupportedDataRate(Mbps) DataRates
802.11n, 6.5 Mbps to 300 Mbps (MCS0 MCS15, HT
20/40)
802.11b,1,2,5.5,11Mbps
802.11g,6,9,12,18,24,36,48,54Mbps
Frequency 2.4GHz
Dimensions 200x200x36.5mm
Weight 290g(430gwithMountingKits)
NetworkingInterface (1)10/100EthernetPort
Buttons Reset

7) OUTDOORWIRELESSACCESSPOINT

Specifications
Antennas 2 EXTERNAL (Supports 2x2 MIMO with Spatial
Diversity)
WiFiStandards 802.11b/g/n*
PowerMethod PassivePoweroverEthernet(1224V)
PowerSupply 24V,0.5APoEAdapterIncluded
MaximumPowerConsumption 6W
MaximumTXPower 27dBm
BSSID UptoFourPerRadio
PowerSave Supported
WirelessSecurity WEP,WPAPSK,WPATKIP,WPA2AES,802.11i
Certifications CE,FCC,IC
Mounting Wall
OperatingTemperature 10to70C
OperatingHumidity 5 80%Condensing
Supported WMM,Voice,Video,BestEffort,andBackground
ConcurrentClients 50+
SupportedDataRates(Mbps) DataRates
802.11n, 6.5 Mbps to 300 Mbps (MCS0 MCS15, HT
20/40)802.11b,1,2,5.5,11Mbps802.11g,6,9,12,18,
24,36,48,54Mbps
Frequency 2.4GHz

Page100
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

Dimensions 200x200x36.5mm
Weight 290g(WITHOUTANTENNA)
NetworkingInterface (1)10/100EthernetPort
Buttons Reset

8) 1GBPSMEDIACONVERTER

Specifications

Worksat1000MbpsinFullDuplexmodeforbothTXportandFXport
SupportsautoMDI/MDIXforTXport
ProvidesswitchconfigurationofForce/AutotransfermodeforFXport.
Extendsfiberdistanceupto15km
EasytoviewLEDindicatorsprovidestatustomonitornetworkactivityeasily
MEDIACONVERTER&MODULEStandardsandProtocols
IEEE802.3ab,
IEEE802.3z,
IEEE802.3xBasicFunctionFullDuplexFlowControl(IEEE802.3x)
Ports
11000MSCport
11000MRJ45port(AutoMDI/MDIX)
WaveLength1310nm
NetworkMedia
1000BASEFXSinglemodeFiber
1000BASETUTPcategory5,5ecable(maximum100m)EIA/TIA568100STP
(maximum100m)
LEDIndicators:PWR,LINK,RX
Dimensions(W*D*H)3.7*2.9*1.1in.(94.5*73.0*27.0mm)
PowerSupply:ExternalPowerAdapter
Safety&Emission:FCC,CE,RoHS
Environment
OperatingTemperature:0 ~40
StorageTemperature:40 ~70
OperatingHumidity10%~90%noncondensing
StorageHumidity:5%~90%noncondensing

9) UNIFIEDTHREATMANAGEMENTSYSTEM

Interfaces
CopperGbEPorts 6
ConfigurableInternal/DMZ/WANPorts Yes
ConsolePorts(RJ45/DB9) 1
USBPorts 2
HardwareBypassSegments 1*

SystemPerformance
Firewallthroughput(UDP)(Mbps) 2200
Firewallthroughput(TCP)(Mbps) 1500
Newsessions/second 12,000
Concurrentsessions 450,000
168bit3DES/AESthroughput(Mbps) 150/180
WAFProtectedThroughput(Mbps 100
AntiVirusthroughput(Mbps) 280

Page101
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

IPSthroughput(Mbps) 750
UTMthroughput(Mbps) 250

StatefulInspectionFirewall

Layer8(UserIdentity)Firewall
MultipleSecurityZones
AccessControlCriteria(ACC)UserIdentity,Source&DestinationZone,MACandIPaddress,
Service
UTMpoliciesIPS,WebFiltering,ApplicationFiltering,AntiVirus,AntiSpamandBandwidth
Management
Layer7(Application)Control&Visibility
AccessScheduling
PolicybasedSource&DestinationNAT
H.323,SIPNATTraversal
802.1qVLANSupport
DoS&DDoSAttackprevention
MAC&IPMACfilteringandSpoofprevention

GatewayAntiVirus&AntiSpyware

Virus,Worm,TrojanDetection&Removal
Spyware,Malware,Phishingprotection
Automaticvirussignaturedatabaseupdate
ScansHTTP,HTTPS,FTP,SMTP,POP3,IMAP,IM,VPNTunnels
Customizeindividualuserscanning
SelfServiceQuarantinearea
Scananddeliverbyfilesize
Blockbyfiletypes
Adddisclaimer/signature

GatewayAntiSpam

RealtimeBlacklist(RBL),MIMEheadercheck
Filterbasedonmessageheader,size,sender,recipient
Subjectlinetagging
IPaddressBlacklist/Whitelist
RedirectSpammailstodedicatedemailaddress
ImagebasedSpamfilteringusingRPDTechnology
ZerohourVirusOutbreakProtection
SelfServiceQuarantinearea
SpamNotificationthroughDigest
IPReputationbasedSpamfiltering

IntrusionPreventionSystem

Signatures:Default(3000+),Custom
IPSPolicies:Multiple,Custom
Userbasedpolicycreation
AutomaticrealtimeupdatesfromCRProtectnetworks
ProtocolAnomalyDetection

WebFiltering

InbuiltWebCategoryDatabase
URL,keyword,Filetypeblock

Page102
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

Categories:Default(82+),Custom
Protocolssupported:HTTP,HTTPS
BlockMalware,Phishing,PharmingURLs
Schedulebasedaccesscontrol
Customblockmessagespercategory
BlockJavaApplets,Cookies,ActiveX
CIPACompliant
DataleakagecontrolviaHTTP,HTTPSupload

ApplicationFiltering

InbuiltApplicationCategoryDatabase
ApplicationCategories:e.g.Gaming,IM,P2P,
Block
P2Papplicationse.g.Skype
Anonymousproxiese.g.UItrasurf
Phonehomeactivities
Keylogger
Layer7(Applications)&Layer8(UserIdentity)Visibility

WebApplicationFirewall

PositiveProtectionmodel
Unique"IntuitiveWebsiteFlowDetector"technology
ProtectionagainstSQLInjections,CrosssiteScripting(XSS),SessionHijacking,URL
Tampering,CookiePoisoning
SupportforHTTP0.9/1.0/1.1
ExtensiveLogging&Reporting
Backendserverssupported:10

VirtualPrivateNetwork

IPSec,L2TP,PPTP
Encryption3DES,DES,AES,Twofish,Blowfish,Serpent
HashAlgorithmsMD5,SHA1
AuthenticationPresharedkey,Digitalcertificates
IPSecNATTraversal
DeadpeerdetectionandPFSsupport
DiffieHellmanGroups1,2,5,14,15,16
ExternalCertificateAuthoritysupport
ExportRoadWarriorconnectionconfiguration
Domainnamesupportfortunnelendpoints
VPNconnectionredundancy
OverlappingNetworksupport
Hub&SpokeVPNsupport

SSLVPN

TCP&UDPTunneling
AuthenticationActiveDirectory,LDAP,RADIUS,
MultilayeredClientAuthenticationCertificate,Username/Password
User&Grouppolicyenforcement
NetworkaccessSplitandFulltunneling
Browserbased(Portal)AccessClientlessaccess
LightweightSSLVPNTunnelingClient
GranularaccesscontroltoalltheEnterpriseNetworkresources

Page103
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

AdministrativecontrolsSessiontimeout,DeadPeerDetection,Portalcustomization
TCPbasedApplicationAccessHTTP,HTTPS,RDP,TELNET,SSH

InstantMessaging(IM)Management

YahooandWindowsLiveMessenger
VirusScanningforIMtraffic
Allow/BlockLogin
Allow/BlockFileTransfer
Allow/BlockWebcam
Allow/Blockonetoone/groupchat
Contentbasedblocking
IMactivitiesLog
Archivefilestransferred
CustomAlerts

WirelessWAN

USBport3GandWimaxSupport
PrimaryWANlink
WANBackuplink

BandwidthManagement

ApplicationandUserIdentitybasedBandwidthManagement
Guaranteed&Burstablebandwidthpolicy
Application&UserIdentitybasedTrafficDiscovery
MultiWANbandwidthreporting
Categorybasedbandwidthrestriction

UserIdentityandGroupBasedControls

Accesstimerestriction
TimeandDataQuotarestriction
SchedulebasedCommittedandBurstableBandwidth
SchedulebasedP2PandIMControls

Networking
FailoverAutomatedFailover/Failback,MultiWANfailover,3GModemfailover
WRRbasedloadbalancing
PolicyroutingbasedonApplicationandUser
IPAddressAssignmentStatic,PPPoE,L2TP,PPTP&DDNSClient,
ProxyARP,DHCPserver,DHCPrelay
SupportforHTTPProxy
DynamicRouting:RIPv1&v2,OSPF,BGP,Multicast
Forwarding
ParentProxysupportwithFQDN
IPv6ReadyGoldLogo

HighAvailability

ActiveActive
ActivePassivewithStateSynchronization
Statefulfailover
Alertsonappliancestatuschange

Page104
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

Administration&SystemManagement

Webbasedconfigurationwizard
Rolebasedaccesscontrol
FirmwareUpgradesviaWebUI
Web2.0compliantUI(HTTPS)
UIColorStyler
CommandLineInterface(Serial,SSH,Telnet)
SNMP(v1,v2c,v3)
Multilingualsupport:Chinese,Hindi,French,Korean
NTPSupport

UserAuthentication

Internaldatabase
ActiveDirectoryIntegration
AutomaticWindowsSingleSignOn
ExternalLDAP/RADIUSdatabaseintegration
ThinClientsupportMicrosoftWindowsServer2003TerminalServicesandCitrixXenApp
ExternalAuthenticationUsersandAdministrators
User/MACBinding
MultipleAuthenticationservers

Logging/Monitoring

Graphicalrealtimeandhistoricalmonitoring
Emailnotificationofreports,virusesandattacks
Syslogsupport
LogViewerIPS,Webfilter,AntiVirus,AntiSpam,Authentication,SystemandAdminEvents

OnApplianceReporting

IntegratedWebbasedReportingtool
1000+drilldownreports
45+ComplianceReports
HistoricalandRealtimereports
MultipleDashboards
Username,Host,EmailIDspecificMonitoringDashboard
ReportsSecurity,Virus,Spam,Traffic,Policyviolations,VPN,SearchEnginekeywords
Multiformatreportstabular,graphical
ExportableformatsPDF,Excel
AutomatedReportScheduling

IPSecVPNClient

InteroperabilitywithmajorIPSecVPNGateways
Supportedplatforms:Windows2000,WinXP32/64bit,
Windows200332bit,Windows200832/64bit,
WindowsVista32/64bit,Windows7RC132/64bit
ImportConnectionconfiguration

Power
InputVoltage 115230VAC
Consumption 62.7W
TotalHeatDissipation(BTU) 324

Page105
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

Environmental
OperatingTemperature 0to40C
StorageTemperature 20to80C
RelativeHumidity(Noncondensing 0to90%

Certification
ICSAFirewallCorporate
CheckmarkUTMLevel5Certification
VPNCBasicandAESinteroperability
IPv6ReadyGoldLogo

Compliance
CE
FCC

10) 32LEDMONITORSPECIFICATION

Synchronization
Horizontal 30~81kHz
Vertical 56~75Hz
DisplayColor 1.07B
Resolution
Optimumresolution 1920x1080@60Hz
Maximumresolution 1920x1080@60Hz
MaximumPixelClock 148.5MHz(Analog,Digital)
PowerSupply Thisproductuses100to240V.Refertothelabelatthebackofthe
productasthestandardvoltagecanvaryindifferentcountries
Audiooutput 10W+10W
Signalconnectors Input : AV IN/COMPONENT IN(common), RGB IN(PC DSub), DVI
IN,HDMIIN,RGB/DVI/HDMI/AUDIOIN,RJ45,RS232CIN
Output:AUDIOOUT,RS232COUT
USB 1DOWN(2.0)

16TECHNICALSPECIFICATIONFORFIREALARMSYSTEM.

FIRE
1. Provide all permits, labor, equipment, materials and services to furnish and install a fully
tested functional, UL Listed, code compliant, intelligent addressable networked fire alarm,
emergencycommunicationsandactivesmokecontrolsystemincluding butnotlimitedto
all initiation and notification appliances, all raceways and wiring, connection to a central
monitoringstation.
2. Thesystemsuppliedunderthisspecificationshallutilizemodularlowvoltagedesignwith
directwired,nodetonode,peertopeernetworkcommunications.Thesystemshallutilize
independently addressed, fire detection devices, input/output control modules, audio
amplifiers, telephone communications and notification appliances as described in this
specification.Networkpanelsshallcontaintherequireduserinterfacesforallfunctions.All
equipmentshallbenewandthecurrentproductsofasinglemanufacturer,activelyengaged
inthemanufacturingandsaleofdigitalfiredetectiondevicesforovertenyears.
3. Also included are system wiring, raceways, pull boxes, terminal cabinets, mounting boxes,
andanyaccessoriesandmiscellaneousitemsrequiredforacodecompliantsystem.
4. Thesystemdrawingsshowtheintendedofcoverageandsuggesteddevicelocations.Final
devicequantity,location,andAHJapprovalaretheresponsibilityofthecontractor.

Page106
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

5. Thefinalsystemshallbecomplete,tested,andreadyforoperationasdescribedelsewhere
inthisspecification,beforeowneracceptance.
6. Strict conformance to this specification is required to ensure that the installed and
programmedsystemwillfunctionasdesigned,iscompatiblewithexistingsystems,andwill
accommodatethefuturerequirementsandoperationsofthebuildingowner.Allspecified
operationalfeaturesmustbemetwithoutexception.

REFERENCES

CODESGENERAL
All work and materials shall conform to all applicable federal, state and local codes and
regulationsgoverningtheinstallation.Ifthereisaconflictbetweenthereferencedstandards,
federal, state or local codes, and this specification, it is the bidders responsibility to
immediately bring the conflict to the attention of the engineer for resolution. National
standardsshallprevailunlesslocalcodesaremorestringent.

The bidder shall not attempt to resolve conflicts directly with the local authorities unless
specificallyauthorizedbytheengineer.
FIRECODE
The equipment and installation shall comply with the provisions of the following codes and
standardsunlesstheauthorityhavingjurisdictionhasadoptedanearlierversion:

NationalFireProtectionAssociation(NFPA)
NFPA702011NationalElectricCode
NFPA722010NationalFireAlarmCode
NFPA90A2012InstallationofAirConditioningandVentilatingSystems
NFPA92A2009SmokeControlSystemsUtilizingBarriersandPressureDifferences
NFPA92B2009SmokeManagementSystemsinMalls,Atria,andLargeAreas
NFPA1012012LifeSafetyCode

UnderwritersLaboratories,Inc
UL864ControlUnitsforFireProtectiveSignalingSystems.
UL268SmokeDetectorsforFireProtectiveSignalingSystems.
UL268ASmokeDetectorsforDuctApplications.
UL217SingleandMultipleStationSmokeAlarms
UL521HeatDetectorsforFireProtectiveSignalingSystems.
UL228DoorClosersHolders,WithorWithoutIntegralSmokeDetectors.
UL464AudibleSignalingAppliances.
UL38ManuallyActuatedSignalingBoxesforUsewithFireProtectiveSignalingSystems
UL346WaterflowIndicatorsforFireProtectiveSignalingSystems.
UL1971SignalingDevicesfortheHearingImpaired.
UL1480SpeakersforFireAlarm,Emergency,andCommercialandProfessionalUse
UL1481PowerSuppliesforFireProtectiveSignalingSystems.
UL1711AmplifiersforFireProtectiveSignalingSystems.
UL1635DigitalAlarmCommunicatorSystemUnits
UL1638SignalingAppliancesPrivateModeEmergencyandGeneralUtilitySignaling

FactoryMutual(FM)approval

<Local codes/standards such as: CSFM (State of California), MEA (New York City), City of
Chicago>

InternationalCodeCouncil
InternationalBuildingCode

Page107
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

InternationalFireCode
InternationalMechanicalCode

FederalCodesandRegulations
AmericanswithDisabilitiesAct(ADA)

ElectricalIndustriesAssociation
EIA232D: Interface Between Data Terminal Equipment and Data CircuitTerminating
EquipmentEmployingSerialBinaryDataInterchange
EIA485: Electrical Characteristics of Generators and Receivers for Use in Balanced Digital
MultipointSystems

DEFINITIONSANDABBREVIATIONS
ACU:AutonomousControlUnit.
ADA:AmericanswithDisabilitiesAct.
AFF:AboveFinishedFloor.
AHJ:AuthorityHavingJurisdiction.
Approved: Unless otherwise stated, materials, equipment or submittals approved by the
AuthorityorAHJ.
Circuit:Wirepathfromagroupofdevicesorappliancestoacontrolpanelortransponder.
CCS:CentralControlStation.
CPU:Thecentralcomputerofamultiplexfirealarmorvoicecommandcontrolsystem.
ECS:EmergencyCommunicationSystem.
FACP:FireAlarmControlPanel.
FCC:FireCommandCenter.
FM:FMGlobal(FactoryMutual)
FSCP:FirefightersSmokeControlPanel.
HPSA:HighPowerSpeakerArray.
HVAC:HeatingVentilatingandAirConditioning.
IDC:InitiatingDeviceCircuit.
LCD:LiquidCrystalDisplay.
LED:LightEmittingDiode.
LOC:LocalOperatingConsole.
MN:MassNotification.
MNEC:MassNotificationEmergencyCommunications.
NAC:NotificationApplianceCircuit.
NFPA:NationalFireProtectionAssociation.
NICET:NationalInstituteforCertificationinEngineeringTechnologies
NRTL:NationallyRecognizedTestingLaboratory
PTR:Printer.
RCP:RemoteControlPanel
SLC:SignalingLineCircuit.
Style1:AsdefinedbyNFPA72,ClassB.
Style4:AsdefinedbyNFPA72,ClassB.
Style6:AsdefinedbyNFPA72,ClassA.
Style7:AsdefinedbyNFPA72,ClassA.
StyleB:AsdefinedinNFPA72,ClassB.
StyleD:AsdefinedinNFPA72,ClassA.
StyleY:AsdefinedinNFPA72,ClassB.
ULorULI:UnderwritersLaboratories,Inc.
ULListed:MaterialsorequipmentlistedandincludedinthemostrecenteditionoftheULFire
ProtectionEquipmentDirectory.
Zone:Combinationofoneormorecircuitsordevicesinadefinedbuildingarea,i.e.3speaker
circuitsonafloorcombinedtoformasinglezone.

Page108
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

SYSTEMDESCRIPTIONFIRE

GENERALFIRE
The system supplied under this specification shall be a new UL Listed modular fire alarm
network that uses independently addressed fire detection devices, input/output control
modules,andnotificationappliances.
Thenetworkshallutilizetokenring,peertopeercommunications.Thenetworkshallconsist
ofamainpanel andremotecontrol panels.To enhancesurvivability, eachpanelshallbean
equal, active functional member of the network, capable of making all local decisions and
initiating network tasks for other panels. In the event of a panel failure or communications
failure between panels, panels shall be capable of forming subnetworks and remain
operationalbetweencommunicatingpanels.Master/slavesystemconfigurationsshallnotbe
consideredasequal.
The system shall be fully field programmable such that virtually any combination of system
output functions may be correlated to any type of input event(s). Inputs may be combined
usingBooleanlogic,betimedependentorundermanualcontrol,asdefinedbyrequiredsystem
operation.Allsoftwareoperationsaretobestoredinanonvolatileprogrammablememory
within the fire alarm control panels. There shall be no limit, other than maximum system
capacity,astothenumberofaddressabledeviceswhichmaybeinalarmsimultaneously.

Addressablesmokedetectorsensitivitysettingsforbothprealarmandalarmactivationshall
be automatically individually configurable for both daytime and nighttime operation.
AddressablesmokedetectorsshallbeULlistedforautomaticsensitivitytesting.

Ease of maintenance shall be facilitated by the use of panel based and PC based system
diagnostics.
1. The system shall automatically test smoke detector sensitivity, eliminating the need for
manualsensitivitytesting.
2. Ground fault detection and annunciation shall be by individual module address for
supervisedinputandoutputdevices.
3. System test operation shall be configurable by individual addressable devices, and not
disableentirecircuits.
4. The system shall be capable of generating a graphical map of connected all addressable
devicestoaideincircuittroubleshooting.
5. Placement supervision of addressable devices shall couple a devices location (not its
address)totheprogrammedsystemresponse.

Thesystemshallbedesigned,inspected,testedandapprovedtoprovideoccupantnotification
audibilitylevelsof15dBAoverambientconditions.

The system shall support CO and security detection devices with appropriate independent
annunciationandsignalprocessing.

Thesystemshallinterfacewithotherbuildingsystemsasrequiredbythefirecodes.

Thesystemshalltransmitrequiredsignalstoacentralmonitoringstation.

Systempanelsandannunciatorsshallutilizeconfigurablemessageroutingandselectiveevent
messaging to direct event information only to the required system displays and printers as
determinedbytheeventtypeandlocation.


<The existing fire alarm shall be removed and discarded and new control panels, power
supplies, audio/visual indicating appliances (wiring may be reused if warranted as new and

Page109
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

will work with new system if electrically sound) and related equipment shall be installed as
specified.>
FIREALARMPERFORMANCE
ALARMOPERATION
Thefollowingrepresentativetasksshouldbecustomizedforeachproject.Asanalternativeto
descriptivetext,theuseofafunctionalinput/outputmatrixmayprovideadditionaldetail.>

Upon the alarm activation of any area smoke detector, heat detector, manual pull station,
sprinklerwaterflow<ductsmokedetector>,thefollowingfunctionsshallautomaticallyoccur:

The system shall remain in the alarm mode until all initiating devices are reset and the fire
alarmpanelismanuallyresetandrestoredtonormal.
Theinternalaudibledeviceshallsoundatthecontrolpanelorcommandcenter.
Displaythealarmeventonthegraphicalworkstation.
TheLCDdisplayshallindicateallapplicableinformationassociatedwiththealarmcondition
including;zone,devicetype,devicelocationandtime/date.
Allsystemactivity/eventsshallbedocumentedonthesystemprinterandloggedintosystem
history.
Any remote or local annunciator LCD/LED's associated with the alarm zone shall be
illuminated.

<Activate notification audible appliances on the fire floors (zones) immediately above and
below(adjacentto)thefirefloor(zone)<generalalarmevacuation>.
Activatevisualstrobesnotificationappliancesonthefirefloors(zones)immediatelyaboveand
below(adjacentto)thefirefloor(zone)<generalalarmevacuation>.Thevisualstrobeshall
continuetoflashuntilthesystemhasbeenreset.Thevisualstrobe<shall><shallnot>notstop
operatingwhenthe"AlarmSilence"ispressed.
Or
<Sound the ANSI 1171 signal with synchronized audibles and synchronized strobes
throughoutthefacility.>
Audible alarmsignalsshallbesilenced fromthefire alarm controlpanel byan alarmsilence
switch.Visualsignalsshallbeprogrammabletoflashuntilsystemresetoralarmsilencing,as
required.
Thenotificationappliancededicatedtosprinklersystemwaterflowalarmshallnotbesilenced
whilethesprinklersystemisflowingatarateofflowequaltoasinglehead.
Transmitsignaltothebuildingautomationsystem.
Transmitsignaltothecentralmonitoringstationwithpointidentification.
Activateautomaticsmokecontrolsequences.
Activateemergencylightingcontrol.
Activate emergency shutoffs for gas and fuel supplies.
Activate emergency shutdown for the following equipment: <supply list of equipment to be
shutdown.>
All automatic events programmed to the alarm point shall be executed and the associated
outputsactivated.
1. Activation of elevator lobby or elevator equipment room smoke detectors shall initiate
recallofthebankofelevatorstothe1stfloorandlockouttheelevatorcontrols.Activationof
the first floor elevator lobby smoke detector shall recall shall be to an alternate floor, and
lockouttheelevatorcontrols.
2. Activation of heat detectors in elevator shafts and machine rooms shall activate the
elevatorpowershunttripcircuitbreaker.
Allstairwell/exitdoorsshallunlockthroughoutthebuilding.
Allselfclosingfire/smokedoorsheldopenshallbereleased.
Transmitalarmtextmessagesto"alphanumerical"displaypagers.
DirecttheclosedcircuitTVcamerastothealarmeventandstartvideorecording.

GRAPHICWORKSTATION

Page110
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

PERFORMANCEFIRE
Thecommandcentershallfunctionasthecenterpointforoperationalandadministration
functionsrequiredforthefirealarmsystem(s)providedinthisspecification.

Ataminimum,thesystemshallprovideannunciationandcontrolsfor:
<Firedetection.>
<Firesuppression.>
<Firepumpstatus>
<Smokecontrol.>
<Standbygenerator.>
<Automatictransferswitch>
<Elevatormonitor>

Workstationfunctionsshallincludebutnotbelimitedto:

Display events in response to an alarm or off normal point. The workstation shall
simultaneouslydisplay
AnEventListViewporttodisplaythealarmoroffnormalpointwithtypeand
descriptionandtimeoftheeventinaprioritizedcolorcodedeventlist.
AnEventActionViewporttoprovidecommoncontrolcapabilityforAlarmSilence,
PanelSilence,DrillandResetaswellastheEventAcknowledgebutton,the
ComputerSilencebutton,andtheEventLog.
AMapViewporttodisplayagraphicalrepresentationofthearea/locationinwhich
thealarmoroffnormaldeviceislocated.DeviceIconsshallbesurroundedbya
colorcodedboarderthatindicatesthestatusofeachdevice.
ACCTVViewporttodisplaytheoutputofaClosedCircuitTVsysteminthe
viewportinresponsetoasystemevent.
ABrowserViewporttoautomaticallyaccesswebbasedemergencyinformation
sites.
AnImageViewporttodisplayastoredimageofitemsrelevanttotheevent
highlightedintheeventlistarea.ExamplesincludeHardwareidentification,
Equipmentdiagrams,etc.

Highlightinganyeventintheeventlistviewportshallautomaticallycausetheviewportsto
displayinformationrelatingtothehighlightedevent.Systemsrequiringmultiplescreensto
displaythisinformationshallnotbeconsideredasequal.

Receiptofincomingeventsshalltransmiteventdetailstowebclients.
ReceiptofincomingeventsshallEmaileventdetailstoresponsibleparties.

Theworkstationshallbecapableof:
Acknowledging,silencing,andresettingallfirealarmfunctions.
Manuallyactivating,deactivating,enabling,anddisablingindividualfirealarm
points.
Generatingstatus,maintenanceandsensitivityreportsforallfirealarm
components.
Operatingthesmokecontrolsystem.

Theworkstationshalllogalleventsandoperatoractionstohistoryforfuturereview.
Theworkstationshallbecapableofloggingtheoperator'scommentsforeacheventtohistory
withtimeanddate.
Theworkstationshalltransmitsystemstatustoallconnectedwebclients.

QUALITYASSURANCE

Page111
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

QUALIFICATIONSOFSUPPLIER
Thesystemsuppliershallhaveaminimumof<10>yearsofexperienceindistributionand
serviceoftheproposedequipmentbrand.

Thesuppliershallhavesuccessfullydesignedandinstalledsimilarsystemfiredetection,
evacuationvoiceandvisualsignalingcontrolcomponentsonapreviousprojectofcomparable
scope,sizeandcomplexity.
Thesuppliershallhaveinhouseengineeringandprojectmanagementcapabilityconsistent
withtherequirementsofthisproject.Theprojectshallbesupervisedbypersonnelcertifiedby
NICETasfirealarmLevelIVtechnicians.

Thesuppliershallemployqualifiedandmanufacturercertifiedsystemdesignerstoperformthe
detailedengineeringdesign,systemcalculations,forallthesystemequipmentand
programming.

Thesuppliershallproduceallpanelandequipmentdrawings,submittals,andoperating
manuals,asdetailedelsewhereinthisspecification.

Thesuppliershallberesponsibleforprovidingqualifiedonsiterepresentative(s)for
coordinationofsysteminstallation,andfinalsystemtestingandcommissioninginaccordance
withthesespecifications.

QUALIFICATIONSOFINSTALLER
Beforecommencingwork,submitevidenceshowingthattheequipmentinstallerhas
successfullyinstalledsystemsofthesimilarscope,typeanddesignasspecified.

Thecontractor/installershallsubmitcopiesofallrequiredLicensesandBondsasrequiredin
theStatehavingjurisdiction.
Thecontractor/installershallberesponsibleforretainingqualifiedandauthorized
representative(s)ofthesystemmanufacturer(TheSupplier)specifiedfordetailedsystem
designanddocumentation,coordinationofsysteminstallationrequirements,andfinalsystem
testingandcommissioninginaccordancewiththesespecifications.
Thecontractor/installershallemployonstaffaminimumofoneNICETlevelIItechnicianora
professionalengineer,registeredintheStateoftheinstallation.

ContractorsunabletocomplywiththeprovisionsofQualificationofInstallersshallpresent
proofofengagingtheservicesofasubcontractorqualifiedtofurnishtherequiredservices.

SUBMITTALS

PRODUCTDATA
SystemcomponentsproposedinthisspecificationshallbeULlistedtooperatetogether
asasystem.Thesuppliershallprovideevidence,withhissubmittal,oflistingsofall
proposedequipmentandcombinationsofequipment.
Foreachproductsubmittedprovidethefollowinginformation:

1. Manufacturerscatalogdata,toincludematerialdescription,agencyapprovals,
operatingcharacteristics,electricalcharacteristics,dimensions,mounting
requirementsandaccessories.

Productdatasheetsforsystemcomponentsshallbehighlightedtoindicate
thespecificproducts,features,orfunctionsrequiredtomeetthis
specification.

Page112
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

Alternateorasequalproductssubmittedunderthiscontractshallprovidea
detailedlinebylinecomparisonofhowthesubmittedproductmeets,exceeds,or
doesnotcomplywiththisspecification.
2. Manufacturersproductinstallationsheets:Acopyofthedocumentationthatis
requiredtobeshippedwithalllistedproductsbyUL.

PART2PRODUCTS

ACCEPTABLEMANUFACTURERS
A. Themanufacturerofthesystemequipmentshallberegularlyinvolvedinthedesign,
manufacture,anddistributionoftheproductsspecifiedinthisdocument.These
processesshallbemonitoredunderaqualityassuranceprogramthatmeetsISO
9000/9001requirements.

B. ThecatalognumbersusedarethoseofEdwards,aUTCClimate|Controls|Security
Companyorequal,andconstitutethetypeandqualityofequipmenttobefurnished.
ForalistofEdwardsauthorizedfirealarmvendors,contact:
edwardsmarketing@fs.utc.com.
C. Ifequipmentofanothermanufactureristobesubmittedforapprovalasequal,the
contractorshall,atthetimeofbid,listallexceptionstakentothesespecifications,all
variancesfromtheseSpecificationsandallsubstitutionsofoperatingcapabilitiesor
equipmentcalledforinthesespecificationsandforwardsaidlisttotheengineer.Any
suchexceptions,variancesorsubstitutionsnotlistedatthetimeofbidandare
subsequentlyidentifiedinthesubmittal,shallbegroundsforimmediatedisapproval
withoutcomment.Finaldeterminationofcompliancewiththesespecificationsshall
restwiththeengineer,who,athisdiscretion,mayrequireproofofperformance.
D. Alternateproductsubmissionsshallprovideproofofnolessthanthree(3)factory
authorizedandcertifiedmanufacturersdistributorswithin<50miles>oftheproject
jobsite.Thesedistributorsshallprovideinstallationsupport,shallhaveaservice
organizationcapableof24houremergencycallserviceandSHALLHAVEBEEN
CONTRACTEDANDDELIVEREDNOLESSTHANFIVE(5)SIMILIARPROJECTSUSING
THESUBMITTEDPRODUCTOVERTHEPASTYEAR.Alternatesubmissionswithoutthe
requiredreferencesshallberejected.
E. Alternateproductsubmissionsbaseduponuseofaproductlineconsideredproprietary
initsdistribution,design,applicationsoftware,orongoingmaintenanceandrepairshall
notacceptable.Proofofaproductsnonproprietarynatureshallbetheburdenofthe
contractoratthetimeofbid,andshallbeintheformofwrittendocumentation.The
determinationofaproductscompliancetothisrequirementshallbeexclusivelythatof
theengineer.
Allproductsusedshallbeofasinglemanufacturer.Allproductsshallbelistedbythe
manufacturerfortheirintendedpurpose.Submissionofnotificationappliances,
auxiliaryrelays,ordocumentationfromotherthanasinglemanufacturershallnotbe
acceptableandwillbegroundsforimmediatedisapprovalwithoutcomment.
F. ApprovedProducts:Allpanelsandperipheraldevicesshallbeofthestandardproduct
ofsinglemanufacturerandshalldisplaythemanufacturersnameofeachcomponent.
ThecatalognumbersspecifiedunderthissectionarethoseofEdwards,aUTCClimate|
Controls|SecurityCompany,andshallconstitutethetype,productquality,materialand
desiredoperatingfeatures.
FIREALARMPANEL

GENERALFIRE
OVERVIEW

Page113
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

Allmaterials,equipment,accessories,devicesandotherfacilitiesandappurtenancescoveredby
thesespecificationsornotedonthedrawingsshallbenew,bestsuitedfortheintendeduseand
shall conform to applicable and recognized standards for their use, and supplied by a single
manufacturer. Should any equipment provided under this specification be supplied by a
differentmanufacturer,thatequipmentshallberecognizedcompatiblebyBOTHmanufacturers
andlistedassuchasrequiredbyUnderwritersLaboratories.

Thefirealarmcontrolpanel(s)shallbeamultiprocessorbasednetworkedsystemdesigned
specificallyforfire,onewayandtwowayemergencyaudiocommunications,smokecontrol,
<extinguishingagentreleasingsystem>,andguardpatrolapplications.Thecontrolpanelshall
belistedandapprovedfortheapplicationstandard(s)aslistedintheReferencessectionofthis
specification.

Thecontrolpanelshallincludeallrequiredhardware,softwareandsitespecificsystem
programmingtoprovideacompleteandoperationalsystem.Thecontrolpanel(s)shallbe
designedsuchthatinteractionsbetweenanyapplicationscanbeconfigured,andmodifiedusing
softwareprovidedbythemanufacturer.Thecontrolpanel(s)operationalpriorityshallassure
thatlifesafetytakesprecedenceamongtheactivitiescoordinatedbythecontrolpanel.
Theoperatingcontrolsshallbelocatedinadeadfrontsteelenclosurebehinda
lockeddoorwithviewingwindow.Allcontrolmodulesshallbelabeled,andall
zone locations shall be identified. All panel modules shall be placement
supervisedforandsignalatroubleifdamagedorremoved.

SYSTEMFEATURES
Eachcontrolpanelshallincludethefollowingcapabilities:

Supervisionofthesystemelectronics,wiring,detectiondevicesandsoftware
Upto2500analog/addressableinput/outputpoints
Networkconnectionswithupto63othercontrolpanelsandannunciators.
Supportmultipledialers(DACTs)andmodems
Twocommunicationports
Aninternalaudiblesignalwithdifferentpatternstodistinguishbetweenalarm,supervisory,
troubleandmonitorevents
Supportmultiple24VDCandAudioNACs
UserconfigurableswitchesandLEDindicatorstosupportauxiliaryfunctions
Logupto1740chronologicalevents
Theabilitytodownloadallapplicationsandfirmwarefromtheconfigurationcomputerata
singlelocationonthefirenetwork
Arealtimeclockfortimestampsandtimedeventcontrol
Electronicaddressingofintelligentaddressabledevices
ProvideanindependenthardwarewatchdogtosupervisesoftwareandCPUoperation
Dryalarm,troubleandsupervisoryrelaycontacts
Controlpanelmodulesshallplugintoachassisassemblyforeaseofmaintenance
Fieldwiringshallconnecttothepanelusingremovableconnectors

USERORIENTEDFEATURES
Eachcontrolpanelshallincludethefollowinguserorientedfeatures:

AnLCDuserinterfacecontrol/displaythatshallannunciateandcontrolsystemfunctions.
Providediscreetsystemcontrolswitchesforreset,alarmsilence,panelsilence,drillswitch,
previousmessageswitch,nextmessageswitchanddetails.
Alamptestfeatureshallverifyoperationofallvisualindicatorsonthepanel.
Anauthorizedusershallhavetheabilitytooperateormodifysystemfunctionsincluding
systemtime,date,passwords,holidaydates,restartthesystemandclearcontrolpanelevent
historyfile.

Page114
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

Anauthorizedusershallhavetheabilitytodisable/enabledevices,zones,actions,timersand
sequences.
Anauthorizedusershallhavetheabilitytoactivate/restoreoutputs,actions,sequences,and
simulatedetectorsmokelevels.
Anauthorizedusershallhavetheabilitytoentertimeanddate,reconfigureanexternalportfor
downloadprogramming,initiateprogrammingandchangepasswords.
Anauthorizedusershallhavetheabilitytotestthefunctionsoftheinstalledsystem.
Servicegroupsshallfacilitateonemanwalktesting.Service/testgroupsshallbecapableof
beingconfiguredwithanycombinationofaddressabledevices,independentofSLCwiring.It
shallbepossibletoprogramalternatedeviceresponseswhenthedevicesservicegroupis
active.Devicesnotinanactiveservicegroupshallprocessalleventsnormally.
Provideinternalsystemdiagnosticsandmaintenanceuserinterfacecontrolstodisplay/report
thepower,communication,andgeneralstatusofspecificpanelcomponents,detectors,and
modules.
SLCloopcontrollerdiagnosticsshallidentifycommonalarm,trouble,groundfault,ClassAfault,
andmapfaults.Mapfaultsincludewirechanges,devicetypechangesbylocation,device
additions/deletionsandconventionalopen,short,andgroundconditions.Groundfaultsonthe
supervisedcircuitwiringofremoteaddressablemodulesshallbeidentifiedbydeviceaddress.
Anauthorizedusershallhavetheabilitytogenerateareporthistoryforalarm,supervisory,
monitor,trouble,smokeverification,watchdog,andrestoreactivity.
Systemreportsshallprovidedetaileddescriptionofthestatusofsystemparametersfor
correctiveactionorforpreventativemaintenanceprograms.Reportsshallbedisplayedbythe
operatorinterfaceorcapableofbeingprintedonaprinter.
Anauthorizedusershallhavetheabilitytodisplay/reporttheconditionofaddressableanalog
detectors.Reportsshallincludedeviceaddress,devicetype,percentobscuration,and
maintenanceindication.Themaintenanceindicationshallprovidetheuserwithameasureof
contaminationofadeviceuponwhichcleaningdecisionscanbemade.
PROGRAMMABILITY
AWindowsbasedConfigurationUtility(CU)shallbeusedtocreatethesitespecificsystem
programming.Theutilityshallfacilitateprogrammingofanyinputpointtoanyoutputpoint.
Theutilityshallallowcustomizationoffundamentalsystemoperationsusinginitiatingeventsto
startactions,timers,sequencesandlogicalalgorithms.

Zoningofinitiationdevices.
Initiationofeventsbytimeofday,dayofweek,dayofyear.
Initiationofeventsbymatrixgroups(XYcoordinaterelationships)forreleasing
systems.
InitiationofeventsusingOR,AND,NOTandcountingfunctions.
Prioritizingsystemevents.
Programmableactivationofdetectorsounderbasesbydetector,groupsofbases,orall
bases.
Directingselecteddevicemessagestospecificpanelannunciators
Detectorsensitivityselectionbytimeofday
Supportof256CentralMonitoringStationaccountsanddirectingselecteddevice
messagestoanyoneoftenCentralMonitoringStations.

Theconfigurationutilityshalltimeanddatestampallchangestothesitespecificprogram,and
shallfacilitateprogramversioningandshallstoreallpreviousprogramversiondata.Theutility
shallprovideacomparefeaturetoidentifythedifferencesbetweendifferentversionsofthe
sitespecificprogram.

Page115
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

Theconfigurationutilityshallbecapableofgeneratingreportswhichdetailtheconfigurations
ofallfirealarmpanels,addressabledevicesandtheirconfigurationsettingsincluding
generatingelectricalmapsoftheaddressabledeviceSLCs.

Theconfigurationutilityshallsupporttheuseofbarcodereaderstoexpediteelectronic
addressingandcustomprogrammingfunctions.

PleaserefertotheGeneral,SystemDescriptionSectionforthisprojectssitespecific
systemoperatingrequirements.

ThefirealarmcontrolpanelshallbeanEdwards3CPU3andsupportcomponentsinan
appropriatelysizedenclosure.
POWERSUPPLY
Systempowersupply(s)shallbeahighefficiencyswitchedmodedesignprovidingmultiple
supervisedpowerlimited24VDCoutputcircuitsasrequiredbythepanelandexternalloadsfed
bythepanel.Initialpowersupplyloadingshallnotexceed80%ofpowersupplycapacityin
ordertoallowforfuturesystemexpansion.

Eachsystempowersupplyshallbeindividuallysupervised.Powersupplytroublesignalsshall
identifythespecificsupplyandthenatureofthetroublecondition.

Itshallbepossibletoparallelsystempowersuppliestoincreasecapacityortoprovide
redundantoperation.

Uponfailureofnormal(AC)power,theaffectedportion(s)ofthesystemshallautomatically
switchovertosecondarypowerwithoutlosinganysystemfunctionality.

Allsystempowersuppliesshallbecapableofrechargingtheirassociatedbatteries,fromafully
dischargedconditiontoacapacitysufficienttoallowthesystemtoperformconsistentwiththe
requirementsofthissection,in48hoursmaximum.

Allstandbybatteriesshallbecontinuouslymonitoredbythepowersupply.Thepowersupply
shallbeabletoperformanautomaticloadtestofbatteriesandindicateatroubleconditionif
thebatteriesfalloutsideapredeterminedrange.Powersuppliesshallincorporatetheabilityto
adjustthechargerateofbatteriesbasedonambienttemperatures.Thepowersupplyshall
automaticallydisconnectthebatterybeforelowvoltagedamagesthebattery.Lowbatteryand
disconnectionofbatterypowersupplyconditionsshallimmediatelyannunciatedasbattery
troubleandidentifythespecificpowersupply(s)affected.

Batteriesshallutilizesealedleadacidchemistry.Initialbatterycapacityshallprovide125%of
calculatedcapacityrequirementsinordertoallowforfuturesystemexpansion.

AllACpowerconnectionsshallbetothebuilding'sdesignatedemergencyelectricalpower
circuitandshallmeettherequirementsofNFPA70andNFPA72.Thepowercircuitdisconnect
meansshallbeclearlylabeledFIREALARMCIRCUITCONTROLandshallhavearedmarking.
Thelocationofthecircuitdisconnectshallbelabeledpermanentlyinsidetheeachcontrolpanel
thedisconnectserves.

ThepowersupplyshallbeanEdwards3PPS/Mseries.

USERINTERFACE

PANELLCDANDCOMMONCONTROLS

Thesystemshallbedesignedandequippedtoreceive,monitor,andannunciatesignalsfrom
devicesandcircuitsinstalledthroughoutthefacility.

Page116
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

Eachfirealarmcontrolpanel(systemnode)shallbecapableofsupportingabacklitLCDdisplay.
Thedisplayoneachsystemnodeshallbeconfigurabletodisplaythestatusofanyand/orall
combinationsofallalarm,supervisory,trouble,monitor,orservicegroupeventmessageson
thenetwork.EachLCDdisplayonthesystemshallbecapableofbeingprogrammedtoallow
controlfunctionsofanycombinationofnodesontheentirenetwork.Thesystemshallsupport
both168characterand960characterLCDdisplaysonthesamenetwork.

TheLCDdisplayshallprovideseparatealarm,trouble,supervisory,andmonitoreventqueues
oftominimizeoperatorconfusion.Receiptofalarm,trouble,andsupervisorysignalsshall
activateintegralaudibledevicesatthecontrolpanel(s)andateachremoteannunciationdevice.
Theintegralaudibledevicesshallproduceasoundoutputuponactivationofnotlessthan85
dBAat10feet.

TheLCDdisplayshallcontainthefollowingsystemstatusindicators:
SystemPowerIndicator
SystemTestIndicator
SystemCPUFailIndicator
GroundFaultIndicator
DisabledPointsIndicator
SystemNormalIndicator
SystemCommonAlarmIndicator
SystemCommonTroubleIndicator
SystemCommonSupervisoryIndicator
SystemCommonMonitorEventIndicator

TheLCDdisplayshallcontainthefollowingsystemswitch/indicators:
SystemResetSwitchwithIndicator
SystemAlarmSilenceSwitchwithIndicator
SystemPanelSilenceSwitchwithIndicator
DrillSwitchwithIndicator
AlarmAcknowledgeSwitchwithIndicator
TroubleAcknowledgeSwitchwithIndicator
SupervisoryAcknowledgeSwitchwithIndicator
MonitorAcknowledgeSwitchwithIndicator

TheLCDdisplayshallcontainthefollowingsystemfunctionswitches
SystemEventMessageQueueScrollSwitch.
EventDetailsSwitch(providesanadditional2000charactermessageaboutthedevice
highlightedbytheoperator.)
CommandMenuSwitch
10DigitKeypadwithEnterandBackspaceswitches

<168CharacterBacklitLiquidCrystalTextDisplay>
TheuserinterfaceshallprovideabacklitLCDthatwillallowcustomeventmessagesofupto42
characters.Theinterfaceshallprovideaminimumofeightlinesby21charactersandprovide
theemergencyuserhandsfreeviewingofthefirstandlasthighestpriorityevents.Thelast
highestpriorityeventshallalwaysdisplayandupdateautomatically.Eventsshallbe
automaticallyplacedinoneoffoureasytoaccessqueues.Itshallbepossibletoscrollthrough
andviewspecificalarm,trouble,supervisoryandmonitoreventsseparately.Havingtoscroll
throughamixedlistofeventtypesshallnotbeconsideredasequal.Thetotalnumberofactive
anddisabledeventsbytypeshallbedisplayed.Visualindicationshallbeprovidedofanyevent
typethathasnotbeenacknowledgedorviewed.Itshallbepossibletocustomizethe
designationofalluserinterfaceLEDsandSwitchesforlocallanguagerequirements.

Page117
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

Instructionaltextmessagesshallsupportamaximumof2,000characterseach.

Thesystem168characterLCDdisplayshallbeanEdwardsmodel3LCD.>

<960CharacterBacklitLiquidCrystalTextDisplay>
TheuserinterfaceshallprovideabacklitLCDthatwillallowcustomeventmessagesofupto42
characters.Theinterfaceshallprovideaminimumof24linesby40charactersandprovidethe
emergencyuserhandsfreeviewingofthefirstseven(7)andlasthighestpriorityevents.The
lasthighestpriorityeventshallalwaysdisplayandupdateautomatically.Eventsshallbe
automaticallyplacedinoneoffoureasytoaccessqueues.Itshallbepossibletoviewspecific
alarm,trouble,supervisoryandmonitoreventsseparately.Havingtoscrollthroughamixedlist
ofeventtypesshallnotbeconsideredasequal.Thetotalnumberofactiveeventsbytypeshall
bedisplayed.Visualindicationshallbeprovidedofanyeventtypethathasnotbeen
acknowledgedorviewed.Itshallbepossibletocustomizethedesignationofalluserinterface
LEDsandSwitchesforlocallanguagerequirements.

Instructionaltextmessagessupportamaximumof2,000characterseach.

Thesystem960characterLCDdisplayshallbeaEdwardsmodel3LCDXL1.>

LEDSANDSWITCHES
AmodularseriesofswitchesandLEDindicatorsshallbeavailabletocustomizethefirealarm
controlpaneloperationinaccordancewiththisspecification.AllLEDandswitchfunctionsshall
besoftwareprogrammable.Switchesshallbeconfigurableformomentary,maintained,toggle,
orexclusiveoroperationasrequiredbytheapplication.LEDsshallbeconfigurableforslow
flash,fastflashorsteadyoperation.LED/Switchmodulesshallbecapableofmountinginany
availablefirepanelmoduleposition.AllLED/Switchmodulesshallbesupervised.LEDsshallbe
availableinavarietyofcolorstofacilitateidentificationfromadistance.TheLED/Switch
modulesshallprovideampleroomforcustomfunctiontextlabelsunderaprotective
membrane.

TheLED/SwitchmodulesshallbeEdwards324xseries,312xxseries,and36/3S1xxxseries
devices.

SIGNALINGLINECIRCUITS

FIRENETWORKWIRING
Thenetworkinterpanelwiringshallbe<ClassA>ClassB>.Thenetworkmediashallbecopper
exceptwherefiberopticcableisspecifiedonthedrawings.

Thesystemsuppliedunderthisspecificationshallutilizenodetonode,directwiredpeerto
peernetworkoperations.Thesystemshallutilizeindependentlyaddressed,smokedetectors,
heatdetectorsandinput/outputmodules<intrusiondetection>asdescribedinthis
specification.Thepeertopeernetworkshallcontainmultiplenodesconsistingofthecommand
center,maincontroller,remotecontrolpanels,LCD/LEDannunciationnodes,andworkstations.
Eachnodeisanequal,activefunctionalnodeofthenetwork,whichiscapableofmakingalllocal
decisionsandgeneratingnetworktaskstoothernodesintheeventofnodefailureor
communicationsfailurebetweennodes.

WhenanetworkiswiredinaClassBconfiguration,asinglebreakorshortonthenetwork
wiringisolatesthesystemintotwogroupsofpanels.Eachgroupcontinuestofunctionasa
peertopeernetworkworkingwiththeircombineddatabases.WhenwiredusingaClassA
configuration,asinglebreakorshortonthenetworkwiringcausesthesystemtoisolatethe
fault,andnetworkcommunicationcontinuesuninterrupted,withoutanylossoffunction.
Shouldmultiplewiringfaultsoccur,thenetworkreconfiguresintomanysubnetworksand

Page118
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

continuestorespondtoalarmeventsfromeverypanelthatcantransmitandreceivenetwork
messages.

ThecoppernetworkinterfaceshallbeanEdwards3RS485series.
ThefiberopticnetworkinterfaceshallbeanEdwards3FIBMB2with<singlemode><multi
mode>fiberoptictransceivers.

EST3SYSTEM
Thesignalinglinecircuitconnectingpanels/nodestointelligentaddressabledevicesincluding,
detectors,monitormodules,controlmodules,isolationmodules,intrusiondetectionmodules
andnotificationcircuitmodulesshallbe<ClassA(style6or7)><ClassB(style4).>All
signalinglinecircuitsshallbesupervisedandpowerlimited.

Whentheaddressabledevicesonasignalinglinecircuitcovermorethanonedesignated
fire/smokecompartment,awiretowireshortonthecircuitshallnotaffecttheoperationofthe
addressabledevicesinotherfire/smokecompartments.

Each SLC shall support 125 addressable detector addresses and 125 module
addresses.TheSLCshallsupport100%ofalladdressabledevicesinalarmand
provide support for a 100% compliment of detector isolator bases. Initial
circuit loading shall not exceed 80% in order to allow for future system
expansion.

Ttaps(branching)shallbepermittedonClassBcircuits.Wherepossible,thedevicesinstalled
attheendofeachbranchshouldbeeasilyaccessiblefortroubleshooting,e.g.apullstationat
normalmountingheight.

TheaddressabledeviceSLCmoduleshallbeULListedforusewithcodecompliant,electrically
soundexistingwiring.

Eachintelligentaddressabledeviceshalltransmitinformationaboutitslocationwithrespectto
other devices on the circuit. This information shall be used to create an AsBuilt wiring
diagram as well as provide enhanced supervision of a devices physical location. The device
messageandprogrammedsystemoutputfunctionshallbeassociatedwiththedeviceslocation
ontheSLCcircuitlocationandnotadeviceaddress.

TheSLCmoduleshallallowreplacementofsametypedeviceswithouttheneedtoaddressand
reloadthelocationparametersonreplacementdevice.

TheSLC/PanelsshallnotifytheuserwhenprogrammeddevicesaredetectedontheSLCcircuit.
TheSLC/Panelsshallnotifytheuserwhenthewrongdevicetypeisinstalledatalocation
configuredforadifferentdevicetypeontheSLCcircuit.

ShouldanSLCControllerCPUfailtocommunicate,theSLCcircuitshallgointothestandalone
mode.Thecircuitshallbecapableofproducingaloopalarmifanalarmtypedevicebecomes
activeduringstandalonemodetoenhancesystemintegrity.

TheaddressabledevicesignalinglinecircuitmoduleshallbeanEdwards3SDDC1series.

NOTIFICATIONAPPLIANCECIRCUITS
GENERAL
Allnotificationcircuitsshallbesupervisedandpowerlimited.Nonpowerlimited
circuitsarenotacceptable.Allnotificationappliancecircuitsshallbe<ClassA(Style
"Z")><ClassB(Style"Y")>.
Initialcircuitloadingshallnotexceed80%inordertoallowforfuturesystem
expansion.

Page119
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

24VDCNotificationAppliancecircuits
Notificationappliancecircuitsshallhaveaminimumcircuitoutputratingof2amps@
24VDC

24VDCNACsshallbepolarizedandprovidebothstrobesynchronizationandahorn
silencesignalsonasinglepairofwires.

AudioNotificationApplianceCircuits
Audionotificationappliancecircuitsshallbepolarizedandhaveaminimumcircuit
outputratingof50watts@25Vaudio,and35watts@70Vaudio.

INITIATINGDEVICECIRCUITS
Conventional(2wire)initiatingdevicecircuitsmonitoringmanualfirealarmstations,smoke
andheatdetectors,waterflowswitches,valvesupervisoryswitches,firepumpfunctions,andair
pressuresupervisoryswitchesshallbe<ClassA(Style"D"or"E")><ClassB(Style"A"or"B").>

<Initiatingdevicecircuitsmonitoringmagneticsecuritycontacts,motiondetectors,duress
station,glassbreakandintrusiontypedevicesshallbeClassB(Style"A"or"B").>

Initiatingdevicecircuitsshallbeconfigurableforlatchedornonlatchedoperationand
configurabletoinitiatealarm,supervisoryormonitorevents.

Endoflineresistorsforconventionalinitiatingdevicecircuitsshallbecoveredwithinsulated
tubing,terminatedwithringlugsanddisplayaULlabel.

ANNUNCIATORS

REMOTEANNUNCIATOR
ProvideaUL864listed<semiflush><surface>mountedremoteannunciatoratthelocation(s)
shownonthedrawings.

Theannunciatorshallutilizestandardfirealarmuserinterfacecomponentstoprovidethe
abilitytooperatetheFireAlarmControlPanelfunctionsfromalternatelocationswithinthe
building.Theannunciatorshallbecapableofreceivingthesameeventinformationandissuing
thesamesystemcommandsastheFACPtowhichitisconnected,asspecifiedinthefunctional
matrixelsewhereinthisspecification.<Functionsshallincludelivepagemessages.>

Thefollowingcommonindicatorsandcontrolsshallbeprovidedontheannunciator.
<TheannunciatorshallincludeanintegralfirealarmLCDtextannunciator.><Theannunciator
shallincludeanintegralremotemicrophoneforfireaudiosystempaging.>AnnunciatorPower,
Alarm,Supervisory,Trouble,andSignalSilencedLEDs;<SystemReset>,<Silence>,<Trouble
Silence>,<Drill>andLampTestpushbuttons.

Theremoteannunciatorshallbeequippedwithakeylockedseethroughdoormounting.The
annunciatorshallbepoweredbyabatterybackedupnominal24VDCpowersource.

ThefirealarmremoteannunciatorshallbeEdwards3ANNseriesannunciator.

GRAPHICANNUNCIATOR
ProvideaUL864listed<semiflush><surface>mountedgraphicannunciatoratthelocation(s)
shownonthedrawings.

Theannunciatorshallprovideagraphicrepresentationofthefacilityfirealarmsystem.

Page120
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

Thegraphicannunciatorshallbeequippedwithakeylockedseethroughdoormounting.The
annunciatorshallbepoweredbyabatterybackedupnominal24VDCpowersource.All
communicationbetweenthegraphicannunciatorandthefirealarmcontrolpanelshallbe
digital.

AnnunciatorgraphicsshallbewhiteartworkonsmokedPlexiglas withhighintensitystatus
LEDsmountedbehindthePlexiglasatthelocationsshownonthedrawings.Itshallbepossible
toupdatethegraphicimageinthefieldwithoutreplacingtheentiregraphic.

Thefaceofeachannunciatorshallgraphicallyrepresentthebuildingusingafullfloorplanand
theareaservedbytheannunciator.Thegraphicshallindicateareasmokedetectors,heat
detectors,ducttypesmokedetectors,waterflowswitches,specialsuppressionsystems,and
manualfirealarmboxes.Allcoreareasshallbedepictedontheannunciatorincludingexit
stairs,elevators,andelevatorlobbies.AYouarehereindicatorandnorthpointingarrowshall
beprovided

Thefollowingcommonindicatorsandcontrolsshallbeprovidedontheannunciator.
AnnunciatorPower,Alarm,Supervisory,System,andSignalSilencedLEDs;<SystemReset>,
<Silence>,<TroubleSilence>,<Drill>andLampTestpushbuttons.<Theannunciatorshall
includeanintegralfirealarmLCDtextannunciator.><Theannunciatorshallincludeanintegral
remotemicrophoneforfireaudiosystempaging.>

ThefirealarmgraphicannunciatorshallbeEdwardsEnvoyseriesannunciator.

PERIPHERALCOMPONENTS

ADDRESSABLEDETECTORS

GENERAL

GeneralRequirementsforIntelligentAddressableHeat,SmokeandCODetectors

Eachdetectorshallcontainanintegralmicroprocessorwhichshalldetermineifthe
deviceisnormal,inalarm,orhasaninternaltrouble.Themicroprocessorsnon
volatilememoryshallpermanentlystorethedetectorsserialnumber,devicetypeand
systemaddress.Itshallbepossibletoaddresseachintelligentdevicewithouttheuse
ofswitches.Devicesrequiringswitchesforaddressingshallnotbeconsideredasequal.
Memoryshallautomaticallybeupdatedwiththehoursofoperation,lastmaintenance
date,numberofalarmsandtroubles,timeoflastalarm,andanalogsignalpatternsfor
eachsensingelementjustbeforethelastalarm.

Each detector shall be capable of identifying up to 32 diagnostic codes. This
informationshallbeavailableforsystemmaintenance. The diagnostic code shallbe
storedatthedetector.

Each addressable detector on the Signaling Line Circuit (SLC) shall transmit
information regarding its location with respect to other intelligent devices on the
signaling line circuit to the control panel, creating an AsBuilt circuit map. The
circuitmappingfunctionshallprovidelocationsupervisionofallintelligentdeviceson
the signaling line circuit. An intelligent detectors programmed system response
functions shall be associated with the detectors actual location on the signaling line
circuit and not with the detectors address. After system commissioning, detectors
improperly installed in the wrong location shall function according to the mapped
programmedresponseforitslocationonthecircuit,notitsdetectorsaddress.

Page121
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

TwostatusLEDsshallbeprovidedoneachdetector.AflashinggreenLEDshall
indicatenormaloperation;flashingREDshallindicatethealarmstate.AsteadyRED
andsteadyGREENshallindicatealarmstatewheninthestandalonemode.LEDsshall
bevisiblefromanydirection.

Thesystemshallallowforchangingofdetectortypesforservicereplacement
purposeswithouttheneedtoreprogramthesystem.Thereplacementdetectortype
shallautomaticallycontinuetooperatewiththesameprogrammedsensitivitylevels
andfunctionsasthedetectoritreplaced,withouttheneedforreprogramming.System
shalldisplayanoffnormalconditionuntiltheproperdetectortypeisinstalledora
changeinthedevicetypeprofilehasbeenmade.

Detectorsshallberatedforoperationinthefollowingenvironmentunlessspecifically
noted:
Temperature:32Fto120F(0Cto49C)
Humidity:093%RH,noncondensing

Detectorswithaddressingcomponentsinthebaseshallnotbeconsideredasequal.

TheintelligentdetectorsshallbeEdwardsSignatureSeriesdevices.

PleaserefertotheGeneral,SystemDescriptionSectionforsitespecificdetectoroperating
requirements.

PHOTOHEATCO
Provideanalog/addressablecombinationphotoelectricsmokeheatandcarbonmonoxide(CO)
detectorsatthelocationsshownonthedrawings.

Thecombinationsmokeheat&COdetectorshallprovidetwoindependentsignals(fire&CO)to
thecontrolpanelforprogrammingsystemresponses.Whenmountedinasounderbase,the
detectorshallbecapableofinitiatingatemporal333whensmokeorheatisdetectedor
temporal4444whenCOisdetected.Detectorsthattransmitacommonsignalforbothfire
andCOalarmsshallnotbeconsideredasequal.ThedetectorshallbelistedunderstandardsUL
268andUL2075.

Eachsmokeheatdetectorshallbeindividuallyprogrammabletooperateatanyoneoffive(5)
sensitivitysettings.Thedetectorshallalsostoreprealarmandalternateprealarmsensitivity
settings.Prealarmsensitivityvaluesshallbeconfigurablein5%incrementsofthealarmand
alternatealarmsensitivitysettingsrespectively.Thedetectorshallbeabletodifferentiate
betweenalongtermdriftabovetheprealarmthresholdandfastriseabovethethreshold.The
detectorshallmonitorthesensitivityofthesmokesensor.IfthesensitivityshiftsoutsidetheUL
limits,atroublesignalshallbesenttothepanel.Itshallbepossibletoautomaticallychangethe
sensitivityofindividualintelligentaddressablesmokedetectorsfordayandnight(alternate)
periods.

Eachdetectorshallutilizeanenvironmentalcompensationalgorithmthatshallautomatically
adjustforbackgroundenvironmentalconditionssuchasdust,temperature,andpressure.The
detectorshallprovideamaintenancealertsignalwhen80%(dirty)oftheavailable
compensationrangehasbeenused.Thedetectorshallprovideadirtyfaultsignalwhen100%
orgreatercompensationhasbeenused.

ThesmokechambershallbeULlistedforfieldreplacement.

Threelowmassthermistorsshallactasfixedtemperature130to140F(54to60C)heat
sensors,contributingalongwiththephotosensortothefirealarmalgorithm.

Page122
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

TheelectrochemicalCOsensorshallgenerateaCOalarmincompliancewiththeUL2034
requirements.Thesensorshallhaveanominalsixyearlife.Whenthesensorapproachesthe
endofitsusefullife,itshalltransmitamaintenanceconditiontothecontrolpanel,indicating
theCOsensorboardreplacementisrequired.Onlywhenthesensorisnolongeroperational
shallatroubleconditionbesenttothecontrolpanel.Sensorsthattransmitacommontrouble
indicationforbothsensorendoflifeandothercausesofdetectortroubleshallnotbe
consideredasequal.Performingasensitivitycheckfromthepanelshallreportthe
approximatenumbermonthsofCOsensorliferemaining.

PlacingtheCOdetectorintestmodeshallfacilitatetheuseofdirectinjectionofsmallquantities
ofCOtocheckdetectorfunctionality.TheCOsensorboardshallbeULlistedasfieldreplaceable.
ReplacementoftheCOsensorshallnotrequireanyfieldcalibration.

TheCombinationphotoelectricsmokeheat&COdetectorshallbeanEdwardsSIGA2PHCOS.

PHOTOCO
Provideanalog/addressablecombinationphotoelectricsmokeandcarbonmonoxide(CO)
detectorsatthelocationsshownonthedrawings.

ThecombinationsmokeandCOdetectorshallprovidetwoindependentsignals(smoke&CO)to
thecontrolpanelforprogrammingsystemresponses.Whenmountedinasounderbase,the
detectorshallbecapableofinitiatingatemporal333whensmokeisdetectedortemporal44
44whenCOisdetected.Detectorsthattransmitacommonsignaltothecontrolpanelforboth
smokeandCOalarmsshallnotbeconsideredasequals.Thedetectorshallbelistedunder
standardsUL268andUL2075.

Eachsmokedetectorshallbeindividuallyprogrammabletooperateatanyoneoffive(5)
sensitivitysettings.Thedetectorshallalsostoreprealarmandalternateprealarmsensitivity
settings.Prealarmsensitivityvaluesshallbeconfigurablein5%incrementsofthealarmand
alternatealarmsensitivitysettingsrespectively.Thedetectorshallbeabletodifferentiate
betweenalongtermdriftabovetheprealarmthresholdandfastriseabovethethreshold.The
detectorshallmonitorthesensitivityofthesmokesensor.IfthesensitivityshiftsoutsidetheUL
limits,atroublesignalshallbesenttothepanel.Itshallbepossibletoautomaticallychangethe
sensitivityofindividualintelligentaddressablesmokedetectorsfordayandnight(alternate)
periods.

Eachdetectorshallutilizeanenvironmentalcompensationalgorithmthatshallautomatically
adjustforbackgroundenvironmentalconditionssuchasdust,temperature,andpressure.The
detectorshallprovideamaintenancealertsignalwhen80%(dirty)oftheavailable
compensationrangehasbeenused.Thedetectorshallprovideadirtyfaultsignalwhen100%
orgreatercompensationhasbeenused.

ThesmokechambershallbeULlistedforfieldreplacement.

TheelectrochemicalCOsensorshallgenerateaCOalarmincompliancewithUL2034
requirements.Thesensorshallhaveanominalsixyearlife.Whenthesensorapproachesthe
endofitsusefullife,itshalltransmitamaintenanceconditiontothecontrolpanel,indicating
theCOsensorboardreplacementisrequired.Onlywhenthesensorisnolongeroperational
shallatroubleconditionbesenttothecontrolpanel.Sensorsthattransmitacommontrouble
indicationforbothsensorendoflifeandothercausesofdetectortroubleshallnotbe
consideredasequal.Performingasensitivitycheckfromthepanelshallreportthe
approximatenumbermonthsofCOsensorliferemaining.

PlacingtheCOdetectorintestmodeshallfacilitatetheuseofdirectinjectionofsmallquantities
ofCOtocheckdetectorfunctionality.TheCOsensorboardshallbeULlistedasfieldreplaceable.
ReplacementoftheCOsensorshallnotrequireanyfieldcalibration.

Page123
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

TheCombinationphotoelectricsmoke&COdetectorshallbeanEdwardsSIGA2PCOS.

HEATCO
Provideanalog/addressablecombinationheatandcarbonmonoxide(CO)detectorsatthe
locationsshownonthedrawings.

Lowmassthermistersshallprovidea135F(57C)fixedtemperatureheatsensingforthe
detectionofheatduetofire.Thesensormonitorsthetemperatureofthesurroundingairand
determineswhetheranalarmshouldbeinitiated.

ThecombinationheatandCOdetectorshallprovidetwoindependentsignals(fire&CO)tothe
controlpanelforprogrammingsystemresponses.Whenmountedinasounderbase,the
detectorshallbecapableofinitiatingatemporal333whenheatisdetectedortemporal444
4whenCOisdetected.Detectorsthattransmitacommonsignaltothecontrolpanelforboth
heatandCOalarmsshallnotbeconsideredasequals.Thedetectorshallbelistedunder
standardsUL521andUL2075.

TheelectrochemicalCOsensorshallgenerateaCOalarmincompliancewithUL2034
requirements.Thesensorshallhaveanominalsixyearlife.Whenthesensorapproachesthe
endofitsusefullife,itshalltransmitamaintenanceconditiontothecontrolpanel,indicating
theCOsensorboardreplacementisrequired.Onlywhenthesensorisnolongeroperational
shallatroubleconditionbesenttothecontrolpanel.Sensorsthattransmitacommontrouble
indicationforbothsensorendoflifeandothercausesofdetectortroubleshallnotbe
consideredasequal.Performingasensitivitycheckfromthepanelshallreportthe
approximatenumbermonthsofCOsensorliferemaining.

PlacingtheCOdetectorintestmodeshallfacilitatetheuseofdirectinjectionofsmallquantities
ofCOtocheckdetectorfunctionality.TheCOsensorboardshallbeULlistedasfieldreplaceable.
ReplacementoftheCOsensorshallnotrequireanyfieldcalibration.

TheCombinationheat&COdetectorshallbeanEdwardsSIGA2HCOS.

IONPHOTOHEAT
Provideanalog/addressablemultisensorionization,photoelectric,thermalsmokedetectorsat
thelocationsshownonthedrawings.

Whenmountedinasounderbase,thedetectorshallbecapableofinitiatingatemporal333
whensmokeorheatisdetected.ThedetectorshallbelistedunderstandardUL268.

Alarmconditionshallbebaseduponthecombinedinputfromtheionization,photoelectric,and
thermaldetectionelements.

Itshallbepossibletoindependentlyconfigurethesensitivityandalarmverificationvaluesof
eachindividualdetectorontheSLC.

Eachsmokedetectormaybeindividuallyprogrammedtooperateatanyoneoffive(5)
sensitivitysettings.Thedetectorshallalsostoreprealarmandalternateprealarmsensitivity
settings.Prealarmsensitivityvaluesshallbeconfigurablein5%incrementsofthealarmand
alternatealarmsensitivitysettingsrespectively.

Thedetectorshallbeabletodifferentiatebetweenalongtermdriftabovetheprealarm
thresholdandfastriseabovethethreshold.Thedetectorshallmonitorthesensitivityofthe
smokesensor.IfthesensitivityshiftsoutsidetheULlimits,atroublesignalshallbesenttothe
panel.Itshallbepossibletoautomaticallychangethesensitivityofindividualintelligent
addressablesmokedetectorsfordayandnight(alternate)periods.

Page124
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

Eachdetectorshallutilizeanenvironmentalcompensationalgorithmthatshallautomatically
adjustforbackgroundenvironmentalconditionssuchasdust,temperature,andpressure.The
detectorshallprovideamaintenancealertsignalwhen80%(dirty)oftheavailable
compensationrangehasbeenused.Thedetectorshallprovideadirtyfaultsignalwhen100%
orgreatercompensationhasbeenused.

TheCombinationionization,photoelectric,heatdetectorshallbeanEdwardsSIGAIPHS.

PHOTOHEAT
Provideanalog/addressablecombinationphotoelectricsmokeheatdetectorsatthelocations
shownonthedrawings.

Whenmountedinasounderbase,thedetectorshallbecapableofinitiatingatemporal333
whensmokeorheatisdetected.

Eachsmokeheatdetectorshallbeindividuallyprogrammabletooperateatanyoneoffive(5)
sensitivitysettings.Thedetectorshallalsostoreprealarmandalternateprealarmsensitivity
settings.Prealarmsensitivityvaluesshallbeconfigurablein5%incrementsofthealarmand
alternatealarmsensitivitysettingsrespectively.Thedetectorshallbeabletodifferentiate
betweenalongtermdriftabovetheprealarmthresholdandfastriseabovethethreshold.The
detectorshallmonitorthesensitivityofthesmokesensor.IfthesensitivityshiftsoutsidetheUL
limits,atroublesignalshallbesenttothepanel.Itshallbepossibletoautomaticallychangethe
sensitivityofindividualintelligentaddressablesmokedetectorsfordayandnight(alternate)
periods.

Eachdetectorshallutilizeanenvironmentalcompensationalgorithmthatshallautomatically
adjustforbackgroundenvironmentalconditionssuchasdust,temperature,andpressure.The
detectorshallprovideamaintenancealertsignalwhen80%(dirty)oftheavailable
compensationrangehasbeenused.Thedetectorshallprovideadirtyfaultsignalwhen100%
orgreatercompensationhasbeenused.

Threelowmassthermistorsshallactasfixedtemperature130to140F(54to60C)heat
sensors,contributingalongwiththephotosensortothefirealarmalgorithm.

TheCombinationphotoelectricsmokeheatdetectorshallbeanEdwardsSIGAPHS.

PHOTOELECTRIC
Provideanalog/addressablephotoelectricsmokedetectorsatthelocationsshownonthe
drawings.

Whenmountedinasounderbase,thedetectorshallinitiateatemporal333whensmokeis
detected.

Thephotoelectricsmokedetectorshallbesuitablefordirectinsertionintoairductsupto3ft
(0.91m)highand3ft(0.91m)widewithairvelocitiesupto5,000ft/min.(025.39m/sec)
withoutrequiringspecificductdetectorhousingsorsupplytubes.

Eachsmokedetectorshallbeindividuallyprogrammabletooperateatanyoneoffive(5)
sensitivitysettings.Thedetectorshallalsostoreprealarmandalternateprealarmsensitivity
settings.Prealarmsensitivityvaluesshallbeconfigurablein5%incrementsofthealarmand
alternatealarmsensitivitysettingsrespectively.Thedetectorshallbeabletodifferentiate
betweenalongtermdriftabovetheprealarmthresholdandfastriseabovethethreshold.The
detectorshallmonitorthesensitivityofthesmokesensor.IfthesensitivityshiftsoutsidetheUL
limits,atroublesignalshallbesenttothepanel.Itshallbepossibletoautomaticallychangethe

Page125
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

sensitivityofindividualintelligentaddressablesmokedetectorsfordayandnight(alternate)
periods.

Eachdetectorshallutilizeanenvironmentalcompensationalgorithmthatshallautomatically
adjustforbackgroundenvironmentalconditionssuchasdust,temperature,andpressure.The
detectorshallprovideamaintenancealertsignalwhen80%(dirty)oftheavailable
compensationrangehasbeenused.Thedetectorshallprovideadirtyfaultsignalwhen100%
orgreatercompensationhasbeenused.

ThephotoelectricsmokedetectorshallbeanEdwardsSIGAPS.

DUCTSMOKE
Provideintelligentlowprofilephotoelectricductsmokedetectors/remotetestswitchesatthe
locationsshownonthedrawings.

Theintelligentductsmokedetectorshalloperateinductshavingfrom100ft/minto
4,000ft/minairvelocity.Thedetectorshallbesuitableforoperationoveratemperaturerange
of20to158Fandofferaharshenvironmentgasketoption.Thedetectorshallutilizeanair
exhausttubeandanairsamplinginlettubethatextendsintotheductairstreamuptoten(10)
feet.Designofthedetectorshallpermitsamplingtubeinstallationfromeithersideofthe
detectorandpermitsamplingtubeinstallationin45degreeincrementstoensureproper
alignmentwithductairflow.Drillingtemplatesandgasketstofacilitatelocatingandmounting
thehousingshallbeprovided.

Theintelligentductsmokedetectorshallobtaininformationfromaphotoelectricsensing
element.Thedetectorshallbeabletodifferentiatebetweenalongtermdriftabovethepre
alarmthresholdandfastriseabovethethreshold.Thedetectorshallmonitorthesensitivityof
thesmokesensor.IfthesensitivityshiftsoutsidetheULlimits,atroublesignalshallbesentto
thepanel

Eachdetectorshallutilizeanenvironmentalcompensationalgorithmthatshallautomatically
adjustforbackgroundenvironmentalconditionssuchasdust,temperature,andpressure.The
detectorshallprovideamaintenancealertsignalwhen80%(dirty)oftheavailable
compensationrangehasbeenused.Thedetectorshallprovideadirtyfaultsignalwhen100%
orgreatercompensationhasbeenused.

TheintelligentductsmokedetectorshallprovideaformCauxiliaryalarmrelayratedat
2amps@30Vdc.Thepositionoftherelaycontactshallbesupervisedbythecontrolpanel
software.Operationoftherelayshallbecontrolledeitherbyitsrespectivedetectorprocessor
orunderprogramcontrolfromthecontrolpanelasrequiredbytheapplication.Detectorrelays
notcapableofprogrammedoperationindependentofthedetectorsstateshallnotbe
consideredasequal.Thedetectorshallbeequippedwithalocalmagnetactivatedtestswitch.

Eachductdetectorshallbeinstalledandtestinginaccordancewithmanufacturersinstructions,
including pressure differential and, velocity testing. Test results shall be submitted to the
owner.

Remotetestswitches/LEDindicatorsshallbeprovidedbelowthedetectorontheceilingto
indicatelocationofthedetectorinnonmechanicalareas,atlocationsindicatedonthedrawings.
TheIntelligentPhotoelectricDuctSmokeDetectorshallbeanEdwardsmodelSIGASD.The
remotekeyoperatedtestswitch/LEDshallbeaEdwardsmodelSDTRK

DUCTMOUNTINGPLATE
Whereaddressablesmokedetectorsaredirectlymountedonalowvelocityductsupto3ft
(0.91m)highx3ft(0.91m)wide,providefactorymountingplateassembliestofacilitate

Page126
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

mountingthedetectors.Themountingplateshallbecodegaugesteelwithcorrosionresistant
redenamelfinish.Thedetectormountingplateshallsupportanaddressabledetectoralong
withastandard,relayorisolatordetectormountingbase.

ThedetectormountingplateshallbeanEdwardsSIGADMP.

FIXEDHEAT
Provideintelligentfixedtemperatureheatdetectorsatthelocationsshownonthedrawings.

Thedetectorshallcontinuallymonitorthetemperatureoftheairinitssurroundingsto
minimizethermallagtothetimerequiredtoprocessanalarm.Thedetectorshallutilizealow
massthermistorheatsensorandoperateatanominalfixedtemperaturealarmpointratingof
135oF(57oC).Theintegralmicroprocessorshalldetermineifanalarmconditionexistsand
initiateanalarmbasedontheanalysisofthermistordata.Systemsusingcentralintelligencefor
alarmdecisionsshallnotbeconsideredasequal.

Theheatdetectorshallberatedforceilinginstallationataminimumof70ft(21.3m)centers
andalsobesuitableforwallmountapplications.

TheIntelligentfixedtemperaturedetectorshallbeanEdwardsSIGAHFS.

RATEOFRISE
Provideintelligentcombinationfixedtemperature/rateofriseheatdetectorsatthelocations
shownonthedrawings.

Thedetectorshallcontinuallymonitorthetemperatureoftheairinitssurroundingsto
minimizethermallagtothetimerequiredtoprocessanalarm.Thedetectorshallutilizealow
massthermistorheatsensorandoperateatanominalfixedtemperaturealarmpointratingof
135oFandatatemperaturerateofrisealarmpointof15oFperminute.Theintegral
microprocessorshalldetermineifanalarmconditionexistsandinitiateanalarmbasedonthe
analysisofthermistordata.Systemsusingcentralintelligenceforalarmdecisionsshallnotbe
consideredasequal.

Theheatdetectorshallberatedforceilinginstallationataminimumof70ftcentersandalsobe
suitableforwallmountapplications.

TheIntelligentcombinationfixedtemperature/rateofriseheatdetectorshallanEdwards
SIGAHRS.

CO
Provideaddressablecarbonmonoxide(CO)detectorsatthelocationsshownonthedrawings.

TheCOdetectorshallprovideasignaltothecontrolpanelforprogrammingsystemresponses.
Whenmountedinasounderbase,thedetectorshallbecapableofinitiatingatemporal4444
signalwhenCOisdetected.ThedetectorshallbelistedunderstandardUL2075.

TheelectrochemicalCOsensorshallgenerateaCOalarmincompliancewithUL2034
requirements.Thesensorshallhaveanominalsixyearlife.Performingasensitivitycheck
fromthepanelshallreporttheapproximatenumbermonthsofsensorliferemaining.Whenthe
sensorapproachestheendofitsusefullife,itshalltransmitamaintenanceconditiontothe
controlpanel,indicatingtheCOsensorboardreplacementisrequired.Onlywhenthesensoris
nolongeroperationalshallatroubleconditionbesenttothecontrolpanel.Detectorsthat
transmitacommontroubleindicationforbothsensorendoflifeandothercausesofdetector
troubleshallnotbeconsideredasequal.

Page127
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

PlacingtheCOdetectorintestmodeshallfacilitatetheuseofdirectinjectionofsmallquantities
ofCOtocheckdetectorfunctionality.TheCOsensorboardshallbeULlistedasfieldreplaceable.
ReplacementoftheCOsensorshallnotrequireanyfieldcalibration.

TheCOdetectorshallbeanEdwardsSIGA2COS.

STANDARDBASE
ProvidestandarddetectorbasessuitableformountingoneitherNorthAmerican1gang,3or
4inchoctagonboxand4inchsquarebox,EuropeanBESAor1gangbox.

Thebasesshallutilizeatwistlockdesignandprovidescrewterminalsforallfieldwiring
connections.

ThebaseshallcontainnoactiveelectronicsandsupportallSignatureseriesdetectortypes.

ThebaseshallbecapableofsupportingaRemoteAlarmLEDIndicator.ProvideremoteLED
alarmindicatorswhereshownontheplans.
Removaloftherespectivedetectorshallnotaffectcommunicationswithotherdetectors.

ThestandardaddressabledetectorbaseshallbeanEdwardsSIGASBorSB4.

TheremoteLEDindicatorshallbeanEdwardsSIGALED

RELAYBASE
ProviderelaydetectorbasessuitableformountingoneitherNorthAmerican1gang,3or4
inchoctagonboxand4inchsquarebox,EuropeanBESAor1gangbox;atthelocationsshown
onthedrawings.

Thebasesshallutilizeatwistlockdesignandprovidescrewterminalsforallfieldwiring
connections.

ThebaseshallcontainnoelectronicsandsupportallSignatureseriesdetectortypes.
Removaloftherespectivedetectorshallnotaffectcommunicationswithotherdetectors.

Therelaybaseshallmeetthefollowingrequirements:
Therelayshallbeabistabletypeandselectablefornormallyopenornormallyclosed
operation.
Thepositionoftherelaycontactshallbesupervised.
Theoperationofthebaserelayshallbeconfigurableforcontrolbyitsrespective
detectororforindependentprogrammablecontrolfromthefirealarmpanel.Relay
basesnotconfigurablefordetectororpaneloperationshallnotbeconsideredequal.
Thebaserelayshallprovideform"C"contactswithaminimumratingof1amp@30
Vdcandbelistedforpilotduty.

ThestandardaddressablerelaydetectorbaseshallbeanEdwardsSIGARBorRB4.

SOUNDERBASE
ProvideaudibledetectormountingbasessuitableformountingonaNorthAmerican1gang,
3or4inchoctagonboxand4inchsquarebox,orEuropeanBESAor1gangbox;atthe
locationsshownonthedrawings.

Thebasesshallutilizeatwistlockdesignandprovidescrewterminalsforallfieldwiring
connections.

Removaloftherespectivedetectorshallnotaffectcommunicationswithotherdetectors.

Page128
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

Theaudiblebaseshallsupportalldetectortypesandshallbecapableofsingleorgroup
operation.

Theaudiblebaseshallemitatemporal333firealarmtonewhensmokeorheathasbeen
detected.Theaudiblebaseshallemitatemporal4444COalarmtonewhenCOhasbeen
detected.Theoutputsshallbeconfigurableforloworhighoutputbymovingareversible
jumper.ThesystemshallbeUL2017listedfordualsignalingforthispurpose.
TheaudiblebasesshallprovideaUL268reverberantroomsoundoutputof90.8dBAat10ft
(3m)fortemporal333firealarmand84.1dBAat10ft.(3m)fortemporal4444COalarm.

ThedetectorsounderbaseshallbeanEdwardsSIGAAB4GT.

ISOLATORBASE
ProvideisolatordetectorbasessuitableformountingoneitherNorthAmerican1gang,3or4
inchoctagonboxand4inchsquarebox,EuropeanBESAor1gangbox;atthelocationsshown
onthedrawings.

Thebasesshallutilizeatwistlockdesignandprovidescrewterminalsforallfieldwiring
connections.

ThebaseshallsupportallSignatureseriesdetectortypes.

Isolatorbasesshalllimitnumberofmodulesordetectorsthatmayberenderedinoperativeby
shortcircuitfaultonSLCloopsegmentorbranch.IntheeventtheClassAsignalinglinecircuit
onwhichtheisolatorbasesareinstalledisshorted,eachbaseshallopentheSLC.Isolatorbases
shallthensequentiallyreconnecttheisolatedcircuitsegmentsuntilonlythesegmentwiththe
shortisleftoutofthecircuit,leavingthebalanceofthecircuitoperational.

TheIsolatorBaseshallbeanEdwardsSIGAIBorSIGAIB4.

MANUALSTATIONS

SINGLEACTIONSINGLESTAGE
Provideaddressablesingleaction,singlestagefirealarmstationsatthelocationsshownonthe
drawings.

ThemanualstationshallbesuitableformountingonNorthAmerican2(64mm)deep1gang
boxes and 1 (38mm) deep 4 square boxes with 1gang covers. If indicated as surface
mounted,providemanufacturer'ssurfacebackbox.
Thefirealarmstationshallbeofmetalconstruction,shallbefinishedinredwithsilver"PULLIN
CASEOFFIRE"lettering,shallshowvisibleindicationofoperationandincorporateaninternal
toggleswitch.

Themanualpullstationwillhaveanaddressablemoduleintegraltotheunit.
Thestationshallberesetusingacommontool.
Manualpullstationsthatinitiatedanalarmconditionwhenopeningtheunitarenotacceptable.
Theaddressablesingleaction,singlestagefirealarmstationshallbeanEdwardsSIGA270

SINGLEACTIONTWOSTAGE
Provideaddressablesingleaction,twostagefirealarmstationsatthelocationsshownonthe
drawings.

Page129
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

ThemanualstationshallbesuitableformountingonNorthAmerican2(64mm)deep1gang
boxes and 1 (38mm) deep 4 square boxes with 1gang covers. If indicated as surface
mounted,providemanufacturer'ssurfacebackbox.

Thefirealarmstationshallbeofmetalconstruction,shallbefinishedinredwithsilver"PULLIN
CASEOFFIRE"lettering,shallshowvisibleindicationofoperationandincorporateaninternal
toggleswitchforfirststagealarmandkeyswitchforsecondstagealarm.

Themanualpullstationwillhaveanaddressablemoduleintegraltotheunit.
Manualpullstationsthatinitiatedanalarmconditionwhenopeningtheunitarenotacceptable.
TheaddressablesingleactiontwostagemanualfirealarmstationshallbeanEdwardsSIGA
270P

DOUBLEACTIONSINGLESTAGE
Provideaddressabledoubleaction,singlestagefirealarmstationsatthelocationsshownonthe
drawings.

ThemanualstationshallbesuitableformountingonNorthAmerican2(64mm)deep1gang
boxes and 1 (38mm) deep 4 square boxes with 1gang covers. If indicated as surface
mounted,providemanufacturer'ssurfacebackbox.
Thefirealarmstationshallutilizeredpolycarbonateconstructionwithmolded,raisedletter
operatinginstructionsinacontrastingcolor;shallshowvisibleindicationofoperationand
incorporateaninternaltoggleswitch.

Themanualpullstationwillhaveanaddressablemoduleintegraltotheunit.
Thestationresetkeyshallmatchthecontrolpanelkey.
Manualpullstationsthatinitiatedanalarmconditionwhenopeningtheunitarenotacceptable.
Theaddressabledoubleaction,singlestagemanualfirealarmstationshallbeanEdwardsSIGA
278.

MODULES

GENERAL
Intelligentaddressablemultifunctionmodulesshallbeprovidedatthelocationsshownonthe
drawingstoprovidethespecificsysteminputandoutputfunctionsdescribedbytheoperation
sectionandfunctionalmatrixfoundelsewhereinthisspecification.

Theoperationofmultifunctionmodulesshallbesoftwareconfigurableatthesitetomeet
operationalconditions,andmaybechangedatanytimebydownloadchangesfromthecontrol
panel.Theintelligentmultifunctionmodulesshallutilizeelectronicaddressing.Modulesusing
rotaryorDIPswitches,memorychipsand/orjumpersforaddressingshallnotbeconsidered
asequal.

Each intelligent multifunction module on the Signaling Line Circuit (SLC) shall transmit
informationregardingitslocationwithrespecttootherintelligentdevicesonthesignalingline
circuittothecontrolpanel,creatinganAsBuiltcircuitmap.Thecircuitmappingfunctionshall
providelocationsupervisionofallintelligentdevicesonthesignalinglinecircuit.Anintelligent
devices programmed system response functions shall be associated with the devices actual
location on the signaling line circuit and not with the devices address. After system
commissioning, devices improperly installed in the wrong location shall function according to
themappedprogrammedresponseforitslocationonthecircuit,notitsdeviceaddress.

Page130
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

Allinput/outputstatusdecisionsshallbemadebythemicroprocessorwithinthemodule.
Communicationswithacontrolpanelshallnotberequiredinorderforthemoduletoidentify
offnormalinput/outputconditions.Moduleswithsupervisedinputoroutputcircuitsshallbe
capableofidentifyinggroundfaultconditionsdowntothemoduleaddresslevel.

Each module shall be equipped with two (2) diagnostic indicators; a green LED to confirm
communications and a red LED to display active status. LEDs shall be visible through the
finishedcoverplate.Themoduleshallbecapableofstoringauniqueserialnumberandupto24
diagnosticcodes,hoursofoperation,numberofalarmsandtroubles,andtimeoflastalarmin
itsmemorywhichcanberetrievedfortroubleshooting.

Modulesshallberatedforoperationinthefollowingenvironment:
Temperature:32Fto120F(0Cto49C)
Humidity:093%RH,noncondensing

Wheremultiplemodulesaremountedincloseproximitytoeachother,pluginmodular
versionsofthemodulesandmotherboardsshallbeavailabletominimizefieldwiringand
facilitatetroubleshooting.

TheaddressablemultifunctionmodulesshallEdwardsSignatureSeriesdevices.

PleaserefertotheGeneral,SystemDescriptionSectionforsitespecificmoduleoperating
requirements.

ONEINPUTMONITOR
Provideaddressablesingleinputmultifunctionmodulesatthelocationsshownonthedrawings.

ThemoduleshallbesuitableformountingonNorthAmerican2(64mm)deep1gangboxes
and1(38mm)deep4squareboxeswith1gangcovers.

Eachmoduleshallprovideone(1)supervisedClassBinputcircuitconfigurableasoneofthe
followingpersonalities.
1. NormallyOpenAlarmLatching(foralarminitiationapplications)
2. NormallyOpenAlarmDelayedLatching(forwaterflowswitchapplications)
3. NormallyOpenActiveNonLatching(forlimitswitchandmonitorapplications)
4. NormallyOpenActiveLatching(fortamperswitchandsupervisoryapplications)

Eachmoduleshallidentifyandreportbydeviceaddress,groundfaultsandopensassociated
withitsinitiatingdevicecircuit,tothecontrolpanel.Singlefunctionmodulesorwithout
individualgroundfaultdetectionidentificationcapabilityshallnotbeconsideredasequal.

TheIntelligentSingleInputModuleshallbeanEdwardsSIGACT1.

NOTIFICATIONCIRCUIT
Provideaddressablenotificationappliancecircuitmodulesatthelocationsshownonthe
drawings.

ThemoduleshallbesuitableformountinginNorthAmerican2(64mm)deep2gangboxes
and1(38mm)deep4squareboxeswith2gangcovers,orEuropean100mmsquareboxes.

The addressable NAC module shall provide one (1) supervised Class B notification appliance
circuit.
TheNACcontrolmoduleshallbeconfigurableforthefollowingoperations:
24VDCsynchronizedNACcircuit,2amps@24VDC.
Audionotificationcircuit25Vrms@50wattsor70Vrms@35watts

Page131
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

FirefightersTelephonecontrolwithringtone
TheaddressablenotificationappliancecircuitmoduleshallbeanEdwardsSIGACC1(S)or
MCC1(S)

RELAY
Provideaddressablecontrolrelaymodulesatthelocationsshownonthedrawings.

ThemoduleshallbesuitableformountingonaNorthAmerican2(64mm)deep1gangbox
or1(38mm)deep4squareboxwith1gangcovers.
Themoduleshallprovideone(1)formCdryrelaycontactsratedat24Vdc@2amps(pilot
duty)tocontrolexternalappliancesorequipment.Thepositionoftherelaycontactshallbe
confirmedbythesystemfirmware.Therelaycoilshallbemagneticallylatchedtoreducewiring
andensure100%oftherelaysontheSLCcanbeenergizedatsametime.

TheaddressablecontrolrelaymoduleshallbeanEdwardsSIGACRorMCR.

WATERFLOWTAMPER

Provideaddressabledualinputwaterflow/tampermodulesatthelocationsshownonthe
drawings.

ThemoduleshallbesuitableformountingonNorthAmerican2(64mm)deep1gangboxes
and1(38mm)deep4squareboxeswith1gangcovers.

Eachmoduleshallprovidetwo(2)supervisedClassBinputcircuitconfiguredas:
1. NormallyOpenAlarmDelayedLatchingforwaterflowswitchapplications.
2. NormallyOpenActiveLatchingfortamperswitchandsupervisoryapplications.

Eachmoduleshallidentifyandreportbydeviceaddress,groundfaultsandopensassociated
withitsinitiatingdevicecircuits,tothecontrolpanel.Modulesorwithoutindividualground
faultdetectionidentificationcapabilityshallnotbeconsideredasequal.

TheAddressableDualInputModuleshallanEdwardsSIGAWTM.

ISOLATIONMODULE
Provideaddressableisolatormodulesatthelocationsshownonthedrawings.

ThemoduleshallbesuitableformountingonNorthAmerican2(64mm)deep1gangboxes
and1(38mm)deep4squareboxeswith1gangcovers.

IntheeventtheClassAsignalinglinecircuitonwhichtheintelligentisolatormoduleisinstalled
isshorted,eachmoduleshallopentheSLC.Isolatormodulesshallthensequentiallyreconnect
theisolatedcircuitsegmentsuntilonlythesegmentwiththeshortisleftoutofthecircuit,
leavingthebalanceofthecircuitoperational.

<SLCisolationshallbeprovidedforeachfloororprotectionzoneofbuilding.>

TheaddressableIsolatorModuleshallbeanEdwardsSIGAIM.

NOTIFICATIONAPPLIANCES

LOWPROFILE

HORNS

Page132
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

Providelowprofilewallmountedhornsatthelocationsshownonthedrawings.

LowprofilehornsshallmountinaNorthAmerican1gangbox,andprotrudelessthan1from
thefinishedwall.ThewordFIREshallbeprominentlydisplayedonthehousing.

Thehornsshallprovideanaudibleoutputof85dBAat10ft.whenmeasuredinreverberation
roomperUL464,andhaveaselectablesteadyorsynchronizedtemporal(333)output
pattern.

Hornpower,hornsilencing,andstrobesynchronizationshallbeaccomplishedoverasinglepair
ofwires.Inandoutscrewterminalsshallaccommodate18AWGto12AWGwiringandhave
captivehardware.

ThehornsshallbeEdwardsGenesisG1Series.

STROBES
Providelowprofilewallmountedstrobesatthelocationsshownonthedrawings.

LowprofilestrobesshallmountinaNorthAmerican1gangbox,andprotrudelessthan1from
thefinishedwall.ThewordFIRE<ALERT>shallbeprominentlydisplayedonthehousing.

Thestrobeoutputshallbeswitchselectableasrequiredbyitsapplicationfromthefollowing
availablesettings:15cd,30cd,75cd&110cd.Selectedstroberatingshallbevisiblewhenthe
strobeisinitsinstalledposition.Amberlensstrobesshallbeavailablewithoutputsof
12/24/60/88cd.Lightshallbeevenlydistributedthroughouttherequiredvolumeusingcavity
andmaskFullLighttechnologytopreventhotspots.Strobesusingspecularreflectorsshallnot
beconsideredasequal.

Whenmultiplestrobesareinstalledwithinviewofeachother,theiroutputsshallbe
synchronizedwithinten(10)millisecondsofeachotherforanindefiniteperiodwithoutthe
needforseparatesynchronizationmodules.

Hornandstrobepower,hornsilencing,andstrobesynchronizationshallbeaccomplishedovera
singlepairofwires.Inandoutscrewterminalsshallaccommodate18AWGto12AWGwiring
andhavecaptivehardware.

ThestrobesshallbeEdwardsGenesisG1Series.

HORNSTROBES
Providelowprofilewallmountedhornstrobesatthelocationsshownonthedrawings.

LowprofilehornstrobesshallmountinaNorthAmerican1gangbox,andprotrudelessthan1
fromthefinishedwall.ThewordFIREshallbeprominentlydisplayedonthehousing.Theword
FIRE<ALERT>shallbeprominentlydisplayedonthehousing.

Thehornstrobeshallprovideanaudibleoutputof85dBAat10ft.whenmeasuredin
reverberationroomperUL464,andhaveaselectablesteadyorsynchronizedtemporal(333)
outputpattern.

Thestrobeoutputshallbeswitchselectableasrequiredbyitsapplicationfromthefollowing
availablesettings:15cd,30cd,75cd&110cd.Selectedstroberatingshallbevisiblewhenthe
hornstrobeisinitsinstalledposition.Amberlensstrobesshallbeavailablewithoutputsof
12/24/60/88cd.Lightshallbeevenlydistributedthroughouttherequiredvolumeusingcavity
andmaskFullLighttechnologytopreventhotspots.Strobesusingspecularreflectorsshallnot
beconsideredasequal.

Page133
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

Whenmultiplestrobesareinstalledwithinviewofeachother,theiroutputsshallbe
synchronizedwithinten(10)millisecondsofeachotherforanindefiniteperiodwithoutthe
needforseparatesynchronizationmodules.

Hornandstrobepower,hornsilencing,andstrobesynchronizationshallbeaccomplishedovera
singlepairofwires.Inandoutscrewterminalsshallaccommodate18AWGto12AWGwiring
andhavecaptivehardware.

ThehornstrobesshallbeEdwardsGenesisG1Series.

17TECHNICALSPECIFICATIONFORUPS.

1) SCOPEOFWORK

24. ThescopeofworkunderthisheadshallincludeInstallation,commissioningofOnlineUPS
withbatterybank&requiredsizerack.

2) ENVIRONMENT

OperatingTemperature : 0to45Deg.C.
Storage : 10to70Deg.C.
Humidity : upto95%RH.(noncondensing)
Cooling : ForcedAirCooling.
Altitude : Noderatingtill1000m.

3) REFERNCESTANDARDS

IEC620402,IEC60950,EN6204011,EN500912(A)andIEC146(IV)fortesting
withISO9001:2000andISO14001certification.


4) CABLES
InputCable:AsperSinglelinediagram
Outputcable:AsperSinglelinediagram
Earth:Copperconductor

5) BATTERYBANK

1. Vendershallsupplymaintenancefreeshieldbatterywithrackwithbackupof30Min.for
fullload.

2. Batteryshallbeofreputedmake(CompanywithISO)andshallbeguaranteedfor3Years.

3. Calculations for battery bank for 15 mins shall be provided. The battery status indication
shallbethereonUPS.

4. Therechargingtimeshallbenotmorethan10timesthedischargetime.

5. Thebatteryrackshallhavepropercooling(microprocessorcontrolled)arrangementsand
shallbewithcastorsandlevelingfeet.

6. The battery shall be stable till 1000 mtr altitude with no condensation from 1590% Rh.
Noiselevelshallbelessthan50dB.

6) OFFERSHALLINCLUDE

Page134
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

o UPSSystems.
o BatterySetwithinterconnections&Rack.
o Packing,Transportation,forwarding,installation&commissioningofUPSatour
site.
o Exciseduty,SalesTax.
o Allsparesrequiredduringwarrantyperiod.

7) DOCUMENTSTOBEPROVIDEDWITHUPSSYSTEMS

o Operatinginstructionmanual 2Sets
o InstallationDrawings 2Sets
o Maintenance/troubleshootingmanual 2Sets


TECHNICALDATASHEET

SrNo. Description TechnicalSpecification

1 Rating(inKVA) (Aspertender)KVAOnlineUPS
2 Make Aspermakelist
3 Model VendortoSpecify
[A] Input
1 RectifierDesign IGBTBased
2 NominalVoltage 230VAC
3 NominalFrequency 50Hz
4 InputPowerFactor >0.98
5 InputVoltageRange 180to270AC
6 FrequencyRange 47to53Hz
[B] Output
1 InvertorDesign IGBTBasedTechnology
2 InverterType DSPBased
3 Voltage 230VAC
4 Waveform Pure Sinewave
5 VoltageRegulation +/1%
6 CrestFactor 3:1
[C] Environmental
1 OperationalTemperatureforUPS 0to40Deg.
2 RelativeHumidity 5to95%,nocondensationallowed
3 Altitude 1000mabovesealevel
[D] Physical
1 EnclosureProtection IP20
2 Cooling ForcedAirCooling
3 Colour VendorSpecify
[E] Bypass
1 Phase Three Phase
2 StaticBypass Auto&Manual
InBuilt Manual Bypass Switch with
4 ManualBypassSwitch
Interlockedfaciltiy
5 Voltage 230VAC

Page135
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

6 Frequency 50Hz
7 Transfer NoBreak
[F] Battery
1 Type 12V,SMF
2 DCVoltage VendorSpecify
3 RechargeTime 810hrs
4 VAHRequired 6240VAH
5 BatteryBackup 15 Min
6 MinimumChargerCapacity 10%ofthebatteryAHcapacity
8 Batterymake Aspermakelist
[G] General
1 OverallEfficiency >88%
2 HeatDissipation(BTU) 574W
3 AcousticNoise(indbA) <55dBA@1Meter
Audible Alarm required for Mains
4 Alarms Failure, Low Battery, Inverter Trip,
OverTemperature,OverLoad
5 ParallelRedudancy ParallelCompitibleup3units
6 SNMPCard OptionalPriceQuoted
1 x RS232 DB9 Serial Port, Parallel
7 CommunicationPorts
CommunicationsPort
8 BatteryrackthicknessCRCAsheet MSAnglestand
9 PaintingDetailsforBatteryRack PowdercoatedMSRack
[H] Approx.Dimensions(mm)
A. UPS(mm)
1 Width VendorSpecify
2 Depth VendorSpecify
3 Height VendorSpecify
4 Approx.Weight(Kg) VendorSpecify
B. BatteryStand(mm)
1 Width VendorSpecify
2 Depth VendorSpecify
3 Height VendorSpecify
4 Approx.Weight(Kg) VendorSpecify
[I] Standard
1 EMCMarking IEC/EN620402CategoryC3
2 Safety CE
[J] Protection
1 BatteryOvervoltage Required
2 BatteryUnderVoltage Required
3 DCHigh Required
4 OutputOver/UnderVoltage Required
5 O/PshortCircuit Required
6 InvOverTemp Required
7 Surge Required
[L] Warranty
UPS 2Years
Battery 2Years


8) MODEOFMEASUREMENT

Page136
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

UPSshallbemeasuredinunitasindicatedinBOQ.

18TECHNICALSPECIFICATIONFORLIGHTNINGPROTECTIONSYSTEM.

1) SCOPE

1. Thisspecificationcoverstherequirementofsupply,installation,testingandcommissioning
oflightningprotectionsystem.

2) GENERAL

1. The Advanced Lightning Protection system shall include components as follow: air
termination(s), mechanical support(s), downconductor(s), performance recording
equipment(s)(optional)andalowimpedancegroundingsystem.

2. InstallationproceduresoftheentirelightningprotectionsystemshallbegovernedbytheIS:
2309, the IEC 61024, NFC17102, UNE21186 and UNEEN501641 standard. The
manufacturer of the airtermination shall provide designs and instructions for the
installationaspertheformerstandards.

3. Prior to the installation of the system, a risk assessment survey shall be conducted to
determine: the level of protection required for the structure (according to standards) and
theadaptedsolutionanddesigntobechosen.

4. The Advanced lightning protection system shall be mounted adequately rated for wind
shear loading. Guying kits shall be provided as appropriate to local environmental
conditions,orbasedonmastarrangementselected.

5. Eachairterminalmustbeconnectedtotheearthterminationsystembyatleastonedown
conductor. Two downconductors are required when a) The horizontal projection of the
conductorislargerthanitsverticalprojection,b)Whenthestructureishigherthan28m.

3) AIRTERMINATION

1. ManufacturingprocessoftheairterminalshallbeISO:9001certified.

2. TheairterminalshallhavebeentestedinaHighVoltagelaboratory withastandardized
waveform:8/20sor10/350s.

3. The protection area of the airterminal shall be determined using an acceptable method
giveninthefollowingstandardsIS:2309,IEC62305(RollingSphereMethod),andNFC17
102(EarlyStrimerEmission).

4. The air terminal shall be made of noncorrosive materials. It shall be equipped with a
centralrodmadeofcopper,copperalloyorstainlesssteel.

5. The rod and the airterminal tip shall have a conductive crosssectional area larger than
120mm.

6. Lightning Air Terminal Configured as a Spheroid which is comprised of separate
electricallyisolated4panelssurroundinganEarthenedCentral Finial.Theuppersectionof
the central finial shall be rated to withstand 200KA. The Insulation material used to
electrically isolate the panels shall be comprised of base polymer which provides high
Ozone & UV resistance with a dielectric strength of 2438KV/mm & ESE terminal shall
withstandaminimumSwitchingImpulseVoltageof500KVtestedasperNFC17102&IEC

Page137
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

Test Standard IEC601:1989.The airterminal shall guarantee a full electrical continuity


betweenthetipandthedownconductor.

7. Theairterminalshallbeabletosupporta200kAcurrentormore.Noexternalpowersupply
shallberequired.

8. Theairterminalshallbeactiveonlyduringastorm.

9. The airterminal shall ensure the emission of a streamer (ionisation of the air around the
tip)whenalightningstrikeisoccurringintheprotectionareaclaimed.

10. Theintensityandpotentialofthestreamershallbecontrolledbytheairterminaltoensure
sufficient values (above 10A and 2000V) so it can develop properly and intercept the
lightning.

11. Theairterminalshallemitastreameronlywhenalightningstrikeisoccurring(provoking
lightningstrikescaninducesurges).

12. Performancesoftheairterminalshallnotbeaffectedbyextremeclimaticconditions.

4) AIRTERMINATIONSUPPORT

1. Theairterminalsupportshallconsistofaminimal5metersGalvanizedsteel(GI),Powder
Coated or steel elevation pole with a minimal diameter of 50 mm. The mast having
arrengmentforfixingofairterminalonthetop.

2. The air termination support shall be fixed securely on the structure to enable the air
terminationandmastsystemtowithstandmaximumlocallyrecordedwindvelocities.Guy
wiresmightbenecessarytosecurethesystemproperly.

5) DOWNCONDUCTOR

1. Downconductorsconsistofstrips,braidedcablesorroundsections.

2. Materials to be used: insulated multistrand copper (recommended) suitable for 1.1KV
insulation.


3. Minimalcrosssectionalareamustbe70mm.

4. Downconductorsshallberoutedtotheearthterminationasdirectaspossible.Sharpbends
andupwardsections(40cmmaxwitha45slopemaxareacceptable)aretobeavoided.

5. Downconductorsshallbeattachedonthebasisofthreefixingpermetre.

6. Down conductors shall eventually be protected against the risk of impact by installing
sleevesuptoheightof2mabovegroundlevel.

7. Thedownconductorsshallbedirectlyconnectedtothebaseof theairterminalandtothe
earthterminationsystembythemeanofatestclamp.

6) EARTHTERMINATION

1. Oneearthterminationsystemistobeprovidedforeachdownconductor.

Page138
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

2. Resistance value should be 10 ohms or less (5 ohms or less when the structure contents
sensitive materials). Minumum Resistance should be achieved by using earth enhancing
compoundandthesecompoundshouldholdandabsorbthemoistureforlonglifeanddoes
notrequiredregularrechargingofearthingsystem.

3. Materialtobeused:Bareortinplatedcopper(recommended),orstainlesssteel.

4. Bondingoftheearthterminationtotheelectricalearthofthebuilding,tometallicpartsof
the building, to the structural reinforcing steel of the building and to arriving services is
stronglyrecommended.

7) PERFORMANCERECORDINGEQUIPMENT(OPTIONAL)

1. Eachprotectionsystemshallbesuppliedwithalightningstrikerecorder.

2. Thelightningflashcountershallregisterastrikeforeverydischargewherethepeakcurrent
exceeds1500A.

3. Thelightningflashcountershallhavebeentestedandcertifiedinahighvoltagelaboratory
witha8/20sor10/350swaveform.

4. Thelightningflashcountershallbeinstalleddirectlyonthedownconductorandasperthe
manufacturerinstructions.

8) EARTHINGOFAIRTERMINAL:

1. AirterminalshallbeconnectedtoMaintenancefreeearthing.

2. Maintenance free Earthing shall be based on copper bonded earth rod minimum copper
bondingof150micron.

3. SuitablequantityshallbeusedofBackfillcompound(MoistureHolder)asrecommended
bymanufacturerandtheseearthenhancingcompoundshouldholdandabsorbthemoisture
forlonglifeanddoesnotrequiredregularrechargingofearthingsystem.

4. EachearthpitshallbecoveredwithusingCICoverof12X12ofGIwith6/7mmthick.


9) TESTJOINT

1. Each Down conductor shall be incorporated a Test Joint, which allows disconnecting the
earthelectrodeandthusallowstomeasuringitsresistivity.Thetestjoibtshallbemounted
2meterabovetheground.

10) MAINTENANCE

1. As per the standards (IS: 2309, IEC 62305 and NFC 17102), the lightning protection
systemshallbeinspectedatleastevery2years.

2. Avisualinspectionshallbeperformedtomakesurethat:a)Noextensionormodificationof
theprotectedstructurecallsfortheinstallationofadditionallightningprotectivemeasures,
b)theelectricalcontinuityofvisibleconductorsiscorrect, c)allcomponentsfastenersand
mechanicalprotectorsareingoodcondition,d)nopartshavebeenweakenedbycorrosion

3. Measure ofthe earth termination resistanceshall berealized toensureit is still below10


ohms(or5ohms)

Page139
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

4. Air termination system shall be checked to ensure a) It is still properly connected to the
downconductor(s),b)Thetiphasnotmelt,c)Thesystemisstillinoperatingconditionsd)
It is still properly installed on the support and it can withstand high wind velocities
(relativelytothelocalconditions).

11) METHODOFMEASUREMENT

1. The complete earth conductor shall be measured and paid per unit length, including Air
terminationnetwork,downconductor,testjointsandearthingterminationnetworkasper
BOQmentioneditems.

19TECHNICALSPECIFICATIONFOREXTERNALLIGHTING&HIGHMASTPOLE

1) SCOPE:

1. Thescopeofworkcoversthesupply,installationandtestingoflightingpoles,weatherproof
light fixtures, wiring to the fixtures, cable laying, earthing as specified and shown on
drawings.

2) STANDARDS:
1. AsperBOQstandard

3) LIGHTFIXTURES:

1. The light fixture construction shall be of IP 65 die cast aluminium with a separate
compartment for integral ballast equipment. The reflector shall be anodized polished
aluminium.Theglassrefractorshallbeheatresistant.
2. Lampholdershallbeofporcelainandshallcompriseofaterminalblockofnonhygroscopic
material. The luminaries shall have integral ballast housed in water tight and dust tight
metalcases.BallastshallbeprewiredtotheLampsocketandterminalblock,requiringonly
powersupplyleadstotheballastprimaryterminals.
3. The Lamp & Laminar shall generally follow the specification under section `LIGHT
FIXTURES'.

4) LIGHTING POLES : LIGHTING POLES FOR STREET LIGHTS /FLOOD LIGHTS SHALL BE
SWAGEDTYPEGIPOLECONSTRUCTION
1. The lighting poles shall be fabricated from heavy duty coldrolled steel tubes to
IS:12391958 and hot dip galvanized or painted as specified. The pole shall have a base
plate,alargeaccesspanel,andnecessaryfixturemountingbracketattop.Theaccesspanel
shallprovideeasyaccesstoamultiwayporcelainconnectorandfuseboard,tobemounted
inside the pole. The access shall be specially fabricated with adequate reinforcement and
weather gasket to prevent ingress of moisture and vandal proof. Poles shall have large
diameterentriesforincomingandoutgoingcableandtwoearthstuds.Thepolefabrication
shallconformtothedrawingsandwheresuchdrawingisnotavailable,thecontractorshall
makesuchdrawingandhaveitapprovedbeforefabrication.

2. Thepoleshallhouseamultiwayporcelainterminalblockandrewirablefuseasshownon
thedrawings.Poleshallhaveaconcretecoping.

5) HIGHMAST
A)MASTSTRUCTURE

1. The high Mast shall be of continuously tapered, polygonal cross section polygon type
(Minimum16Sides)of30Mtrs.inheightpresentinggoodvisualappearanceandshallbe
basedonprovendesigntogivenassuredperformance,reliabilityandservice.TheMastshall

Page140
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

haveanapproximatetopdiameterofsay180mmto200mmandbottomdiameterof580
mm to 600 mm. The weight of the Mast shall not exceed more than 1600 kgs. excluding
weightofLuminaire,tomaintaingoodelasticityofslenderstructure.

B)MASTCONSTRUCTION:

1. TheMastshallbefabricatedfromspecialsteelplatesofBSEN10025grade,cutandfolded
toformpolygonalsectionandshallbetelescopicallyjointedandfilletwelded.Thewelding
shallbeinaccordancewithBS:5135.Theproceduralweldgeometryandtheworkmanship
shall be exhaustively tested by the radiography on the completed welded and certificates
submitted.

2. TheMastshallbedeliveredinonly3sectionswithoutanycircumferentialweldingatsite,
which shall be joined together by slipstressedfit method. The joining shall be with
stressing equipment, thus forming the sleeve joint. No site welding or bolted joint will be
accepted. The overlap distance shall have full penetration of longitudinal welds. The base
plateofthemastshallbeatleast45mm.thick.Anadequatedooropeningofmin.1400mmx
300mmshallbeprovidedatthebaseofeachMast.Theopeningshallbesuchastopermit
clear access to equipment like winches, cable pug and socket, etc. The opening shall be
complete with a close fitting vandal resistant, weather proof door provided with a heavy
duty lock. For metal protection of the Mast, the entire fabricated Mast shall be not dip
galvanisedinternallyandexternally,havingminimumaveragethicknessof65microns.


C)DYNAMICLOADING:

1. The Mast structure shall be designed for an assumed maximum reaction arising from the
maximumwinspeed(3secondsgust),likelytobeexceededonlyoncein50years(180km
perhour)andmeasuredataheightof10Mtrs.abovegroundlevelasperIS875,PartIII,
1987. The design life of the Mast shall be min. 25 years. Wind excited oscillation shall be
damped by the method of constructions and adequate allowance made for the related
stresses.TheofferedHighMastshallbeatesteddesign


D)FOUNDATION:

1. The tenderer shall see the site closely and minutely with regard to the nature of the soil,
averagedepthofdecomposedgarbageanddebrisatproposedMastlocationsandtheother
site conditions before working out the type of foundation and specifications for the
proposedHighMast.

2. The tenderer shall be responsible for the design of the foundation and safe erection and
installationoftheHighMastinmechanicallyandstructurallysafeworkingconditionforthe
design life of the Mast. The load bearing (safe) capacity of the soil shall be indicted by
purchaser to decide the type of foundation and its specifications. The holding down bolts
shall be atleast 20 nos. of high tensile strength (EN 19 grade) and shall be supplied
complete with anchor plate of 6 mm thick for casting into the foundation. The precision
made steel template with tube holes shall be provided to ensure correct verticality and
horizontalityofboltalignment.

E)LANTERNCARRIAGE:

1. The fabricated lantern carriages shall be provided for holding the floodlight fittings and
controlgearprovidedoneachHighMast.Thelanterncarriageshallbeofspecialdesignand
ofdurablesteeltubeconstructiondesignedtoactaselectric conduitwithcableholesfully
protectedbygrummets.ThediameterofthelanternCarriageshallbesuitabesoastohold

Page141
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

designed number of floodlight fittings, as specified in the tender design along with the
controlgearboxesandlantern.

2. ThelanterncarriageshallbefabricatedinthreepartsjoinedbyboltedflangeswithSSbolts
with nuts to enable easy removal from the erected mast for replacement/ maintenance
purpose. The carriage shall be supported / suspended by three wire ropes for better
stability.ThelanterncarriageAssemblyshallnottouchthelowersurfaceoftheMast.The
carriagedesignandfabricationshallbesuchthatthelanterncarriagewillsuitthelanterns
andtheircontrolgearboxestobeusedinthework.

3. TheLanternCarriageshallbesoinstalledthatitdoesnotcauseanydamagetothesurfaceof
the Mast and is provided with protective buffer arrangement. The complete Lantern
Carriageshallbehotdipgalvanisedafterfabrication.

4. Theweatherproofcastaluminumjunctionboxes(IP55)shallbeprovidedontheLantern
Carriageassemblyfromwhichtheinterconnectionswillbemadetothedesignednumber
offloodlightfittingsandlanternsonthecarriage.


MECHANICALARRANGMENT:

1. For installation and maintenance purpose, it will become necessary to raise or lower the
lanterncarriageassembly.Toenablethis,asuitablewincharrangementshallbeprovided
inthebaseoftheMast,completewithtoppulley,winchstainlesssteelwireropesandwinch
drivingpowertool.

A:WINCH:

1. The winch shall be of completely self sustaining type. The winches shall be of self
sustaining type by means of an oil bath and the lubrication shall be of recommended
quality.Terminationoftheropesofthewinchshallbeinsuchaway,thatitdoesnotinvolve
distortion or twisting of the rope configuration. At least 6 turns of rope shall remain in
tension on the drum even when the lantern carriage is fully lowered. The winch shall be
designed to be installed or removed form the door opening at the base of the mast. The
winchdrumsshallbegroovedtoensuremechanicallystrong,stableandtidyropelaywith
nochancesofropeslippageorskippage.Thewinchshallbecapableofoperationbyhandor
bymeansofexternalpowertool.Integratedpowertoolwithwormisnotacceptable.
2. Atestcertificateshallbesuppliedalongwitheachwinchinsupportofthemaximumload
operatedbythewinch andforthesafetyofoperationatthefullloadrotation. Ahandle
shallalsobeprovidedforhandoperationofthewinches.

B:TOPPULLEYASSEMBLY:

1. Thetoppulleysshallbeofadiameter,appropriatelylargeenoughtoaccommodatethesteel
wireropesandthemuiticoreelectriccable.Thematerialofconstructionofthepulleyblocks
shallbenoncorrosiveandmadeofdiacast(LM6)aluminumalloy.Thepulleyassembly
shallbecompletewithselflubricatingbearingandstainlesssteelspindle.

C:STAINLESSSTEELWIREROPES:

1. Stainless steel wire ropes shall be of 7 / 19 construction of 6 mm diameter, having a


breakingloadofnotlessthan2400kgs.Completewithstainlesssteelthimbles.Theendfor
connectiontothewinchdrumshallbefittedwiththimblesandthethimblesshallbesecured
bycoppercompressionsplices.

CABLEANDCABLECONNECTIONS:

Page142
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

1. The connections shall be made with flat core flexible round sheath power cables of
appropriateratingaspertheschedule.ThebasecompartmentoftheHighMastshallhave
one terminalboxforterminating theincomercable. Themaintenance cables equal to that
withintheMastandfittedwitha5coreplugsocketshallbeprovidedtoenergiselanterns
whileinloweringpositionbyhookingupatthebasecompartmentsocketsupply.

2. Similarly,theprovisionshallbemadeforelectricsupplyatthebasecompartmenttoenable
operationoftheexternalpowertoolforloweringorrisingofthelanterncarriageassembly.
Thetrailingcablesofthelanterncarriageringsshallbeterminatedbymeansofmetalcased
plugandsocketprovidedinthebasecompartmenttoenableflexibility.

WINCHDRIVINGPOWERTOOL:

1. Theexternalelectricdriventoolshallbesinglespeed,(1.2Mt./min.)reversiblethreephase
&handoperatedmotor.Thepowertoolshallbecompletewithveryrobustremotecontrol
switch such that the tool can be operated from safe distance of 5 Mtrs. There shall be an
arrangementforselfalignmentoffpowertoolwhichcanbeselfsupportedduringoperation.
Manualhandleshallbeprovidedforhandoperationofthewinches.Thecapacityratingand
speedoftheelectricmotorusedinthepowertoolshallbespecifiedbythetenderers.

LIGHTNINGFINIAL&AVIATIONOBSTRUCTIONLIGHTS:

1. One number heavy duty hot dip galvanized lighting finial shall be provided for each mast.
Suitable Aviation Obstruction Lights of reliable design and reputed manufacturer shall be
providedontopofeachmast.

6) CABLELAYING:

1. Cablingshallbegenerallyasspecifiedinthesection`CABLING'.

2. Cablesshallbeterminatedina4wayterminalblockinsidethepoleorattachedtherewith
asshownondrawings.

3. Cable route shall be as shown on the drawings or the contractor shall mark out the route
andlaythecablesonlyuponapprovaloftheroute.

7) EARTHING:

4. Allstreetlightsfixturesandpolesshallbeearthedasspecifiedundersection`EARTHING'.

8) MODEOFMEASUREMENT:

5. Each light fitting with lamp, control gear, earthing etc. shall be considered as one unit for
measurementandpayment.

6. Eachlightingpole,concretecoping,baseplateearthingetc.shallbeconsideredasoneunit
formeasurementandpayment.

7. Allcablingworkshallbemeasuredonthebasisofunitlengthandthecostshallinclude,cost
ofcable,cableterminationinjunctionboxesorpoleterminalboxetc.


20MAKEOFMATERIALS.

Page143
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

SR.NO. MATERIALDESCRIPTION MAKESOFCOMPANY


HTPANELS,HTCABLES,TRANSFORMER&DGSET
1 HTVCB SEIMENS,ABB,L&T,CG,AREVA
2 HTCABLE HAVELLS,FINOLEX,TORRENT,POLYCAB
3 DRYTYPETRANSFORMER VOLTAMP,KIRLOSKAR,ABB,T&R,CROMPTON
4 DGSETS&AMFPANEL CUMMINS,KIRLOSKAR,STERLING,CATTERPILLAR
5 CABLEJOINTKIT RAYCHEM,DENSON,MSEAL
LTPANELS,LTCABLESSWITCHGEAR&ACCESSORIES
ACTIVEENGINEERS,ELEMECLTD,PRIMA
1 ENCLOSUREMANUFACTURER AUTOMATION,SHIVSHAKTI,SWATISWITCHGEARS.
(SHALLBECPRIAPPROVED)
LEGRAND,ABB,HAGER,SCHNEIDER,C&S,
2 MCB/ELCB/RCCB/ELMCB
L&T,SEIMENS
3 MCCB/ACB LEGRAND,ABB,SCHNEIDER,SIEMENS,L&T
LEGRAND,ABB,HAGER,SCHNEIDER,C&S,
4 DISTRIBUTIONBOX
L&T,SEIMENS
5 CHANGEOVERSWITCH HHELECON,L&T,ABB,HPL,C&S
6 CAPACITOR L&T,EPCOS,CONZERV,DATAR,POWERMATRIX,ABB
7 PUSHBUTTON SIEMENS,ABB,L&T,SCHNEIDER
8 INDICATINGLIGHT SIEMENS,ABB,L&T
9 TIMERS L&T,SIEMENS,ABB,CONZERV
10 SELECTORSWITCH L&T,SEIMENS,KAYCEE
11 AUTOMATICTRANSFERSWITCH L&T,HPL,CUMMINS,HAVELLS
12 CTs KAPPA,L&T,AREVA,MAXWELL
13 PTs KAPPA,L&T,AREVA,MAXWELL
14 CONNECTORS L&T,SCHINDER,SEIMENS,ABB
15 PROTECTIONRELAY AREVA,L&T,ABB,SEIMENS

16 ANALOG/DIGITALMETER/LOAD CONSERV,L&T,SCHNEIDER/ABB/HPL
MANAGER/MFM

17 IRONCLADSWITCHWITH KEW,TRISHUL,SUPER,C&S
REWIREABLEFUSE/SFU

18 METALCLADSWITCHWITH HAVELLS,KEW,C&S,INDOASIAN
REWIREABLEFUSE/SFU

19 MAINLTCABLE AVOCAB,FINOLEX,PRIMECAB,POLYCAB,DIAMOND
POWER,RRCABLE,HAVELLS
20 CABLEGLANDS COMET,HMI,DOWELLS,SIEMENS,CROMPTON,HEX
21 CABLELUGS DOWELLS,JOHNSON,HEX
22 BUSDUCT L&T,SCHNEIDER,C&S,SEIMENS,LEGRAND
INTERNALWIRING,FIXTURES&ACCESSORIES
1 RIGIDFRPVCCONDUIT NIHIR,PRECISION,POLYCAB,BEC
2 ACCESSORIESOFCONDUIT NIHIR,PRECISION,POLYCAB,BEC
3 COPPERFLEXIBLEWIRES AVOCAB,FINOLEX,POLYCAB,RRCABLE,HAVELLS

Page144
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

4 TISSINOTYPESWITCHES&SOCKETS POINTERTRUMP,SSKTOPLINEPC,ANCHORPENTA
CHEERY
MODULARTYPESWITCHES& LEGRANDMYRIUS,MKWRAPROUND,ANCHOR
5
SOCKETS WOODS,HAVELLSCRABTREEATHENA
6 PVCTAPE STEELGRIP,ANCHOR
7 M.S.CONDUIT BEC,AKG,STEELCRAFT
8 LIGHTFIXTURES&LAMPS PHILIPS,WIPRO,CROMPTON
14 CEILINGFAN&EXHAUSTFAN USHA,CG,ORIENT,HAVELLS
15 CALLBELL ANCHOR/ORPAT/MAX
16 WINDOW/SPLITTYPEA.C.MACHINE CARRIER,PANASONIC,DAIKIN,HITACHI,BLUESTAR
17 WATERCOOLER VOLTAS,USHA,BLUESTAR
18 GEYSER RECOLD,HAVELLS,BAJAJ,SPHEREHOT
19 MOTORPUMPSET CROMPTON,AMRUT,KSB,UNEEL,KIRLOSKAR
CABLETRAY,RACEWAY&ACCESSORIES
1 CABLETRAY INDIANA,RUSHABH,PROFAB
2 ALUMINIUMFLOORRACEWAY MKORAPPROVEDBYCONSULTANTS
3 GIFLOORRACEWAY MKORAPPROVEDBYCONSULTANTS
4 PVCWALLRACEWAY MK,PROFAB,LEGRAND
UPS&INVERTER
1 UPS NUMERIC,EATON,APC,HITACHI
2 INVERTER SUVIK,SUKAM,MEGATECH
3 SMFBATTERY PANASONIC,EXIDE,GLOBAL(YUASA)
4 RACK FABRICATED
STREETLIGHTPOLES,FIXTURES&ACCESSORIES
1 GIPOLES FABRICATED
2 HIGHMASTPOLES CGORASAPPROVEDBYCONSULTANTS
3 SMCPRESSMOULDEDJUNCTIONBOX SYNTEXORASAPPROVEDBYCONSULTANTS
LIGHTNINGPROTECTION&EARTHINGSYSTEM
1 AIRTERMINAL MAP,LPI,INDESCO
2 SUPPORTINGGAYEDMAST MAP,LPI,INDESCO
3 LIGHTNINGSTROKERECORDER MAP,LPI,INDESCO

4 COPPERBONDEDROD&CHEMICAL MAP,LPI,INDESCO
COMPOUND
ELECTROLYTIC/CHEMICAL
5 GRESLO,GALAXYEARTHING
EARTHINGKIT
ELVSYSTEM&ACCESSORIES
FIREALARMPANEL&DISPLAY
1 ESSER,EDWARD,NOTIFIER,HONEYWELL
PANEL
2 REPEATERPANEL ESSER,EDWARD,NOTIFIER,HONEYWELL

3 ADDRESSABLE&CONVENTIONAL ESSER,EDWARD,NOTIFIER,HONEYWELL
SMOKEDETECTORS

Page145
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

INTELLIGENTSMOKE&HEAT
4 ESSER,EDWARD,NOTIFIER,HONEYWELL
DETECTORS

5 ADDRESSABLE&CONVENTIONAL ESSER,EDWARD,NOTIFIER,HONEYWELL
HEATDETECTORS

6 ADDRESSABLE&CONVENTIONAL ESSER,EDWARD,NOTIFIER,HONEYWELL
BEAMDETECTORS
7 FAULTISOLATOR ESSER,EDWARD,NOTIFIER,HONEYWELL
8 RESPONSEINDICATOR ESSER,EDWARD,NOTIFIER,HONEYWELL
9 MANUALCALLPOINT ESSER,EDWARD,NOTIFIER,HONEYWELL
10 ADDRESSABLEHOOTER ESSER,EDWARD,NOTIFIER,HONEYWELL
11 FIRECABLE RRCABLE,FINOLEX,DELTON,POLYCAB

12 RJ45SOCKETOUTLET(COMPUTER LEGRANDMYRIUS,MKWRAPROUND,ANCHOR
&TELEPHONE) WOODS,HAVELLSCRABTREEATHENA

13 RJ11TELEPHONESOCKET LEGRANDMYRIUS,MKWRAPROUND,ANCHOR
WOODS,HAVELLSCRABTREEATHENA

14 CAT6CABLE TYCOELE(AMP),SCHINDERELE.(DIGILINK),
R&M,SYSTIMAX,MOLEX

15 CAT6ECABLE TYCOELE(AMP),SCHINDERELE.(DIGILINK),
R&M,SYSTIMAX,MOLEX
16 TELEPHONETAGBOX KRONE
17 TELEPHONEPAIRWIRE RRCABLE,FINOLEX,DELTON,POLYCAB
18 EPABX AVAYA,NEC,SEIMENS
COMNET,CISCO,HP,MATRIX ORAPPROVEDBY
19 NETWORKSWITCH
CONSULTANT
COMNET,CISCO,HP,MATRIX ORAPPROVEDBY
20 ETHERNETSWITCH
CONSULTANT
COMNET,CISCO,HP,MATRIX ORAPPROVEDBY
21 PATCHCORDS
CONSULTANT
VEROPRESIDENT,VALRACK,SPIDERORAPRROVED
22 URACKS
BYCONSULTANTS
23 PUSHBUTTONPHONE PANASONICORAPPROVEDBYCONSULTANTS
24 PROGRAMPHONE PANASONICORAPPROVEDBYCONSULTANTS
25 AMPLIFIER(POWER&BOOSTER) YAMAHA,CROWN,CAMCO
26 AUDIOMIXER ALLEN&HEATH,YAMAHA,SOUNDCRAFT
SHURE,AUDIOTECH,AUDIOPOWER,JBL,
27 CD/DVD/FMPLAYER
AUDIOQUEST.
SHURE,AUDIOTECH,AUDIOPOWER,JBL,
28 MICROPHONE
AUDIOQUEST.
SHURE,AUDIOTECH,AUDIOPOWER,JBL,
29 MULTIPLEXER
AUDIOQUEST.
SHURE,AUDIOTECH,AUDIOPOWER,JBL,
30 CEILINGANDWALLSPEAKER
AUDIOQUEST.
SHURE,AUDIOTECH,AUDIOPOWER,JBL,
31 GOOSENECKMIC
AUDIOQUEST.
SHURE,AUDIOTECH,AUDIOPOWER,JBL,
32 WIRELESSMIC
AUDIOQUEST.
SHURE,AUDIOTECH,AUDIOPOWER,JBL,
33 STANDMIC
AUDIOQUEST.
34 PROJECTORDISPLAY CRISTY,OPTOMA,CASIO

Page146
GENERALTECHNICALSPECIFICATIONFORELECTRICALWORKS DAEC

35 PROJECTORSCREEN LIBERTY,GRANDVIEW,DALITE,DRAPER
36 AUDITORIUMLIGHTFIXTURES SATAN,SPECTRA,CANERA
37 AUDITORIUMAUTOMATION AMX,KRAMER,EXTRON
38 AUDITORIUMMIXINGCONSOLE YAMAHA,SOUNDCRAFT,DIGICO
39 ARRAYSPEAKER JBL,NEXO,MAYERSOUND
40 AUDIOSYSTEMCONTROLLER SHURE,BSS,DBX
41 3LCDPROJECTOR SONY,CHRISTY,OPTOMA,NEC,MITSUBISHI
42 SPEAKERCABLE RRCABLE,FINOLEX,DELTON,POLYCAB
HONEYWELL,AVIGILON,SCHNEIDER(PELCO),
43 CCTV
SONY,BOSCH
HONEYWELL,AVIGILON,SCHNEIDER(PELCO),
44 DIGITALVIDEORECORDER
SONY,BOSCH
HONEYWELL,AVIGILON,SCHNEIDER(PELCO),
45 NETWORKVIDEORECORDER
SONY,BOSCH
46 LED/LCDDISPLAYUNIT SONY,SAMSUNG,PANASONIC,SHARP